A PRACTICAL APPROACH TO WATER AUDITS AND
LEAK DETECTIONPresented By:
RRYE ENGINEERING PLCConsulting Engineers & System Operators
Friday, March 15, 2013
![Page 3: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/3.jpg)
RYE ENGINEERING PLCConsulting Engineers & System Operators
4210 West Main StreetErin, TN 37061
Phone: (931) 289-2300Fax (931) 289-2313
Leak Detection Services
![Page 4: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/4.jpg)
Experience and QualificationsMike Sheppard, Senior
Project Manager
• Water Distribution Manager CGW (Retired)
• 35+ Years of Experience
• Utility and Construction Background
![Page 5: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/5.jpg)
Why is Leak Detection Important?
TN Comptroller’s Office
• After January 1, 2013
• All Water Audits in AWWA Format
• Reduce “REAL LOSSES”
![Page 6: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/6.jpg)
AWWA Water BalanceBilled Metered Consumption(including water exported)
Billed Unmetered Consumption
Unbilled Metered Consumption
Unbilled Unmetered Consumption
Unauthorized Consumption
Customer Metering Inaccuracies
Systematic Data Handling Errors
Leakage on Transmission and Distribution Mains
Leakage and Overflows at Utility's Storage Tanks
Leakage on Service Connections up to point of
Customer metering
Figure 1. IWA/AWWA Water Balance (All data in volume for the period of reference, typically one year)
System Input Volume (corrected for known errors)
Authorized Consumption
Billed Authorized Consumption
Revenue Water
Unbilled Authorized
Consumption
Non-Revenue Water (NRW)
Water Losses
Apparent Losses
Real Losses
![Page 7: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/7.jpg)
Real LossesUnauthorized Consumption
Customer Metering Inaccuracies
Systematic Data Handling Errors
Leakage on Transmission and Distribution Mains
Leakage and Overflows at Utility's Storage Tanks
Leakage on Service Connections up to point of
Customer metering
Water Losses
Apparent Losses
Real Losses
![Page 8: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/8.jpg)
Real Losses Water Main Leakage Service Line Leakage
![Page 9: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/9.jpg)
Apparent Losses Encountered
Unauthorized ConsumptionCustomer Metering
Inaccuracies
Systematic Data Handling Errors
Apparent Losses
![Page 10: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/10.jpg)
Practical Approach to Water Audits
• Useful in Before Leak Detection
• TOP DOWN Approach
• Pre-Audit Survey – Not Perfect
![Page 11: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/11.jpg)
Who Can Help with Water Audit?
• TAUD – Classes, Circuit Riders
• Engineering Consultant
• Leak Detection Consultant
![Page 12: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/12.jpg)
Why Perform a Water Audit?
A. Because Comptroller says so
B. It’s the law
C. It may actually be useful
D. All of the above
![Page 13: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/13.jpg)
How Can a Water Audit Help with Leak Detection?
• Quantifies Leakage
• Calculates Realistic Leakage Reduction Goals
• Answers: Is leak detection worth it?
![Page 14: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/14.jpg)
What Type of Audit Should I Do?
• TOP DOWN WATER AUDIT
• Use AWWA Software
• AWWA M-36
![Page 15: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/15.jpg)
TIPS for TOP DOWN initial AUDIT
• Keep it simple
• Don’t search endlessly for data
• Set a time deadline (1/2 day)
![Page 16: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/16.jpg)
TIPS for TOP DOWN initial AUDIT
• Pull out last financial annual audit
• Get out your latest water loss calculation sheet from old method
• Use information from the same FY
• GET STARTED!
![Page 17: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/17.jpg)
What Information is Needed for a Quick, Top Down, Water Audit?
1. Distribution System Information
2. Financial Data
3. Operational Data
4. Water Balance Inputs
![Page 18: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/18.jpg)
Distribution System Information
• Miles of Transmission Main
• Number of Service Connections
• Average Operating Pressure
![Page 19: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/19.jpg)
Financial Data
• Total Costs to Operate Water System ($)
• Retail Water Rate ($ per MG)
• Cost to Produce Water ($ per MG)
![Page 20: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/20.jpg)
Water Balance Inputs
MAJOR COMPONENTS
• Water Produced from WTP
• Water Purchased
• Water Billed and Metered to Customers
![Page 21: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/21.jpg)
Water Balance Inputs
Other Components
DON’T GET HUNG UP ON THESE
• Unbilled Authorized Consumption
- Flushing, Fire Dept, Gov’t uses, etc.
• Validities – Calibration Schedules, etc.
![Page 22: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/22.jpg)
Water Balance InputsMinor Components
DON’T GET HUNG UP ON THESE either
• Adjustment for Meter Error (if known)
• Adjustment for Tank Level Difference - (1st Day vs. Last Day of Year)
• Other Adjustments
![Page 23: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/23.jpg)
Water Balance InputsApparent Losses –
• Mistakes, Inaccuracies
• NOT LEAKS
• Most Important = Meter Inaccuracies
![Page 24: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/24.jpg)
Water Balance InputsLet’s look at the AWWA Audit Software…….
Southern Middle TN Community Example Water System - BEFORE LEAK DETECTION.xlsx
![Page 25: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/25.jpg)
What Outputs are Useful for Leak Detection?
• NRW – Non-Revenue Water
• CARL – Current Annual Real Losses
• UARL – Unavoidable Annual Real Losses
• ILI – Infrastructure Leakage Index
![Page 26: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/26.jpg)
NRWNon-Revenue Water
• Don’t Say “Unaccounted For Water” ANYMORE!
• NRW by % of Supply - Traditional
• NRW by % of Operating Costs – REPORT TO COMPTROLLER
![Page 27: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/27.jpg)
Non-Revenue WaterBilled Metered Consumption(including water exported)
Billed Unmetered Consumption
Unbilled Metered Consumption
Unbilled Unmetered Consumption
Unauthorized Consumption
Customer Metering Inaccuracies
Systematic Data Handling Errors
Leakage on Transmission and Distribution Mains
Leakage and Overflows at Utility's Storage Tanks
Leakage on Service Connections up to point of
Customer metering
Figure 1. IWA/AWWA Water Balance (All data in volume for the period of reference, typically one year)
System Input Volume (corrected for known errors)
Authorized Consumption
Billed Authorized Consumption
Revenue Water
Unbilled Authorized
Consumption
Non-Revenue Water (NRW)
Water Losses
Apparent Losses
Real Losses
![Page 28: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/28.jpg)
CARLCurrent Annual Real Losses
• Total Water Leaking from System (MG)
• Calculated Value (not input data)
• CARL/day or CARL/minute – gpm
![Page 29: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/29.jpg)
UARLUnavoidable Annual Real Losses
• May we call him “Earl”?
• Leakage that cannot be reasonably eliminated (MG)
• “U Are Really Low”
![Page 30: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/30.jpg)
UARLUnavoidable Annual Real Losses
• UARL/day or UARL/minute – gpm
• Target Number?
![Page 31: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/31.jpg)
The CARL and UARL Relationship
• CARL and UARL are brothers
• We are parents
• UARL is perfect
• CARL is not
• Our Goal: CARL to be more like UARL
![Page 32: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/32.jpg)
ILIInfrastructure Leakage Index
• CARL divided by UARL
• ILI = 1 is the best we can hope for
• If ILI = 10 then we are leaking about 10 times what we should be
![Page 33: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/33.jpg)
Operational IndicatorsUseful in Leak Detection
• Let’s look at AWWA Audit Software…..
Southern Middle TN Community Example Water System - BEFORE LEAK DETECTION.xlsx
![Page 34: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/34.jpg)
Financial Indicators Justifying Leak Detection
Annual Cost of Real Losses
• How much are my leaks costing me?
• If Annual Cost of Leak Detection and Repair is less than Annual Costs of Real Losses, then is it justified?
![Page 35: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/35.jpg)
Financial Indicators Justifying Leak Detection
Let’s look at AWWA Audit Software….
![Page 36: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/36.jpg)
Water Balance InputsLet’s look at the AWWA Audit Software…….
Southern Middle TN Community Example Water System - BEFORE LEAK DETECTION.xlsx
![Page 37: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/37.jpg)
After the TOP DOWN Audit
• If Audit Justifies Leak Detection
• What’s next?
• Practical Approach to Leak Detection
![Page 38: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/38.jpg)
Practical Approach to Leak Detection
1. Meet and Listen to Utility Staff
2. Investigate System
3. Acoustic Leak Detection
![Page 39: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/39.jpg)
Utility Staff MeetingQuestions
1. Can a map of distribution system and sewer system be provided?
2. How much water are we looking for?
3. From Audit: CARL-UARL = ____ gpm
![Page 40: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/40.jpg)
Effect of the Size of Distribution System on Water Loss
¼” dia = 15,000 gallons/day (625 GPH, 10 GPM)
System #1: 50,000 GPD usage
•Results in a 30% water loss
![Page 41: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/41.jpg)
Effect of the Size of Distribution System on Water Loss
¼” dia = 15,000 gallons/day (625 GPH, 10 GPM)
System #2: 3 MGD usage
• Results in a 0.5% water loss
![Page 42: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/42.jpg)
Pipe Leak Size
Approximate Gallons
Lost/Day
Approximate Gallons
Lost/Month
Approximate Gallons
Lost/Month x 5 Leaks
1/16” 360 11,000 55,000
1/8” 3,100 96,000 480,000
3/16” 8,400 260,000 1,300,000
1/4” 15,000 465,000 2,300,000
Leak Estimation Chart (60 PSI)
![Page 43: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/43.jpg)
50 GPM = 3,000 GPH = 72,000 GPD = 2,160,000 Gallons Per Month =
$6,480 (@$3.00/thousand gallons/month)
Value of a Leak
![Page 44: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/44.jpg)
4. Has there been a gradual increase in water loss?
5. Has there been a large increase recently in water loss?
6. What failures have been found within the distribution system?
Utility Staff MeetingQuestions
![Page 45: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/45.jpg)
Service line failures: polyethylene, galvanized, copper;
Distribution System Failures
![Page 46: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/46.jpg)
Service Line Failures
![Page 47: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/47.jpg)
1.0 Million Gallon/Month Leak ($3000/Month)
IMG_1268.MOV
![Page 48: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/48.jpg)
Main Lines
IMG_1272.MOV
![Page 49: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/49.jpg)
Main line failures: PVC, cast iron, galvanized.
Distribution System Failures
![Page 50: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/50.jpg)
7. What soil types are present? a. Limestone;b. Red clay;c. Sand;d. Sink holes.
Utility Staff MeetingQuestions, cont’d
![Page 51: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/51.jpg)
Sink Hole
![Page 52: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/52.jpg)
Sink Hole
![Page 53: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/53.jpg)
Sink Hole
![Page 54: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/54.jpg)
Sink Hole
![Page 55: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/55.jpg)
Investigate the System
1. Sewer System
a. Check manholes
b. Check flow between manholes
c. Compare water usage of sewer customers v. water metered to sewer plant
![Page 56: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/56.jpg)
2. Storm Drainage
a. Catch basins
b. Monitor where drainage spills out
Investigate the System
![Page 57: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/57.jpg)
Investigate the System
3. River Crossings
4. Cross Country Lines
5. Examine areas that are not visible on a daily, weekly, or monthly basis.
6. Meter Boxes – Automatic Read
![Page 58: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/58.jpg)
Acoustic Leak Detection
1. Start in older sections of system (downtown area)
2. Work outwards to newer areas
3. Daily Leak Log
![Page 59: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/59.jpg)
Acoustic Leak Detection
![Page 60: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/60.jpg)
Acoustic Leak Detection
![Page 61: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/61.jpg)
Acoustic Leak Detection
![Page 62: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/62.jpg)
![Page 63: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/63.jpg)
Billing for Leak Detection
1. By the Mile
2. By the Hour
![Page 64: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/64.jpg)
By the Mile
Based on length of water main surveyed
Pros and Cons:
1. Pro: Fixed Price (Easy to Budget)
2. Con: Unknown Conditions in System
![Page 65: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/65.jpg)
By the HourBased on time required to survey system
Pros and Cons:
1. Pro: Promotes thoroughness
2. Pro: Can be less expensive with Utility’s assistance
3. Con: Price is Variable (Hard to Budget)
![Page 66: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/66.jpg)
Assistance from the Utility
1. Provide an employee
a. Familiar with all meter locations
b. Cuts time by 1/2 +/-
c. Much time spent looking for meters
![Page 67: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/67.jpg)
2. Pre-mark listening points
a. Paint / flag meters
b. Paint arrows in road
c. Can be done by meter reader
Assistance from the Utility
![Page 68: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/68.jpg)
Manual Acoustic Leak DetectionVs.
Correlators
1. Ground microphone – FCS X-Mic
2. PVC and Correlators – Sound conductivity
3. Listening on polyethylene / PVC services
• Short distances
![Page 69: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/69.jpg)
4. Main line PVC leaks:
a. Ground microphone
b. Direct position over main
c. Detector tape
5. Copper services - metallic
Manual Acoustic Leak Detection
![Page 70: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/70.jpg)
6. Alternate methods:
a. Valve pinch off
b. Monitor low use times
Manual Acoustic Leak Detection
![Page 71: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/71.jpg)
![Page 72: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/72.jpg)
Results1. New Factory built in
Clarksville: New 16” DI line – 2000 L.F.
• Contractor: $40,000 on correlators
• Contractor: 2 weeks spot digging
• Rye Engineering: 3 hrs-LEAK FOUND
![Page 73: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/73.jpg)
Results2. Northern KY
town located on Ohio River
• Approx. 4 weeks of leak detection
• 3.3 million gallons/month water loss detected
![Page 74: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/74.jpg)
Results
3. Cumberland River Community
• 3 days of leak detection
• A savings of 600,000 gallons/month
![Page 75: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/75.jpg)
Results
4. Western Montgomery County
• 6 weeks of leak detection
• Savings of 2 million gallons/month
![Page 76: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/76.jpg)
Results
5. Tennessee River community
• 2 days of leak detection
• Found one 6” main line split and one ¾” service
![Page 77: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/77.jpg)
Results6. Clarksville
Housing Authority (120 units)
• 5 days of leak detection
• A savings of 432,000 gallons/month
![Page 78: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/78.jpg)
Results7. Large rural
system in Macon County
• 1 month of leak detection
• Reduced leakage from 54% to 15%+/-
![Page 79: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/79.jpg)
Results8. West TN City
near Mississippi River
• 2 days of leak detection
• With only partial survey reduced to under 20% leakage
![Page 80: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/80.jpg)
CASE STUDY9. Southern Middle TN Community
• Non-Revenue Water = 46% +/- by Volume
• CARL= 103 MG/year
• CARL / min = 198 gpm* = Leakage+/-
• *Utility estimated165 gpm+/- of its flow was being lost due to leakage in March 2013
![Page 81: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/81.jpg)
CASE STUDY
Well Prepared Utility
• Zone Meters in Place
• Isolated Leak to Downtown Area
• Narrowed Search: 30 mi down to 10 mi
![Page 82: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/82.jpg)
CASE STUDY
• 2-1/2 Days of Acoustic Leak Detection
• Real Losses Found = 110 gpm – 150gpm
• 13 Total Leaks – All Service Lines
• REPAIRS MADE DURING LEAK SURVEY
![Page 83: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/83.jpg)
Types of Leaks
![Page 84: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/84.jpg)
Types of Leaks
![Page 85: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/85.jpg)
Repairs
![Page 86: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/86.jpg)
Repairs
![Page 87: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/87.jpg)
Leaks Found
![Page 88: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/88.jpg)
Leaking Into Sewer
Goes with Audio.MOV
![Page 89: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/89.jpg)
Leaks Found
Goes with Audio - 1.MOV
![Page 90: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/90.jpg)
Leak Sound - Faint
Goes with Audio 0.MOV
![Page 91: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/91.jpg)
Sound of a Leak - Loud
Goes with Audio 1.MOV
![Page 92: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/92.jpg)
Leaks Found
gusher again.MOV
![Page 93: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/93.jpg)
Leaks Found
Service Line Leak with Pump Out.MOV
![Page 94: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/94.jpg)
After Leak Detection
• Re-run Audit Software (for Leak Detection Purposes Only)
• Use Master Meter to Estimate Reduction in Real Losses (extrapolate for 1-year)
• Quantify Results and Compare with Before
• Importance of Repair and Maintenance
![Page 95: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/95.jpg)
Quantify Results with AWWABEFORE Leak Survey
UARL = 20 MG/Year
CARL = 103 MG/Year
ILI = 5.2
NRW (vol)= 46%
NRW ($) = 20%
Real Losses= $190,000/YR
AFTER Leak Survey
UARL = 20 MG/Year
CARL = 26 MG/Year
ILI = 1.3
NRW (vol)= 20%
NRW ($) = 7%
Real Losses= $49,000/YR
![Page 96: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/96.jpg)
Re-run Audit Software
• Let’s go to the AWWA Audit Software…
Southern Middle TN Community Example Water System - PROJECTIONS AFTER LD.xlsx
![Page 97: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/97.jpg)
Audit Phenomena
• Use the Audit Software to try what-ifs
• Does it encourage higher operating costs?
• How can a system with NRW = 46% (vol) not be in violation?
• What to do with the money saved?
![Page 98: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/98.jpg)
What can you do with Money Saved?
• Spend?, Invest?, Save?
• Replace Lines?
• Replace Services?
• Timeliness
![Page 99: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/99.jpg)
Pros and Cons of Purchasing Your Own Leak Detection Equipment
• Cost of Equipment
• Dedicated Employee(s) Cost
• Training
• Shelving It!
![Page 100: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/100.jpg)
The Human Elements of Leak Detection
• It’s the Person – Not the equipment
• Experience in Water Distribution Systems
• Not just “Technicians”
• Grabbing the Low Hanging Fruit
![Page 101: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/101.jpg)
RYE ENGINEERING PLCConsulting Engineers & System Operators
4210 West Main StreetErin, TN 37061
Phone: (931) 289-2300Fax (931) 289-2313
Leak Detection Services
THANK YOU!
![Page 102: Rye leak detection 931-289-2300. A PRACTICAL APPROACH TO WATER AUDITS AND LEAK DETECTION LEAK DETECTION Presented By: RYE ENGINEERING PLC Consulting Engineers](https://reader030.vdocuments.net/reader030/viewer/2022032723/56649cfa5503460f949cc3e9/html5/thumbnails/102.jpg)
ryeleak detection931-289-2300