  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    1/22

    50000.00

    1) Name of the Revenue Village :-Ayyampalayam

    2) Location (S.F.No.& Location):- The site is located at a distance of 20KM

    From Sathyamangalam and 12 km from Pulliyampatti.

    3) Particulars of land use :-

    Village Name of the S.F.No. Total Extent Extent Remarks

    land owner Sub Division Ha. Proposed Ha.

    Panayampalli

    4) RAIN FALL

    Average annual rain fall :-775.46mm

    5) SOIL CONDITION

    Depth of soil :- 0 to 0.30 m

    Depth of sub soil :-0.30 to 0.65

    Texture :- Earth mixed with small sized boulders & hard

    gravelly soil

    Infiltration capacit :- Fair / Moderate

    6) Crops

    Main crops :- Ground nut

    Rotation of crops :- Ragi, Cholam

    Pattern of cultivation :-Sown in July,Aug & Harvested

    in October, November

    Whether composed manure used :- Yes

    7) Erosion

    Hazards of Erosion :- Severe

    Type of Erosion :- Gully Erosion

    Assistant Executive Engineer Junior Engineer

    Agricultural Engineering Department Agricultural Engineering Department

    Gobichettipalayam Gobichettipalayam

    Estimate Amount Rs:-

    for the year 2008-09

    Report to accompany the Estimate for the Construction of Farm Pond

    in AyyampalayamVillage of Bhavani Sagar Block ,Sathyamangalam Taluk

    in Erode Disrtict under Rain Water Harvesting Scheme

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    2/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    3/22

    DEPTH in

    metreQUANTITY in cum

    FORM POND 62.00 + 58.60 12.00 + 8.60

    2 2

    33.75 23.75

    x 35.32 x 10-6

    = mcft

    Asst.Executive Engineer Junior Engineer,

    Agrl Engineering Dept Agrl Engineering Dept

    Gobichettipalayam Gobichettipalayam

    NAME OF WORK : FARM POND under RWHS

    CAPACITY OF THE POND

    LENGTH in metre BREADTH in metreNO

    1.701 1055.853

    1055.853

    0.037

    Capacity of the pond =

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    4/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    5/22

    NAME OF WORK : FARM POND under RWHS

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    1 Rough stone for revetm 1 Cu.M Nalroad 11 60.65 200.00 260.65

    2. The rates adopted are as per the current P.W.D. Schedule of rates for the year 2008-09

    Counter signed

    Assistant Exeutive Engineer, Junior Engineer,Agricultural Engg, Department, Agricultural Engg, Department,

    Gobichettipalayam. Gobichettipalayam.

    1. The distance furnished are correct and minimum to the best of my Knowledge.

    Destinatio Lead charges

    Ordinary Hill

    Cost of

    Materials

    Total

    Cost

    Rs.

    Worksite

    LEAD STATEMENT

    Sl.No.Description of

    MaterialsQuantity

    Source of

    supply

    Lead Distance

    in K.m.

    Ordinary Hill

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    6/22

    DATA SHEET

    Rate AmountRs Ps Rs. Ps

    1 2 3 4 5 6

    1 M2

    Clearing light jungle as per SI.No:2 1.65 M2

    1.65

    2 M3

    H.G.S.SS.20.B.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. 28.75 M3

    28.75

    3 M3

    H.G.S. S.S.20.A. Earth work excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with small

    size boulders as per S.S.20.A.and S.I.61. 30.60 M3

    30.60

    4 M3

    SDR (Not requiring blasting).Earthwork excovating and

    depositing on bank within initial lead of 10 M.& initial lift of 2M. 42.90 M3

    42.90

    soft disintegrated rock,laterite,softrock or kunkar

    not requirig blasting as per SI67 For Pond

    5 M3

    Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A. 6.05 M3

    6.05

    6 M3

    Extra for every additional 10M. Lead or part thereof

    over the initial lead as per Sl.No 76

    I Lead 3.65 M3

    3.65

    II Lead 2x3.65 M3

    7.30

    III Lead 3x3.65 M3

    10.95

    IV Lead 4x3.65 M3

    14.60

    V Lead 5x3.65 M3

    18.25

    7 M3

    Extra for every additional 1Meter. Lift or part thereof

    over the initial lift as per Sl.No 77

    I Lift 2.95 M3

    2.95

    II Lift 2 x 2.95 M3

    5.90Certified that the above rates are adopted as per the current P.W.D standard shedule ofrates for the year 2008-09

    Assistant executive engineer,Agricultural engineering department, Agricultural Engg department,

    Gobichettipalayam Gobichettipalayam

    NAME OF WORK : FARM POND under RWHS

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Junior Engineer,

    Sl.No. Quantity Description of item Unit

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    7/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    8/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    9/22

    NAME OF WORK : FARM POND under RWHS

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    Depth Quantity

    M

    1 6 7

    1 H.G.S.SS.20.B.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. For DEEPENING OF POND

    1 x 1 62.00 + 61.10 12.00 + 11.10 0.45 319.91

    2 2

    319.91

    2 SDR (Not requiring blasting).Earthwork excovating and depositing on bank within initial lead of 10 M.and

    initial lift of 2M.soft disintegrated rock,laterite,softrock or kunkar not requirig blasting as per SI67 For Pond

    1 x 1 61.10 + 58.60 11.10 + 8.60 1.25 736.90

    2 2

    736.903 H.G.S.SS.20.A.Earthwork excovating and depositing on bank within initial lead of 10 M.& initial lift of 2M.

    small size boulders as per S.S.20.A.and S.I.61. For Bund

    1 x 1 3.00 + 1.00 1.00 336.00

    2

    1 x 2 3.00 + 1.00 1.00 18.00

    2

    318.004 Extra or every a t ona 10M. Lea or part t ereo

    over the initial lead as per Sl.No 76

    50.00

    100.00200.00

    220.00

    5 Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A. 318.00

    6 Provision for TNCLW Fund 0.3% LS

    7 Provision for photography charges LS

    8 Provisoion for Unforseen items LS

    Asst.Executive Engineer Junior Engineer

    Agrl Engineering Dept Agrl Engineering Dept

    Gobichettipalayam Gobichettipalayam

    For DEEPENING OF POND

    For DEEPENING OF POND

    I Lead

    II LeadIII Lead

    IV Lead

    For Bund qty

    Deduct inlet&outlet vent

    DETAILED ESTIMATE FOR FARM POND

    Sl

    no Description of work

    No Breadth

    M M

    Length

    Total

    Total

    2 3 5

    Total

    In hard stiff clay,stiff black cotton, hard red earth, shales, murram, gravel, stoneyearth, and earth mixed with

    168

    4.5

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    10/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    11/22

    M3

    M3

    M3

    M3

    M

    3

    M3

    M

    M3

    M3

    M3

    M3

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    12/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    13/22

    NAME OF WORK : FARM POND under RWHS

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    Rate

    Rs Ps

    1 H.G.S.SS.20B.Earthwork excovating and depositingon bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62.

    1.91 M3

    28.75 M3

    2 SDR (Not requiring blasting).Earthwork excovating and

    depositing on bank within initial lead of 10 M.& initial

    lift of 2M.soft disintegrated rock,laterite,softrock or kunkar

    not requirig blasting as per SI67 For Pond

    736.90 M3

    42.90 M3

    3 H.G.S.SS.20.A.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.A.and S.I.61.

    318.00 M3

    30.60 M3

    4 Extra for every additional 10M. Lead or part thereof

    over the initial lead as per Sl.No 76

    50.00 M3

    I Lead 3.65 M3

    100.00 M3

    II Lead 7.30 M3

    200.00 M

    3

    III Lead 10.95 M

    3

    220.00 M3

    IV Lead 14.60 M3

    5 318.00 M3

    Add to relevent T.N.D.S.S No. 20.A rates for new tank

    bunds and closing breaches for extra watering and

    consolidation. (A) By hand rollars as per Sl.No.79.A. 6.05 M3

    6 Provision for TNCLW Fund 0.3%

    7 LS Provision for photography charges LS

    8 LS Provisoion for Unforseen items LS

    (Rupees Fifty thousand only) weir

    Assistant Executive Engineer,

    Agricultural Engineering Department, Agricultural Engineering Departm

    Gobichettipalayam

    Junior Engineer,

    For Deepening of Farm Pond

    ABSTRACT ESTIMATE FOR FARM POND

    Sl

    noDescription of work

    Gobichettipalayam

    For BUND Qty

    Qty Unit

    Total

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    14/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    15/22

    Amount

    Rs Ps

    55.00

    31613.00

    9731.00

    182.50

    730.00

    2190.003212.00

    1924.00

    150.00

    150.00

    62.50

    50000.00#REF!

    ent,

    #REF!

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    16/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    17/22

    NAME OF WORK : FARM POND under RWHS

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Quantity

    Cu.M

    1 3 7

    1 H.G.S.SS.20.B.Earthwork excovating and depositing

    on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62.

    For foundation of weir.

    Bell mouth toe 1x1 1.11

    Cutt off wall - I 1x1 1.42

    Cutt off wall - II 1x1 1.52

    Side wall 1x1 0.51

    Apron 1x1 7.00 + 7.50 2.25

    2

    Total 6.81

    2 Rough stone dry Packing for Bell

    Mouth

    BGL Bell mouth toe 1x1 1.11

    Cutt off wall - I 1x1 1.42

    Cutt off wall - II 1x1 1.52

    Side wall 1x1 0.51

    Apron 1x1 7.00 + 7.50 2.25

    2

    AGL Slopping portion 1x1 5.50 + 2.50 0.92

    2 7.73

    Counter signed.

    Asst. Exe. Engineer. Junior Engineer.

    Agri.Engg.Department, Agrl.Engg.Department,

    Gobichettipalayam Gobichettipalayam

    0.45

    7.00 0.45 0.45

    0.45

    1.35

    7.50 0.45 0.45

    5.50 0.45

    2.50 0.45

    7.00

    7.50

    2.50

    0.45

    0.45

    5 6

    0.45 0.45

    0.45

    0.23

    Total

    1.00

    0.23

    0.45

    0.45

    0.23

    0.45

    1.35

    DETAILED ESTIMATE

    Sl.no. Description of work Nos.Length Breadth Depth

    M. M. M.

    2

    5.50

    4

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    18/22

    ABSTRACT ESTIMATE

    NAME OF WORK : FARM POND under RWHS

    VILLAGE:AYYAMPALAYAM ; SF.NO: 59/2

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    Rate Amount

    Rs Ps Rs. Ps

    1 6.81 H.G.S.SS.20.B.Earthwork excovating and depositing

    Cu.M. on bank within initial lead of 10 M.& initial lift of 2M.

    In hard stiff clay,stiff black cotton, hard red earth, shales,

    murram, gravel, stoneyearth, and earth mixed with

    small size boulders as per S.S.20.B.and S.I.62. 28.75 Cu.M. 195.80

    2 7.73 Rough stone dry packing for bund bell mouth

    Cu.M.

    #REF! Cu.M. #REF!

    TOTAL #REF!

    Counter signed.

    Asst. Exe. Engineer.

    Agri.Engg.Department,

    Gobichettipalayam

    Junior Engineer,

    Gobichettipalayam

    l.No uantit Description of item Unit

    Agrl.Engg.Department,

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    19/22

    N

    3.00 1.00 1.70 1.70 1.00 3.00

    1.00 1.00

    GL 1.00 GL

    3.00 0.45 HGS 3.00

    1.70 GL

    1.0

    1.0

    3.0

    0

    1.0

    1.0

    CS 1

    .7

    58.60 HGS

    SDR

    LS LS 1.0

    0

    0.4

    5

    1.2

    5

    8.60

    58.60

    CS 1

    .7

    62.00 1.0

    1.0

    1.0

    1.0

    GL

    SCALE:NOT TO S

    PLAN SHOWING THE PROPOSED FARM POND

    NAME OF WORK : FARM POND under RWHS

    DISTRICT:ERODE/ TALUK:SATHYAMANGALAM / BLOCK:BHAVANISAGAR

    VILLAGE: ; SF.NO:

    58.60

    62.00

    1.25

    LONGITUDINAL SECTION

    62.00

    1.7

    0

    8.6

    0

    8.6

    0

    12.0

    0

    SDR

    3.0

    0

    PLAN

    12.00 12.00

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    20/22

    : ERODE N

    : SATHYAMANGALAM

    : BHAVANISAGAR

    : PERIYAKALLIPATTI

    SATHYAMANGALAM

    GOBI

    ERODE

    SANAPIRATAI

    Checked by me:- Prepared by me:-

    CEMENT

    SAND(SANAPIRATAI)

    Asst. Executive Engineer, Junior Engineer,

    Agricultural Engineeing Dept. Agricultural Engineeing Dept. PROPOSED SITE

    Gobichettipalayam. Gobichettipalayam.

    ILLAGE

    SF NO: :SCALE:NOT

    TO SCALETHALAVADI &

    MYSORE

    LEAD CUM LOCATION MAP

    ISTRICT

    TALUK

    BLOCK

    AYYAMPALAYAM PULIYAMPATTI

    TO METTUPALAYAM

    TO KOVAI

    ANTHIYUR & BHAVANI

    KAVANDAPADI

    BHAVANISAGAR NALL ROAD

    PERIYAKALLIPATTI PIRIUV PANAYAMPALLI

    STONE(BHAVANISAGAR

    NALLROAD)

    KARUR

    REFERENCE

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    21/22

  • 7/29/2019 Rwhs Fp Anbu Nataraj a 2side

    22/22

    : un er

    : ; . :

    ####

    Sl.No DescriptionAmount

    Rs. Ps

    1 Cost of Formation of Bund 50000.00

    2 Cost of Construction of Surplus Arrengement #REF!

    3 Provision for Photographic Charges 250.00

    4 Provisoion for Unforseen items 531.30

    Total #REF!

    ( Rupees One Lakh nine thousand only )

    Counder singined

    Asst.Executive Engineer Junior Engineer,

    Agrl Engineering Dept Agrl. Engineering Dept.

    Gobichettipalayam Gobichettipalayam.

    GENERAL ABSTRACT