s: 5 metalcraft roofing@ final-watermarkedmetcom 7rvmcm7 ...€¦ · pre-finished window sill...

21
RESIDENTIAL VERTICAL CLADDING Metcom 7 RVMCM7 RVMCM7 0800 ROOFNZ (0800 766 369) www.metalcraftroofing.co.nz Architectural / Specification Enquiries Ph: 09 274 0408 Mobile: 027 603 1096 Email: [email protected] 00 / 20 COVER SHEET 01 / 20 PARAPET AND BALUSTRADE CAPPING 02 / 20 SOFFIT 03 / 20 FLUSH WINDOW HEAD 04 / 20 FLUSH WINDOW SILL 05 / 20 FLUSH WINDOW JAMB 06 / 20 RECESSED WINDOW HEAD 07 / 20 RECESSED WINDOW SILL 08 / 20 RECESSED WINDOW JAMB 09 / 20 BUTT WINDOW HEAD 10 / 20 BUTT WINDOW SILL 11 / 20 BUTT WINDOW JAMB 12 / 20 METERBOX HEAD 13 / 20 METERBOX SILL 14 / 20 METERBOX JAMB 15 / 20 INTERNAL CORNER 16 / 20 EXTERNAL CORNER 17 / 20 SOAKER FLASHING 18 / 20 BOTTOM OF CLADDING (FLUSH) 19 / 20 BOTTOM OF CLADDING (RECESSED) 20 / 20 3D WINDOW FLASHINGS DETAIL LIST

Upload: others

Post on 10-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

RESIDENTIAL VERTICAL CLADDING

Metcom 7

RVMCM7RVMCM7

0800 ROOFNZ (0800 766 369)www.metalcraftroofing.co.nz

Architectural / Specification EnquiriesPh: 09 274 0408

Mobile: 027 603 1096Email: [email protected]

00 / 20 COVER SHEET01 / 20 PARAPET AND BALUSTRADE CAPPING02 / 20 SOFFIT03 / 20 FLUSH WINDOW HEAD04 / 20 FLUSH WINDOW SILL05 / 20 FLUSH WINDOW JAMB06 / 20 RECESSED WINDOW HEAD07 / 20 RECESSED WINDOW SILL08 / 20 RECESSED WINDOW JAMB09 / 20 BUTT WINDOW HEAD10 / 20 BUTT WINDOW SILL11 / 20 BUTT WINDOW JAMB12 / 20 METERBOX HEAD13 / 20 METERBOX SILL14 / 20 METERBOX JAMB15 / 20 INTERNAL CORNER16 / 20 EXTERNAL CORNER17 / 20 SOAKER FLASHING18 / 20 BOTTOM OF CLADDING (FLUSH)19 / 20 BOTTOM OF CLADDING (RECESSED)20 / 20 3D WINDOW FLASHINGS

DETAIL LIST

Page 2: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

PRE-FINISHED PARAPET CAP FLASHINGNO FIXINGS ON TOP OF FLASHING

BUILDING PAPER SHOWN DASHEDPRE-FINISHED SELFDRILLING/TAPPING SCREW WITHRUBBER WASHER

METALCRAFT METCOM 7VERTICAL CLADDINGWALL FRAMING

CONTINUOUS TIMBER PACKING MIN

.5°

BUILDING PAPER TO PROVIDE SEPARATION OFMETAL CAPPING AND TIMBER SHOWN DASHED

Z

CLE

ARAN

CE

25m

m

PRE-FINISHED POP RIVET BEDDEDIN SILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

5 GAP

20

15

AlTERNATIVE OPTIONBIRDS BEAK EDGE

HEMMED EDGE

STOPENDS TO WALL CLADDING

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT.

CLE

ARAN

CE

25m

m

Z

20mm CAVITY

SITUATION 1

1. LOW, MEDIUM, HIGH WIND ZONES2. ROOF PITCH ≥ 10°

MIN. 50mm

SITUATION 2

1. VERY HIGH WIND ZONE2. ALL ROOF PITCHES

MIN. 70mmZ

SITUATION 3

1. EXTRA HIGH WIND ZONE2. ALL ROOF PITCHES

MIN. 90mm

PLEASE REFER TO E2 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.

CATEGORY A

1. NORMAL EXPOSURE2. ROOF PITCH >10°

MIN. 50mm (VERTICALLY DOWN FACE - SMOOTH)MIN. 75mm (VERTICALLY DOWN FACE - PROFILED)

CATEGORY B

1. EXPOSED (HIGHER RISK) & WIND LOAD EXCEEDS 1.5 kPa.2. ROOF PITCH <10°

MIN. 75mm (VERTICALLY DOWN FACE - SMOOTH)MIN. 100mm (VERTICALLY DOWN FACE - PROFILED)

Z

PLEASE REFER TO MRM CODE OF PRACTICE VERSION 2.2/2012 FOR FURTHER INFORMATION ON FLASHING COVER WIDTHS.

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

PARAPET AND BALUSTRADE CAPPING

01 / 202015

Page 3: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

FLY RAFTER

BARGE BOARD

SOFFIT LINING

PURLIN

INTERNAL CEILING LINING

SQUARE STOP CORNICE

EXTRA NOG FOR TOP FIXING OFWALL CLADDING

CO

VER

CLA

DD

ING

60m

m (M

IN. 3

5mm

)

BUILDING PAPER SHOWN DASHED

WALL FRAMING

METALCRAFT METCOM 7 VERTICALCLADDING

COMPRESSIBLE FOAM SEAL. REFER TO MRM CODEOF PRACTICE VERSION 2.2 /2012 FOR REQUIRMENT.

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

PRE-FINISHED SOFFIT FLASHING

20mm CAVITY

STOPENDS TO WALL CLADDING

INTERNAL WALL LINING

PRE-FINISHED POP RIVET BEDDEDIN SILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

MIN. 50mm

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

SOFFIT

02 / 202015

Page 4: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED

WALL FRAMING

STST OR GALV. FLAT HEAD NAIL FORFLASHING

METALCRAFT METCOM 7 VERTICALCLADDING

PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL

DOUBLE GLAZING WINDOW JOINERY

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

WINDOW HEAD LINER

LINE OF WINDOW JAMB LINER BEHIND

STOPENDS TO HEAD FLASHING

LINE OF JAMB FLASHING BEHIND

BUILDING PAPER SHOWN DASHED

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

CAVITY CLOSER AS REQUIRED TO NZBC

INTERNAL WALL LINING

MIN

. 10m

m C

OVE

R

COMPRESSIBLE FOAM SEAL TO FILLOVERLAP OF FLASHING

5mm

GAP

DR

IP E

DG

E TO

CLA

DD

ING

MIN

. 15m

m G

AP

MIN

. 75m

m W

ITH

OU

T H

EM

ED

GE

MIN

. 50m

m C

OVE

R

SU

GG

EST

MIN

. 50m

m

DIM

ENS

ION

TO

SU

IT

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

FLUSH WINDOW HEAD

03 / 202015

Page 5: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

DOUBLE GLAZING WINDOW JOINERY

LINE OF WINDOW JAMB LINER BEHIND

WINDOW SILL LINER

MIN. 8mm PACKER

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT

WALL FRAMING

INTERNAL WALL LINING

STOPENDS TO SILL FLASHING

LINE OF JAMB FLASHING BEHIND

STOPENDS TO WALL CLADDING

SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED

AIRSEAL ON BACKING ROD TO RUN CONTINUOUSLYAROUND HEAD, SILL AND JAMB

PRE-FINISHED WINDOW SILL FLASHING

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8g WAFER-TEK SCREW

PRE-FINISHED SECONDARY FLASHING

20mm CAVITY

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

WINDOW SILL SUPPORT BAR

5mm GAP

MIN

. 8m

m C

OV

ER

CO

VER

CLA

DD

ING

60m

m (M

IN. 3

5mm

)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

FLUSH WINDOW SILL

04 / 202015

Page 6: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

METALCRAFT METCOM 7VERTICAL CLADDING

BUILDING PAPER SHOWN DASHED

DOUBLE GLAZING WINDOW JOINERY

LINE OF WINDOW SILL LINER BELOW

WINDOW JAMB LINER

TIMBER PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

20mm JAMB BATTEN

INTERNAL WALL LINING

PRE-FINISHED SECONDARY FLASHING

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

LINE OF SILL FLASHING BELOW

PRE-FINISHED WINDOW JAMBFLASHING

MIN. 10mm COVER

SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

LINE OF SILL FLASHING BELOW

5mm

GAP

SUGGEST 50mm

DIMENSION TO SUITCOMPRESSIBLE FOAM SEAL TO FILLOVERLAP OF FLASHING

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER

5mm

GAP

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

FLUSH WINDOW JAMB

05 / 202015

Page 7: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

WINDOW LINTEL FRAMING

PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL

DOUBLE GLAZING WINDOW JOINERY

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

WINDOW HEAD LINER

LINE OF WINDOW JAMB LINER BEHIND

STOPENDS TO HEAD FLASHING

LINE OF JAMB FLASHING BEHIND

EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED

INTERNAL WALL LINING

STST OR GALV. FLAT HEAD NAIL FORFLASHING

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

CAVITY CLOSER AS REQUIRED TO NZBC

5mm

GAP

DR

IP E

DG

E TO

CLA

DD

ING

MIN

. 15m

m G

AP

MIN

. 75m

m W

ITH

OU

T H

EM

ED

GE

MIN

. 50m

m C

OVE

R

MIN

. 10m

m C

OVE

R

SU

GG

EST

MIN

. 50m

m

DIM

ENS

ION

TO

SU

IT

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

RECESSED WINDOW HEAD

06 / 202015

Page 8: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

STOPENDS TO SILL FLASHING

LINE OF WINDOW JAMB LINER BEHIND

MIN. 8mm PACKER

WINDOW SILL LINER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

PRE-FINISHED WINDOW SILL FLASHING

LINE OF JAMB FLASHING BEHIND

WINDOW SILL SUPPORT BAR

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

DOUBLE GLAZING WINDOW JOINERY

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

STOPENDS TO WALL CLADDING

WALL FRAMING

INTERNAL WALL LINING

SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

PRE-FINISHED SECONDARY FLASHING

20mm CAVITY

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

5mm

GAP

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT

MIN

. 8m

m C

OV

ER

CO

VER

CLA

DD

ING

65m

m(M

IN. 3

5mm

)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

RECESSED WINDOW SILL

07 / 202015

Page 9: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

5mm GAP

MIN. 10mm COVER

SUGGEST MIN. 50mm

DIMENSION TO SUIT

BUILDING PAPER SHOWN DASHED

DOUBLE GLAZING WINDOW JOINERY

LINE OF WINDOW SILL LINER BELOW

WINDOW JAMB LINER

TIMBER PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

20mm JAMB BATTEN

INTERNAL WALL LINING

PRE-FINISHED SECONDARYFLASHING

STST OR GALV. FLAT HEAD NAILFOR FLASHING

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED WINDOW JAMB FLASHING

SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

LINE OF SILL FLASHING BELOW

PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER

METALCRAFT METCOM 7VERTICAL CLADDING

PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

5mm

GAP

LINE OF SILL FLASHING BELOW

LINE OF HEAD FLASHING ABOVE

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

RECESSED WINDOW JAMB

08 / 202015

Page 10: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED,REMOVED AFTER FIXING

WINDOW LINTEL FRAMING

PRE-FINISHED WINDOW HEADFLASHING WITH 15° FALL

DOUBLE GLAZING WINDOW JOINERY

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

WINDOW HEAD LINER

LINE OF WINDOW JAMB LINER BEHIND

STOPENDS TO HEAD FLASHING

LINE OF JAMB FLASHING BEHIND

EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED

INTERNAL WALL LINING

STST OR GALV. FLAT HEADNAIL FOR FLASHING

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

CAVITY CLOSER AS REQUIRED TO NZBC

MIN

. 10m

m C

OVE

R

SU

GG

EST

MIN

. 50m

m

DIM

ENS

ION

TO

SU

IT

5mm

GAP

5mm GAP

DR

IP E

DG

E TO

CLA

DD

ING

MIN

. 15m

m G

AP

MIN

. 75m

m W

ITH

OU

T H

EM

ED

GE

MIN

. 50m

m C

OVE

R

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

BUTT WINDOW HEAD

09 / 202015

Page 11: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

STOPENDS TO SILL FLASHING

LINE OF WINDOW JAMB LINER BEHIND

MIN. 8mm PACKER

WINDOW SILL LINER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

PRE-FINISHED WINDOW SILL FLASHING

LINE OF JAMB FLASHING BEHIND

WINDOW SILL SUPPORT BAR

5mm GAP

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

DOUBLE GLAZING WINDOW JOINERY

5mm

GAP

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

STOPENDS TO WALL CLADDINGWALL FRAMING

INTERNAL WALL LINING

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

PRE-FINISHED SECONDARY FLASHING

20mm CAVITY

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

COMPRESSIBLE FOAM SEAL. REFERTO MRM CODE OF PRACTICE VERSION2.2 /2012 FOR REQUIRMENT

SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED

MIN

. 8m

m C

OV

ER

CO

VER

CLA

DD

ING

60m

m (M

IN. 3

5mm

)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

BUTT WINDOW SILL

10 / 202015

Page 12: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

5mm GAP

MIN.10mm COVER

SUGGEST MIN. 50mm

DIMENSION TO SUIT

BUILDING PAPER SHOWN DASHED

DOUBLE GLAZING WINDOW JOINERY

LINE OF WINDOW SILL LINER BELOW

WINDOW JAMB LINER

TIMBER PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

20mm JAMB BATTEN

INTERNAL WALL LINING

PRE-FINISHED SECONDARYFLASHING

PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER

FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED WINDOW JAMBFLASHING

SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

LINE OF SILL FLASHING BELOW

LINE OF HEAD FLASHING ABOVE

STST OR GALV. FLAT HEAD NAILFOR FLASHING

METALCRAFT METCOM 7VERTICAL CLADDING

PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

5mm

GAP

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

BUTT WINDOW JAMB

11 / 202015

Page 13: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER DRESSED INTO OPENINGWITH FLEXIBLE FLASHING TAPE INSTALLEDOVER WRAP TO CORNERS AT HEAD

TEMPORARY PACKER IF REQUIRED, REMOVEDAFTER FIXING

EXTRA BUILDING PAPER OVER WINDOWHEAD FLASHING SHOWN DASHED

INTERNAL WALL LINING

METERBOX LINTEL FRAMING

METALCRAFT METCOM 7 VERTICALCLADDING

PRE-FINISHED HEAD FLASHING WITH 15° FALL

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB

METER BOX

STOPENDS TO HEAD FLASHING

LINE OF JAMB FLASHING BEHIND

PRE-FINISHED 'U' BRACKET FIXED TOMETERBOX BEFORE INSTALLATION

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

STST OR GALV. FLAT HEAD NAIL FOR FLASHING

CAVITY CLOSER AS REQUIRED TO NZBC

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

5mm

GAP

DR

IP E

DG

E TO

CLA

DD

ING

MIN

. 15m

m G

AP

MIN

. 75m

m W

IHTO

UT

HE

M E

DG

E

MIN

. 50m

m C

OVE

R

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

METERBOX HEAD

12 / 202015

Page 14: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

METALCRAFT METCOM 7 VERTICALCLADDING

BUILDING PAPER SHOWN DASHED

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER BOX

MIN. 8mm PACKER

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD, SILL AND JAMB COMPRESSIBLE FOAM SEAL. REFER

TO MRM CODE OF PRACTICEVERSION 2.2 /2012 FORREQUIRMENT

WALL FRAMING

INTERNAL WALL LINING

LINE OF JAMB FLASHING BEHIND

STST OR GALV. FLAT HEAD NAIL FORFLASHING

20mm CAVITY

FLEXIBLE FLASHING TAPE OVER BUILDINGPAPER FOR FULL WIDTH/DEPTH SILL

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

PRE-FINISHED SILL FLASHING

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

SEPARATE BATTEN AND FLASHING WITHEPDM AS REQUIRED

STOPENDS TO SILL FLASHING

PRE-FINISHED SECONDARY FLASHING

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

METER BOX

STOPENDS TO WALL CLADDING

CO

VER

CLA

DD

ING

65m

m (M

IN. 3

5mm

)

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

METERBOX SILL

13 / 202015

Page 15: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

METALCRAFT METCOM 7VERTICAL CLADDING

BUILDING PAPER SHOWN DASHED

METER BOX

TIMBER PACKER

20mm JAMB BATTEN

INTERNAL WALL LINING

LINE OF SILL FLASHING BELOW

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

LINE OF HEAD FLASHING ABOVE

PRE-FINISHED JAMB FLASHING FIXED TOMETERBOX BEFORE INSTALLATION

METAL ANGLE TO BE CONTINUOUSAROUND METER BOX.

AIRSEAL ON BACKING ROD TO RUNCONTINUOUSLY AROUND HEAD,SILL AND JAMB

FLEXIBLE FLASHING TAPE OVERBUILDING PAPER FOR FULLWIDTH/DEPTH SILL

SEPERATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

LINE OF HEAD FLASHING ABOVE

STST OR GALV. FLAT HEADNAIL FOR FLASHING

PRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW SUGGEST MIN. 50mm

DIMENSION TO SUIT

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

METERBOX JAMB

14 / 202015

Page 16: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

METALCRAFT METCOM 7VERTICAL CLADDING

PRE-FINISHED FIXINGBRACKET WITH PRE-FINISHED POP RIVETBEDDED IN SILICONE ORPRE-FINISHED 8g WAFER-TEK SCREW

20mm CAVITY

PRE-FINISHED INTERNALCORNER FLASHING

INTERNAL WALL LINING

BUILDING PAPER SHOWNDASHED

WALL FRAMING

SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED

STST OR GALV. FLAT HEADNAIL FOR FLASHING

PRE-FINISHED SECONDARYFLASHING

MIN. 2 CRESTSM

IN. 2

CR

EST

S

PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

INTERNAL CORNER

15 / 202015

Page 17: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

20mm CAVITY

METALCRAFT METCOM 7VERTICAL CLADDING

INTERNAL WALL LINING

WALL FRAMING

PRE-FINISHED EXTERNALCORNER FLASHING

MIN. 2 CRESTS

BUILDING PAPER SHOWN DASHED

STST OR GALV. FLAT HEAD NAILFOR FLASHING

SEPARATE BATTEN AND FLASHINGWITH EPDM AS REQUIRED

PRE-FINISHED SECONDARYFLASHING

MIN

. 2 C

RE

STS

PRE-FINISHED FIXING BRACKET WITHPRE-FINISHED POP RIVET BEDDED INSILICONE OR PRE-FINISHED 8gWAFER-TEK SCREW

PRE-FINISHED 8g WAFER-TEKSCREW WITH EPDM WASHER

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

EXTERNAL CORNER

16 / 202015

Page 18: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPERSHOWN DASHED

METALCRAFT METCOM 7VERTICAL CLADDING

PRE-FINISHED FLAT HEADWAFER-TEK SCREW WITHEPDM WASHER

INTERNAL WALL LINING

SEPARATE BATTEN ANDFLASHING WITH EPDM ASREQUIRED

WALL FRAMING

PRE-FINISHED SOAKERFLASHING TO LINE UP WITHWINDOW JAMB ABOVE

20mm CAVITY

SOAKER FLASHING ONLY REQUIRED TOLINE UP WITH WINDOW JAMB ABOVE.REFER TO MRM CODE OF PRACTICEVERSION 2.2 /2012 FOR REQUIRMENT.

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

SOAKER FLASHING

17 / 202015

Page 19: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER SHOWN DASHED

INTERNAL WALL LINING

WALL FRAMING

METALCRAFT METCOM 7VERTICAL CLADDING

PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALLPRE-PRIMED SKIRTING

CONCRETE SLAB

MIN

. 50m

m L

AP

VEN

TILA

TIO

N G

AP

3-5m

m

DR

IP E

DG

E TO

CLA

DD

ING

MIN

. 15m

m G

AP

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

STST OR GALV. FLAT HEAD NAIL FORFLASHING

CAVITY CLOSER AS REQUIRED TONZBC

20mm CAVITY

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

BOTTOM OF CLADDING (FLUSH)

18 / 202015

Page 20: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

BUILDING PAPER OVER FLASHINGSHOWN DASHED

INTERNAL WALL LINING

WALL FRAMING

METALCRAFT METCOM 7VERTICAL CLADDING

STST OR GALV. FLAT HEAD NAIL FORFLASHING

MIN

. 75m

m C

OVE

R

3-5m

m V

ENTI

LATI

ON

GAP

PRE-PRIMED SKIRTING

CONCRETE SLAB

PRE-FINISHED SELF DRILLING/TAPPINGSCREW WITH RUBBER WASHER

PRE-FINISHED NON-PERFORATEDCLOSURE FLASHING WITH 10° FALL

ALTERNATIVE OPTIONBIRDS BEAK EDGE

5 GAP

20

15

HEMMED EDGE

CAVITY CLOSER AS REQUIRED TONZBC

20mm CAVITY

MIN

. 50m

m L

AP

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7

- BUILDING PAPER IS THE COMMON GENERIC NAME FOR PERMEABLEROOF AND WALL UNDERLAYS. PLEASE REFER TO NZBC E2/AS1 ANDMRM CODE OF PRACTICE VERSION 2.2 /2012.

- CAVITY SYSTEM FOR VERTICAL CLADDING : 20mm NOMINAL THICK(VERTICALLY DRAINING) HORIZONTAL CAVITY SYSTEM WITH BATTENSAS APPLICABLE TO SUPPORT CLADDINGS & FLASHINGS TO NZBC.

ScaleDate Sheet 1 : 2

BOTTOM OF CLADDING (RECESSED)

19 / 202015

Page 21: S: 5 Metalcraft Roofing@ Final-watermarkedMetcom 7RVMCM7 ...€¦ · pre-finished window sill flashing pre-finished pop rivet bedded in silicone or pre-finished 8g wafer-tek screw

Reference

DISCLAIMER:All details are to be used for indicative purposes only and the designer should consult both the MRMcode of pratice version 2.2 /2012, E2 and all other relevant building codesDetails of the supporting mechanisms are indicative only. Compliance of the supporting mechanismsis the responsibility of the designer. Construction detail can vary for wall cladding. The underlay isdetailed as a single line for simplicity and is indicative only. Building paper type and method ofinstallation should comply with underlay manufacturers recommendations and NZBC regulations.

RESIDENTIAL VERTICAL CLADDINGMetcom 7

RVMCM7RVMCM7 ScaleDate Sheet

3D WINDOW FLASHINGS

20 / 202015

HEAD FLASHING

JAMB FLASHING

SILL FLASHING

FLUSH WINDOW FLASHINGS RECESSED WINDOW FLASHINGS

HEAD FLASHING

JAMB FLASHING

SILL FLASHING

METALCRAFTMETCOM 7VERTICALCLADDING

ALUMINIUMWINDOWJOINERY

COMPRESSIBLEFOAM SEALBEHIND TO FILLOVERLAP OFFLASHING

ALUMINIUMWINDOWJOINERY

METALCRAFTMETCOM 7VERTICALCLADDING