run 10 plan based on 25 nov revised plan and s=200 extended by 1 week

47
Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) Dec 31 (midnight-store 11340), Machine, Physics declared (store 11340) s=200 GeV/n Au-Au Jan 2 (midnight) STAR in Physics Mode Jan 8 (0600) PHENIX in Physics Mode Jan 12, Rebucketing not yet routine, stochastic cooling still to come. Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on Mar. 18 (0556), End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup Mar. 20 19, Begin 4 week s = 62.4 GeV/n run Machine physics 19 March for stores ≥11954 PHENIX Physics 19 Mar for stores ≥11955 STAR Physics 22 March for stores ≥11976 Apr. 8, End 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup Apr. 9, Begin 1.5 week s = 39 GeV/n run Machine physics 9 April for stores ≥12119 PHENIX and STAR Physics 9 April for stores ≥12122 Apr. 14, 24 hours APEX for n= 0.67 studies Apr. 22, End 1.9 week s = 39 GeV/n Run Apr 22, Begin s = 7.7 GeV/n setup (12 hr pol. switches) Apr 24 (fill 12238, 2300 hrs), Begin 4 week s = 7.7 GeV/n run May 22 End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary) May 23 – 28 IPAC (Kyoto) May 22 – Jun 3, Satogata is a way May 24, begin s = 11.5 GeV/n for STAR Jun 7, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch, if necessary) Jun 9, begin s = 5 GeV development Jun 12, end 3 days at s = 5 GeV/n Jun 13 , Begin Cryo Warm-up Jun 14, Warm-up complete, Run 10 ends 27.9 CRYO WEEKS Last Week of June – Commission EBIS with He beam to NSRL

Upload: kai-clayton

Post on 30-Dec-2015

25 views

Category:

Documents


0 download

DESCRIPTION

Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week. Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week

• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine, Physics declared (store 11340) s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18 (0556), End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run

– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976

• Apr. 8, End 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 9, Begin 1.5 week s = 39 GeV/n run

– Machine physics 9 April for stores ≥12119– PHENIX and STAR Physics 9 April for stores ≥12122

• Apr. 14, 24 hours APEX for n= 0.67 studies • Apr. 22, End 1.9 week s = 39 GeV/n Run• Apr 22, Begin s = 7.7 GeV/n setup (12 hr pol. switches)• Apr 24 (fill 12238, 2300 hrs), Begin 4 week s = 7.7 GeV/n run

• May 22 End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary)• May 23 – 28 IPAC (Kyoto)• May 22 – Jun 3, Satogata is away• May 24, begin s = 11.5 GeV/n for STAR• Jun 7, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 9, begin s = 5 GeV development• Jun 12, end 3 days at s = 5 GeV/n • Jun 13 , Begin Cryo Warm-up• Jun 14, Warm-up complete, Run 10 ends – 27.9 CRYO WEEKS• Last Week of June – Commission EBIS with He beam to NSRL

Page 2: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week

• Apr. 8, End 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 9, Begin 1.5 week s = 39 GeV/n run

– Machine physics 9 April for stores ≥12119– PHENIX and STAR Physics 9 April for stores ≥12122

• Apr. 14, 24 hours APEX for n= 0.67 studies • Apr. 22, End 1.9 week s = 39 GeV/n Run• Apr 22, Begin s = 7.7 GeV/n setup (12 hr pol. switches)• Apr 24 (fill 12238, 2300 hrs), Begin 4 week s = 7.7 GeV/n run

• May 22 End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary)

• May 23 – 28 IPAC (Kyoto)• May 22 – Jun 3, Satogata is away• May 24, begin s = 11.5 GeV/n for STAR• Jun 7, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch,

if necessary)• Jun 9, begin s = 5 GeV development• Jun 12, end 3 days at s = 5 GeV/n • Jun 13 , Begin Cryo Warm-up• Jun 14, Warm-up complete, Run 10 ends – 27.9 CRYO WEEKS• Last Week of June – Commission EBIS with He beam to NSRL

Page 3: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals4/27/10

• STAR– s = 7.7 GeV/n

• Luminosity Sampled/Delivered = ?/? mb-1

• 5M Min-bias events

• PHENIX– s = 7.7 GeV/n

• Luminosity Recorded/Delivered = ?/? mb-1

• 0.5M Min-bias events

Page 4: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 5: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 6: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 7: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 8: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 9: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 10: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 11: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 12: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 13: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX BUR

STAR BUR

(Actual 2.9 weeks, 660M)

Actual Average ZDC Rate ~1200 Hz

(Actual 1.9 weeks, 250M)

(Actual 1.9 weeks, ~250M)

Page 14: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

http://www.bnl.gov/cad/esfd

AGS-Booster-Tandem/Linac Startup

RHIC Cryo Cooldown to 45 deg K

RHIC Cryo Cooldown/Warm-up

RHIC Cryo Operation

RHIC Cryo off

RHIC STAR & PHENIX Lattice Sextupole Polarity Swap

RHIC Research with s = 200 GeV /n AuAu IBS NO

RHIC Research with s = 62.4 GeV /n AuAu IBS NO

RHIC Research with s = 39 GeV /n AuAu IBS NO

Complete n ~ 0.67 for pp studies (before polarity switches)

RHIC Research with s = 7.7 GeV /n AuAu NO YES

STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)

Beam Studies at s = 5 GeV /n AuAu NO YES

IPAC

NSRL (NASA Radiobiology)

BLIP (Isotopes)

BLIP (other)

Shutdown (RHIC)

C-A Operations-FY10

Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 2010

15 Apr 10

setup with beams in both rings

Sep

concurrent with RHIC

ramp up luminosity

21 Sep

27.9 weeks

1 Dec

20 Nov

setup as required

10 weeks physics

6/14 End Date

11 weeks

2.9 weeks

1.9wks

4weeks

2wks

as run/planned

~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities

4-6 hour overhead to reverse sextupole polarities (if necessary)

30 Mar 7 May

10A 10B09C

Page 15: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Archive

Page 16: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals, s = 39 GeV/n4/13/10

• STAR– s = 39 GeV/n

• Luminosity Sampled/Delivered = ?/? mb-1

• 24M Min-bias events

• PHENIX– s = 39 GeV/n

• Luminosity Recorded/Delivered = ?/? mb-1

• 50M Min-bias events <30 cm vertex, (revised request 250M)

Page 17: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX BUR

STAR BUR

(Actual 2.5 weeks, 660M)

Actual Average ZDC Rate ~1200 Hz

We should revisit Luminosity Projections

Page 18: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Future Topics

• Toward Smaller beta* - new quad triplets – D. Trbojevic

Page 19: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX Goal (400M min-bias events)

STAR Goal (100M min-bias events)19 Mar

Page 20: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 21: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

s = 62 GeV/nfinal

Page 22: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 23: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 24: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 25: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 26: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 27: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 28: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals3/30/10

• STAR– s = 62 GeV/n

• Luminosity Sampled/Delivered = ?/90 mb-1

• 100M Min-bias events

• PHENIX– s = 62 GeV/n

• Luminosity Recorded/Delivered = 64/193 mb-1

• 400M Min-bias events

Page 29: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Wh

rBilled Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

Through Feb 2010

Page 30: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 31: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 32: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 33: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 34: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

Page 35: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

First Store Monday, 29 March, Store 12026

WC

M L

ongi

tuda

l Em

ittan

ce

Page 36: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

31 x 31 GeV/n Au horiz and vert emittances

Store 12026

Page 37: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

PHENIX Goal*

* With 20 cm sigma IR diamond

PHENIX Minimum Goal*

STAR Goal

Page 38: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week
Page 39: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

560.8629.2665.2

483.2

302.9

541.2526.8

359.5

588.6

178.9

71.3

590.3610651.2

703.0

525.4

335.4

569.2547.5

358.8

599.7

179.4

72.4

92.694.7105.899.183.895.296.076.2107.243.080.30

100

200

300

400

500

600

700

800

12

/31

to 1

/07

1/0

8 to

1/1

4

1/1

5 to

1/2

1

1/2

2 to

1/2

8

1/2

9 to

2/0

4

2/0

5 to

2/1

1

2/1

2 to

2/1

8

2/1

9 to

2/2

5

2/2

6 to

3/0

4

3/0

5 to

3/1

1

3/1

2 to

3/1

8

period

inte

gra

ted

lum

nio

sit

y [

mb

-1]

0

24

48

72

96

120

Run 10 (AuAu) -- Integrated Luminosity by week

ho

urs

pe

r w

ee

k a

t s

tore

Phenix STAR (lumi) hours at store

thru fill 11932ending 06:00 March 18

Average hours per week at store = 88.5

Page 40: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through Jan 2010

BNL Energy Cost

$(20)

$-

$20

$40

$60

$80

$100

$120O

ct-0

0

Oct

-01

Oct

-02

Oct

-03

Oct

-04

Oct

-05

Oct

-06

Oct

-07

Oct

-08

Oct

-09

Oct

-10

$/M

Wh

rBilled Cost/MWhr

Without Balanced Billing

Balanced Billing Projection

RHIC ON

AGS SEB/FEB

NSRL

Page 41: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

RHIC Operations FY06-10

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

CAD P ower 06

CAD P ower 07

CAD P ower 08

CAD P ower 09

CAD P ower 10

Page 42: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Ring Bunches/Cycles

Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 56/56 909 0.836 1.056 0.963 0.992 0.828

Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970

28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing, STAR 32.7 mb-1, 3.9 hr store

Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC

XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977

Yellow

111/28 1246 0.910 0.961 0.964 0.988 0.994

0.9050.9890.9611.0230.8791168111/29Yellow

0.9270.9990.9611.0240.9111196111/28Blue

Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC

Avg Bunch in RHIC (10^6 ions)

Bunches/Cycles Ring

18 Jan Physics Store 11489, 0.6 m b* No cooling or rebucketing, STAR 22.6 mb-1, 3.9 hr store

Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)

Avg Efficiency XCBM to RHIC

XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC

Blue 111/28 1354 0.927 0.990 0.965 1.003 0.968

Yellow 111/28 1377 0.931 0.990 0.964 0.989 0.987

2 Mar Physics Store 11834, 0.7 m b* with some cooling and with rebucketing, STAR 29.4 mb-1,3.9 hr store)

31 Dec 1st Physics Store 11340, 0.6 m b* No cooling or rebucketing, STAR 3.2 mb-1, 2.6 hr store

Page 43: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

RHIC Cryo Operations FY06-10

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

-30 -10 10 30 50 70 90 110 130 150 170 190

Days since beginning of Run

MW

RHIC Cryo 06

RHIC Cryo 07

RHIC Cryo 08

RHIC Cryo 09

RHIC Cryo 10

Page 44: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Through 2/28/10

BNL Energy Use FY 2009-10

0

5

10

15

20

25

30

35

40

45

501-

Jul-

08

1-A

ug-0

8

1-S

ep-0

8

1-O

ct-0

8

1-N

ov-0

8

1-D

ec-0

8

1-Ja

n-09

1-F

eb-0

9

1-M

ar-0

9

1-A

pr-0

9

1-M

ay-0

9

1-Ju

n-09

1-Ju

l-09

1-A

ug-0

9

1-S

ep-0

9

1-O

ct-0

9

1-N

ov-0

9

1-D

ec-0

9

1-Ja

n-10

1-F

eb-1

0

1-M

ar-1

0

Date

Dai

ly A

vera

ge

Po

wer

(M

W)

RHIC Cryo RHIC other

AGS-Exp Booster

AGS-Mach Tandem

CAD Bldg less SMD NSRL

Site Base BNL Peak-Av

Site total not recorded after 30 Nov

Page 45: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run

200 10 1062.4 4 439 1.5 1.527 0 018 0 0

11.5 @ STAR 0 27.7 4 4

Beam studies @ 5 GeV and @ 0.67

0.5 0.5

Revised Run 10 Plan, Nov 25, 2009

Page 46: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 10 Au-Au Goals11/19/09

• STAR– s = 200 GeV/n

• Luminosity Sampled/Delivered = 2/4 nb-1

• 250M Central Events• 300M Min-bias events

• PHENIX– s = 200 GeV/n

• Luminosity Recorded/Delivered = 1.4/>6 nb-1

• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1

Page 47: Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week

Run 03 Run 04 Run 05 Run 06 Run 07 Run 08 Run 09 Run 100

1

2

3

4

5

6

7

8

9

Time from start of 4.5 deg cooldown to Physics

Run 10 Actual

Goal

Actual

Wee

ks t

o P

hys

ics