R/V Rachel Carson Doug Russell University of Washington Manager of Marine Operations 9/26/2018 IRSO 2018 1

Upload: others

Post on 18-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

R/V Rachel Carson

Doug RussellUniversity of Washington Manager of Marine Operations9/26/2018 IRSO 2018 1

Page 2: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

The Challenge

• Replace the 50+ year old R/V Clifford A. Barnes

9/26/2018 IRSO 2018 2

Page 3: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Initial Plan• Design and build a replacement vessel

9/26/2018 IRSO 2018 3

Unable to secure funding for design/build of a new vessel

Page 4: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

R/V AORA

9/26/2018 IRSO 2018 4

UK Fisheries Research Vessel – found for sale online

Page 5: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Timeline - Milestones

Identified RV AORA for sale in England late Dec 2016 Visited / inspected RV AORA – Mar 2017 Vessel Purchased – 8 Aug 2017 - $1.07M Shipyard Contract – major maintenance, some modifications – complete 5

Oct 2017 Load Rachel Carson in Rotterdam for transport to US – 28 Oct 2017 Arrive West Palm Beach, FL – 11 Nov 2017 Rachel Carson moored in Ft. Pierce, FL awaiting next load/transport Load Rachel Carson on next transport ship – 30 Nov 2017 Arrive Victoria, BC 25 Dec 2017 Move Rachel Carson to UW 28 Dec 2017 Jan-Apr 2018 – prep for science, develop processes /procedures Apr 2018 – enter service, retire R/V Barnes

First cruise – 7-11 April Eight cruises completed as of 27 Sept

9/26/2018 IRSO 2018 5

Page 6: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Drydocked at MacDuff Shipyard - Fraserborough, Scotland

Onloading RC on to M/V Transporter – Rotterdam, NL9/26/2018 IRSO 2018 6

Page 7: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Shipyard WorkMacDuff Shipyard, Fraserborough, Scotland

• Engine maintenance• Harbor Generator engine replacement• Electrical system repairs• Battery bank replacements• Stern Bulwark removal• Gantry cross beam removal• Move crane / winch controls• Hydraulic system maintenance (inc. fitting/piping renewals)• Stateroom modifications (incr. berthing from 9 to 13)• Drydock Inspection – shafts, rudders, through hull fittings• Painting touch up & top coat plus full blast/paint for aft end

of ship

9/26/2018 7IRSO 2018

Page 8: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Rachel Carson Prep for Science Opssince arrival at UW

• Summary of what’s been accomplished since RC arrival at UW– Improved egress from lower berthing – Installed new Engine Room CO2 fire fighting system– Hydraulic controls (winches, crane) upgraded including

addition of wireless controls– Cross decked winches from Barnes to Carson– Completed Gantry Modifications– Added 115V 60 Hz power for labs & Pilothouse– Added Shore Power converter– Completed important Engine Maintenance– Replaced Port Generator control– Added fire extinguishing system for Hydraulic Space

9/26/2018 IRSO 2018 8

Page 9: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

– Replaced stern tube cooling failing piping/fittings – Completed major maintenance on watertight closures– Added 2nd life raft – now 28 person capacity– Cross decked CTD system from Barnes– Added Rosepoint electronic charting– Added SCS – Verified Data network– Added VHF radio & multiple remotes– Installed met sensors & integrated into data system– Got ES-60 & EK-60 working– Completed US Coast Guard inspection– Completed JMS inspection – Accepted as a UNOLS vessel in the U.S. Academic Research

Fleet 24 July

9/26/2018 IRSO 2018 9

Page 10: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

Ready for science!

9/26/2018 10

Near term priorities:• Gain experience & determine best

practices• Get the word out – need more users!!• ID & prioritize needed improvements• Raise funds for more upgrades

IRSO 2018

Page 11: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

The Old and the New

9/26/2018 IRSO 2018 11

Page 12: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

9/26/2018 IRSO 2018 12

First Science Cruise- Ocean Acidification in Puget

Sound (Dr. Jan Newton)

“ I'm very impressed by the ship! …. Frankly, I sort of fell in crush with the ship. I know its early, but I'm so very pleased. “

Page 13: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

9/26/2018 13

Getting right to work doing science

IRSO 2018

Page 14: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

9/26/2018 IRSO 2018 14

Page 15: R/V Rachel Carson Update - irso.info · Rachel Carson Prep for Science Ops since arrival at UW •Summary of what’s been accomplished since RC arrival at UW –Improved egress from

9/26/2018 IRSO 2018 15