s: 5 metalcraft roofing@ final-watermarkedmetcom 7rvmcm7 ...€¦ · pre-finished window sill...
TRANSCRIPT
RESIDENTIAL VERTICAL CLADDING
Metcom 7
RVMCM7RVMCM7
0800 ROOFNZ (0800 766 369)www.metalcraftroofing.co.nz
Architectural / Specification EnquiriesPh: 09 274 0408
Mobile: 027 603 1096Email: [email protected]
00 / 20 COVER SHEET01 / 20 PARAPET AND BALUSTRADE CAPPING02 / 20 SOFFIT03 / 20 FLUSH WINDOW HEAD04 / 20 FLUSH WINDOW SILL05 / 20 FLUSH WINDOW JAMB06 / 20 RECESSED WINDOW HEAD07 / 20 RECESSED WINDOW SILL08 / 20 RECESSED WINDOW JAMB09 / 20 BUTT WINDOW HEAD10 / 20 BUTT WINDOW SILL11 / 20 BUTT WINDOW JAMB12 / 20 METERBOX HEAD13 / 20 METERBOX SILL14 / 20 METERBOX JAMB15 / 20 INTERNAL CORNER16 / 20 EXTERNAL CORNER17 / 20 SOAKER FLASHING18 / 20 BOTTOM OF CLADDING (FLUSH)19 / 20 BOTTOM OF CLADDING (RECESSED)20 / 20 3D WINDOW FLASHINGS
DETAIL LIST
PRE-FINISHED PARAPET CAP FLASHINGNO FIXINGS ON TOP OF FLASHING
BUILDING PAPER SHOWN DASHEDPRE-FINISHED SELFDRILLING/TAPPING SCREW WITHRUBBER WASHER
METALCRAFT METCOM 7VERTICAL CLADDINGWALL FRAMING
CONTINUOUS TIMBER PACKING MIN
.5°
BUILDING PAPER TO PROVIDE SEPARATION OFMETAL CAPPING AND TIMBER SHOWN DASHED
Z
CLE
ARAN
CE
25m
m
PRE-FINISHED POP RIVET BEDDEDIN SILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
5 GAP
20
15
AlTERNATIVE OPTIONBIRDS BEAK EDGE
HEMMED EDGE
STOPENDS TO WALL CLADDING
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.
CLE
ARAN
CE
25m
m
Z
20mm CAVITY
SITUATION 1
1. LOW, MEDIUM, HIGH WIND ZONES2. ROOF PITCH ≥ 10°
MIN. 50mm
SITUATION 2
1. VERY HIGH WIND ZONE2. ALL ROOF PITCHES
MIN. 70mmZ
SITUATION 3
1. EXTRA HIGH WIND ZONE2. ALL ROOF PITCHES
MIN. 90mm
PLEASE REFER TO E2 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.
CATEGORY A
1. NORMAL EXPOSURE2. ROOF PITCH >10°
MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH)MIN. 75mm (VERTICALLY DOWN FACE - PROFILED)
CATEGORY B
1. EXPOSED (HIGHER RISK) & WIND LOAD EXCEEDS 1.5 kPa.2. ROOF PITCH <10°
MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH)MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)
Z
PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
PARAPET AND BALUSTRADE CAPPING
01 / 202015
FLY RAFTER
BARGE BOARD
SOFFIT LINING
PURLIN
INTERNAL CEILING LINING
SQUARE STOP CORNICE
EXTRA NOG FOR TOP FIXING OFWALL CLADDING
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)
BUILDING PAPER SHOWN DASHED
WALL FRAMING
METALCRAFT METCOM 7 VERTICALCLADDING
COMPRESSIBLE FOAM SEAL. REFER TO MRM CODEOF PRACTICE VERSION 2.2 /2012 FOR REQUIRMENT.
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
PRE-FINISHED SOFFIT FLASHING
20mm CAVITY
STOPENDS TO WALL CLADDING
INTERNAL WALL LINING
PRE-FINISHED POP RIVET BEDDEDIN SILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
MIN. 50mm
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
SOFFIT
02 / 202015
BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
WALL FRAMING
STST OR GALV. FLAT HEAD NAIL FORFLASHING
METALCRAFT METCOM 7 VERTICALCLADDING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMB LINER BEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
BUILDING PAPER SHOWN DASHED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
CAVITY CLOSER AS REQUIRED TO NZBC
INTERNAL WALL LINING
MIN
. 10m
m C
OVE
R
COMPRESSIBLE FOAM SEAL TO FILLOVERLAP OF FLASHING
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM
ED
GE
MIN
. 50m
m C
OVE
R
SU
GG
EST
MIN
. 50m
m
DIM
ENS
ION
TO
SU
IT
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
FLUSH WINDOW HEAD
03 / 202015
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOW JOINERY
LINE OF WINDOW JAMB LINER BEHIND
WINDOW SILL LINER
MIN. 8mm PACKER
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT
WALL FRAMING
INTERNAL WALL LINING
STOPENDS TO SILL FLASHING
LINE OF JAMB FLASHING BEHIND
STOPENDS TO WALL CLADDING
SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED
AIRSEAL ON BACKING ROD TO RUN CONTINUOUSLYAROUND HEAD, SILL AND JAMB
PRE-FINISHED WINDOW SILL FLASHING
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW
PRE-FINISHED SECONDARY FLASHING
20mm CAVITY
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
WINDOW SILL SUPPORT BAR
5mm GAP
MIN
. 8m
m C
OV
ER
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
FLUSH WINDOW SILL
04 / 202015
METALCRAFT METCOM 7VERTICAL CLADDING
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOW JOINERY
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
PRE-FINISHED SECONDARY FLASHING
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
LINE OF SILL FLASHING BELOW
PRE-FINISHED WINDOW JAMBFLASHING
MIN. 10mm COVER
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
LINE OF SILL FLASHING BELOW
5mm
GAP
SUGGEST 50mm
DIMENSION TO SUITCOMPRESSIBLE FOAM SEAL TO FILLOVERLAP OF FLASHING
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER
5mm
GAP
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
FLUSH WINDOW JAMB
05 / 202015
BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
WINDOW LINTEL FRAMING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMB LINER BEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
INTERNAL WALL LINING
STST OR GALV. FLAT HEAD NAIL FORFLASHING
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
CAVITY CLOSER AS REQUIRED TO NZBC
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM
ED
GE
MIN
. 50m
m C
OVE
R
MIN
. 10m
m C
OVE
R
SU
GG
EST
MIN
. 50m
m
DIM
ENS
ION
TO
SU
IT
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
RECESSED WINDOW HEAD
06 / 202015
STOPENDS TO SILL FLASHING
LINE OF WINDOW JAMB LINER BEHIND
MIN. 8mm PACKER
WINDOW SILL LINER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
PRE-FINISHED WINDOW SILL FLASHING
LINE OF JAMB FLASHING BEHIND
WINDOW SILL SUPPORT BAR
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
STOPENDS TO WALL CLADDING
WALL FRAMING
INTERNAL WALL LINING
SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
PRE-FINISHED SECONDARY FLASHING
20mm CAVITY
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
5mm
GAP
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT
MIN
. 8m
m C
OV
ER
CO
VER
CLA
DD
ING
65m
m(M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
RECESSED WINDOW SILL
07 / 202015
5mm GAP
MIN. 10mm COVER
SUGGEST MIN. 50mm
DIMENSION TO SUIT
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOW JOINERY
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
PRE-FINISHED SECONDARYFLASHING
STST OR GALV. FLAT HEAD NAILFOR FLASHING
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED WINDOW JAMB FLASHING
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
LINE OF SILL FLASHING BELOW
PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER
METALCRAFT METCOM 7VERTICAL CLADDING
PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
5mm
GAP
LINE OF SILL FLASHING BELOW
LINE OF HEAD FLASHING ABOVE
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
RECESSED WINDOW JAMB
08 / 202015
BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING
WINDOW LINTEL FRAMING
PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL
DOUBLE GLAZING WINDOW JOINERY
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
WINDOW HEAD LINER
LINE OF WINDOW JAMB LINER BEHIND
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
INTERNAL WALL LINING
STST OR GALV. FLAT HEADNAIL FOR FLASHING
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
CAVITY CLOSER AS REQUIRED TO NZBC
MIN
. 10m
m C
OVE
R
SU
GG
EST
MIN
. 50m
m
DIM
ENS
ION
TO
SU
IT
5mm
GAP
5mm GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
ITH
OU
T H
EM
ED
GE
MIN
. 50m
m C
OVE
R
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
BUTT WINDOW HEAD
09 / 202015
STOPENDS TO SILL FLASHING
LINE OF WINDOW JAMB LINER BEHIND
MIN. 8mm PACKER
WINDOW SILL LINER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
PRE-FINISHED WINDOW SILL FLASHING
LINE OF JAMB FLASHING BEHIND
WINDOW SILL SUPPORT BAR
5mm GAP
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
DOUBLE GLAZING WINDOW JOINERY
5mm
GAP
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
STOPENDS TO WALL CLADDINGWALL FRAMING
INTERNAL WALL LINING
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
PRE-FINISHED SECONDARY FLASHING
20mm CAVITY
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT
SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED
MIN
. 8m
m C
OV
ER
CO
VER
CLA
DD
ING
60m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
BUTT WINDOW SILL
10 / 202015
5mm GAP
MIN.10mm COVER
SUGGEST MIN. 50mm
DIMENSION TO SUIT
BUILDING PAPER SHOWN DASHED
DOUBLE GLAZING WINDOW JOINERY
LINE OF WINDOW SILL LINER BELOW
WINDOW JAMB LINER
TIMBER PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
20mm JAMB BATTEN
INTERNAL WALL LINING
PRE-FINISHED SECONDARYFLASHING
PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED WINDOW JAMBFLASHING
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
LINE OF SILL FLASHING BELOW
LINE OF HEAD FLASHING ABOVE
STST OR GALV. FLAT HEAD NAILFOR FLASHING
METALCRAFT METCOM 7VERTICAL CLADDING
PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
5mm
GAP
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
BUTT WINDOW JAMB
11 / 202015
BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD
TEMPORARY PACKER IF REQUIRED, REMOVEDAFTER FIXING
EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED
INTERNAL WALL LINING
METERBOX LINTEL FRAMING
METALCRAFT METCOM 7 VERTICALCLADDING
PRE-FINISHED HEAD FLASHING WITH 15° FALL
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB
METER BOX
STOPENDS TO HEAD FLASHING
LINE OF JAMB FLASHING BEHIND
PRE-FINISHED 'U' BRACKET FIXED TOMETERBOX BEFORE INSTALLATION
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
STST OR GALV. FLAT HEAD NAIL FOR FLASHING
CAVITY CLOSER AS REQUIRED TO NZBC
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
5mm
GAP
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
MIN
. 75m
m W
IHTO
UT
HE
M E
DG
E
MIN
. 50m
m C
OVE
R
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
METERBOX HEAD
12 / 202015
METALCRAFT METCOM 7 VERTICALCLADDING
BUILDING PAPER SHOWN DASHED
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER BOX
MIN. 8mm PACKER
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB COMPRESSIBLE FOAM SEAL. REFER
TO MRM CODE OF PRACTICEVERSION 2.2 /2012 FORREQUIRMENT
WALL FRAMING
INTERNAL WALL LINING
LINE OF JAMB FLASHING BEHIND
STST OR GALV. FLAT HEAD NAIL FORFLASHING
20mm CAVITY
FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
PRE-FINISHED SILL FLASHING
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED
STOPENDS TO SILL FLASHING
PRE-FINISHED SECONDARY FLASHING
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
METER BOX
STOPENDS TO WALL CLADDING
CO
VER
CLA
DD
ING
65m
m (M
IN. 3
5mm
)
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
METERBOX SILL
13 / 202015
METALCRAFT METCOM 7VERTICAL CLADDING
BUILDING PAPER SHOWN DASHED
METER BOX
TIMBER PACKER
20mm JAMB BATTEN
INTERNAL WALL LINING
LINE OF SILL FLASHING BELOW
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
LINE OF HEAD FLASHING ABOVE
PRE-FINISHED JAMB FLASHING FIXED TOMETERBOX BEFORE INSTALLATION
METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.
AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB
FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL
SEPERATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
LINE OF HEAD FLASHING ABOVE
STST OR GALV. FLAT HEADNAIL FOR FLASHING
PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW SUGGEST MIN. 50mm
DIMENSION TO SUIT
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
METERBOX JAMB
14 / 202015
METALCRAFT METCOM 7VERTICAL CLADDING
PRE-FINISHED FIXINGBRACKET WITH PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW
20mm CAVITY
PRE-FINISHED INTERNALCORNER FLASHING
INTERNAL WALL LINING
BUILDING PAPER SHOWNDASHED
WALL FRAMING
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED
STST OR GALV. FLAT HEADNAIL FOR FLASHING
PRE-FINISHED SECONDARYFLASHING
MIN. 2 CRESTSM
IN. 2
CR
EST
S
PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
INTERNAL CORNER
15 / 202015
20mm CAVITY
METALCRAFT METCOM 7VERTICAL CLADDING
INTERNAL WALL LINING
WALL FRAMING
PRE-FINISHED EXTERNALCORNER FLASHING
MIN. 2 CRESTS
BUILDING PAPER SHOWN DASHED
STST OR GALV. FLAT HEAD NAILFOR FLASHING
SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED
PRE-FINISHED SECONDARYFLASHING
MIN
. 2 C
RE
STS
PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW
PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
EXTERNAL CORNER
16 / 202015
BUILDING PAPERSHOWN DASHED
METALCRAFT METCOM 7VERTICAL CLADDING
PRE-FINISHED FLAT HEADWAFER-TEK SCREW WITHEPDM WASHER
INTERNAL WALL LINING
SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED
WALL FRAMING
PRE-FINISHED SOAKERFLASHING TO LINE UP WITHWINDOW JAMB ABOVE
20mm CAVITY
SOAKER FLASHING ONLY REQUIRED TOLINE UP WITH WINDOW JAMB ABOVE.REFER TO MRM CODE OF PRACTICEVERSION 2.2 /2012 FOR REQUIRMENT.
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
SOAKER FLASHING
17 / 202015
BUILDING PAPER SHOWN DASHED
INTERNAL WALL LINING
WALL FRAMING
METALCRAFT METCOM 7VERTICAL CLADDING
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALLPRE-PRIMED SKIRTING
CONCRETE SLAB
MIN
. 50m
m L
AP
VEN
TILA
TIO
N G
AP
3-5m
m
DR
IP E
DG
E TO
CLA
DD
ING
MIN
. 15m
m G
AP
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
STST OR GALV. FLAT HEAD NAIL FORFLASHING
CAVITY CLOSER AS REQUIRED TONZBC
20mm CAVITY
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
BOTTOM OF CLADDING (FLUSH)
18 / 202015
BUILDING PAPER OVER FLASHINGSHOWN DASHED
INTERNAL WALL LINING
WALL FRAMING
METALCRAFT METCOM 7VERTICAL CLADDING
STST OR GALV. FLAT HEAD NAIL FORFLASHING
MIN
. 75m
m C
OVE
R
3-5m
m V
ENTI
LATI
ON
GAP
PRE-PRIMED SKIRTING
CONCRETE SLAB
PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER
PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL
ALTERNATIVE OPTIONBIRDS BEAK EDGE
5 GAP
20
15
HEMMED EDGE
CAVITY CLOSER AS REQUIRED TONZBC
20mm CAVITY
MIN
. 50m
m L
AP
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7
- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.
- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.
ScaleDate Sheet 1 : 2
BOTTOM OF CLADDING (RECESSED)
19 / 202015
Reference
DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.
RESIDENTIAL VERTICAL CLADDINGMetcom 7
RVMCM7RVMCM7 ScaleDate Sheet
3D WINDOW FLASHINGS
20 / 202015
HEAD FLASHING
JAMB FLASHING
SILL FLASHING
FLUSH WINDOW FLASHINGS RECESSED WINDOW FLASHINGS
HEAD FLASHING
JAMB FLASHING
SILL FLASHING
METALCRAFTMETCOM 7VERTICALCLADDING
ALUMINIUMWINDOWJOINERY
COMPRESSIBLEFOAM SEALBEHIND TO FILLOVERLAP OFFLASHING
ALUMINIUMWINDOWJOINERY
METALCRAFTMETCOM 7VERTICALCLADDING