rural access programme development through access year 1 results and year 2 targets based on a...
TRANSCRIPT
Rural Access ProgrammeDevelopment through access
Year 1 Results and Year 2 Targets
Based on a Presentation for
RAP3 Steering Committee
Michael Green
January 2015
Rural Access ProgrammeDevelopment through access
RAP3 RAP3 Implementation £31.5m –
Works with district and central GON and private sector (14 districts) Employment of the poor maintaining, upgrading, constructing rural roads. (14 districts) Savings, literacy, income training as in RAP2 (14 districts) Sustainable agricultural, small businesses, economic infrastructure (8 districts) Trail Bridge construction (8 districts) Capacity Building of LRN sector
Rural Employment Guarantee Programme Support £3.6m – GON Karnali Employment Program (KEP) in Mid and Far West regions. TA in pilot districts and at the national level. (2 districts) Improving targeting, awareness, wage payment systems, registration, planning and
monitoring, transparency, capacity and coordination with local government. Lessons learned inform a National Employment Guarantee Scheme
Results, Evaluation and Policy support, (MEL) £1.35m – Third party continuous monitoring (8 districts) Separate studies to capture lessons on specific issues Inform the design of future donor and government programmes.
Rural Access ProgrammeDevelopment through access
District Road Core Network
New Construction – (4) Humla, Mugu, Bajura, Kalikot
Maintenance – (10) Doti, Achham, Dailekh, Jumla Dadeldhura, Parbat, Sindhupalchowk, Morang, Jhapa, Sankhuwasabha
SED (8) Humla, Mugu, Bajura, Kalikot (RAP2 style) Doti, Achham, Dailekh, Jumla
Capacity Building/Policy Harmonisation (14/Central) Doti, Achham, Dailekh, Jumla, Humla, Mugu, Bajura, Kalikot Dadeldhura, Parbat, Sindhupalchowk, Morang, Jhapa, Sankhuwasabha
Rural Access ProgrammeDevelopment through access
Summary First Year Results
LogFrame Indicators LogFrame target (Sep 14) Result Remarks
Outcome Indicator 2 Employment
500,000 employment days 767,085 employment days +50%
Output 1 LRN 975 km DRCN under Maintenance
1741 km DRCN Maintenance +17.5%+
57 km 2.5m track opening 57 km 2.5m track opening Target Met
Output 2 SED 7,500 beneficiaries 10,000 beneficiaries +33
10,000 hh 10,500 hh +5%
250 service providers 261 service providers +4%
Output 3 CB/PH 118 persons 651 persons +550%
25% satisfaction with RAP 25% satisfaction with RAP Target Met
4.45 District CIM Score 5.77 District CIM Score +30%
Rural Access ProgrammeDevelopment through access
LogFrame Key Results - Year 2 Contribution
Output Expected Feb 2015 Target at Jan 2016 Y2 Contribution
Employment 1,200,000 employment days 2,500,000 employment days +1,300,000 employment days
LRN 1,741 km DRCN maintained 2,000 km DRCN maintained +259km DRCN maintained
57 km 2.5m track opening 75 km 2.5m track opening +18km at 2.5m track opening
0km 3.5m track opening 50km 3.5km track opening +50km at 3.5m track opening
SED 10,500 beneficiaries 17,500 beneficiaries +7,000 beneficiaries
10,500 hh 26,500 hh +11,000 hh
261 service providers 750 service providers +490 service providers
Capacity Building 1,112 training days 5,000 training days +3,888 training days
25% satisfaction 30% satisfaction +5% in satisfaction
5.77 District CIM Score Increase in District CIM Score Increase in District CIM Score
Rural Access ProgrammeDevelopment through access
Indicator 1 - Km Benefiting from ARAMP
Output 1 – Improved DRCN
Rural Access ProgrammeDevelopment through access
Output 1 – Improved DRCNIndicator 2 – Km of New Roads
Rural Access ProgrammeDevelopment through access
Output 2 - Local Economic GrowthIndicator 1 – No of SED Beneficiaries
Rural Access ProgrammeDevelopment through access
Output 2 - Local Economic GrowthIndicator 2 – Economic Infrastructure Targets
Rural Access ProgrammeDevelopment through access
Output 2 - Local Economic GrowthIndicator 3 – Numbers of Service Providers
Rural Access ProgrammeDevelopment through access
Output 3 – Capacity BuildingIndicator 1 – People trained
Rural Access ProgrammeDevelopment through access
Output 3 – Capacity BuildingIndicator 1 – Training days
Rural Access ProgrammeDevelopment through access
Output 3 – Capacity BuildingIndicator 2 – District Satisfaction Rating
Rural Access ProgrammeDevelopment through access
Output 4 – Capacity BuildingIndicator 3 – Continual Improvement
Rural Access ProgrammeDevelopment through access
Overall Result
We exceeded expectations by about 20%
Overall rating A+
Rural Access ProgrammeDevelopment through access
Procurement
Procurement issues have led to long delays and are closely linked to RAP3’s safeguards ( e.g. related to underbidding by contractors).
In addition GON fund spend prioritised in some districts In future March cut off for procurement to be used RAP funds to be frozen at the end of Dec and decision made
to transfer to next ARAMP
Rural Access ProgrammeDevelopment through access
Private Sector
Attempting to build capacity in the private sector has been disappointing.
Simple supervision can be managed adequately RAP local consultants have performed badly on
milestone/performance contracts, especially design Have shown they are unable to meet delivery timeframes. Not helpful on a “Results Based” contract. Intention is to phase out consulting firms Graduate Programme started (21) linked to CPD training Results very encouraging so far.
Rural Access ProgrammeDevelopment through access
Supporting the Engineering Sector
Sector training through CITC association with SCAEF, FCAN, NEC such as Contract Administration and Project Management.
Results driven training based on the RAP 3 Annual Management Cycle to improve private sector performance on RAP3 contracts.
Annual refresher courses and “in or out” examinations. Six month internships programme for 8 new engineering
graduates (16 per year) Follow up CPD Graduate Programme possibly linked to ICE in
UK for two to three years, expanding at 16 per year. Technician internship and CPD programme for supervision. Phase 1 build supervision capacity in RAP service providers Phase 2 build management and design capacity in house Extend above to other RTI programmes
Rural Access ProgrammeDevelopment through access
Pilot (Exit) Strategy
Assist DTO to disburse GON SWAp funds in Pilots TA embedded in DTO office assisting with
Road condition and road safety surveys ARAMP preparation, LRN Procurement, Supervision of GON budget implementation Piloting of RMGs (funded by RAP)
Explore how to speed up disbursement of LRN budgets RAP budget focus shifts to core (poor) districts in west.
Rural Access ProgrammeDevelopment through access
Improvements A big first year spend meant that 7 districts had “surplus”
budget for improvements. 200km of designs were prepared to allow districts to use
other fund sources as well as RAP. In year two ARAMP JUM, DAI, DAD and DOT meet their
maintenance needs and have designs for improvement However, if existing RAP budget is to last for 4 years there
is not enough budget for any improvements in the Year 2 Implementation Plan.
JHA, MOR and PAR have not covered their maintenance needs in Year 2 ARAMP and no improvements warranted
Rural Access ProgrammeDevelopment through access
Improvements
DIST Maint Budget 2014/15 (NRs)
% ARAMP Version
Required Allocated
MOR 147,288 36,547 25% 15/01/2015JHA 113,612 56,348 50% 01/01/2015PAR 85,398 44,958 53% 17/11/2014DAI 51,174 51,174 100% 27/12/2014JUM 24,430 24,430 100% 27/12/2014DAD 54,110 54,110 100% 17/11/2014DOT 53,776 53,776 100% 17/12/2014
Total 529,788 321,343 61%
Rural Access ProgrammeDevelopment through access
Decisions Taken Endorsement of Year 2 Implementation Plan
More focus in core districts for funding Pilot strategy to focus on TA and support GON commitment and
disbursement from SWAp and other sources Improvement programme behind schedule Procurement cut off in March and expenditure freeze in Dec Capacity building strategies for strengthening the engineering
sector Appreciation from SC to DFID offer of expansion of RAP