PRESIDENTIAL PALACE PROJECT - ABU DHABI SSH/08110 RWA LETTER LOG Page 1 of 48 Reference No. Date In Response To Date Subject RWA/20077040/0670 4/8/2009 RFP/Interior Design/005 4/19/2009 Addendum 5 Clarifications RFP/Interior Design/005 5/21/2009 Addendum 6 Clarifications RFP/Interior Design/006 5/24/2009 Addendum 6A Clarifications RFP/Interior Design/007 6/17/2009 Post Tender Addendum 7 Clarifications RWA/20077040/0670 10/11/2009 Kick Off Meeting Part 1 and Consultant Introductory Meeting RWA-LETTER-001602 10/27/2009 Time Schedule, ref AIXC/SSH/NPP-A.D/2352/09 dated 18 Oct 2009 RWA-LETTER-001633 11/1/2009 AIXC/SSHI/NPP-A.D/2352/09 10/18/2009 List of Queries / Client Brief RWA-LETTER-001635 11/1/2009 AIXC/SSHI/NPP-A.D/2352/09 10/18/2009 Scope of Services RWA-LETTER-001733 11/17/2009 AIXC/SSHI/NPP-A.D/2353/09 11/3/2009 RWA-LETTER-001734 11/17/2009 AIXC/SSHI/NPP-A.D/2353/09 11/3/2009 ID Package Project Organization Chart RWA-LETTER-001855 12/16/2009 LETTER-000009 ID Package (1) Project Organization Chart Rev 0 RWA-LETTER-001893 12/21/2009 LETTER-000007 RWA-LETTER-001920 12/24/2009 AIX-LETTER-000015 RWA-LETTER-002094 1/27/2010 AIX-LETTER-000017 08110 Interior Special Lighting Design Proposed Sub-Consultant RWA-LETTER-002247 2/23/2010 AIX-LETTER-000034 08110 Monthly Project Progress Report - January 2010 RFP/Interior Design/005 4/19/2009 Addendum 5 Clarifications RFP/Interior Design/005 5/21/2009 Addendum 6 Clarifications RFP/Interior Design/006 5/24/2009 Addendum 6A Clarifications RFP/Interior Design/007 6/17/2009 Post Tender Addendum 7 Clarifications RWA/20077040/0670 10/11/2009 Kick Off Meeting Part 1 and Consultant Introductory Meeting RWA-LETTER-001602 10/27/2009 Time Schedule, ref AIXC/SSH/NPP-A.D/2352/09 dated 18 Oct 2009 RWA-LETTER-002002 1/7/2010 -- -- Resident Project Manager Approval (ID Package 1) RWA-LETTER-002007 1/10/2010 AIX-LETTER-000013 12/31/2009 ID Package (1) Design time Schedule Rev G RWA-LETTER-002096 1/27/2010 -- -- PPP Consultants Plan RWA-LETTER-002254 2/23/2010 AIX-LETTER-000042 2/21/2010 ID Package (1) A/E Coordination Workshop 01 RWA-LETTER-002285 2/28/2010 AIX-LETTER-000036 2/15/2010 ID Package (1) Project Quality Plan ref AIX-LETTER-000036 RWA-LETTER-002281 2/28/2010 Supreme Council ID Input RWA-LETTER-002279 2/28/2010 AIX-LETTER-000035 2/15/2009 ID Package (1) Project Mobilization Plan RWA-LETTER-002327 3/8/2010 AIX-LETTER-000059 3/5/2010 RWA-LETTER-002338 3/10/2010 Lighting Design Sub-Consultant RWA-LETTER-002349 3/11/2010 -- -- ID Package (1) Progress MOM No. 011 Rev 1, No 012 Rev 1 and No 13 Rev1 RWA-LETTER-002344 3/11/2010 AIX-LETTER-000051 2/25/2010 ID Package (1) Monthly Project Progress Report - Feb 2010 RWA-LETTER-002355 3/11/2010 AIX-LETTER-000038 2/16/2010 ID Package (1) Consultancy Services Agreement RWA-LETTER-002383 3/16/2010 AIX-TRANSMIT-000027 3/11/2010 RWA-LETTER-002440 3/24/2010 EWN-LETTER-002320 3/21/2010 Loads Locations of Chandelliers in Supreme Council, ref EWN-LETTER-002320 RWA-LETTER-002505 4/1/2010 EWN-LETTER-002347 3/28/2010 PMMB - Part 15 Supreme Council Meeting RWA-LETTER-002506 4/1/2010 EWN-LETTER-002347 3/28/2010 PMMB - Part 15 Supreme Council Meeting Presidential Palalce Project in Abu Dhabi for Interior Design Consultancy Interior Special Lighting Proposed Sub-Consultant Ref AIXC/SSHI/NPP-A.D/2353/09 dated 03 November 2009 Proposed ID Sub-Consultant for Interior Lighting and Signage and Wayfinding Main Building (PMMB) and Presidential Wing (PMPW) Floor Plans - Scope of Work (FOH and BOH) Areas EWN-LETTER-002176 AIX-LETTER-000054 25/02/2010 28/02/2010 Prohibited Direct Communication from AXIC, ref AIX-LETTER-000059 dated 05 March 2010 and RWA-LETTER-002285 dated 28 Feb 2010 RWA-LETTER-002094 AIX-LETTER-000017 27/01/2010 ID Package (1) Final Performance Bond and Advance Payment Bank Guarantee / Editable Version Ref AIX-TRANSMIT-000027

Upload: olivia-valerie-moses

Post on 08-Nov-2014

82 views

Category:

Documents


0 download

DESCRIPTION

Log

TRANSCRIPT

Page 1: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 1 of 23

Reference No. Date In Response To Date Subject Comments

RWA/20077040/0670 4/8/2009 Presidential Palalce Project in Abu Dhabi for Interior Design Consultancy RFP

RFP/Interior Design/005 4/19/2009 Addendum 5 Clarifications

RFP/Interior Design/005 5/21/2009 Addendum 6 Clarifications

RFP/Interior Design/006 5/24/2009 Addendum 6A Clarifications

RFP/Interior Design/007 6/17/2009 Post Tender Addendum 7 Clarifications Actioned

RWA/20077040/0670 10/11/2009 Kick Off Meeting Part 1 and Consultant Introductory Meeting

RWA-LETTER-001602 10/27/2009 Time Schedule, ref AIXC/SSH/NPP-A.D/2352/09 dated 18 Oct 2009

RWA-LETTER-001633 11/1/2009 AIXC/SSHI/NPP-A.D/2352/09 10/18/2009 List of Queries / Client Brief

RWA-LETTER-001635 11/1/2009 AIXC/SSHI/NPP-A.D/2352/09 10/18/2009 Scope of Services

RWA-LETTER-001733 11/17/2009 AIXC/SSHI/NPP-A.D/2353/09 11/3/2009

RWA-LETTER-001734 11/17/2009 AIXC/SSHI/NPP-A.D/2353/09 11/3/2009 ID Package Project Organization Chart

RWA-LETTER-001855 12/16/2009 LETTER-000009 ID Package (1) Project Organization Chart Rev 0

RWA-LETTER-001893 12/21/2009 LETTER-000007 Proposed ID Sub-Consultant for Interior Lighting and Signage and Wayfinding Design

RWA-LETTER-001920 12/24/2009 AIX-LETTER-000015

RWA-LETTER-002094 1/27/2010 AIX-LETTER-000017 08110 Interior Special Lighting Design Proposed Sub-Consultant

RWA-LETTER-002247 2/23/2010 AIX-LETTER-000034 08110 Monthly Project Progress Report - January 2010

RFP/Interior Design/005 4/19/2009 Addendum 5 Clarifications

RFP/Interior Design/005 5/21/2009 Addendum 6 Clarifications

RFP/Interior Design/006 5/24/2009 Addendum 6A Clarifications

RFP/Interior Design/007 6/17/2009 Post Tender Addendum 7 Clarifications

RWA/20077040/0670 10/11/2009 Kick Off Meeting Part 1 and Consultant Introductory Meeting

RWA-LETTER-001602 10/27/2009 Time Schedule, ref AIXC/SSH/NPP-A.D/2352/09 dated 18 Oct 2009

RWA-LETTER-002002 1/7/2010 -- -- Resident Project Manager Approval (ID Package 1) Closed

RWA-LETTER-002007 1/10/2010 AIX-LETTER-000013 12/31/2009 ID Package (1) Design time Schedule Rev G

RWA-LETTER-002096 1/27/2010 -- -- PPP Consultants PlanRWA-LETTER-002254 2/23/2010 AIX-LETTER-000042 2/21/2010 ID Package (1) A/E Coordination Workshop 01RWA-LETTER-002285 2/28/2010 AIX-LETTER-000036 2/15/2010 ID Package (1) Project Quality Plan ref AIX-LETTER-000036RWA-LETTER-002281 2/28/2010 Supreme Council ID Input

RWA-LETTER-002279 2/28/2010 AIX-LETTER-000035 2/15/2009 ID Package (1) Project Mobilization Plan

RWA-LETTER-002327 3/8/2010 AIX-LETTER-000059 3/5/2010

RWA-LETTER-002338 3/10/2010 Lighting Design Sub-Consultant

RWA-LETTER-002349 3/11/2010 -- -- ID Package (1) Progress MOM No. 011 Rev 1, No 012 Rev 1 and No 13 Rev1 Closed

RWA-LETTER-002344 3/11/2010 AIX-LETTER-000051 2/25/2010 ID Package (1) Monthly Project Progress Report - Feb 2010 Closed

RWA-LETTER-002355 3/11/2010 AIX-LETTER-000038 2/16/2010 ID Package (1) Consultancy Services Agreement

RWA-LETTER-002383 3/16/2010 AIX-TRANSMIT-000027 3/11/2010

RWA-LETTER-002440 3/24/2010 EWN-LETTER-002320 3/21/2010 Loads Locations of Chandelliers in Supreme Council, ref EWN-LETTER-002320RWA-LETTER-002505 4/1/2010 EWN-LETTER-002347 3/28/2010 PMMB - Part 15 Supreme Council MeetingRWA-LETTER-002506 4/1/2010 EWN-LETTER-002347 3/28/2010 PMMB - Part 15 Supreme Council MeetingRWA-LETTER-002543 4/7/2010 AIX-LETTER-000069 3/25/2010 17 March 2010 Coordination Meeting

Interior Special Lighting Proposed Sub-Consultant Ref AIXC/SSHI/NPP-A.D/2353/09 dated 03 November 2009

Main Building (PMMB) and Presidential Wing (PMPW) Floor Plans - Scope of Work (FOH and BOH) Areas

EWN-LETTER-002176 AIX-LETTER-000054

25/02/2010 28/02/2010

Prohibited Direct Communication from AXIC, ref AIX-LETTER-000059 dated 05 March 2010 and RWA-LETTER-002285 dated 28 Feb 2010

RWA-LETTER-002094 AIX-LETTER-000017

27/01/2010 06/01/2010

Closed Responded vide AIX-LETTER-000074 dated 02/05/2010

ID Package (1) Final Performance Bond and Advance Payment Bank Guarantee / Editable Version Ref AIX-TRANSMIT-000027

Closed vide AIX-LETTER-000073 dated 21/04/2010

Page 2: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 2 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-002568 4/8/2010 AIX-TRANSMIT-000032 3/25/2010

RWA-LETTER-002576 4/8/2010 Coordination with ID Consultant Package (1) - Missing Data

RWA-LETTER-002654 4/26/2010 -- -- Project Sign Board

RWA-LETTER-002666 4/27/2010 RWA-LETTER-002576 4/27/2010 Coordination with ID Consultant Package (1) - Missing Data ref EWN-LETTER-002532RWA-LETTER-002670 4/28/2010 AIX-RFI-000003 3/22/2010 PMMB Toilets Room Names, Numbers and Door Numbers, ref EWN-RTRFI-000078

RWA-LETTER-002704 5/2/2010 -- -- Concept Design Submission - ID Package (1)

RWA-LETTER-002705 5/2/2010 -- -- ID Package (1) Progress MOM No. 015RWA-LETTER-002721 5/5/2010 -- -- Aconex Attributes Changes

RWA-LETTER-002748 5/10/2010 EWN-LETTER-002542 4/28/2010

RWA-LETTER-002765 5/12/2010 LTR/08110/PM1/11/GD 5/11/2010 5 and 6 May Meeting Minutes

RWA-LETTER-002775 5/13/2010 AIX-LETTER-000075 5/2/2010 AIXC/SSH Interior Signage and Wayfinding Design Pre-Qualification Presentation

RWA-LETTER-002776 5/13/2010 AIX-LETTER-000074 5/2/2010 AIXC/SSH Interior Special Lighting Design Pre-Qualification Presenation

RWA-LETTER-002780 5/16/2010 -- -- Aconex Attachments

RWA-LETTER-002819 5/25/2010 AIX-LETTER-000080 5/20/2010 08110-AIXC - 5th and 6th of May Meeting NotesRWA-LETTER-002848 5/31/2010 Xavier's Contract AdministrationRWA-LETTER-002863 6/2/2010 Clarification of AIXC Scope of Work

RWA-LETTER-002968 7/6/2010 AIX-MM-000002 6/29/2010

RWA-LETTER-002999 7/19/2010 -- -- Estimated Cost

RWA-LETTER-003000

7/19/2010 AIX-MM-000002 6/29/2010

RWA-LETTER-003011 7/27/2010 AIX-LETTER-000086 7/21/2010 Estimated CostRWA-LETTER-003076 8/16/2010 RWA-LETTER-000086 7/21/2010 Estimated Cost

RWA-LETTER-003103 8/25/2010 8/16/2010 Cost Estimate, ref RWA-LETTER-001633 and RWA-LETTER-003076

RWA-LETTER-003220 9/28/2010 MOM 13/09/2010 9/13/2010

RWA-LETTER-003248 10/5/2010 ID Package 1 for Main BuildingRWA-LETTER-003296 10/13/2010 PPP Signage and Wayfinding DesignRWA-LETTER-003338 10/20/2010 AIX-TRANSMIT-000057 9/26/2010

RWA-LETTER-003428 10/31/2010 -- -- RWA-Xavier's Revised ScheduleRWA-LETTER-003462 11/2/2010 AIX-LETTER-000090 10/9/2010 Interior Design Package (1) Main Building Concept Design Approval RWA-LETTER-003523 11/8/2010 ID Package (1) Concept Design RWA-LETTER-003541 11/9/2010 -- -- Interior Design Package (1) Monthly Progress Report October 2010

Main Building Concept Design - ID Package (1) Presenation 04 to TCPPP, Ref AIX-TRANSMIT-000032

AIX-RFI-000003 AIX-LETTER-000042

AIX-MEMO-000005

22/03/2010 21/02/2010 10/04/2010

Responded vide AIX-LETTER-000079 dated 13 May 2010

Responded vide AIX-MEMO-000015 dated 09 May 2010

Supreme Council Concept Design submission due on 15/03/2010 and PMMB Concept Design revised boards for Client Presentation 04

Responded vide AIX-LETTER-000080 dated 20 May 2010

Main Building and Presidential Wing Additional Spaces Concept Design Client Presentation 06 to the Technical Committee for the Presidential Palace Project TCPPP- MOM

Main Building and Presidential Wing Additional Spaces Concept Design Client Presentation 06 to the Technical Committee for the Presidential Palace Project TCPPP- MOM

RWA-LETTER-001633 and RWA-LETTER-003076

Interior Design Package (1) Concept Design Estimate of Construction Cost for Hard and Soft Interiors MOM

Interior Design Package (1) Concept Design Estimate of Construction Cost for Hard and Soft Interiors

Page 3: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 3 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-003665 12/1/2010 -- --

RWA-LETTER-003666 12/1/2010 AIX-LETTER-000095 11/24/2010 Tableware Cost EstimateRWA-LETTER-003681 12/12/2010 AIX-LETTER-000092 10/18/2010 Interior Signage and Way Finding Pre-Concept DesignRWA-LETTER-003724 12/19/2010 -- -- Coordination Meeting Concerning the Domes at Presidential PalaceRWA-LETTER-003730 12/19/2010 RWA-LETTER-003248 10/5/2010 Interior Design Package (1) Main Building Concept Design ApprovalRWA-LETTER-003736 12/19/2010 AIX-LETTER-000092 10/18/2010 Interior Signage and Way Finding Pre-Concept Design RWA-LETTER-003742 12/20/2010 RWA-TRANSMIT-002418 2/11/2010 Domes package drawing for review Ref : Tender documents, RWA-TRANSMIT-002418RWA-LETTER-003754 12/21/2010 -- -- Requirement for MEP Works in Main BuildingRWA-LETTER-003762 12/22/2010 RWA-LETTER-003736 12/19/2010 Signage and Way Finding Pre-Concept Design RWA-LETTER-003767 12/22/2010 -- -- Project Organization ChartRWA-LETTER-003783 12/24/2010 RWA-LETTER-003743 Chandelier Loads in Domes RWA-LETTER-003786 12/26/2010 -- -- Main Building Concept Design Submission due 01/03/2010RWA-LETTER-003847 1/2/2011 -- -- RFIs ID Input for Main BuildingRWA-LETTER-003850 1/2/2011 -- -- Presidential Wing Concept Desing SubmissionRWA-LETTER-003851 1/2/2011 AIX-LETTER-000101 12/22/2010 Signage and Way Finding Pre-Concept Design RWA-LETTER-003862 1/4/2011 RWA-LETTER-003847 1/2/2011 RFIs ID Input for Main BuildingRWA-LETTER-003885 1/6/2011 -- --

RWA-LETTER-003886 1/6/2011 -- -- Main Building Coordination Workshop ScheduleRWA-LETTER-003887 1/5/2011 -- -- Interior Design Package (1) Monthly Progress Report December 2010RWA-LETTER-003991 1/16/2011 AIX-LETTER-000105 Requirement for MEP Works in Main BuildingRWA-LETTER-004032 1/18/2011 -- -- ID Package (1) Invoice 03 [No D03/D-4415]RWA-LETTER-004157 1/27/2011 AIX-MM-000005 1/24/2011 Interior Design Package (1) A/E Coordination Workshop 02RWA-LETTER-004173 1/31/2011 AIX-TRANSMIT-000085 1/29/2011 ID Package (1) RFP Areas Breakdown Estimate of Construction CostsRWA-LETTER-004198 2/1/2011 AIX-TRANSMIT-000082 1/20/2011 Abu Dhabi Core Team Additional Resources Curriculum VitaeRWA-LETTER-004243 2/7/2011 RWA-LETTER-003991 1/16/2011 Requirement for MEP Works in Main BuildingRWA-LETTER-004252 2/7/2011 AIX-MM-000006 2/2/2011 Interior Design Package (1) A/E Coordination Workshop 02 RWA-LETTER-004253 2/7/2011 RWA-LETTER-003754 12/21/2010 Requirement for MEP Works in Main Building and Presidential WingRWA-LETTER-004256 2/7/2011 -- -- PMPW ID Input for 3 Minister's OfficesRWA-LETTER-004266 2/7/2011 -- -- Main Building ID Design ScheduleRWA-LETTER-004278 2/9/2011 -- -- Interior Design Package (1) A/E Coordination Workshop 02 RWA-LETTER-004281 2/9/2011 RWA-TRANSMIT-004407 2/7/2011 Supreme Council ID Input - Reference: RWA-TRANSMIT-004407RWA-LETTER-004284 2/9/2011 -- -- Interior Concept Design (ID Package 01) Construction Cost EstimateRWA-LETTER-004301 2/9/2011 RWA-LETTER-04256 2/7/2011 PMPW ID Input for 3 Minister's OfficesRWA-LETTER-004302 2/9/2011 RWA-LETTER-004198 2/1/2011 Abu Dhabi Core Team Additional Resources Curriculum VitaeRWA-LETTER-004303 2/9/2011 RWA-LETTER-004252 2/7/2011 Interior Design Package (1) A/E Coordination Workshop 02 RWA-LETTER-004304 2/9/2011 RWA-LETTER-004266 2/7/2011 Main Building ID Design ScheduleRWA-LETTER-004306 2/9/2011 RWA-TRANSMIT-004407 2/7/2011 Supreme Council ID Input - Reference: RWA-TRANSMIT-004407RWA-LETTER-004323 2/12/2011 AIX-LETTER-000112 2/8/2011 ID Package (1) AE Coordination Workshop 03RWA-LETTER-004339 2/14/2011 AIX-TRANSMIT-000096 2/13/2011 PMPW ID Input for 3 Minister's OfficesRWA-LETTER-004370 2/15/2011 AIX-LETTER-000114 2/15/2011 PPP Project Related CorrespondenceRWA-LETTER-004373 2/15/2011 AIX-LETTER-000114 2/15/2011 Main Building ID Design ScheduleRWA-LETTER-004377 2/16/2011 -- -- Work Plan for Thursday 17 February 2011RWA-LETTER-004381 2/16/2011 AIX-TRANSMIT-000098 2/13/2011 Supreme Council ID Input - Reference: RWA-TRANSMIT-004407RWA-LETTER-004398 2/21/2011 AIX-TRANSMIT-000001 2/13/2011 ID Package (1) Invoice 03 No D03-D-4417 and Invoice 04 No. D04-D-4418

Interior Design Package (1) Concept Design Estimate of Construction Cost for Hard and Soft Interiors Client Presentation 01 / MOM

Interior Design Package (1) Selected Concept Finishes and Furniture Estimate of Construction Cost

Page 4: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 4 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-004410 2/21/2011 AIX-LETTER-000116 2/15/2011 PMPW ID Input for 3 Minister's OfficesRWA-LETTER-004448 2/24/2011 AIX-TRANSMIT-000090 2/6/2011

RWA-LETTER-004519 3/3/2011 -- -- Requirements for MEP Works in Main Building and Presidential WingRWA-LETTER-004565 3/8/2011 AIX-LETTER-000120 3/6/2011 ID Package (1) A/Ecoordination Workshop 04RWA-LETTER-004577 3/9/2011 AIX-LETTER-000113 2/10/2011 PMMB Main Hall PerspectivesRWA-LETTER-004639 3/14/2011 WA-MM-000020 3/10/2011 Mintues of Meeting VP Wing Concept Design Presentation RWA-LETTER-004673 3/17/2011 AIX-TRANSMIT-000109 3/9/2011

RWA-LETTER-004711 3/21/2011 AIX-LETTER-000123 3/17/2011 Ministerial Wing DomeRWA-LETTER-004777 3/24/2011 AIX-LETTER-000124 3/23/2011 ID Package (1) A/E Coordination Workshops 05 and 06 ScheduleRWA-LETTER-004848 4/3/2011 -- -- PMMB-Supreme Council 100% DD Subsmission - Architectural drawings .dwg filesRWA-LETTER-004853 4/4/2011 -- -- Construction Safety on sites and Labor Welfare facilities RWA-LETTER-004859 4/4/2011 AIX-LETTER-000126 4/3/2011 ID Package (1) Workshop 6 April 2011RWA-LETTER-004897 4/7/2011 -- -- PMMB-Supreme Council 100% DD Subsmission - Architectural drawings .dwg fileRWA-LETTER-004953 4/12/2011 -- -- ID Package (1) PMMB Reception Wing GF Plans (Walls Plans)RWA-LETTER-004968 4/16/2011 -- -- ID Package (1) AE Coordination Workshop 05 MOMRWA-LETTER-004970 4/16/2011 -- -- Requirements for MEP Works in MB Ref RWA-TRANSMIT-003947, AIX-LETTER-000105RWA-LETTER-004971 4/16/2011 -- -- ID Package (1) PMMB Ministerial Wing GF Plans (Walls Plans)RWA-LETTER-005043 4/24/2011 -- -- MB and Presidential Wing Approved Concept Design Submission (Client Presentation 09)RWA-LETTER-005292 5/19/2011 -- -- Coordination Meeting - 12 May 2011RWA-LETTER-005323 5/23/2011 -- -- List of Drawings for MB Package and HH Presidential Wing RWA-LETTER-005093RWA-LETTER-005395 5/31/2011 -- -- DWG Files for Domes Package RWA-LETTER-005405 5/31/2011 -- -- DWG Files of MB (PMMB) and Presidential Wing (PMPW) of Security Package for IDRWA-LETTER-005467 6/5/2011 -- -- Drawing Submittal Log UpdatedRWA-LETTER-005505 6/7/2011 -- -- Supreme Council Final Architectural and Engineering Drawings RWA-LETTER-005506 6/7/2011 -- -- PMPW Doors ScheduleRWA-LETTER-005569 6/12/2011 -- -- Diabled Toilets / CodeRWA-LETTER-005570 6/12/2011 -- -- PMMB Part 15 Supreme Council 100% DD Submission FOH and BOH Area Identification Plan

RWA-LETTER-005571 6/12/2011 -- -- Protocol Requirements for AV systemRWA-LETTER-005574 6/12/2011 -- -- General Architectural Concerns on ID DesignRWA-LETTER-005616 6/14/2011 -- -- Multi Media RoomRWA-LETTER-005617 6/15/2011 AIX-MM-000018 6/9/2011 Technical Meeting with RWA, EWAN and AIXC dated 07 June 2011RWA-LETTER-005629 6/15/2011 -- -- List of Employees and Copy of Labour Card RWA-LETTER-005630 6/15/2011 -- -- Payment Receipts (Presidential Palace ProjectRWA-LETTER-005690 6/21/2011 -- -- Revised issued for Construction Architectural Drawings of MB (PMMB)RWA-LETTER-005770 6/27/2011 -- -- Client / RWA Meetings RWA-LETTER-005842 6/29/2011 -- -- Ascension Day Thursday 30.06.2011RWA-LETTER-005856 7/3/2011 -- -- Client / RWA Meetings RWA-LETTER-005871 7/4/2011 -- -- ID Package (1) Monthly Project Progress Report - June 2011RWA-LETTER-005891 7/6/2011 -- --

RWA-LETTER-005943 7/10/2011 -- -- PMPW Presidential Wing Bldg - Main Majlis PerspectivesRWA-LETTER-005944 7/10/2011 -- -- PMPW Wing Building HH OfficeRWA-LETTER-006035 7/18/2011 -- -- ID Package (1) Client Presentation Schedule 20 July 2011

Interior Design Package (1) Revised Selected Concept Finishes and Furniture Estimate of Construction Cost

Interior Design Package (1) Revised Selected Concept Finishes and Furniture Estimate of Construction Cost

Ministers Offices Layout RWA-LETTER-005685, EWN-LETTER-005578 and EWN-TRANSMIT-006724

Page 5: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 5 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-006057 7/19/2011 -- -- PMPW Presidential Wing Bldg - HH OfficeRWA-LETTER-006073 7/19/2011 -- -- ID Package (1) Sanitary SelectionRWA-LETTER-006097 7/21/2011 -- -- MOM - Technical Meeting with RWA, EWAN and AIXC -15-06-2011 RWA-LETTER-006195 8/2/2011 -- -- Presidental Palace Project - PM's Ramadan TimingsRWA-LETTER-006362 8/18/2011 -- -- PMMB and PMPW Clinics RequirementsRWA-LETTER-006383 8/22/2011 -- -- ID Package (1) PMMB Hall 02 (GF1101) WSP Coordination for ID (AIXC)RWA-LETTER-006385 8/22/2011 -- -- PMPW Majlis FF0306 WSP Coordination for ID (AIXC)RWA-LETTER-006386 8/22/2011 -- -- PMPW Dining FF0410 WSP Coordination for ID (AIXC)RWA-LETTER-006387 8/22/2011 -- -- Entrance Hall GF0517 PMPW Coordination for ID (AIXC)RWA-LETTER-006388 8/22/2011 -- -- HH Office FF0302 PMPW WSP Coordination for ID (AIXC)RWA-LETTER-006389 8/22/2011 -- -- EWAN/WSP Coordination with ID (AIXC) Multi Purpose Hall - GF1201RWA-LETTER-006390 8/22/2011 -- -- Entrance Hall GF0802 PMMB WSP Coordination for ID (AIXC)RWA-LETTER-006408 8/23/2011 -- --

RWA-LETTER-006453 8/28/2011 -- -- Eid Holiday

RWA-LETTER-006498 9/4/2011 -- -- DWG drawings of MB (PMMB) and Presidential Wing (PMPW) of Security Package for ID

RWA-LETTER-006577 9/11/2011 -- -- Acoustical Report for the PMMB and PMPWRWA-LETTER-006579 9/11/2011 -- -- Acoustical Report for the PMMB and PMPW

RWA-LETTER-006645 9/14/2011 -- --

RWA-LETTER-006770 9/28/2011 -- -- Elevators & Escalators Tender Package Ref.: CCP210-EE1

RWA-LETTER-006771 9/28/2011 -- --

RWA-LETTER-006794 9/29/2011 -- -- PMMB Library Requirements

RWA-LETTER-006862 10/4/2011 -- -- Client Notification for Design and Supervision Consultants of the Presidential Palace Project

RWA-LETTER-006863 10/4/2011 -- -- Client Notification for Design and Supervision Consultants of the Presidential Palace Project

RWA-LETTER-006864 10/6/2011 -- -- Revised issued for Construction Architectural Drawings of MB (PMMB)

RWA-LETTER-006923 10/11/2011 -- -- Fire Rated Doors ref RWA-MM-000626

RWA-LETTER-006935 10/12/2011 -- -- Contractors recommendations for ID works

RWA-LETTER-007014 10/19/2011 -- -- DWG files of revised Architectural drawings for HH Presidential Wing (PMPW)

RWA-LETTER-007016 10/19/2011 -- -- Lift Schedules for HH Presidential Wing (PMPW)

RWA-LETTER-007093 10/25/2011 -- -- PMPW - Dining (FF 0410) - WSP Coordination for Interior Design (AIXC)

RWA-LETTER-007117 10/25/2011 -- -- Interior Design Package (1) - Revised Design Schedule

RWA-LETTER-007154 10/29/2011 -- -- Floor Trunking Metal Color - Ref CCEP2-TRANSMIT-000836

RWA-LETTER-007240 11/3/2011 -- -- Eid Al Adha Holiday

RWA-LETTER-007248 11/3/2011 -- -- Value Engineering for Lighting System in Presidential Place

RWA-LETTER-007261 11/10/2011 -- -- Acoustical Report for the PMMB and PMPW

RWA-LETTER-007265 11/10/2011 -- -- Acoustical Report for the PMMB and PMPW

RWA-LETTER-007330 11/14/2011 -- -- Interior Design Package (1) - Quantity Surveying Support Sub-Consultant

RWA-LETTER-007334 11/15/2011 -- -- Acoustical Report for the PMMB and PMPW

RWA-LETTER-007362 11/17/2011 -- -- Hard Copies Submittals

RWA-LETTER-007394 11/20/2011 -- -- 100% DD Submission due on 17.11.2011 Delay

Requirements for MEP Works in Main Building - Reference: RWA-TRANSMIT-003947; AIX-LETTER-000105

Interior Design Package (1) - PMMB - Hall Ministerial Wing (GF1421) & Main Majlis (GF0201) - WSP Coordination for Interior Design (AIXC)

PMMB - Supreme Council - AIXC Lighting and HVAC Coordination Meeting - 04-07-2011 - Technical Data

Page 6: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 6 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-007403 11/21/2011 -- -- 08110-MOM-AE Coordination Meeting with MOPA-13-11-2011

RWA-LETTER-007414 11/21/2011 -- --

RWA-LETTER-007473 11/24/2011 -- -- Al Hijra New Year

RWA-LETTER-007496 11/28/2011 -- -- MEP System Design in Presidential Place Project

RWA-LETTER-007496 11/28/2011 -- -- Value Engineering for lighting System in Presidental Place Project

RWA-LETTER-007617 12/6/2011 -- -- Procurement startegy and packaging

RWA-LETTER-007672 12/8/2011 -- -- Interior Design Package (1) - PMMB Updated ID Partition Plans to the Contractor

RWA-LETTER-007734 12/12/2011 -- -- AIXC Response Delays to Contractor RFI dated as of 6 December 2011

RWA-LETTER-007764 12/14/2011 -- -- Elevators ID finishes loads for PMMB and PMPW

RWA-LETTER-007765 12/14/2011 -- -- Interior Design Package (1) - PMPW Updated ID Partition Plans to the Contractor

RWA-LETTER-007774 12/14/2011 -- -- Interior Design Package (1) - PMPW Updated ID Partition Plans to the Contractor

RWA-LETTER-007781 12/14/2011 -- -- Value Engineering for lighting System in Presidental Place Project

RWA-LETTER-007820 12/15/2011 -- --

RWA-LETTER-007852 12/18/2011 -- -- List of Outstanding Information

RWA-LETTER-007877 12/19/2011 -- -- Aconex Distribution

RWA-LETTER-007894 12/19/2011 -- -- PMMB ID Elevations for FOH Areas

RWA-LETTER-007981 12/22/2011 -- --

RWA-LETTER-007989 12/25/2011 -- --

RWA-LETTER-007990 12/25/2011 -- --

RWA-LETTER-007993 12/25/2011 -- --

RWA-LETTER-008002 12/25/2011 -- -- Value Engineering for lighting System in Presidental Place Project

RWA-LETTER-008035 12/27/2011 -- -- AIXC PMMB and PMPW 100% Design Development Phase Submission

RWA-LETTER-008036 12/27/2011 -- -- MEP System Design in Presidential Place Project

RWA-LETTER-008076 12/28/2011 -- -- ADM Quality Control & Quality Assurance Procedures 2011

RWA-LETTER-008082 12/29/2011 -- -- PMMB - ID Elevations for FOH Areas

RWA-LETTER-008096 12/29/2011 -- -- NY Holiday PPP-Memo 042

RWA-LETTER-008131 1/2/2012 -- --

RWA-LETTER-008150 1/3/2012 -- -- Value Engineering for lighting System in Presidental Place Project

RWA-LETTER-008192 1/5/2012 -- --

RWA-LETTER-008232 1/8/2012 -- --

RWA-LETTER-008265 1/10/2012 -- -- FOH Finishes GF PMMB

RWA-LETTER-008306 1/11/2012 -- --

PMMB – PART 4 & 12 – GF – Operable Partition Ref CCEP-RFI-000587, RWA-RFI-000907, EWN-RTRFI-000987, AIX-RTRFI-000025

Revised Prayer Room Drawings of Presidential Wing, Vice Presidential Wing, and Crown Prince Wing Buildings

MEP-False ceiling height in Part 14 Lower Ground Floor - Ref CCEP-RFI-000806, RWA-RFI-001487, EWN-RTRFI-001530, RWA-RFI-001531, AIX-RTRFI-000050

RFI - ARC - PMPW - Lower Ground - Height of Free Openings - (G16) - Ref CCEP2-RFI-000267, RWA-RFI-001267, EWN-RTRFI-001352, AIX-RTRFI-000037, RWA-LETTER-007614, EWN-LETTER-009137

RFI - AR - (CB) - (49) - PMPW - Recesses & doors way - Ref CCEP2-RFI-000271, RWA-RFI-001279, EWN-RTRFI-001364, RWA-RFI-001446, AIX-RTRFI-000044

RFI - (CB) - AR - 51- PMPW - Height of sills & lintels for Recesses - Part (1) - Ref CCEP2-RFI-000309, RWA-RFI-001372, EWN-LETTER-008864, RWA-RFI-001449, AIX-RTRFI-000045

PMMB-Part 5 GF To M2 - Pre Function HALL ID and Structural Detail Ref CCEP-RFI-000744, RWA-RFI-001317, EWN-LETTER-008703, RWA-RFI-001358, AIX-RTRFI-000047

MEP Discrepancies between Arch and FF Dwgs FF PART 15, Supreme Council Ref EWN-RTRFI-001309

PMMB-Part 2-M1 High Level Arch Depth RefCCEP-RFI-000816, RWA-RFI-001533, EWN-LETTER-009643, AIX-RTRFI-000059

MEP-Mezz 1 - Builder Work Required For Louvers Ref CCEP-RFI-000725, RWA-RFI-001268, EWN-RTRFI-001347, AIX-RTRFI-000033

Page 7: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 7 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-008313 1/11/2012 -- -- Signage and Way Finding Presentation

RWA-LETTER-008395 1/18/2012 -- --

RWA-LETTER-008442 1/21/2012 -- --

RWA-LETTER-008467 1/23/2012 -- --

RWA-LETTER-008488 1/24/2012 -- -- Presidential Palace Project – All Packages

RWA-LETTER-008489 1/24/2012 -- -- Report of Conflict

RWA-LETTER-008525 1/26/2012 -- -- WSP Information Required from AIXC

RWA-LETTER-008534 1/28/2012 AIX-RTRFI-000057

RWA-LETTER-008562 1/30/2012 -- --

RWA-LETTER-008584 1/31/2012 -- -- AIXC Response Delays to Contractor for RFIs dated as of 26.12.11 Wings Package

RWA-LETTER-008631 2/2/2012 -- -- Roof Tops and Roof Terraces

RWA-LETTER-008638 2/2/2012 -- -- Prophet Mohammed's Day

RWA-LETTER-008705 2/6/2012 AIX-TRANSMIT-000288 25.12.2011 ID Works CCE

RWA-LETTER-008716 2/7/2012 -- -- PMMB Dome Changes

RWA-LETTER-0087753 2/9/2012 -- -- Procedures for preparing and submitting projects documents

RWA-LETTER-0087754 2/9/2012 -- --

RWA-LETTER-008772 2/9/2012 -- --

RWA-LETTER-008781 2/12/2012 AIXC-LETTER-000173 2/8/2012 PMMB Dome changes

RWA-LETTER-008844 2/14/2012 -- -- Interior Design Package (1) Monthly Project Progress Report - January 2012

RWA-LETTER-008850 2/14/2012 -- -- Technology Review & lessons learnt No. 1

RWA-LETTER-008913 2/19/2012 RWA-LETTER-008131 1/2/2012

RWA-LETTER-009104 2/28/2012 RWA-LETTER-008442 1/21/2012

RWA-LETTER-009111 2/28/2012 RWA-RFI-001996 2/20/2012

RWA-LETTER-009113 2/28/2012 -- -- AIXC Response Delays to Contractor for RFI dated as of 27/02/2012 Main Building Package

RWA-LETTER-009158 3/1/2012 -- -- Preparation of ID Package Vendor List

RWA-LETTER-009263 3/8/2012 -- --

RWA-LETTER-009294 3/12/2012 -- --

RWA-LETTER-009339 3/14/2012 AIX-RTRFI-000075 2/16/2012 MEP Lift Door Opening Ref Ref CCEP-RFI-000921, RWA-RFI-001829, EWN-RTRFI-001878

PMMB-GF Part 7and 9 – Block Work Detail at ID area ref CCEP-RFI-000772, RWA-RFI-001404, EWN-LETTER-008930, RWA-RFI-001481, AIX-RTRFI-000039

RFI-ARC-PMPW - Lower Ground Height of Free Openings (G16) Ref CCEP2-RFI-000267, RWA-RFI-001267, EWN-RTRFI-001352, AIX-RTRFI-000058

MEP Discrepancies bet Arch and FF dwgs FF Part 15 Supreme Council Ref CCEP-RFI-000689 , RWA-RFI-001160 , EWN-RTRFI-001309 , RWA-RFI-001359, AIX-RTRFI-000042

RFI-CB-AR-80 MPW Recesses at Lobby no GF0420 GF Part (4) Ref CCEP-RFI-000373, RWA-RFI-001539, EWN-LETTER-009525, AIX-RTRFI-000057, EWN-LETTER-009888

PMMB - Consultant's Comments in Ground Floor Block Work Drawings for Part 5, 6 & 7, Ref RWA-TRANSMIT-017836

MEP-PMMB- Parts 08 - False Ceiling Level – Ref CCEP-RFI-000911, RWA-RFI-001801, EWN-RTRFI-001839

RFI-ARC-PMPW LG Height of Free Openings G16 Ref CCEP2-RFI-000267, RWA-RFI-001267, EWN-RTRFI-001352, AIX-RTRFI-000037, RWA-LETTER-007614, EWN-LETTER-009137, AIX-LETTER-000168

PMMB Part 5 GF to M2 Pre Funcition Hall ID Design and Struc Detail Ref CCEP-RFI-000744, RWA-RFI-001317, EWN-LETTER-008703, RWA-RFI-001358, AIX-RTRFI-000047

RFI-ARC PMPW Lower Ground Height of Free Openings G16 Ref CCEP2-RFI-000267, RWA-RFI-001267, EWN-RTRFI-001352, AIX-RTRFI-000058

Deletion of Concrete middle arches arch type B 4 nos at Main Hall Ref CCEP-RFI-000945, RWA-RFI-001917, EWN-RTRFI-001975

PMMB Doors at BOH Scope of Works modified by IS Ref CCEP-RFI-000939, RWA-RFI-001904, EWN-LETTER-010606, AIX-RTRFI-000079

PMMB GF Part 9 ID Zone Door size clarification Ref CCEP-RFI-000925, RWA-RFI-001849, EWN-LETTER-010377, AIX-RTRFI-000078

Page 8: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 8 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-009346 3/14/2012 -- --

RWA-LETTER-009347 3/14/2012 -- --

RWA-LETTER-009355 3/14/2012 -- --

RWA-LETTER-009425 3/19/2012 AIX-LETTER-000178/179 14-12/03/2012

RWA-LETTER-009433 3/19/2012 -- -- Lifts Doors Finishes and Cabins Sizes Ref AIX-LETTER-000178, AIX-LETTER-000179

RWA-LETTER-009470 3/21/2012 -- -- Helipads Design

RWA-LETTER-009477 3/21/2012 -- -- H.H. WING PRIVATE TERRACE - LIWAN

RWA-LETTER-009500 3/22/2012 -- -- LIST OF ALL PPP STAFF for all Consultants, Contractors, Sub-Contractors

RWA-LETTER-009507 22/03/2012 -- --

RWA-LETTER-009508 22/03/2012 RWA-LETTER-009508 12/3/2012

RWA-LETTER-009509 22/03/2012 RWA-LETTER-009341 14/3/2012

RWA-LETTER-009512 22/03/2012 -- --

RWA-LETTER-009536 25/03/2012 -- -- Saturdays Working hours

RWA-LETTER-009557 27/03/2012 AIX-RTRFI-000084 12/3/2012

RWA-LETTER-009558 27/03/2012 AIX-RTRFI-000087 12/3/2012

RWA-LETTER-009559 27/03/2012 AIX-RTRFI-000085 12/3/2012

RWA-LETTER-009572 27/03/2012 AIX-RTRFI-000088 12/3/2012

RWA-LETTER-009638 29/03/2012 AIX-RTRFI-000097 28/03/2012

RWA-LETTER-009640 29/03/2012 AIX-RTRFI-000096 28/03/2012

RWA-LETTER-009641 29/03/2012 AIX-RTRFI-000098 28/03/2012

RWA-LETTER-009715 5/4/2012 -- -- PPP Packaging Strategy

RWA-LETTER-009719 5/4/2012 -- --

RWA-LETTER-009733 7/4/2012 -- -

RFI 1060-ID-STR-0124 CB Contra btw ID False ceiling levels and struc beams mezz Part 6 Ref CCEP2-RFI-000608, RWA-RFI-002009, EWN-LETTER-010822

RFI 1060-ID-STR-0135 CB Contr btw ID False ceiling levels and struc beam at office no GF0518 Mezz Part 5 Ref CCEP2-RFI-000637, RWA-RFI-002080, EWN-LETTER-011019

Vertical Transporting System Works Lift Cabin Finishes Scope of Work Summary Ref CCEP2-LETTER-000315

GEW Internal cladding dwg not matching with Arch dwg Ref CCEP-RFI-001015, RWA-RFI-002133, EWN-RTRFI-002133

PMMP Part 11 1st Floor Beam MP 1B13 and 1B14 Ref CCEP-RFI-000994, RWA-RFI-002062, EWN-LETTER-011053

Delay Resp for Deletion of concrete middle arches arch type B 4nos at MH Ref CCEP-RFI-000945, RWA-RFI-001917, EWN-RTRFI-001975, RWA-RFI-001996, AIX-RTRFI-000083

PMMB Lower Ground Part 14 Partial BOH doors are incl in door sch ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670, RWA-RFI-001998, AIX-RTRFI-000088

PMMB Part 8 Level B inner dome concrete edge Ref CCEP-RFI-000974, RWA-RFI-001987, EWN-RTRFI-002052

RFI 1060-ID-ARC-0126 CB Contra bet ID dwg & Arch dwg for Elev lobby LG0432 Lobby LG0502 Part4 lower GF Ref CCEP2-RFI-000567, RWA-RFI-001929, EWN-LETTER-010668,AIX-RTRFI-000084

RFI 1060-ID-ARC-0127 CB Contr bet ID dwg & Arch dwg for Lobby LG0403 Ref CCEP2-RFI-000566, RWA-RFI-001909, EWN-LETTER-010671,AIX-RTRFI-000087

RFI 1060-ID-ARC-0120 CB PMPW lower GF Part 6 Ref CCEP2-RFI-000570, RWA-RFI-001932, EWN-LETTER-010669, AIX-RTRFI-000085

PMMB lower GF Part 14 Partial BOH doors are incl in door schedule Ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670,AIX-RTRFI-000088

PMMB part 8 level B inner dome concrete edge Ref CCEP-RFI-000974, RWA-RFI-001987, EWN-RTRFI-002052

PMMB part 5&11 level B ID Ceiling metalfamr support to peremater conc beam below skylight type1 Ref CCEP-RFI-000979, RWA-RFI-002004, EWN-LETTER-010924

GEW-INTERNAL CLADDING DRAWING NOT MATCHING WITH ARCHITECTURAL DRAWING - Reference: CCEP-RFI-001015, RWA-RFI-002133, EWN-RTRFI-002133

PMMB Lower GF Part 14 partial BOH doors incl in door sch Ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670,AIX-RTRFI-000088

RFI 1060-ID-ARC-0127 CB Contrac btw ID dwgs & Arch dwg for Lobby (LG0403) Ref CCEP2-RFI-000566, RWA-RFI-001909, EWN-LETTER-010671,AIX-RTRFI-000087

Page 9: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 9 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-009734 7/4/2012 -- -

RWA-LETTER-009735 7/4/2012 -- -

RWA-LETTER-009737 7/4/2012 -- -

RWA-LETTER-009764 9/4/2012 -- -- PMST GF Part 7 and ID Part A13 Ref CCEP-RFI-000956

RWA-LETTER-009784 9/4/2012 -- -- PMMB Doors at Border of BOH & FOH Areas

RWA-LETTER-009827 2/4/2012 RWA-LETTER-009536 25/03/2012 Saturdays Working hours

RWA-LETTER-009873 15/04/2012 RWA-LETTER-009735 27/03/2012

RWA-LETTER-009875 15/04/2012 RWA-LETTER-009733 7/4/2012

RWA-LETTER-009888 16/04/2012 -- --

RWA-LETTER-009889 16/04/2012 -- --

RWA-LETTER-009898 16/04/2012 -- --

RWA-LETTER-009992 16/04/2012 -- -- PMST GF part 7 & ID part A13 ref CCEP-RFI-000956

RWA-LETTER-009994 16/04/2012 -- --

RWA-LETTER-009976 22/04/2012 -- -- Signage & Wayfinding Presentation

RWA-LETTER-009997 23/04/2012 -- --

RWA-LETTER-010036 25/04/2012 -- --

RWA-LETTER-010079 26/04/2012 -- -- Value Engineer FOH-BOH Doors and Areas in PMPW and PMMB

RWA-LETTER-010096 29/04/2012 -- --

RWA-LETTER-010134 1/5/2012 -- --

RWA-LETTER-010136 1/5/2012 -- --

RWA-LETTER-010183 3/5/2012 -- --

RWA-LETTER-010207 6/5/2012 -- --

RWA-LETTER-010211 6/5/2012 -- --

RWA-LETTER-010256 9/5/2012 -- --

RFI 1060-ID-ARC-0126 CB Contr btw ID & Arch dwg for Elevator lobby LG0432 Lobby LG0502 Part 4 Lower GF Ref CCEP2-RFI-000567, RWA-RFI-001929, EWN-LETTER-010668,AIX-RTRFI-000084

RFI 1060-ID-ARC-0120 CB PMPW Lower GF Part 6 Ref CCEP2-RFI-000570, RWA-RFI-001932, EWN-LETTER-010669, AIX-RTRFI-000085

MEP Finishes of Electrical Devices- Ref CCEP-RFI-001012, RWA-RFI-002129, EWN-LETTER-011237

Delay response of RFI 1060-ID-ARC-0120 CB PMPW LGF Part 6 ref CCEP2-RFI-000570, RWA-RFI-001932, EWN-LETTER-010669, AIX-RTRFI-000085

RFI 1060-ID-ARC-0127 CB Contr btw ID dwg & Arch dwg for Lobby LG0403 Ref CCEP2-RFI-000566, RWA-RFI-001909, EWN-LETTER-010671,AIX-RTRFI-000087

PMMB LGF Part 14 partial BOH doors are incl in door schedule Ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670,AIX-RTRFI-000088

Delay Response of MEP-Finishes of Electrical Devices Ref CCEP-RFI-001012, RWA-RFI-002129, EWN-LETTER-011237

Delay Response PMMB DOME MB3 ID Dome ceiling support and suspension ref CCEP-RFI-001045, RWA-RFI-002194, EWN-LETTER-011583

PMMB Part 3 GF Door type revised by ID at BOH Arch Ref CCEP-RFI-001030, RWA-RFI-002168, EWN-LETTER-011573

PMMP Part 11 1st floor beam MP 1B13 &1B14 Ref CCEP-RFI-000994, RWA-RFI-002062, EWN-LETTER-011053

PMMB Part 3 GF door type rev by ID at BOH Ref CCEP-RFI-001030, RWA-RFI-002168, EWN-LETTER-011573

OTIS-SC5 & SC6 Door Finishes- Reference: CCEP-RFI-001028, RWA-RFI-002170, EWN-LETTER-011332

PMMB LGF part 14 partial BOH doors are incl in door sch Ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670,AIX-RTRFI-000088

Delay Resp of MEP Finishes of Electrical Devices Ref CCEP-RFI-001012, RWA-RFI-002129, EWN-LETTER-011237

PMMB dome MB3 ID Dome ceiling support & suspension Ref CCEP-RFI-001045, RWA-RFI-002194, EWN-LETTER-011583

Delay Response of PMMB drop off prov depth of chandlier Ref CCEP-RFI-000970, EWN-RTRFI-002260

Delay Response of PMMB-PART 3 GF door type rev by ID at BOH Arch Ref CCEP-RFI-001030, RWA-RFI-002168, EWN-LETTER-011573

Delay Response of PMMB part 2 beam type MM-M1B1 on grid H7 &H5 Ref CCEP-RFI-001039, RWA-RFI-002182, EWN-RTRFI-002203

Page 10: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 10 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-010263 9/5/2012 -- --

RWA-LETTER-010372 5/14/2012 -- --

RWA-LETTER-010377 5/14/2012 -- --

RWA-LETTER-010379 5/14/2012 -- --

RWA-LETTER-010380 5/14/2012 -- --

RWA-LETTER-010381 5/14/2012 -- --

RWA-LETTER-010405 5/15/2012 -- --

RWA-LETTER-010406 5/15/2012 -- --

RWA-LETTER-010407 5/15/2012 -- --

RWA-LETTER-010506 5/22/2012 -- -- ID MEP design requirements for the Front of House in PPP

RWA-LETTER-010524 5/23/2012 RWA-RFI-002633 5/16/2012

RWA-LETTER-010525 5/23/2012 RWA-RFI-002625 5/15/2012

RWA-LETTER-010526 5/23/2012 RWA-RFI-002605 5/12/2012

RWA-LETTER-010542 5/24/2012 -- -- PMMB Supreme Council ID Door detail at stair ST01-04 Ref CCEP-RFI-001189

RWA-LETTER-010553 5/24/2012 -- --

RWA-LETTER-010558 5/24/2012 RWA-LETTER-010380 5/14/2012

RWA-LETTER-010614 5/28/2012 RWA-LETTER-010372 5/14/2012

RWA-LETTER-010615 5/28/2012 -- -- PMMB part 11 FF external mashrabiya & window detail Ref CCEP-RFI-001166

RWA-LETTER-010643 5/29/2012 -- -- Coordination with Other Consultants

RWA-LETTER-010656 5/29/2012 -- -- PMMB Main Hall color scheme proposal

RWA-LETTER-010697 5/31/2012 -- -- MEP False ceiling height in Room No.FF0943 located in Part 09 FF ref CCEP-RFI-001158

RWA-LETTER-010730 6/2/2012 RWA-LETTER-010506 5/22/2012 ID MEP design requirements for the Front of House in PPP Ref RWA-LETTER-010506

RWA-LETTER-010781 6/5/2012 -- -- Elev CAD Dwgs Ref RWA-LETTER-010654 - REFERENCE: CCEP-LETTER-000522

RWA-LETTER-010819 6/6/2012 RWA-RFI-002699 5/24/2012

Delay Response of PMMB part 2 beam type MM-M1B1 on grid H7&H5 Ref CCEP-RFI-001039, RWA-RFI-002182, EWN-RTRFI-002203

PMMB Part 2 beam type MM-M1B1 on grid H7 & H’5 Ref CCEP-RFI-001039, RWA-RFI-002182, EWN-RTRFI-002203

Delay Reponse for MEP False ceiling height in Room No.FF0943 located in Part 09 FF Ref CCEP-RFI-001158,

Delay Reponse for MEP FoH Luminaries Sch & Control Schematics Ref CCEP-RFI-001066, RWA-RFI-002275, EWN-LETTER-011569

Delay Response of MEP Finishes of Electrical Devices Ref CCEP-RFI-001012, RWA-RFI-002129, EWN-LETTER-011237

Delay Responsed for PMMB LGF part 14 partial BOH doors are incl in door sch Ref CCEP-RFI-000953, RWA-RFI-001926, EWN-LETTER-010670,AIX-RTRFI-000088

RFI 1060-ID-ARC-0127 CB Contr btw ID dwgs & Arch dwg for Lobby LG0403 Ref CCEP2-RFI-000566, RWA-RFI-001909, EWN-LETTER-010671,AIX-RTRFI-000087

RFI 1060-ID-ARC-0126 CB Contr btw ID dwg & Arch dwg for Elev lobby LG0432 LG0502 Part4 LGFRef CCEP2-RFI-000567, RWA-RFI-001929, EWN-LETTER-010668,AIX-RTRFI-000084

Delay response of RFI 1060-ID-ARC-0120 CB PMPW LGF Part 6 Ref CCEP2-RFI-000570, RWA-RFI-001932, EWN-LETTER-010669, AIX-RTRFI-000085

Delay Resp of RFI 1060-ID-ARC-0176 Door width for staircase PW7A FF Part 4 Ref CCEP2-RFI-000888, EWN-RTRFI-002632

Delay Resp of RFI 1060-ID-ARC-0173 Struc opening for doors no GF0214 & GF0215 Ref CCEP2-RFI-000867, RWA-RFI-002551, EWN-RTRFI-002587

Delay Resp of RFI 1060-ID-ARC-0172 Struc opening for door way at office GF0118 Ref CCEP2-RFI-000870, EWN-RTRFI-002628

ID Pkg Internal Cladding Support Prov to Steel domes MB2 and MB5 Ref CCEP-LETTER-000467, RWA-LETTER-010055, EWN-LETTER-012352

Delay Resp of MEP Finishes of Electrical Devices Ref CCEP-RFI-001012, RWA-RFI-002129, EWN-LETTER-011237

PMMB Part 2 beam type MM-M1B1 on grid H7 & H5 Ref CCEP-RFI-001039, RWA-RFI-002182, EWN-RTRFI-002203

Delay Resp of PMMB Supreme counc bldg GF ID doors on sch not match on ID layout plan dwg Ref CCEP-RFI-001190, EWN-LETTER-012517

Page 11: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 11 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-010820 6/6/2012 RWA-RFI-002700 5/24/2012

RWA-LETTER-010822 6/6/2012 RWA-RFI-002743 5/28/2012 Delay Response of MEP - Floor Boxes in FoH - Mail Number CCEP-RFI-001185

RWA-LETTER-010828 6/6/2012 -- -- Engineering and structural report for ID finishes

RWA-LETTER-010928 6/10/2012 -- -- PMMB Main Hall Color Scheme Proposal

RWA-LETTER-010936 6/11/2012 -- -- Estimated Construction Schedule for ID Works MP and PW

RWA-LETTER-010943 6/11/2012 -- --

RWA-LETTER-010947 6/11/2012 -- --

RWA-LETTER-010951 6/11/2012 RWA-LETTER-010943 6/11/2012

RWA-LETTER-010986 6/13/2012 -- -- Al Isra Wal Miraaj Day

RWA-LETTER-011111 6/21/2012 -- -- PMMB Main Hall Color Scheme Proposal

RWA-LETTER-0011116 6/21/2012 RWA-LETTER-010943 6/11/2012

RWA-LETTER-0011118 6/21/2012 -- -- PMMB & PMPW Tender Documents and BOQ

RWA-LETTER-011158 6/21/2012 -- -- Master Key / Locking Strategy

RWA-LETTER-011184 6/25/2012 RWA-LETTER-011111 6/21/2012 PMMB Main Hall Color Scheme Proposal

RWA-LETTER-011257 6/27/2012 -- -- Packaging & Procurement Strategy

RWA-LETTER-011324 6/28/2012 RWA-LETTER-010943 6/11/2012

RWA-LETTER-011325 6/28/2012 RWA-LETTER-010951 6/11/2012

RWA-LETTER-011347 6/30/2012 -- -- Coordination with ID Consultants with regards to Contractor's Shop Drawing & RFI's

RWA-LETTER-011353 7/2/2012 RWA-LETTER-011116 6/21/2012

RWA-LETTER-011515 7/8/2012 -- -- MEP - Contradicting between Power and ID drawings

RWA-LETTER-011516 7/8/2012 -- -- PMMB Part 2 ID Block wall from GF to level A

RWA-LETTER-011517 7/8/2012 -- --

RWA-LETTER-011518 7/8/2012 -- -- Structural opening doors GF0605, GF0608B & GF0615B Part 6 Zone B02

RWA-LETTER-011519 7/8/2012 -- -- Slab covering elevator Shaft – Level A – Part (4)

RWA-LETTER-011520 7/8/2012 -- -- Structural opening doors GF0509A, GF0509B Part 5 Zone B02

RWA-LETTER-011523 7/8/2012 -- -- Air Outlet Clarification - PMPW

RWA-LETTER-011524 7/8/2012 -- -- PPWP- double leaf swing barrier door

RWA-LETTER-011525 7/8/2012 -- -- MEP - False Ceiling height in PMMB Part 7 Ground Floor

RWA-LETTER-011526 7/8/2012 -- -- MEP - RFI-EL-PMMB-83-Light fitting type G1 (Rep.10) in Main Majlia

RWA-LETTER-011527 7/8/2012 -- -- MEP - FoH Staircases Light Fitting C4 to be changed to C4-E

RWA-LETTER-011532 7/9/2012 -- -- Missing doors number FT 0 rev - C01- Part 3

Delay Resp of PMMB Sup counc bldg GF ID door details Ref CCEP-RFI-001188, EWN-LETTER-012516

Stamping Process of Rev Dwgs (latest FC revision) Consultants Coordinated Dwgs FOH Areas

PMMB Part 1 ID Door nos. GF0221A, 221B, 216A, 216B ref CCEP-RFI-001180, RWA-RFI-002621, EWN-LETTER-012427

Stamping of Rev Dwgs (latest FC revision) FOH Areas Arch for MB PMMB Ref EWN-LETTER-013085

Stamping of Rev Dwgs (latest FC revision) FOH Areas MEP for MB (PMMB) Ref EWN-LETTER-013402

Stamping of Rev Dwgs latest FC revision FOH Areas Arch, Struc & MEP for Presidential Wing (PMPW) Ref EWN-LETTER-013642

Stamping of Rev Dwgs latest FC revision FOH Areas Arch for MB PMMB Ref EWN-LETTER-013085

Stamping of Rev Dwgs latest FC revision FOH Areas MEP for MB (PMMB) Ref EWN-LETTER-013402, RWA-LETTER-011116

Struc opening doors GF0604, GF06022, GF0606 GF0608 & Rolling shutter for lobbies Part 6 Zone (B02)

Page 12: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 12 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-011578 7/10/2012 -- --

RWA-LETTER-011580 7/11/2012 -- -- PMMB Part 5 FFWindow Type 12 BW Ref CCEP-RFI-001165

RWA-LETTER-011583 7/11/2012 -- -- Door type of Stair 3 at part 4 - Mezzanine floor

RWA-LETTER-011619 7/12/2012 -- -- PMMB Part 16 ID Block wall starting from GF

RWA-LETTER-011620 7/12/2012 -- -- PMMB Part 4 & 12 ID Block wall top level

RWA-LETTER-011621 7/12/2012 -- -- PMMB Part 5, 6, 10, 11 ID Block wall top level

RWA-LETTER-011639 7/12/2012 -- -- MEP False Ceiling height in PMMB (Part 9) GF

RWA-LETTER-011672 7/16/2012 RWA-LETTER-011257 6/27/2012 Packaging & Procurement Strategy

RWA-LETTER-011673 7/16/2012 -- -- PS Items for the 3 VIP Ministerial Offices in PMPW

RWA-LETTER-011718 7/18/2012 -- -- PPWP- Double Leaf Swing Barrier Door

RWA-LETTER-011737 7/19/2012 -- -- PMMB Supreme council ID door detail at stair ST01 to ST04 Mail No. CCEP-RFI-001189

RWA-LETTER-011824 7/25/2012 -- -- Screens for HVAC Level B Main Hall Entrance Part 4

RWA-LETTER-011968 8/1/2012 -- -- Missing door type & contradiction in door (FF0307A) width at ID FF part 3 –A4,A5

RWA-LETTER-011969 8/1/2012 AIX-RTRFI-000153 6/25/2012

RWA-LETTER-011970 8/1/2012 -- -- Missing door types FF Part 4 Zone A04

RWA-LETTER-011971 8/1/2012 AIX-RTRFI-000149 6/25/2012 RFI 1060-ID-ARC-0202 Missing info Prayer area GF part 4 Zone A05

RWA-LETTER-011975 8/1/2012 AIX-RTRFI-000103 4/17/2012 Door type of Stair 3 at part 4 - Mezzanine floor

RWA-LETTER-011976 8/1/2012 -- -- RFI 1060-ID-ARC-0281 Doors FF0312A , FF0304A , FF0309A contr in ID FF part 3 A4,A5

RWA-LETTER-012006 8/2/2012 -- -- Delay Notification Alert

RWA-LETTER-012059 8/7/2012 -- -- MEP Sanitary wares & Accessories Approved Details Ref CCEP-RFI-001332

RWA-LETTER-012087 8/9/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER--012102 8/9/2012 RWA-TRANSMIT-032453 7/12/2012 MEP Design Requirement- PMPW- Part 6

RWA-LETTER-012107 8/9/2012 -- -- RFI 1060- ARC-0159 Door type of Stair 3 at part 4 Mezzanine floor

RWA-LETTER-012115 8/11/2012 -- -- ID Packages Mock Up Location

RWA-LETTER-012158 8/13/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER-012178 8/14/2012 -- -- PW3, 6C, 7B, AND 8 FOH lift cabin details ADC/4240/12/67 Ref CCEP2-LETTER-000535

RWA-LETTER-012171 8/15/2012 RWA-LETTER-011116 6/21/2012

RWA-LETTER-012220 8/16/2012 AIX-TRANSMIT-000535 8/13/2012 PMMB - Main Building Drop Off & Main Entrance Door Finishes Design Proposal

RWA-LETTER-012280 8/23/2012 Beam RB2fH’ clashes with ID – Level A – H.H. Office - Part (3)

RWA-LETTER-012281 8/23/2012 PMMB - Perineal Spray Mixer

RWA-LETTER-012285 8/23/2012 PMPW Finishes of Electrical Devices

RWA-LETTER-012286 8/23/2012 Access Panels' location for toilets no (GF0611)&(GF0629)- Part 6 – Zone (B02)

RWA-LETTER-012291 8/25/2012 AIX-TRANSMIT-000519 8/2/2012 PMMB & PMPW Struc Steel dwgs related to ID Works

RWA-LETTER-012292 8/25/2012 AIX-LETTER-000259 7/23/2012 PPWP Double leaf swing barrier door

RWA-LETTER-012297 8/25/2012 -- -- ID Works Managing Contractors RFP docs warning

RWA-LETTER-012315 8/26/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER-012323 8/27/2012 -- -- Toilets partition height at GF part 6

RWA-LETTER-012351 8/28/2012 -- -- MEP Design Requirement- PMPW- Part 6

RWA-LETTER-012352 8/28/2012 -- -- PPWP Double leaf swing barrier door

ID Pkg Internal Cladding Support Prov to Steel Domes MB2 Supreme Council and MB5 Ministerial Wing Ref CCEP-LETTER-000467, RWA-LETTER-010055, EWN-LETTER-012352

Contr btw doors schedule & doors types GF0307D,GF0317A,GF0313B Part 3 zone C01,A03,A07

Stamping of Rev Dwgs latest FC revision FOH Areas Elec Dwgs and Sch for Presidential Wing (PMPW) Ref EWN-LETTER-013642,EWN-TRANSMIT-023155

Page 13: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 13 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-012353 8/28/2012 -- -- RFI-1060-ARC-0159 Door type of stair 3 at part 4 mezzanine floor

RWA-LETTER-012354 8/28/2012 -- -- PMPW Finishes of Electrical Devices

RWA-LETTER-012355 8/28/2012 -- -- Beam RB2fH’ clashes with ID – Level A – H.H. Office - Part (3)

RWA-LETTER-012359 8/29/2012 -- -- Beams clash with false ceiling avobe staircase PW7A Level A Part 4

RWA-LETTER-012366 8/29/2012 -- -- MEP finishes of electrical devices

RWA-LETTER-012402 9/1/2012 -- -- Door height at lobby FF0443 FF Part 4

RWA-LETTER-012414 9/2/2012 RWA-LETTER-012280 8/23/2012

RWA-LETTER-012433 9/2/2012 -- -- PMMB & PMPW Pending Correspondence

RWA-LETTER-012476 9/4/2012 -- -- ID Packages Tender Docs MB Presidential Wing

RWA-LETTER-012481 9/4/2012 -- -- ID Packages Tender Docs MB Presidential Wing

RWA-LETTER-012501 9/5/2012 -- -- FOH Lighting design

RWA-LETTER-012502 9/6/2012 AIX-TRANSMIT-000569 9/3/2012 PMPW Finishes of Electrical Devices ref EWN-LETTER-015096 AIX-TRANSMIT-000569

RWA-LETTER-012515 9/6/2012 -- -- Door height at lobby FF0443 FF Part 4

RWA-LETTER-012516 9/6/2012 -- -- Beams clash with false ceiling avobe staircase PW7A Level A Part 4

RWA-LETTER-012524 9/6/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER-012541 9/9/2012 -- -- Beams clash with false ceiling avobe staircase PW7A Level A Part 4

RWA-LETTER-012542 9/9/2012 -- -- ID Issues in GF PMVW

RWA-LETTER-012543 9/9/2012 -- -- Doors height at Lobby FF0443 FF Part 4

RWA-LETTER-012545 9/9/2012 -- -- PMPW Finishes of Elec devices ref EWN-LETTER-015096, AIX-TRANSMIT-000569

RWA-LETTER-012560 9/10/2012 -- --

RWA-LETTER-012604 9/11/2012 RWA-LETTER-012481 9/4/2012 ID Packages Tender Documents MB, Presidential Wing Ref RWA-Letter-012481

RWA-LETTER-012616 9/11/2012 -- -- PMMB & PMPW Tableware and Linen Submission

RWA-LETTER-012618 9/11/2012 -- -- Updated Master Plan

RWA-LETTER-012623 9/11/2012 -- -- General Requirements - Division 1 for the Interior Design and Fit Out Tender Package

RWA-LETTER-012639 9/12/2012 AIX-TRANSMIT-000573 9/5/2012 PMPW - Toilets’ partition height at ground floor-part (6)

RWA-LETTER-012641 9/12/2012 -- -- MEP-Finishes of Electrical Devices

RWA-LETTER-012642 9/12/2012 -- -- MEP - Drain Requirement for ID areas – Part 16 - Ref CCEP-RFI-001328

RWA-LETTER-012681 9/13/2012 -- -- Lift Cabin details for FOH Lifts (in PDF/CAD/DWF Formats) - MB Package (PMMB)

RWA-LETTER-012682 9/13/2012 -- -- Lift Cabin details for FOH Lifts (in PDF/CAD/DWF Formats) - Presidential Wing (PMPW)

RWA-LETTER-012710 9/16/2012 AIX-TRANSMIT-000565 9/2/2012 MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER-012711 9/16/2012 AIX-LETTER-000243 7/8/2012 PMMB and PMPW Tender Docs and BOQ Ref EWN-LETTER-015307

RWA-LETTER-012725 9/17/2012 AIX-RTRFI-000169 7/19/2012 MEP Finishes of Elec devices Ref RWA-LETTER-012366

RWA-LETTER-012727 9/17/2012 -- -- PMPW - Toilets’ partition height at ground floor-part (6)

RWA-LETTER-012728 9/17/2012 -- -- PMPW- ID -plaster locations - clinic area

RWA-LETTER-012793 9/19/2012 -- -- RFI - ( RFI-EL-PMXX-025 ) - Fire Alarm and Emergency System Drawings Incomplete

RWA-LETTER-012795 9/19/2012 -- -- PMMB & PMPW Pending Correspondences

RWA-LETTER-012804 9/19/2012 AIX-LETTER-000608 9/17/2012 PMMB MB AV Coordination Design Issue Ref EWN-Letter-013368

RWA-LETTER-012809 9/19/2012 -- --

RWA-LETTER-012846 9/21/2012 -- -- Interface of BOH abd FOH finishes in stairs Ref EWN-Letter-015377

Beam RB2fH’ clashes with ID – Level A – H.H. Office - Part (3) ref RWA-LETTER-12280 EWN-RTRFI-003247

Supplementary material trans MEP Fire Detection & Voice Annunciation System Reply to Rev 02 comments Ref CCEP-LETTER-000652

AIXC Replies on the A/E Consultants Comments related to AIXC 100 % DD and Construction Documents (FT) Submissions

Page 14: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 14 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-012849 9/21/2012 -- --

RWA-LETTER-012860 9/23/2012 -- -- ID scope of Works – Loose Furniture for Secondary Areas

RWA-LETTER-012868 9/23/2012 -- -- PW6A & 6B FOH Lift Cabin Detail

RWA-LETTER-0126872 9/23/2012 AIXC-LETTER-000598 9/15/2012 Audio Visual Specifications

RWA-LETTER-0126876 9/23/2012 -- -- PMPW - Toilets’ partition height at ground floor-part (6)

RWA-LETTER-0126877 9/23/2012 -- -- RFI - ( RFI-EL-PMXX-025 ) - Fire Alarm and Emergency System Drawings Incomplete

RWA-LETTER-012891 9/24/2012 -- -- General Requirements - Division 1 for the Interior Design and Fit Out Tender Package

RWA-LETTER-012913 9/25/2012 AIX-LETTER-000294 9/20/2012 Fire Alarm and Emergency System Drawings Incomplete

RWA-LETTER-012917 9/25/2012 -- -- Car Internal Finishes and Lighting of Elevators

RWA-LETTER-012922 9/25/2012 -- -- PMMB - proposed fixing detail coordinated with stone cladding

RWA-LETTER-012941 9/26/2012 AIX-LETTER-000267 8/6/2012

RWA-LETTER-012952 9/26/2012 AIX-TRANSMIT-000565 9/2/2012 MEP - Drain Requirement for ID areas – Part 16 - Ref CCEP-RFI-001328

RWA-LETTER-012954 9/27/2012 -- -- ID Scope of Works – Loose Furniture for Secondary Areas Ref RWA-LETTER-012860

RWA-LETTER-012961 9/27/2012 -- -- PMPW Main Hall Color Scheme Proposal

RWA-LETTER-013002 10/1/2012 AIX-LETTER-000297 9/27/2012 Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297

RWA-LETTER-013044 10/3/2012 AIX-TRANSMIT-000609 9/17/2012

RWA-LETTER-013051 10/3/2012 -- -- Sanitary Wares & Accessories approved details for PMPW

RWA-LETTER-013063 10/3/2012 AIX-LETTER-000299 9/27/2012 MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328

RWA-LETTER-013080 10/3/2012 -- -- Tender Documents - ID Fit Out Contractors - Packages 1, 2 & 3

RWA-LETTER-013097 10/6/2012 AIX-TRANSMIT-000565 9/2/2012 MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328 AIX-TRANSMIT-000565

RWA-LETTER-013149 10/7/2012 -- -- ID Fit out Packages 1 to 5 Tender Queries Set No. 1

RWA-LETTER-013156 10/7/2012 -- -- PMPW Addendum to Tender Docs

RWA-LETTER-013157 10/7/2012 -- -- PMMB Addendum to Tender Docs

RWA-LETTER-013167 10/7/2012 AIX-TRANSMIT-000589 9/15/2012 GSM Antena Layout at Main Building Ref EWN-LETTER-015636

RWA-LETTER-013168 10/7/2012 -- --

RWA-LETTER-013170 10/7/2012 -- --

RWA-LETTER-013205 10/9/2012 -- -- FF & E Bill of Quantities

RWA-LETTER-013217 10/9/2012 AIX-LETTER-000302 10/7/2012 Tender Issue of AV Package Submission

RWA-LETTER-013239 10/10/2012 -- --

RWA-LETTER-013240 10/10/2012 AIX-TRANSMIT-000628 10/7/2012 Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297

RWA-LETTER-013288 10/13/2012 -- -- MEP - Flashing Beacon

RWA-LETTER-013289 10/13/2012 -- -- ID issues in PMPW - Part 4 - Ground Floor- Waiting Area

RWA-LETTER-013296 10/13/2012 -- -- ID issues in PMPW-Part 4- Ground Floor- Lobby Area

ID Pkg 1 TD-0 Phase Submission Deliv related to Packages 01, 02 and 03 - PMMB and PMPW All Zones due on the 16 September 2012

ID Pkg Internal Cladding Supp Prov to Steel Domes MB2 Supreme Council and MB5 Ministerial Wing Ref CCEP-LETTER-000467, RWA-LETTER-010055, EWN-LETTER-012352

AIXC replies on the A/E Consultants Comments related to AIXC 100 % DD and Construction Documents (FT) Submissions Ref RWA-LETTER-012809

ID Pkg 1 TD-0 Phase Sub Deliv related to Packages 01, 02 and 03 PMMB and PMPW All Zones due on the 16.09.2012

ID Pkg 1 TD-0 Phase Sub Deliv related to Packages 01, 02 and 03 - PMMB and PMPW All Zones Soft Interiors due on the 23.09.2012

ID Pkg 1 TD-0 Phase Sub Deliv related to Packages 01, 02 and 03 - PMMB and PMPW All Zones due on the 16.09.2012

Page 15: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 15 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-013297 10/14/2012 -- --

RWA-LETTER-013300 10/14/2012 -- --

RWA-LETTER-013301 10/14/2012 AIX-TRANSMIT-000530 8/11/2012

RWA-LETTER-013302 10/14/2012 RWA-LETTER-013051 10/3/2012 Sanitary Wares & Accessories approved details for PMPW

RWA-LETTER-013303 10/14/2012 AIX-TRANSMIT-000526 8/5/2012

RWA-LETTER-013331 10/15/2012 -- -- PMMB Addendum to Tender Docs

RWA-LETTER-013334 10/15/2012 -- -- ID Issues in PMPW Part 4 GF Hall Area

RWA-LETTER-013336 10/15/2012 -- -- ID Issues in PMPW Part 4 GF

RWA-LETTER-013337 10/15/2012 -- -- ID Issues in PMPW Part 4 GF

RWA-LETTER-013358 10/17/2012 -- --

RWA-LETTER-013365 10/17/2012 -- --

RWA-LETTER-013369 10/17/2012 -- -- MEP - Flashing Beacon

RWA-LETTER-013372 10/17/2012 -- -- PMMB & PMPW Tableware and Linen Submission

RWA-LETTER-013374 10/17/2012 -- --

RWA-LETTER-013395 10/18/2012 AIX-TRANSMIT-000529 8/9/2012

RWA-LETTER-013396 10/18/2012 AIX-TRANSMIT-000526 8/6/2012

RWA-LETTER-013404 10/18/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 2

RWA-LETTER-013405 10/18/2012 -- -- ID Main Contractor for Fitouts, FF&E and Landscape Package - Query Set No. 01

RWA-LETTER-013451 10/21/2012 -- -- PMMB Addendums to Tender Documents

RWA-LETTER-013452 10/21/2012 -- -- Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297

RWA-LETTER-013462 10/22/2012 RWA-LETTER-013336 10/15/2012 ID issues in PMPW – Part 4 – Ground Floor

RWA-LETTER-013463 10/22/2012 RWA-LETTER-013296 10/14/2012 ID issues in PMPW-Part 4- Ground Floor- Lobby Area

RWA-LETTER-013464 10/22/2012 RWA-LETTER-013289 10/13/2012 ID issues in PMPW - Part 4 - Ground Floor- Waiting Area

RWA-LETTER-013466 10/22/2012 -- --

RWA-LETTER-013511 10/23/2012 RWA-LETTER-013156 10/7/2012 PMPW Addendum to Tender Docs

RWA-LETTER-013512 10/23/2012 AIX-LETTER-000304 10/20/2012 PMMB MB FOH Floor Box Layouts

RWA-LETTER-013514 10/24/2012 -- -- PMPW Addendum to Tender Docs

RWA-LETTER-013521 10/24/2012 -- --

RWA-LETTER-013551 10/24/2012 -- --

PMPW Skylight Mismatching in Size Of Skylight Between ID-DESIGN and IFC Dwgs-PART 4 LEVEL A

Stamping of Rev Dwgs latest FC rev FOH Areas Arch for Presidential Wing (PMPW) Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000524; EWN-TRANSMIT-025064; AIX-TRANSMIT-000581, EWN-LETTER-015692

Stamping of Rev Dwgs latest FC rev FOH Areas Elec Services for PMPW Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000530, RWA-TRANSMIT-034232, EWN-LETTER-015715

Stamping of Rev Dwgs latest FC rev FOH Areas MEP Drainage & Water Supply Services for PMPW Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000526, EWN-LETTER-015718

Stamping of Rev dwgs latest FC rev FOH Areas Elec Services for MB PMMB Ref EWN-LETTER-013402, RWA-LETTER-011116, AIX-TRANSMIT-000529

ID issues in PMPW – Part 4 – Ground Floor – Hall Area

ID Fit Out Packages 1 to 5 Tender Queries Set No. 1 Ref RWA-LETTER-013149; AIX-TRANSMIT-000633

Stamping of Rev Dwgs latest FC rev FOH Areas Elec Services for MB PMMB Ref EWN-LETTER-013402, RWA-LETTER-011116, AIX-TRANSMIT-000529, EWN-LETTER-015890

Stamping of Rev Dwgs latest FC rev FOH Areas Fire Prot Sys for PMPW Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000527, EWN-LETTER-015721

ID Fit Out Packages 1 to 5 - Tender Queries Set No. 3 Ref Spazio Letter SDB-PS-PP-2210-12 dtd 18Oct12

ID Fit Out Packages 1 to 5 - Tender Queries Set No. 4 Ref Spazio Letter - SDB-PS-PP-2216-12 dtd 23 Oct 12

H. H. Presidential Wing (PMPW) Mechanical Drawings and Equipment Schedules - Ref AIX-TRANSMIT-000649

Page 16: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 16 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-013555 10/29/2012 AIX-LETTER-000247 7/11/2012 Light Fitting Type G1 Rep.10 in Main Majlis Ref CCEP-RFI-001434

RWA-LETTER-013563 10/30/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-013570 10/30/2012 -- -- MOM Sanitary Ware Client Presentation Rev 1 dated 17.10.2012

RWA-LETTER-013572 10/30/2012 -- -- Slab at level +24.250 Level B Part 3

RWA-LETTER-013575 10/31/2012 AIX-LETTER-000303 10/11/2012 AIXC Performance Bond AIX-LETTER-000303

RWA-LETTER-013576 10/31/2012 RWA-LETTER-013452 10/21/2012 Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297

RWA-LETTER-013586 10/31/2012 -- -- Stainless Steel Plate Covers

RWA-LETTER-013593 10/31/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 5)

RWA-LETTER-013612 11/1/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 5

RWA-LETTER-013622 11/1/2012 -- -- PMMB Floor Plans- Plaster Locations for External Walls in ID Areas - EWN-LETTER-015991

RWA-LETTER-013623 11/1/2012 -- -- PMPW Floor Plans- Plaster Locations for External Walls in ID Areas - EWN-LETTER-015976

RWA-LETTER-013645 11/3/2012 -- -- ID Fit Out Packages 1 to 5 Tender Queries Set No. 6

RWA-LETTER-013661 11/4/2012 -- -- PMMB Floor Plans- Plaster Locations for External Walls in ID Areas - EWN-LETTER-015991

RWA-LETTER-013665 11/4/2012 -- -- Stainless Steel Plate Covers - Ref RWA-LETTER-013586

RWA-LETTER-013666 11/4/2012 -- -- PMPW Floor Plans Plaster Locations for External Walls in ID Areas EWN-LETTER-015976

RWA-LETTER-013671 11/4/2012 AIX-TRANSMIT-000265 8/1/2012

RWA-LETTER-013678 11/4/2012 AIX-TRANSMIT-000528 8/9/2012

RWA-LETTER-013692 11/5/2012 -- -- Revised Contract Issue of MB PMMB Supreme Council Electrical Drawings and Sch

RWA-LETTER-013718 11/6/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 7

RWA-LETTER-013719 11/6/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 8

RWA-LETTER-013727 11/6/2012 AIX-TRANSMIT-000523 8/2/2012

RWA-LETTER-013740 07/110/2012 AIX-RTRFI-000123 5/27/2012 False ceiling height in Room No.FF0943 located in Part 09, first floor

RWA-LETTER-013744 07/110/2012 -- -- ID - False Ceiling issues in PMPW Ground Floor (Part- 6)

RWA-LETTER-013745 07/110/2012 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5|)

RWA-LETTER-013757 11/8/2012 -- -- ID Fit Out Packages 1 to 5 Tender Queries

RWA-LETTER-013771 11/8/2012 AIX-LETTER-000315 11/1/2012 PMMB and PMPW Addendum Drawings - Bill of Quantities Ref AIX-LETTER-000315

RWA-LETTER-013778 11/8/2012 AIX-TRANSMIT-000525 8/5/2012

RWA-LETTER-013781 11/8/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-013791 11/11/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 9

RWA-LETTER-013792 11/11/2012 -- -- MEP - Flashing Beacon (2nd REMINDER)

RWA-LETTER-013834 11/12/2012 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5)

RWA-LETTER-013835 11/12/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-013836 11/12/2012 -- -- ID - False Ceiling issues in PMPW Ground Floor (Part- 6)

Stamping of Rev Dwgs latest FC rev FOH Areas MEP for MB PMMB Ref EWN-LETTER-013402, AIX-LETTER-000265, RWA-LETTER-011998, EWN-LETTER-016167

Stamping of Rev Dwgs latest FC rev FOH Areas HVAC for PMPW Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000528, RWA-TRANSMIT-034233, EWN-LETTER-016203

Stamping of Rev Dwgs latest FC rev FOH Areas Fire Protection Sys for MB PMMB Ref AIX-TRANSMIT-000523, RWA-TRANSMIT-033896, EWN-LETTER-015724

Stamp of Rev Dwgs latest FC rev FOH Areas Struc for PMPW Ref EWN-LETTER-013642, RWA-LETTER-011324, AIX-TRANSMIT-000525, RWA-TRANSMIT-033955, EWN-LETTER-016281

Page 17: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 17 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-013844 11/12/2012 -- -- Copyright Transfer Form - AIX-LETTER-000320

RWA-LETTER-013853 11/12/2012 RWA-LETTER-013771 11/8/2012 PMMB and PMPW Addendum Drawings - Bill of Quantities Ref AIX-LETTER-000315

RWA-LETTER-013859 11/13/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 10

RWA-LETTER-013869 11/13/2012 -- -- Finishing Color and Installation Detail for Line Array Speakers

RWA-LETTER-013870 11/13/2012 AIX-RTRFI-000123 5/27/2012 PMMB - False ceiling height in Room No.FF0943 located in Part 09, first floor

RWA-LETTER-013899 11/14/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 11

RWA-LETTER-013902 11/14/2012 -- -- ID - False Ceiling issues in PMPW Ground Floor (Part- 6)

RWA-LETTER-013903 11/14/2012 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5|)

RWA-LETTER-013904 11/14/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-013910 11/14/2012 AIX-TRANSMIT-000668 11/14/2012 PMMB and PMPW Addendum Drawings - Bill of Quantities Ref AIX-LETTER-000315

RWA-LETTER-013913 11/15/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 12

RWA-LETTER-013918 11/17/2012 -- -- PMMB - False ceiling height in Room No.FF0943 located in Part 09, first floor

RWA-LETTER-013939 11/18/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 13

RWA-LETTER-013940 11/18/2012 -- --

RWA-LETTER-013978 11/19/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328; AIX-TRANSMIT-000565

RWA-LETTER-013988 11/20/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 14

RWA-LETTER-013989 11/20/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-013996 11/20/2012 -- -- ID – False Ceiling Issues in PMPW Ground Floor – Part – 2

RWA-LETTER-013997 11/20/2012 AIX-LETTER-000306 10/23/2012

RWA-LETTER-14007 11/20/2012 -- -- Revised Contract Issue for Main Building (PMMB) - Supreme Council

RWA-LETTER-14023 11/21/2012 RWA-LETTER-013570 10/30/2012 08110-MOM-Sanitaryware Client Presentation Rev.1 -17-10-2012

RWA-LETTER-14043 11/21/2012 -- --

RWA-LETTER-14045 11/21/2012 -- -- ID Fit Out Packages 1 to 5 - Tender Queries Set No. 15

RWA-LETTER-14055 11/21/2012 -- -- Copyright Transfer Form - AIX-LETTER-000320 (Reminder 1)

RWA-LETTER-14057 11/21/2012 -- -- PMMB False ceiling height in meeting FF0736 & Office FF0738, FF

RWA-LETTER-014069 11/22/2012 AIX-TRANSMIT-000660 11/1/2012

RWA-LETTER-014078 11/22/2012 AIX-LETTER-000244 11/4/2012

RWA-LETTER-014094 11/22/2012 AIX-LETTER-000340 11/20/2012

RWA-LETTER-014098 11/22/2012 -- --

RWA-LETTER-014099 11/22/2012 -- --

RWA-LETTER-014100 11/22/2012 -- --

RWA-LETTER-014104 11/22/2012 AIX-LETTER-000331 11/14/2012 ID Terminal HVAC Services for PMPW GF Part- 1, 2 & 5 CCEP2-RFI-001293

RWA-LETTER-014117 11/25/2012 -- --

CCP300 - ID Main Contractor for Fitouts, FF&E and Landscape Package Query Set No. 06 Ref CCEP 31-2012-368

ID issues in PMPW-Part 4- Ground Floor- Lobby Area

ID Fit Out Works - Tender Queries - Packages 1, 2 & 3

Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297,AIX-TRANSMIT-000660

Stamping of Rev Dwgs latest FC rev FOH Areas Struc for MB PMMB Ref EWN-LETTER-013283, AIX-LETTER-000244, RWA-LETTER-011606, EWN-LETTER-016280

Material submittal MEP OTIS Supreme Council Esc 1-4 Escalators Rev 01 Ref CCEP-TRANSMIT-011519

Stamping of Rev Dwgs latest FC rev FOH Areas Elec Serv for MB PMMB Ref EWN-LETTER-013402, RWA-LETTER-011116, AIX-TRANSMIT-000529, EWN-LETTER-015890 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas Fire Protection Sys for MB PMMB Ref AIX-TRANSMIT-000523, RWA-TRANSMIT-033896, EWN-LETTER-015724 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas MEP for MB PMMB Ref EWN-LETTER-013402, AIX-LETTER-000265, RWA-LETTER-011998, EWN-LETTER-016167 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas Struc for PMPW Ref EWN-L-013642, RWA-L-011324, AIX-T-000525, RWA-T-033955, EWN-L-016281 (1st Rem)

Page 18: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 18 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-014118 11/25/2012 -- -- ID issues in PMPW-Part 4- Ground Floor- Lobby Area

RWA-LETTER-014119 11/25/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-014120 11/25/2012 -- -- ID False Ceiling issues in PMPW Ground Floor (Part- 3)

RWA-LETTER-014127 11/25/2012 -- --

RWA-LETTER-014128 11/25/2012 -- --

RWA-LETTER-014129 11/25/2012 -- --

RWA-LETTER-014130 11/25/2012 -- --

RWA-LETTER-014149 11/26/2012 AIX-TRANSMIT-000669 11/18/2012 Main External gate Proposal 01 - AIX-TRANSMIT-000669

RWA-LETTER-014153 11/26/2012 -- -- Sanitary Wares & Accessories approved details for PMMB and PMPW

RWA-LETTER-014159 11/26/2012 -- -- MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328; AIX-TRANSMIT-000565

RWA-LETTER-014195 11/27/2012 -- -- RFI - CIVIL - RFI G- 88- PMPW- Missing doors information - Ground Floor

RWA-LETTER-014233 11/29/2012 -- -- False Ceiling issues in PMPW (Part 1)- Ground Floor (Corridor)

RWA-LETTER-014236 11/29/2012 -- -- Missing Emergency Lights in Dining Room Ref. GF0904

RWA-LETTER-014245 11/29/2012 -- --

RWA-LETTER-014284 12/4/2012 AIX-TRANSMIT-000660 11/1/2012

RWA-LETTER-014285 12/4/2012 RWA-LETTER-013570 10/30/2012 08110-MOM-Sanitaryware Client Presentation Rev.1 -17-10-2012 (Reminder 2)

RWA-LETTER-014301 12/4/2012 AIX-LETTER-000365 11/28/2012 PMMB False ceiling height in meeting FF0736 & OFFICE FF0738, FF

RWA-LETTER-014320 12/5/2012 -- -- ID Fitout Package 2 and 3 Proposal Evaluation

RWA-LETTER-014322 12/5/2012 -- -- Revised Tender Issue of AV Package Dwgs EWN-LETTER-016929

RWA-LETTER-014326 12/5/2012 -- --

RWA-LETTER-014327 12/5/2012 -- -- PPP Interior Design Package (1) Consultancy Services Agreement

RWA-LETTER-014381 12/9/2012 AIX-LETTER-000381 12/6/2012 ID Fitout Package 2 & 3 Proposal Evaluation Ref AIX-LETTER-000381

RWA-LETTER-014392 12/10/2012 -- -- ID – False Ceiling Issues – PMPW – Ground Floor

RWA-LETTER-014406 12/10/2012 -- -- Revising the ID false ceiling height located in Ground floor Part-14

RWA-LETTER-014409 12/10/2012 -- --

RWA-LETTER-014410 12/10/2012 -- -- PMMB False Ceiling Height in meeting FF0736 & Office FF0738, FF

RWA-LETTER-014420 12/10/2012 -- -- ID Main Contractor - Proposal Evaluation - Tender Submission

RWA-LETTER-014421 12/10/2012 -- -- ID Fit out Package 1 - Proposal Evaluation - Tender Submission

RWA-LETTER-014432 12/11/2012 AIX-LETTER-000389 12/10/2012

RWA-LETTER-014449 12/12/2012 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5)

RWA-LETTER-014454 12/12/2012 -- -- ID Drawings not matching with Architecture Drawing

RWA-LETTER-014461 12/12/2012 AIX-LETTER-000379 12/5/2012 ID-False Ceiling Issues in PMPW Ground Floor {Part- 4)

RWA-LETTER-014470 12/12/2012 -- -- ID – False Ceiling Issues – PMPW – Ground Floor (Entrance Hall)

RWA-LETTER-014473 12/12/2012 -- -- ID Fit out Package 1 - Proposal Evaluation - Tender Submission

Stamping of Rev Dwgs latest FC rev FOH Areas Fire Protection Sys for PMPW Ref EWN-L-013642, RWA-L-011324, AIX-T-000527, EWN-L-015721 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas MEP Drainage & Water Supply Serv for PMPW Ref EWN-L-13642, RWA-L-011324, AIX-T-000526, EWN-L-015718 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas Elec Serv for PMPW Ref EWN-L-013642, RWA-L-011324, AIX-T-000530, RWA-T-034232, EWN-L-015715 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas HVAC for PMPW Ref EWN-L-013642, RWA-L-011324, AIX-T-000528, RWA-T-034233, EWN-L-016203 (1st Rem)

Stamping of Rev Dwgs latest FC rev FOH Areas Elec Dwgs and Sch for PMPW Ref EWN-L-013642,EWN-T-023155, AIX-T-000625, RWA-T-037792, EWN-L-016836

Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297,AIX-TRANSMIT-000660 (Reminder 1)

MEP Drain Requirement for ID areas Part 16 Ref CCEP-RFI-001328; AIX-TRANSMIT-000565 (Reminder No. 2)

ID False Ceiling Height in PMMB for Multimedia Room GF0901

PMMB Main Hall Part 16, Sheets 1, 2, 3 & 4 Levels B,C&D Floor Plan Block work dimensions layout AIX-LETTER-000389

Page 19: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 19 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-014516 12/16/2012 -- -- ID Main Contractor - Proposal Evaluation - Tender Submission

RWA-LETTER-014533 12/16/2012 -- -- ID Fit out Package 1,2 & 3 - Proposal Evaluation - Tender Submission

RWA-LETTER-014536 12/16/2012 AIX-LETTER-000361 11/27/2012 Material sub MEP OTIS Supreme Council Esc 1-4 Esc Rev 01 Ref CCEP-TRANSMIT-011519

RWA-LETTER-014537 12/16/2012 -- -- Steel structure works Evalaution for ID main Contract

RWA-LETTER-014554 12/17/2012 -- -- ID Drawings not matching with Architecture Drawing

RWA-LETTER-014555 12/17/2012 -- -- ID – False Ceiling Issues – PMPW – Ground Floor (Entrance Hall)

RWA-LETTER-014569 12/17/2012 -- -- Stamping of FOH FC Coordinated Drawings – Workshop Meeting

RWA-LETTER-014576 12/18/2012 -- -- PMMB - ID false ceiling height Issue located in Ground floor Part-14

RWA-LETTER-014580 12/18/2012 -- -- Breach of Confidentiality Undertaking

RWA-LETTER-014628 12/19/2012 -- -- ID Fitout Package 2 & 3 Proposal Evaluation

RWA-LETTER-014633 12/20/2012 -- -- ID Main Contractor - Proposal Evaluation - Tender Submission Ref AIX-LETTER-000400

RWA-LETTER-014645 12/20/2012 AIX-LETTER-000404 12/17/2012 ID False Ceiling Issues PMPW GF Ref EWN-LETTER-016995 AIX-LETTER-000404

RWA-LETTER-014684 12/23/2012 -- -- ID Fitout Package 2 & 3 Proposal Evaluation

RWA-LETTER-014726 12/24/2012 -- -- Delay Response for Shop Drawing Submittals as of 24 December 2012

RWA-LETTER-014737 12/26/2012 AIX-TRANSMIT-000706 12/20/2012 ID Main Contractor - Proposal Evaluation Ref AIX-Transmit-000706

RWA-LETTER-014739 12/26/2012 -- -- ID False Ceiling issues in Ground Floor - PMPW (Part 5)

RWA-LETTER-014740 12/26/2012 -- -- Material trans MEP FF System Components Rev. 05 - CCEP-LETTER-000815

RWA-LETTER-0147242 12/26/2012 AIX-LETTER-000415 12/19/2012 PMMB - ID false ceiling height Issue located in Ground floor Part-14

RWA-LETTER-0147243 12/26/2012 -- -- PMMB - Part 15B - First Floor Doors Opening Height

RWA-LETTER-014771 12/27/2012 RWA-LETTER-014684 12/23/2012 ID Fitout Package 1, 2 & 3 Proposal Evaluation

RWA-LETTER-014791 12/30/2012 -- -- GSM Antenna Internal Coverage Drawings

RWA-LETTER-014797 12/30/2012 AIX-LETTER-000416 12/19/2012 Mat sub MEP OTIC Supreme Concil Esc 1-4 Esc Rev 01 Ref CCEP-TRANSMIT-011519

RWA-LETTER-014800 12/30/2012 -- -- PMMB - ID false ceiling height Issue located in Ground floor Part-14

RWA-LETTER-014926 1/5/2013 -- -- ID False Ceiling issues in Ground Floor - PMPW (Part 5)

RWA-LETTER-014927 1/5/2013 -- -- ID False Ceiling issues in Ground Floor - PMPW (Part 5 - General Office)

RWA-LETTER-014972 1/7/2013 -- --

RWA-LETTER-015024 1/8/2013 -- --

RWA-LETTER-015082 1/10/2013 -- -- Fit Out Packages Evaluation - Detailed BOQ comparision

RWA-LETTER-015088 1/13/2013 -- -- Panoramic Lift Ref CCEP2-LETTER-000684

RWA-LETTER-015103 1/13/2013 -- -- Main External gate Proposal 01 AIX-TRANSMIT-000669

RWA-LETTER-015162 1/15/2013 -- --

RWA-LETTER-015165 1/16/2013 AIX-TRANSMIT-000699 1/12/2013 PMMB MB FOH Floor Box Layouts CCEP-TRANSMIT-013443 Ref EWN-LETTER-017666

RWA-LETTER-015175 1/16/2013 AIX-TRANSMIT-000699 1/12/2013

RWA-LETTER-015194 1/17/2013 -- -- ID Fitout Package 1, 2 & 3 - Proposal Evaluation

RWA-LETTER-015262 1/20/2013 AIX-TRANSMIT-000720 1/17/2013

RWA-LETTER-015285 1/21/2013 RWA-LETTER-015082 1/10/2013 Fit Out Packages Evaluation Detailed BOQ comparision Ref AIX-LETTER-000448

RWA-LETTER-015303 1/22/2013 AIX-LETTER-000367 11/29/2012 RFI Civil RFI G- 88- PMPW Missing doors information GF

PMMB - Main Building Drop Off & Main Entrance Door Finishes Design Proposal - AIX-TRANSMIT-000683

Wings Package - Inclusion of External ID Doors in to BOH Area - Ref EWN-TRANSMIT-030956

MB PMMB Supreme Council Building New Block Modification at FF Part 4 Ref RWA-TRANSMIT-041414

Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297,AIX-TRANSMIT-000660,AIX-TRANSMIT-000699

Presidential Palace Project Main Entrance Doors AIX-TRANSMIT-000678,AIX-TRANSMIT-000720

Page 20: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 20 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-015309 1/22/2013 RWA-LETTER-015262 1/20/2013 Main Entrance Doors AIX-TRANSMIT-000678,RWA-LETTER-000686

RWA-LETTER-015359 1/23/2013 -- --

RWA-LETTER-015398 1/27/2013 RWA-LETTER-015194 1/17/2013 ID Fitout Package 1, 2 & 3 - Proposal Evaluation Ref RWA-LETTER-015194

RWA-LETTER-015400 1/28/2013 -- -- RFI-CIVIL-RFI G 88 PMPW- Missing doors information GF

RWA-LETTER-015418 1/28/2013 -- -- ID –False Ceiling Issues in Ground Floor - PMPW –Part 3

RWA-LETTER-015419 1/28/2013 -- -- ID –False Ceiling Issues in First Floor - PMPW –Part 4

RWA-LETTER-015420 1/28/2013 AIX-LETTER-000370 11/29/2012 ID issues in PMPW-Part 4- Ground Floor- Lobby Area – ( RFI-AC-PMPW-037 ) - Rev.02

RWA-LETTER-015421 1/28/2013 AIX-LETTER-000369 11/29/2012 False Ceiling issues in PMPW (Part 4)- GF Corridor RFI-AC-PMPW-053 Rev.01

RWA-LETTER-015476 1/31/2013 -- --

RWA-LETTER-015504 1/31/2013 -- -- Main External gate Proposal 01 - AIX-TRANSMIT-000669 (REMINDER 01)

RWA-LETTER-015521 2/3/2013 AIX-LETTER-000454 1/30/2013

RWA-LETTER-015522 2/3/2013 AIX-LETTER-000455 1/30/2013

RWA-LETTER-015536 1/4/2013 -- -- Main External gate Proposal 01 - AIX-TRANSMIT-000731

RWA-LETTER-015547 1/4/2013 -- -- ID –False Ceiling Issues in First Floor - PMPW –Part 4

RWA-LETTER-015549 1/4/2013 AIX-LETTER-000401 12/17/2012 ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5|)

RWA-LETTER-015581 1/5/2013 -- -- ID False Ceiling Height Issue in GF Part - 15 - CCEP-RFI-001523

RWA-LETTER-015583 1/6/2013 -- -- PMPW – Part -1 – Mezzanine Floor Emergency Fire Escape Ladder

RWA-LETTER-015587 1/6/2013 -- -- Revised ID Design Detailed Drawings for parts 2 & 5 Ground Floor – Presidential Wing

RWA-LETTER-015602 1/6/2013 -- -- ID Fitout Package 1, 2 & 3 - Proposal Evaluation Ref RWA-LETTER-015194

RWA-LETTER-015624 2/7/2013 -- -- ID False Ceiling Issues in FF PMPW Part 4

RWA-LETTER-015635 2/7/2013 -- -- Main External gate Proposal 01 - AIX-TRANSMIT-000731,RWA-LETTER-015536

RWA-LETTER-015637 2/7/2013 -- --

RWA-LETTER-015653 2/9/2013 AIX-TRANSMIT-000723 1/21/2013 Mat sub MEP OTIS Supreme council esc 1-4 ESC Rev. 01 Ref CCEP-TRANSMIT-011519

RWA-LETTER-015698 2/11/2013 -- --

RWA-LETTER-015699 2/11/2013 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5)

RWA-LETTER-015716 2/11/2013 -- -- ID Fit Out Pkgs 1,2 and 3 Tender Evaluations

RWA-LETTER-015756 2/13/2013 -- -- Structural Steel Works - Drawings and Specifications

RWA-LETTER-015782 2/13/2013 -- --

RWA-LETTER-015793 2/14/2013 -- -- ID Terminal HVAC Services for PMPW GF Part- 1, 2 & 5) - RWA-LETTER-015549

RWA-LETTER-015795 2/14/2013 -- -- Air Outlet Clarification - PMPW Part 5

RWA-LETTER-015804 2/14/2013 -- -- Mat sub MEP OTIS Supreme Council Esc 1-4 Esc Rev 01 Ref CCEP-TRANSMIT-011519

RWA-LETTER-015830 2/17/2013 -- -- ID Fit out Package 1 - Proposal Evaluation - Clarification R3

RWA-LETTER-015833 2/17/2013 -- --

RWA-LETTER-015888 2/18/2013 -- -- Electrical Rolling Shutter Door Size at Lobby R-GF 0606 - Part 6

RWA-LETTER-015889 2/18/2013 -- -- Air outlet Location in PMPW - Part 5 (Reminder No.1)

PMMB MB FOH Floor Box Layouts CCEP-TRANSMIT-013443 Ref EWN-LETTER-017666 (Reminder No. 1)

Shop Dwgs Sub PW-114 CIVIL At FF Plan Finishes Layout 02 Ref CCEP2-TRANSMIT-005905, EWN-TRANSMIT-031974

Shop dwgs submittal 113 Civil GF Finishes Layout 06 App as noted Ref EWN-TRANSMIT-031973, RWA-TRANSMIT-045854, AIX-LETTER-000454

Shop Dwgs Sub PW-114 Civil at FF Plan finishes Layout 02 Ref CCEP2-TRANSMIT-005905, EWN-TRANSMIT-031974, RWA-TRANSMIT-045853, AIX-LETTER-000455

Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297,AIX-TRANSMIT-000660,AIX-TRANSMIT-000699

RFI - CIVIL Cladding Confirmation for Skylight Types 1 & 2 for Presidential Wings PPW-010-13-AL-RFI0016

Car Internal Finishes and Lighting of Elevators Ref AIX-LETTER-000297,AIX-TRANSMIT-000660,AIX-TRANSMIT-000699 - Reminder No.1

Main External gate Proposal 01 - AIX-TRANSMIT-000731,RWA-LETTER-015536,AIX-LETTER-000472

Page 21: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 21 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-015923 2/19/2013 -- -- Client Presentation

RWA-LETTER-015935 2/19/2013 -- -- Fire Alarm System Array Speaker - EWN-LETTER-017831,EWN-LETTER-018322

RWA-LETTER-015945 2/19/2013 -- -- ID Fit Out Packages - 1, 2 & 3 - Tender Evaluation Ref RWA-Letter-015716

RWA-LETTER-015991 2/21/2013 -- --

RWA-LETTER-016000 2/21/2013 -- -- ID –False Ceiling Issues in First Floor - PMPW –Part 4 - CCEP2-RFI-001409

RWA-LETTER-016003 2/21/2013 -- -- Revised ID Design Detailed Drawings for parts 2 & 5 Ground Floor – Presidential Wing

RWA-LETTER-016006 2/23/2013 -- -- Mat sub MEP OTIS Supreme Council Esc 1-4 Esc Rev 01 Ref CCEP-TRANSMIT-011519

RWA-LETTER-016007 2/23/2013 -- -- PMMB – False Ceiling Height in Hall (FF1428, 1427, 1426 & 1425) in FF Part-14

RWA-LETTER-016015 2/23/2013 -- -- ID Fit out Packages 1, 2 & 3 - Proposal Evaluation - Clarification R3

RWA-LETTER-16042 2/25/2013 AIX-TRANSMIT-000740 2/14/2013 ID Terminal HVAC Services for PMPW GF Part- 1, 2 & 5 CCEP2-RFI-001426

RWA-LETTER-016045 2/25/2013 -- -- PMPW - Doors Type Scope Changed - First Floor Level Main Pantry - Part 4

RWA-LETTER-016046 2/25/2013 -- -- PMPW - ID False ceiling issues - Ground floor- Main Hall GF 0117 - Part 1

RWA-LETTER-016050 2/25/2013 -- -- Location Changed for Air Diffuser (Prayer Room) in Part-14 First Floor

RWA-LETTER-016051 2/25/2013 -- -- PMMB - Part 14 - Ground Floor - 2 Doors Duplicate Scope of Work

RWA-LETTER-016052 2/25/2013 -- -- ID False Ceiling Height Issue in Ground Floor Part - 15

RWA-LETTER-016053 2/25/2013 -- -- ID False Ceiling Height Issues located in Ground Floor Part-22

RWA-LETTER-016059 2/25/2013 -- --

RWA-LETTER-016072 2/25/2013 -- -- PMPW - Elec Rolling Shutter Door Size at Lobby R-GF 0606 - Part 6 - Reminder No.1

RWA-LETTER-016076 2/25/2013 -- -- ID –False Ceiling Issues in FF PMPW –Part 4 - CCEP2-RFI-001409 - Reminder No.1

RWA-LETTER-016122 2/27/2013 -- -- ID False ceiling issues - Ground floor- Main Hall -PMPW - Part 5

RWA-LETTER-016125 2/27/2013 -- --

RWA-LETTER-016172 2/28/2013 -- -- PMPW - Elec Rolling Shutter Door Size at Lobby R-GF 0606 - Part 6 - Reminder No.2

RWA-LETTER-016174 2/28/2013 -- -- ID –False Ceiling Issues in First Floor - PMPW –Part 4 - CCEP2-RFI-001409 Reminder No.2

RWA-LETTER-016175 2/28/2013 -- --

RWA-LETTER-016200 2/28/2013 -- --

RWA-LETTER-016226 3/3/2013 -- -- PMPW - Doors Type Scope Changed - FF Level Main Pantry - Part 4 - Reminder No.1

RWA-LETTER-016232 3/4/2013 -- -- ID Fit Out Packages - 1, 2,3,4 & 5 - Tender Evaluation Progress review meeting

RWA-LETTER-016241 3/4/2013 -- -- ID False Ceiling Height Issues located in Ground Floor Part-22

RWA-LETTER-016243 3/4/2013 -- -- Location Changed for Air Diffuser (Prayer Room) in Part-14 First Floor

RWA-LETTER-016249 3/4/2013 -- --

RWA-LETTER-016250 3/4/2013 -- -- PMMB - Part 14 - Ground Floor - 2 Doors Duplicate Scope of Work

RWA-LETTER-016251 3/4/2013 -- -- ID False Ceiling Height Issue in Ground Floor Part - 15

RWA-LETTER-016285 3/5/2013 -- --

RWA-LETTER-016297 3/5/2013 -- -- ID Fit out Packages 1, 2 & 3 - Proposal Evaluation - Clarification R4

RWA-LETTER-016311 3/6/2013 -- -- ID Fit out Packages 1, 2 & 3 - Proposal Evaluation - Clarification R4 - CCEP

RWA-LETTER-016314 3/6/2013 -- -- ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5)

RWA-LETTER-016316 3/6/2013 -- -- ID False Ceiling Issues– Ground floor – Part 6

Car Internal Finishes and Lighting of Elev Ref AIX-LETTER-000297,AIX-TRANSMIT-000660,AIX-TRANSMIT-000699 - Reminder No.2

RFI MEP False Ceiling Levels in PSGS GF RFI‐AC‐PSGS‐0002, CCEP3-RFI-000192, EWN-LETTER-018380

PMPW - Staircase Door by ID at Mezznine Level Part 4

ID Terminal HVAC Services for PMPW Ground Floor (Part- 1, 2 & 5|) - RWA-LETTER-016042 Reminder No.1

Revised ID Design Detailed Drawings for parts 2 & 5 Ground Floor – Presidential Wing - Reminder No.2

Dwg sub MB PMMB Recp Wing Part 09 Mezz 2nd Floor plan block work dimension l-out 1 shop dwg Rev 01 Ref CCEP-T-014009 Status A-N Ref EWN-T-033238

RFI MEP False Ceiling Levels in PSGS GF RFI‐AC‐PSGS‐0002, CCEP3-RFI-000192, EWN-LETTER-018380

Page 22: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 22 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-016317 3/6/2013 AIX-LETTER-000484 3/3/2013

RWA-LETTER-0169331 3/6/2013 -- -- ID Fit out Packages 1, 2 & 3 - Proposal Evaluation - Clarification R4 - CCEP

RWA-LETTER-016350 3/7/2013 -- -- Project Emblem

RWA-LETTER-016363 3/7/2013 -- -- ID Fit Out Packages - 1, 2,3,4 & 5 - Proposal Clarifications review meeting

RWA-LETTER-016375 3/7/2013 -- -- ID Fit out Works - Packages 1, 2, & 3 - Controlled BOQ

RWA-LETTER-016377 3/7/2013 -- -- PMPW – Part -1 – Mezz Floor Emergency Fire Escape Ladder - AIX-LETTER-000470

RWA-LETTER-016378 3/7/2013 -- --

RWA-LETTER-016384 3/10/2013 -- -- ID Fit out Packages 1, 2 & 3 - Proposal Evaluation - Clarification R4 - CCEP

RWA-LETTER-016416 3/11/2013 -- -- ID Terminal HVAC Services for PMPW GF Part- 1, 2 & 5 - CCEP2-RFI-001426

RWA-LETTER-016422 3/11/2013 -- -- Required Type of Door Access Control (Locks) - EWN-LETTER-018765

RWA-LETTER-016469 3/13/2013 -- -- Discrepancies between ID Terminal HVAC and ID Enlarged Floor and RC Plan in Part 16 GF

RWA-LETTER-016483 3/13/2013 -- -- PMPW - ID False Ceiling issues in Ground Floor – (Part 5 – General Office)

RWA-LETTER-016530 3/17/2013 AIX-LETTER-000496 3/11/2013 PMPW - Staircase Door by ID at Mezzanine Level Part 4

RWA-LETTER-016577 3/18/2013 -- --

RWA-LETTER-016591 3/19/2013 AIX-LETTER-000501 3/11/2013 Revising ID Ceiling at Part 15 – Ground Floor

RWA-LETTER-016592 3/19/2013 -- --

RWA-LETTER-016596 3/19/2013 -- -- ID Fit Out Works - Supervision - Packages 1, 2 & 3

RWA-LETTER-016619 3/20/2013 -- -- ID Terminal HVAC Services for PMPW GF (Part- 1, 2 & 5) - CCEP2-RFI-001426

RWA-LETTER-016655 3/21/2013 -- --

RWA-LETTER-016663 3/21/2013 -- -- PMMB - FOH Thermostat Locations and Finishes

RWA-LETTER-016695 3/25/2013 -- -- PMPW - Ground Floor Slab – Slab opening for ID Requirements

RWA-LETTER-016774 3/28/2013 AIX-TRANSMIT-000778 3/21/2013

RWA-LETTER-016826 4/1/2013 -- --

RWA-LETTER-016828 4/1/2013 -- -- MEP Coloured Composite Drawings - Ref AIX-LETTER-000513

RWA-LETTER-016844 4/2/2013 AIX-LETTER-000517 3/26/2013 PMPW - FOH Thermostat Locations and Finishes

RWA-LETTER-016853 4/2/2013 -- --

RWA-LETTER-016864 4/3/2013 -- --

RWA-LETTER-016875 4/3/2013 -- --

RWA-LETTER-016919 4/7/2013 -- --

RWA-LETTER-016959 4/8/2013 AIX-LETTER-000411 12/18/2013

ID –False Ceiling Issues in First Floor - PMPW –Part 4 - CCEP2-RFI-001409, RWA-LETTER-016000, AIX-LETTER-000484

Car Internal Finishes and Lighting of Elevators Ref AIX-L-000297,AIX-T-000660,AIX-T-000699 - Reminder No.2

PMPW – Part -1 – Mezz Floor Emergency Fire Escape Ladder - AIX-LETTER-000470 (Reminder 1)

PMMB Part 02.03.04.09.12.13 FF Mezz 1&2 Part 07 Mezz 1 Part 08 FF & Mezz1 (Part 14) - Floor Drain Locations - RWA-TRANSMIT-047995

PMPW Part -1 Mezz Floor Emergency Fire Escape Ladder AIX-LETTER-000470,AIX-LETTER-000508

ID Fit out Packages 1, 2 & 3 Proposal Evaluation Additional Requirements Minutes of Clarification Meeting - AIX-TRANSMIT-000778

Main External gate Proposal 01 AIX-TRANSMIT-000669,AIX-TRANSMIT-000731,EWN-TRANSMIT-032927,EWN-LETTER-019122

Required Type of Door Access Control (Locks) - EWN-LETTER-018765,EWN-LETTER-018941

Supreme Council Building Mezzanine Floor ID Clouded Comments, Ref RWA-LETTER-016759, CCEP-LETTER-000959

Rev Technical Financial Proposal Ancillary Bldgs Public Gate Entrance Gate, Ceremonial Gate and General Store - Communication Center

Main External gate Proposal 01 AIX-T-000669,AIX-T-000731,EWN-T-032927,EWN-L-019122 (Reminder No. 1)

Revised Tender Issue of AV Package Dwgs Addendum no. 1 EWN-TRANSMIT-028897 AIX-LETTER-000411,EWN-LETTER-019259

Page 23: RWA-LETTER LOG.xls

PRESIDENTIAL PALACE PROJECT - ABU DHABISSH/08110

RWA LETTER LOG

Page 23 of 23

Reference No. Date In Response To Date Subject Comments

RWA-LETTER-017011 4/10/2013 -- --

RWA-LETTER-017015 4/10/2013 -- -- ID False Ceiling Issues– First floor – Part 3

RWA-LETTER-017016 4/10/2013 -- -- ID False Ceiling Issues- Roof -level A- Part 4

Revised Contract Issue of H. H. Pres Wing (PMPW) Elec Dwgs and Sch For Final ID Review and Coord EWN-TRANSMIT-035359 / RWA-TRANSMIT-051753 Reminder 1