russell cave elementary – renovation architect: pearson & peters architects general...

4
Russell Cave Elementary – Renovation • Architect: Pearson & Peters Architects • General Contractor: Congleton-Hacker Construction • Substantial Completion Date:August, 2010 • Contract Sum: $5,001,150 • Change Orders to Date: $0 • Current Phase: 1 (On Schedule) • Estimated Completion: 6% June 2009

Upload: heather-greer

Post on 17-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,

Russell Cave Elementary – Renovation

• Architect: Pearson & Peters Architects

• General Contractor: Congleton-Hacker Construction

• Substantial Completion Date: August, 2010

• Contract Sum: $5,001,150

• Change Orders to Date: $0

• Current Phase: 1 (On Schedule)

• Estimated Completion: 6%

June 2009

Page 2: Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,

Russell Cave Elementary – Renovation

Rendering of Final Façade

June 2009

Page 3: Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,

Russell Cave Elementary – Renovation•Work Completed in Last 30 Days:•Footing and foundation walls continue: 40 feet of footings poured and 38 feet of foundation wall have been poured•Interior wall footings: 200 feet have been poured.•Footings at new mechanical enclosures have been poured. Pads for mech units at kitchen and new transformer and generator have been poured.

•Current Work Effort (June):•Additional work on footings and foundation at the new addition will continue. New floor slab will be poured in two weeks, weather permitting.•Installation of the new leach fields for the septic system will begin installation in the front lawn of the building.•Kitchen/Cafeteria demolition and renovation will begin.•Renovation of (4) classrooms on the south side will begin.•Masonry restoration on the existing building will begin the week of June 8th.

June 2009

Page 4: Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,

Russell Cave Elementary – Renovation

Foundation Work 6.2.09 Foundation Work 6.2.09

June 2009

Foundation Work 6.2.09

Foundation Work 6.2.09