ruta critica c

25
T NOR COSTO T. NOR T MIN COSTO T. MINIMO T FIN COSTO COSTO ACT SIGUE (SEM) $1,000 (SEM) $1,000 ∆S ∆T RED SEM REDUCCION TOTAL 1 5.6 5 $1,500,000 5 $1,500,000 - 5 $1,500,000 2 10 15 $7,200,000 10 $8,000,000 160000 4 11 $640,000 $7,840,000 3 13 30 $8,400,000 18 $9,000,000 50000 12 18 $600,000 $9,000,000 4 14 20 $2,100,000 14 $2,700,000 100000 2 18 $200,000 $2,300,000 5 7.12 12 $1,400,000 8 $1,560,000 40000 4 8 $160,000 $1,560,000 6 8,9,10 6 $800,000 4 $1,200,000 200000 6 $800,000 7 11 24 $6,800,000 20 $7,800,000 250000 4 20 $1,000,000 $7,800,000 8 11 8 $1,000,000 5 $1,240,000 80000 8 $1,000,000 9 12 4 $600,000 3 $900,000 300000 4 $600,000 10 12,13,14 10 $3,000,000 7 $3,450,000 150000 3 7 $450,000 $3,450,000 11 17 11 $2,500,000 8 $3,580,000 360000 3 8 $1,080,000 $3,580,000 12 15 9 $1,800,000 6 $2,700,000 300000 9 $1,800,000 13 15.16 14 $2,600,000 10 $3,320,000 180000 14 $2,600,000 14 16.17 21 $8,400,000 15 $10,800,000 400000 3 18 $1,200,000 $9,600,000 15 17 10 $1,900,000 6 $2,140,000 60000 1 9 $60,000 $1,960,000 16 18 12 $1,300,000 10 $1,400,000 50000 2 10 $100,000 $1,400,000 17 18 7 $700,000 5 $840,000 70000 2 5 $140,000 $840,000 18 3 $500,000 3 $500,000 - 3 $500,000 $52,500,000 $62,630,000 $5,630,000 $58,130,000

Upload: jose-bautista-hernnandez

Post on 29-Nov-2014

116 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RUTA CRITICA c

T NOR COSTO T. NOR T MIN COSTO T. MINIMO T FIN COSTO COSTO COSTO ACT SIGUE (SEM) $1,000 (SEM) $1,000 ∆S ∕∆T RED SEM REDUCCION TOTAL SEM

1 5.6 5 $1,500,000 5 $1,500,000 - 5 $1,500,000 $300,0002 10 15 $7,200,000 10 $8,000,000 160000 4 11 $640,000 $7,840,000 $712,7273 13 30 $8,400,000 18 $9,000,000 50000 12 18 $600,000 $9,000,000 $500,0004 14 20 $2,100,000 14 $2,700,000 100000 2 18 $200,000 $2,300,000 $127,7785 7.12 12 $1,400,000 8 $1,560,000 40000 4 8 $160,000 $1,560,000 $195,0006 8,9,10 6 $800,000 4 $1,200,000 200000 6 $800,000 $133,3337 11 24 $6,800,000 20 $7,800,000 250000 4 20 $1,000,000 $7,800,000 $390,0008 11 8 $1,000,000 5 $1,240,000 80000 8 $1,000,000 $125,0009 12 4 $600,000 3 $900,000 300000 4 $600,000 $150,000

10 12,13,14 10 $3,000,000 7 $3,450,000 150000 3 7 $450,000 $3,450,000 $492,85711 17 11 $2,500,000 8 $3,580,000 360000 3 8 $1,080,000 $3,580,000 $447,50012 15 9 $1,800,000 6 $2,700,000 300000 9 $1,800,000 $200,00013 15.16 14 $2,600,000 10 $3,320,000 180000 14 $2,600,000 $185,71414 16.17 21 $8,400,000 15 $10,800,000 400000 3 18 $1,200,000 $9,600,000 $533,33315 17 10 $1,900,000 6 $2,140,000 60000 1 9 $60,000 $1,960,000 $217,77816 18 12 $1,300,000 10 $1,400,000 50000 2 10 $100,000 $1,400,000 $140,00017 18 7 $700,000 5 $840,000 70000 2 5 $140,000 $840,000 $168,00018 3 $500,000 3 $500,000 - 3 $500,000 $166,667

$52,500,000 $62,630,000 $5,630,000 $58,130,000

Page 2: RUTA CRITICA c

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

92 12992 129

37

DIAGRAMA DE RUTA CRITICA 35

92 12992 129

37

36

92 12992 129

92 12937

92 129

37 37

92 12992 129

30 7537

30 75

45 3830 117

290 110 110 117

30 117 90 110 110 117 92 129

87 20 792 129

30 9037

009-D.03 EXCAVACIONES :30 90

5 460 39

392 12992 129

37

52 6040

52 60

892 98

1492 98

6

52 6522

52 60

1392 98

1592 98

6

52 7523

52 75

230 0 92 98

1792 98

6INICIO 0 30 0 30

0 30 22 52 52 92 75 9224

30 3052 92 52 75 75 92

4052 75

17

TERRACERÍAS 1 23

SUBRASANTE 1692 98

1892 98

692 98

52 75 92 9825

52 756

23

OBRAS DE DRENAJE92 98

1992 98

6

52 7526

52 75

2392 98

2092 98

6

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

CONSTRUCCION DE BASE HIDRAULICA

MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO-PAPATLATA (CALNALI), TRAMO: DEL KM. 0+000 AL KM. 39+000, SUBTRAMO A MODERNIZAR: DEL KM. 12+000 AL KM. 14+000

90 DIAS

45

60

60

BQ35
60
AD47
90 DIAS
AV80
45
BR87
60
Page 3: RUTA CRITICA c

6

52 7527

52 75

2392 98

2192 98

6

52 9228

52 92

4030 3130 31

792 98

192 98

6

652 9252 92

2930 75

4030 75 30 52

30 9245

30 5211

92 9830 92

2292 98

62 8 6

952 92

TERRAPLENES52 92

3040

30 5230 52

1292 98

2292 98

6

1052 9252 92

3140

1392 98 92 9892 98 92 98

6 6

32

92 9892 98

6

33

92 9892 98

6

34

ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA

70

60

AC120
70
BQ134
60
Page 4: RUTA CRITICA c

129 188129 188

129 18859

129 188

59 45190 205

41190 205

129 18815

190 205129 188 190 205

129 18859

RAYA CENTRAL15

129 188

59 46 71129 188129 188

4259

129 188129 188

RIEGO DE IMPREGNACIÓN59

190 205

47190 205

129 18815

129 188

59129 188

72129 188

43 59160 190 190 205

48160 190 190 205 190 205

30190 205

15129 188

15129 188 129 188

63 7359

129 188

RAYA LATERAL59

44160 190 190 205

49160 190 190 205

30 15

129 16064 74

129 160129 160

31129 160 160 190 190 205

31 56160 190 190 205

30 15

50129 160

65 75129 160

129 16031

129 160 160 190 190 205

31 57160 190 190 205

160 19030 15

51160 190

129 16030 66 76

129 160129 160

31CUNETAS129 160 160 190 190 205

31 58160 190 190 205 190 205

30 15190 205

129 16052 15

129 160 129 16067 77

31129 160

FIN31

160 190 190 205

59160 190 190 205

30 15129 160 190 205129 160 129 160

68190 205

7831

129 16015

31

53160 190

SEÑALAMIENTO VERTICAL190 205

60160 190 190 205

30 15129 160129 160 129 160

69 7931

129 160

31

54160 190 190 205

61160 190 190 205

30 15129 160129 160 129 160

70 8031

129 160

31

55190 205

62190 205

15

81

190 205190 205

15

82

CARPETA DE CONCRETO ASFALTICO

SEÑAL

SEÑAL

SEÑAL

DEFENZAS

SEÑAL

SEÑAL

SEÑAL

SEÑAL

ZAMPEADO

CONCRETO

ACERO BORDILLOS

60

60

30

15

31

15

CONCRETO

ACERO BORDILLOS

ACERO BORDILLOS

ACERO BORDILLOS

ACERO BORDILLOS

15

CONCRETO

CONCRETO

CONCRETO

CONCRETO

DZ10
15
EG14
CONCRETO
CK17
60
EG24
CONCRETO
DZ30
15
DR31
CONCRETO
EG31
CONCRETO
DR38
ACERO BORDILLOS
EG38
CONCRETO
DR45
ZAMPEADO
EH45
SEÑAL
DK52
30
DR52
CONCRETO
EH52
SEÑAL
EO58
15
DR59
ACERO BORDILLOS
EH59
SEÑAL
CL60
60
DR66
ACERO BORDILLOS
EH66
SEÑAL
DZ67
31
DR73
ACERO BORDILLOS
EH73
SEÑAL
DR80
ACERO BORDILLOS
EH80
SEÑAL
EH87
SEÑAL
EH94
DEFENZAS
Page 5: RUTA CRITICA c

ATENTAMENTE

ING.ENRIQUE AZPEITIA MEDINA

REPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

Page 6: RUTA CRITICA c

15

Page 7: RUTA CRITICA c

Edith Blancas Bautista

M es Enero FebreroSem 1 2 3 4 5 6 7 8Dia m m j v l m m j v l m m j v l m m j v l m m j v m m j v l m m j v l m m j v l m

Fecha 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 1 2 6 7 8 9 12 13 14 15 16 19 20 21 22 23 26 27Act1 23456789

101112131415161718

$300,000.00 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $133,333.00 $133,333.00 $133,333.00$712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00 $712,727.00$500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00$127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00

$195,000.00 $195,000.00 $195,000.00

$1,640,505.00 $1,640,505.00 $1,640,505.00 $1,640,505.00 $1,640,505.00 $1,668,838.00 $1,668,838.00 $1,668,838.001 2 3 4 5 6 7 8

Page 8: RUTA CRITICA c

Edith Blancas Bautista

$1,640,506.00 $1,640,507.00 $1,640,508.00 $1,640,509.00 $1,640,510.00 $1,668,844.00 $1,668,845.00 $1,668,846.00

Page 9: RUTA CRITICA c

Edith Blancas Bautista

Marzo AbrilA 9 10 11 12 13 14 15 16 17c m j v l m m j v l m m j v l m j v l m m j v l m m l m m j v l m m j v l m m j v l m j v mt 28 1 2 5 6 7 8 9 12 13 14 15 16 19 20 22 23 26 27 28 29 30 2 3 4 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 2 3 4 8

123456789

101112131415161718

$133,333.00 $133,333.00 $133,333.00 $125,000.00 $150,000.00 $150,000.00 $150,000.00 $492,857.00 $492,857.00$712,727.00 $712,727.00 $712,727.00 $150,000.00 $492,857.00 $492,857.00 $492,857.00 $125,000.00 $125,000.00$500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00 $500,000.00$127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00 $127,778.00$195,000.00 $195,000.00 $195,000.00 $195,000.00 $195,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00

$492,857.00 $125,000.00 $125,000.00 $125,000.00

$1,668,838.00 $1,668,838.00 $1,668,838.00 $1,590,635.00 $1,590,635.00 $1,785,635.00 $1,785,635.00 $1,635,635.00 $1,635,635.00

Page 10: RUTA CRITICA c

Edith Blancas Bautista

Mayo JunioA 18 19 20 21 22 23 24 25c m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l mt 9 10 11 14 15 16 17 18 21 22 23 24 25 28 29 30 31 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 2 3

123456789

101112131415161718

$492,857.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00$125,000.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00$500,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00$127,778.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00$390,000.00 $125,000.00

$1,635,635.00 $1,434,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00 $1,309,047.00

Page 11: RUTA CRITICA c

Edith Blancas Bautista

Julio AgostoA 26 27 28 29 30 31 32 33 34c m jj v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l m m j v l mt 4 4 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2 3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 31 3 4

123456789

101112131415161718

$390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $390,000.00 $447,500.00$533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00 $533,333.00$200,000.00 $200,000.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $185,714.00 $217,778.00 $217,778.00$185,714.00 $185,714.00

$1,309,047.00 $1,309,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,109,047.00 $1,141,111.00 $1,198,611.00

Page 12: RUTA CRITICA c

Edith Blancas Bautista

Septiembre OctubreA 35 36 37 38 39 40 41 42c m j v l m m j v m m j v l m m j v l m m j v l m m j v l m m v v l m m j v l m mt 5 6 7 10 11 12 13 14 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 39 31

123456789

101112131415161718

$447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $447,500.00 $168,000.00$533,333.00 $533,333.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00 $140,000.00$217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00 $217,778.00

$1,198,611.00 $1,198,611.00 $805,278.00 $805,278.00 $805,278.00 $805,278.00 $805,278.00 $308,000.00

Page 13: RUTA CRITICA c

Edith Blancas Bautista

Noviembre DiciembreA 43 44 45 46 47 48 49c j l m m j v m m m j v l m j v l m m j v l m m j v l m m j v l m m j vt 1 5 6 7 8 9 12 13 14 15 16 19 21 22 23 26 27 28 29 30 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21

123456789

101112131415161718

$168,000.00 $168,000.00 $168,000.00 $168,000.00 $166,667.00 $166,667.00 $166,667.00$140,000.00 $140,000.00 $140,000.00 $140,000.00

$308,000.00 $308,000.00 $308,000.00 $308,000.00 $166,667.00 $166,667.00 $166,667.00

Page 14: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION

TERRACERÍAS

1 I0002 HA 3.00 25-may-2011 30.00

009-D.03 EXCAVACIONES :

A) EN CORTE Y ADICIONALES ABAJO DE LA SUBRASANTE:

2 I0008 2) EN MATERIAL "B" M3 8,794.56 20-jun-2011 45.003 I0009 2) EN MATERIAL "C" M3 35,178.23 5-jul-2011 60.00

4 I0044 M3 3,200.00 30-jun-2011 80.00

5 I0115 M3 10,993.20 20-jun-2011 90.00

TERRAPLENES

6 I0025 M3 3,000.00 1-jul-2011 30.00

009-E.03 EXCAVACIONES DE PRESTAMOS:

7 I0037 B) DE BANCO: 2) EN MATERIAL "B" M3 6,149.56 15-jul-2011 40.008 I0038 B) DE BANCO: 3) EN MATERIAL "C" M3 1,537.39 15-jun-2011 45.00

9 I0119 M3 7,686.95 1-jul-2011 50.00

10 I0120 M3-KM 76,869.50 1-jul-2011 50.00

11 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION M3 1,921.74 15-jul-2011 40.00

12 I0121 M3-KM 24,982.59 15-jul-2011 40.00

13 I0054 M3 7,686.95 15-jul-2011 40.00

SUBRASANTE

14 I0025 M3 3,600.00 10-jul-2011 30.00

15 I0037 B) DE BANCO: 2) EN MATERIAL "B" M3 4,151.89 10-jul-2011 35.0016 I0038 B) DE BANCO: 3) EN MATERIAL "C" M3 1,037.97 25-jul-2011 30.00

17 I0119 M3 5,189.86 10-jul-2011 45.00

18 I0120 M3 - KM 51,898.60 10-jul-2011 45.00

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

009-.C.01 DESMONTE PARA DENSIDAD 100% DE VEGETACIÓN CON TIPO: B) SELVA O BOSQUE

009-F.02 COMPACTACIONES: B) DE LA CAMA DE LOS CORTES EN QUE NO SE HAYA ORDENADO EXCAVACIÓN ADICIONAL: 2) PARA 90%.

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-E.02 DESPALME EN MATERIAL A, DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO.

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS

009-F.04 FORMACION Y COMPACTACION: A) DE TERRAPLENES ADICIONADOS CON SUS CUÑAS DE SOBREANCHO: 2) PARA 90%

009-.E.02 DESPALME EN MATERIAL "A" DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO

009-E.03 EXCAVACIONES DE PRESTAMOS:

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES

Page 15: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

19 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION M3 1,297.47 10-jul-2011 45.00

20 I0121 M3-KM 16,867.05 10-jul-2011 45.00

A) DE LA ELEVACION DE SUBRASANTE EN CORTES Y/O TERRAPLENES EXISTENTES:

21 I0080 2) PARA EL 95% M3 5,189.86 10-jul-2011 45.00OBRAS DE DRENAJE

22 I0123 M3 2.92 1-jul-2011 60.00

23 I0124 M3 26.28 1-jul-2011 60.00

24 I0126 M3 26.28 1-jul-2011 60.00

25 I0127 M3 236.52 1-jul-2011 60.00

26 I0172 M3 40.00 1-jul-2011 60.00

27 I0183 M3 57.97 1-jul-2011 60.00

28 I0194 M2 42.18 1-jul-2011 60.00

29 I0319 ML 60.00 1-jul-2011 60.00

ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA

30 I0369 M3 235.36 1-jul-2011 60.00

31 I0370 2) KILOMETROS SUBSECUENTES M3/KM 23,840.00 1-jul-2011 60.00A) SOBRE BRECHAHASTA 10 KM.

32 I0367 2) KILOMETROS SUBSECUENTES M3/KM 191.61 1-jul-2011 60.0033 I0371 047-Z.03 SOBREACARREO DEL AGUA:

A) SOBRE BRECHA M3/KM 30.05 1-jul-2011 60.00

34 I0380 M-K 60.00 1-jul-2011 60.00

PAVIMENTO

CONSTRUCCION DE BASE HIDRAULICA

35 I0423-B M3 3,940.30 1-ago-2011 60.00

36 I0431 M3 3,031.00 1-ago-2011 60.00

37 I0549 M3 3,940.30 1-ago-2011 60.00

38 I0550 2) KMS SUBSECUENTES M3/KM 685,612.20 1-ago-2011 60.0039 I0453 086-E.04 AGUA UTILIZADA EN COMPACTACION M3 985.08 1-ago-2011 60.0040 I0551 086-P.03 ACARREOS DEL AGUA PARA COMPACTACION M3-KM 12,805.98 1-ago-2011 60.00

RIEGO DE IMPREGNACIÓN

41 I0534 086-I.02 BARRIDO DE LA SUPERFICIE POR TRATAR HA 1.50 30-sep-2011 60.00

42 I0519 LT 22,500.00 30-sep-2011 60.00

43 I0521 LT 22,500.00 30-sep-2011 60.00

44 I0523 LT 22,500.00 30-sep-2011 60.00

45 I0525 086-G.02 RIEGO: A) RIEGO DE IMPREGNACION: 1) EMULSION RM-2K LT 22,500.00 30-sep-2011 60.00

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS

009-F.07 MEZCLADO, TENDIDO Y COMPACTACION DE LA CAPA SUBRASANTE FORMADA CON MATERIAL SELECCIONADO:

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 2) EN MATERIAL "B"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 3) EN MATERIAL "C"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 2) EN MATERIAL "B"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 3) EN MATERIAL "C"

047-D.02 RELLENOS: A) DE EXCAVACION PARA ESTRUCTURAS, 2) CON MATERIAL "B"047-E.03 MAMPOSTERIA DE TERCERA CLASE A CUALQUIER ALTURA: A) PARA PIEDRA OBTENIDA DE BANCOS: 1) CON MORTERO DE CEMENTO047-E.07 PLANTILLA SOBRE LA SUPERFICIE DE DESPLANTE: A) CON MORTERO DE CEMENTO047-L.02 TUBERIA DE CONCRETO : A) REFORZADO, DE F'C=280 KG/CM2, TIPO MACHO Y HEMBRA, FABRICADO EN OBRA: 4) DE 90 CM. DE DIAMETRO

047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTRO Y LOS AGREGADOS FINO Y GRUESO: B) SOBRE CAMINO TERMINADO O PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO b) CARGA CON MAQUINA

047-Z.04 SOBREACARREO DE LOS TUBOS DE CONCRETO PARA ALCANTARILLAS: D) DE 90 CM. DE DIAMETRO

S/C SUMINISTRO DE MATERIAL PÉTREO 1 1/2" A FINOS PARA BASE

086-E.02 OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION, EN LA CONSTRUCCION DE SUB-BASES O BASES: B) DE BASES: 1) CUANDO SE EMPLEE UN MATERIAL PETREO: b) COMPACTADO AL 100%

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM

086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 2) EMULSION RM-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS

Page 16: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

46 I0554 M3 22.50 30-sep-2011 60.00

47 I0555 M3/KM 5,625.00 30-sep-2011 60.00

48 I0556 M3 22.50 30-sep-2011 60.00

49 I0557 M3/KM 225.00 30-sep-2011 60.00

CARPETA DE CONCRETO ASFALTICO

50 I0535 086-J.02 BARRIDO DE LA BASE IMPREGNADA HA 1.50 1-sep-2011 60.00

51 I0518-B SUMINISTRO DE MEZCLA ASFALTICA EN CALIENTE AGREGADO DE 3/4" A FINOS. TON 1,556.08 1-sep-2011 60.00

52 I0549 M3 943.08 1-sep-2011 60.00

53 I0550 M3/KM 164,096.04 1-sep-2011 60.00

54 I0519 LT 12,000.00 1-sep-2011 60.00

55 I0521 LT 12,000.00 1-sep-2011 60.00

56 I0523 LT 12,000.00 1-sep-2011 60.00

57 I0527 086-G.02 RIEGO: B) RIEGO DE LIGA: 1) EMULSION RR-2K LT 12,000.00 1-sep-2011 60.00

58 I0554 M3 12.00 1-sep-2011 60.00

59 I0555 M3/KM 3,000.00 1-sep-2011 60.00

60 I0556 M3 12.00 1-sep-2011 60.00

61 I0557 M3/KM 120.00 1-sep-2011 60.00

62 I0545 M3 264.04 1-sep-2011 60.00

OBRAS COMPLEMENTARIAS

CUNETAS

63 I0123 2) EN MATERIAL B. M3 7.45 1-nov-2011 30.0064 I0124 3) EN MATERIAL C M3 29.80 1-nov-2011 30.00

65 I0207 M3 208.60 1-nov-2011 30.00

66 I0219 M3 5.30 1-nov-2011 30.00

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 2) KMS SUBSECUENTES

086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 1) EMULSION RR-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 523 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES

086-L.02 OPERACIÓN DE CONSTRUCCION DE LAS CARPETAS DE CONCRETOS ASFALTICO: (SOLO TENDIDO Y COMPACTADO SIN INCLUIR MEZCLADO): A) COMPACTADAS AL 95%

047-C.02 EXCAVACION PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACION, A CUALQUIER PROFUNDIDAD: A) EXCAVADO A MANO EN SECO:

047-F.04 ZAMPEADO DE CONCRETO HIDRAULICO, A CUALQUIER ALTURA: A) SIMPLE, DE F'c= 100 Kg/Cm² EN CUNETAS

047-G.02 CONCRETO HIDRAULICO, SIN INCLUIR CIMBRA, COLADO EN SECO: C) SIMPLE, GRUPO III, EN ZAPATAS; PILOTES TABLESTACAS Y POSTES PRECOLADOS, APOYOS PRECOLADOS, TAPONES SUPERIORES DE CILINDROS, LOSETAS PRECOLADAS, DOVELAS PRECOLADAS, DENTELLENES Y GUARNICIONES: 2) DE F´C= 150 KG/CM2

Page 17: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO UNIDAD CANTIDAD FECHA DE INICIO DURACION

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

67 I0271 KG 118.08 1-nov-2011 30.00

68 I0369 M3 328.95 1-nov-2011 30.00

69 I0370 2) KILOMETROS SUBSECUENTES M3/KM 6,579.00 1-nov-2011 30.0070 I0371 047-Z.03 SOBREACARREO DEL AGUA A) SOBRE BRECHA (5 KM) M3/KM 65.79 1-nov-2011 30.00

SEÑALAMIENTO

RAYA CENTRAL

71 I0558 ML 2,000.00 1-dic-2011 15.00

RAYA LATERAL

72 I0559 ML 4,000.00 1-dic-2011 15.00

73 EXT-87 PZA 134.00 1-dic-2011 15.00

74 EXT-87 PZA 268.00 1-dic-2011 15.00

SEÑALAMIENTO VERTICAL

75 EXT-69 PZA 1.00 15-nov-2011 31.00

76 EXT-70 PZA 1.00 15-nov-2011 31.00

77 EXT-78 PZA 21.00 15-nov-2011 31.00

78 EXT-83 PZA 50.00 15-nov-2011 31.00

79 EXT-79 PZA 4.00 15-nov-2011 31.00

80 EXT-80 PZA 4.00 15-nov-2011 31.00

81 EXT-65 PZA 1.00 15-nov-2011 31.00

82 EXT-91 ML 500.00 15-nov-2011 31.00

047-H.02 ACERO DE REFUERZO: A) VARILLAS. ACERO DE 3/8 EN ANCLAJES DE 15 CM DE LONGITUD A CADA METRO, EN BORDILLOS.

047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTROS Y LOS AGREGADOS FINOS Y GRUESOS: B) SOBRE CAMINO TERMINADO A PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO: b) CARGA CON MAQUINA

S/C SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLA Y MICROESFERA EN RAYA CENTRAL, INCLUYE: MATERIAL, MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN

S/C SUMINISTRO Y APLICACIÓN DE PINTURA BLANCA Y MICROESFERA EN RAYAS LATERAL, INCLUYE: MATERIAL,MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN

VIALETAS REFLEJANTES (AMARILLO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION VIALETAS REFLEJANTES (BLANCO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA (SIG-7) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA (SID-9) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL PREVENTIVA (SP-6, SP-8, SP-20, SP-29, SP-33, SP-34) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VUELTA DERECHA, VUELTA IZQUIERDA, CURVA INVERSA, ESTRECHAMIENTPOO SIMETRICO, PENDIENTE PELIGROSA, PEATONES) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL PREVENTIIVA (OD-12) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 45X60 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (INDICADOR DE CURVA PELIGROSA) SUJETA A POSTE DE 3 m DE ANGULO DE 2"X2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8"X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL RESTRICTIVA (SR-9, SR-18) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VELOCIDAD, PROHIBIDO REBASAR) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVAS DE RECOMENDACION , IDENTIFICACION E INFORMACION GENERAL (SII-15) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 30x76 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (KILOMETRAJE SIN RUTA ) SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA RESTRICTIVA (S.I.R.) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

OD- 4 DEFENSA METALICA GALVANIZADA (NORMA AASTHO-M180.- DE 2 CRESTAS CALIBRE 12 DE 4.10 MTS. DE LARGO. INCLUYE POSTE IPR GALVANIZADO DE 1.50 MTS., SEPARADOR PARA DEFENSA ANGULO REFLEJANTE EN COLOR AMBAR ALTA INTENSIDAD, TERMINAL (COLOA DE PATO) Y TORNILLOS.

Page 18: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO

TERRACERÍAS

1 I0002

009-D.03 EXCAVACIONES :

A) EN CORTE Y ADICIONALES ABAJO DE LA SUBRASANTE:

2 I0008 2) EN MATERIAL "B"

3 I0009 2) EN MATERIAL "C"

4 I0044

5 I0115

TERRAPLENES

6 I0025

009-E.03 EXCAVACIONES DE PRESTAMOS:

7 I0037 B) DE BANCO: 2) EN MATERIAL "B"

8 I0038 B) DE BANCO: 3) EN MATERIAL "C"

9 I0119

10 I0120

11 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION

12 I0121

13 I0054

SUBRASANTE

14 I0025

15 I0037 B) DE BANCO: 2) EN MATERIAL "B"

16 I0038 B) DE BANCO: 3) EN MATERIAL "C"

17 I0119

18 I0120

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

009-.C.01 DESMONTE PARA DENSIDAD 100% DE VEGETACIÓN CON TIPO: B) SELVA O BOSQUE

009-F.02 COMPACTACIONES: B) DE LA CAMA DE LOS CORTES EN QUE NO SE HAYA ORDENADO EXCAVACIÓN ADICIONAL: 2) PARA 90%.

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-E.02 DESPALME EN MATERIAL A, DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO.

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS

009-F.04 FORMACION Y COMPACTACION: A) DE TERRAPLENES ADICIONADOS CON SUS CUÑAS DE SOBREANCHO: 2) PARA 90%

009-.E.02 DESPALME EN MATERIAL "A" DESPERDICIANDO EL MATERIAL AL BORDE DEL PRESTAMO

009-E.03 EXCAVACIONES DE PRESTAMOS:

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 1) PARA EL PRIMER KM

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. D) PARA CUALQUIER DISTANCIA, DE MATERIALES DE PRESTAMO DE BANCO PARA LA CONSTRUCCION DE LA CAPA SUBRASANTE Y PARA COMPLETAR LA CONSTRUCCION DEL CUERPO DEL TERRAPLEN, MEDIDO COMPACTO : 2) PARA LOS KM SUB-SECUENTES

DIAGRAMA DE RUTA CRITICA

FECHA DE TERMINO

23-jun-2011

3-ago-20112-sep-2011

17-sep-2011

17-sep-2011

30-jul-2011

23-ago-201129-jul-2011

19-ago-2011

19-ago-2011

23-ago-2011

23-ago-2011

23-ago-2011

8-ago-2011

13-ago-201123-ago-2011

23-ago-2011

23-ago-2011

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

Page 19: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

19 I0088 009-F.08 AGUA EMPLEADA PARA COMPACTACION

20 I0121

A) DE LA ELEVACION DE SUBRASANTE EN CORTES Y/O TERRAPLENES EXISTENTES:

21 I0080 2) PARA EL 95%

OBRAS DE DRENAJE

22 I0123

23 I0124

24 I0126

25 I0127

26 I0172

27 I0183

28 I0194

29 I0319

ACARREOS PARA OBRAS DE DRENAJE Y ESTRUCTURA

30 I0369

31 I0370 2) KILOMETROS SUBSECUENTES

A) SOBRE BRECHAHASTA 10 KM.

32 I0367 2) KILOMETROS SUBSECUENTES

33 I0371 047-Z.03 SOBREACARREO DEL AGUA:

A) SOBRE BRECHA

34 I0380

PAVIMENTO

CONSTRUCCION DE BASE HIDRAULICA

35 I0423-B

36 I0431

37 I0549

38 I0550 2) KMS SUBSECUENTES

39 I0453 086-E.04 AGUA UTILIZADA EN COMPACTACION

40 I0551 086-P.03 ACARREOS DEL AGUA PARA COMPACTACION

RIEGO DE IMPREGNACIÓN

41 I0534 086-I.02 BARRIDO DE LA SUPERFICIE POR TRATAR

42 I0519

43 I0521

44 I0523

45 I0525 086-G.02 RIEGO: A) RIEGO DE IMPREGNACION: 1) EMULSION RM-2K

009-I.02 SOBREACARREOS DE LOS MATERIALES PRODUCTO DE LAS EXCAVACIONES DE LOS CORTES, ADICIONALES DEBAJO DE LA SUBRASANTE, AMPLIACION Y/O ABATIMIENTO DE TALUDES, REBAJES EN LA CORONA DE CORTES Y/O TERRAPLENES EXISTENTES ESCALONES DESPALMES, PRESTAMOS. E) PARA CUALQUIER DISTANCIA, DEL AGUA UTILIZADA EN LA COMPACTACION DE LAS TERRACERIAS

009-F.07 MEZCLADO, TENDIDO Y COMPACTACION DE LA CAPA SUBRASANTE FORMADA CON MATERIAL SELECCIONADO:

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 2) EN MATERIAL "B"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: A) EXCAVANDO A MANO, EN SECO: 3) EN MATERIAL "C"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 2) EN MATERIAL "B"

047-C.02 EXCAVACIÓN PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACIÓN, A CUALQUIER PROFUNDIDAD: B) EXCAVADO A MAQUINA, EN SECO: 3) EN MATERIAL "C"

047-D.02 RELLENOS: A) DE EXCAVACION PARA ESTRUCTURAS, 2) CON MATERIAL "B"047-E.03 MAMPOSTERIA DE TERCERA CLASE A CUALQUIER ALTURA: A) PARA PIEDRA OBTENIDA DE BANCOS: 1) CON MORTERO DE CEMENTO047-E.07 PLANTILLA SOBRE LA SUPERFICIE DE DESPLANTE: A) CON MORTERO DE CEMENTO047-L.02 TUBERIA DE CONCRETO : A) REFORZADO, DE F'C=280 KG/CM2, TIPO MACHO Y HEMBRA, FABRICADO EN OBRA: 4) DE 90 CM. DE DIAMETRO

047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTRO Y LOS AGREGADOS FINO Y GRUESO: B) SOBRE CAMINO TERMINADO O PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO b) CARGA CON MAQUINA

047-Z.04 SOBREACARREO DE LOS TUBOS DE CONCRETO PARA ALCANTARILLAS: D) DE 90 CM. DE DIAMETRO

S/C SUMINISTRO DE MATERIAL PÉTREO 1 1/2" A FINOS PARA BASE

086-E.02 OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION, EN LA CONSTRUCCION DE SUB-BASES O BASES: B) DE BASES: 1) CUANDO SE EMPLEE UN MATERIAL PETREO: b) COMPACTADO AL 100%

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM

086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 2) EMULSION RM-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS

DIAGRAMA DE RUTA CRITICA

FECHA DE TERMINO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

23-ago-2011

23-ago-2011

23-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-ago-2011

29-sep-2011

29-sep-2011

29-sep-2011

29-sep-201129-sep-201129-sep-2011

28-nov-2011

28-nov-2011

28-nov-2011

28-nov-2011

28-nov-2011

Page 20: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

46 I0554

47 I0555

48 I0556

49 I0557

CARPETA DE CONCRETO ASFALTICO

50 I0535 086-J.02 BARRIDO DE LA BASE IMPREGNADA

51 I0518-B SUMINISTRO DE MEZCLA ASFALTICA EN CALIENTE AGREGADO DE 3/4" A FINOS.

52 I0549

53 I0550

54 I0519

55 I0521

56 I0523

57 I0527 086-G.02 RIEGO: B) RIEGO DE LIGA: 1) EMULSION RR-2K

58 I0554

59 I0555

60 I0556

61 I0557

62 I0545

OBRAS COMPLEMENTARIAS

CUNETAS

63 I0123 2) EN MATERIAL B.

64 I0124 3) EN MATERIAL C

65 I0207

66 I0219

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 1) PRIMER KM

086-P.02 ACARREO DE LOS MATERIALES SELECCIONADOS NATURALES O DE LOS QUE HAYAN TENIDO UN TRATAMIENTO DE LAS MEZCLAS Y DE LOS CONCRETOS ASFALTICOS: A) MEDIDO EN EL CAMELLON, EN LOS ALMACENAMIENTOS O EN LOS VEHICULOS DE TRANSPORTE: 2) KMS SUBSECUENTES

086-G.02 SUMINISTRO DE MATERIALES ASFALTICOS A) EMULSIONES ASFALTICAS: 1) EMULSION RR-2K086-G.02 ALMACENAMIENTO DE LOS MATERIALES ASFALTICOS: A) EN TANQUES O FOSAS DEL CONTRATISTA: 1) EMULSIONES ASFALTICAS086-G.02 523 CALENTAMIENTO Y BOMBEO DE MATERIALES ASFALTICOS: A) EMULSIONES ASFALTICAS

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: A) DEL CENTRO PRODUCTOR AL ALMACENAMIENTO MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS. SUBSECUENTES

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: a) PRIMER KM

086-P.04 ACARREOS DE LOS MATERIALES ASFALTICOS: C) DEL ALMACENAMIENTO AL LUGAR DE UTILIZACION MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES: 2) POR VOLUMEN: PARA EMULSIONES ASFALTICAS: b) KMS SUB-SECUENTES

086-L.02 OPERACIÓN DE CONSTRUCCION DE LAS CARPETAS DE CONCRETOS ASFALTICO: (SOLO TENDIDO Y COMPACTADO SIN INCLUIR MEZCLADO): A) COMPACTADAS AL 95%

047-C.02 EXCAVACION PARA ESTRUCTURAS, DE ACUERDO CON SU CLASIFICACION, A CUALQUIER PROFUNDIDAD: A) EXCAVADO A MANO EN SECO:

047-F.04 ZAMPEADO DE CONCRETO HIDRAULICO, A CUALQUIER ALTURA: A) SIMPLE, DE F'c= 100 Kg/Cm² EN CUNETAS

047-G.02 CONCRETO HIDRAULICO, SIN INCLUIR CIMBRA, COLADO EN SECO: C) SIMPLE, GRUPO III, EN ZAPATAS; PILOTES TABLESTACAS Y POSTES PRECOLADOS, APOYOS PRECOLADOS, TAPONES SUPERIORES DE CILINDROS, LOSETAS PRECOLADAS, DOVELAS PRECOLADAS, DENTELLENES Y GUARNICIONES: 2) DE F´C= 150 KG/CM2

DIAGRAMA DE RUTA CRITICA

FECHA DE TERMINO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

28-nov-2011

28-nov-2011

28-nov-2011

28-nov-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-oct-2011

30-nov-201130-nov-2011

30-nov-2011

30-nov-2011

Page 21: RUTA CRITICA c

ATENTAMENTE

ING. ENRIQUE AZPEITIA MEDINAREPRESENTANTE COMUN

ENRIQUE AZPEITIA MEDINA EN ASOSIACIÓN CON GRUPO ALFELI S.A. de C.V.

DIAGRAMA DE RUTA CRITICA

No. DE ACTIVIDAD CLAVE CONCEPTO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

67 I0271

68 I0369

69 I0370 2) KILOMETROS SUBSECUENTES

70 I0371 047-Z.03 SOBREACARREO DEL AGUA A) SOBRE BRECHA (5 KM)

SEÑALAMIENTO

RAYA CENTRAL

71 I0558

RAYA LATERAL

72 I0559

73 EXT-87

74 EXT-87

SEÑALAMIENTO VERTICAL

75 EXT-69

76 EXT-70

77 EXT-78

78 EXT-83

79 EXT-79

80 EXT-80

81 EXT-65

82 EXT-91

047-H.02 ACERO DE REFUERZO: A) VARILLAS. ACERO DE 3/8 EN ANCLAJES DE 15 CM DE LONGITUD A CADA METRO, EN BORDILLOS.

047-Z.02 SOBREACARREOS PARA LA PIEDRA, LA ARENA, EL MATERIAL DE FILTROS Y LOS AGREGADOS FINOS Y GRUESOS: B) SOBRE CAMINO TERMINADO A PAVIMENTADO, CON BUENA SUPERFICIE DE RODAMIENTO, HASTA 20 KM.: 1) PRIMER KILOMETRO: b) CARGA CON MAQUINA

S/C SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLA Y MICROESFERA EN RAYA CENTRAL, INCLUYE: MATERIAL, MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN

S/C SUMINISTRO Y APLICACIÓN DE PINTURA BLANCA Y MICROESFERA EN RAYAS LATERAL, INCLUYE: MATERIAL,MANO DE OBRA, ACARREO Y TODO LO NECESARIO PARA SU CORRECTA APLICACIÓN

VIALETAS REFLEJANTES (AMARILLO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION VIALETAS REFLEJANTES (BLANCO) AMBOS LADOS 10 X 10 CMS, INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA (SIG-7) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA (SID-9) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 40 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (UN TABLERO) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL PREVENTIVA (SP-6, SP-8, SP-20, SP-29, SP-33, SP-34) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VUELTA DERECHA, VUELTA IZQUIERDA, CURVA INVERSA, ESTRECHAMIENTPOO SIMETRICO, PENDIENTE PELIGROSA, PEATONES) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL PREVENTIIVA (OD-12) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 45X60 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (INDICADOR DE CURVA PELIGROSA) SUJETA A POSTE DE 3 m DE ANGULO DE 2"X2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8"X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL RESTRICTIVA (SR-9, SR-18) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71x71 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (VELOCIDAD, PROHIBIDO REBASAR) SUJETA A POSTE DE 3 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVAS DE RECOMENDACION , IDENTIFICACION E INFORMACION GENERAL (SII-15) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 30x76 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE (KILOMETRAJE SIN RUTA ) SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

SEÑAL INFORMATIVA RESTRICTIVA (S.I.R.) LAMINA GALVANIZADA CALIBRE 16 CON CEJA DIMENCION DE 71 x178 CMS. FONDO DE ESMALTE Y LETRAS RECORTADAS CON MATERIAL REFLEJANTE ALTA INTENCIDAD SCOTCH LITE SUJETA A POSTE DE 1.5 m DE ANGULO DE 2"x2" DE 1/4" DE ESPESOR CON TORNILLERIA DE 3/8" X1" INCLUYE SUMINISTRO, ACARREO Y COLOCACION

OD- 4 DEFENSA METALICA GALVANIZADA (NORMA AASTHO-M180.- DE 2 CRESTAS CALIBRE 12 DE 4.10 MTS. DE LARGO. INCLUYE POSTE IPR GALVANIZADO DE 1.50 MTS., SEPARADOR PARA DEFENSA ANGULO REFLEJANTE EN COLOR AMBAR ALTA INTENSIDAD, TERMINAL (COLOA DE PATO) Y TORNILLOS.

DIAGRAMA DE RUTA CRITICA

FECHA DE TERMINO

LICITACION PÚBLICA NACIONAL No.: LO-913004998-N8-2011DESCRIPCION GENERAL DE LA OBRA: MODERNIZACIÓN Y AMPLIACIÓN DEL CAMINO TIANGUISTENGO – PAPATLATLA (CALNALI), TRAMO: DEL KM 0+000 AL KM 39+000, SUBTRAMO A MODERNIZAR: DEL KM 12+000 AL KM 14+000.UBICACIÓN: LOCALIDAD: TIANGUSITENGO-PEMUXCO-LA MORITA-LA ESPERANZA-TEPEHUIXCO-OTLAMALACATLA-PIEDRA ANCHA-YATIPAN-CALNALI-PAPATLATLA. MUNICIPIO: TIANGUISTENGO – CALNALI ESTADO: HIDALGO

PACHUCA, HGO A 19 DE MAYO DEL 2011

30-nov-2011

30-nov-2011

30-nov-201130-nov-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011

15-dic-2011