ALBUQUERQUE RAPID TRANSIT
CONNECTING PEOPLE, CREATING PLACE, DRIVING OPPORTUNITY David Leard, AICP Rail~Volution October 2015
What is ART
• 8.75 Miles • Median of Route 66
• 90% Exclusive Guideway
• Reducing General Purpose Lanes (50%)
• 20 Stations
• 18 Vehicles
• Pedestrian, Landscaping and Bike Lanes
• Gold Standard?
Budget
Transit Elements Capital Cost Capital Cost Estimate (2015) $119.3 MGuideway $12.2 M Capital Cost Estimate (2015) $126.1 MStations $8.0 MDemolition $2.4 MUtilities $7.1 MHazardous Materials $0.3 MSidewalks/Landscaping $3.0 MRoadway $3.9 MGeneral Constrcution Costs $5.0 MTraffic Signals $6.6 M StreetscapeCommunications $4.4 M Enhancement Elements Capital CostFare Collection $1.1 M Sidewalks/landscaping $8.5 MVehicles $18.0 M Roadway $5.0 MRight-‐of-‐Way $2.0 M Traffic Signals $3.5 MProfessional Services $16.2 M General Constrcution Costs $1.8 MUnallocated Contingency $4.6 M Professional Services $5.6 MSubtotal -‐ Transit $94.8 M Subtotal -‐ Enhancements $24.4 M