S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General: 5. Powering Off, dismantling the Servers, Storage & Network devices from respective racks at BKC and installing the devices in racks, Powering ON at proposed location will be done by Bank’s ITSP team in consultation with Bank and OEM / AMC vendors. We understand this is bank's ITSP team scope and not the part of Data Center Service provider, please confirm. No change in RFP terms. Bidder's understanding is correct. Bank's ITSP team in coordination with respective OEM's shall jointly do the activity 2 75/110 Annexure -13 The Bank may in future require additional space at the Near DR site. The bidder will provide the additional space to the Bank within the same Near DR site / floor or building. Request IDBI to share the road map for further expansion. No change in RFP terms. Bank shall share the additional requirements as and when it evolves 3 76/110 Annexure -13 B. Server Room Area - Bank envisages requirement of a dedicated clear space to accommodate 8 Racks (42U). This information doesn’t match with Annexure-23 where max. Rack heights is 45U. Also 2 nos. Racks dimensions are missing The rack specification is 42U as mentioned in RFP Annexure 13, Clause B.2 Rack height of 45U mentioned in Annexure 23 includes height of the castor attached to the rack. Rack dimension is 800 mm X 1000 mm. Please refer the corrigendum Out of 8 racks, 2 are spare 4 76/110 Annexure -13 B. Server Room Area - 3. The specification for the 8 no. of Racks to be shifted are mentioned below, i. 2 no. of network Racks would require 2x16A/1P & 4x32A/1P sockets per rack ii. 1 no. of Netapp Rack would require 4x32A/1P sockets iii. 1 no. of IBM Rack would require 4x32A/3P sockets iv. 4 no. of Racks would require 2x16A sockets per rack. We understand the 2x16A/1P sockets will be provisioned thru rack PDU thru C13/C19 connections and 4x32 Amp/1P circuits will be terminating directly in the Banks switch. Please confirm. No change in RFP terms. 2x16A/1P sockets will be provisioned through rack PDU and 4x32 Amp/1P circuits will be terminating directly in the Banks switch. However necessary power sockets should be provided for connecting the equipment. 5 76/110 Annexure -13 B. Server Room Area - 6. Bidder should provide two factor authentications to the caged area for entry and exit (Combination of any two- Card and Pin or Biometric) We shall provide Biometric+PINPAD reader for server area 'Entry' and Proximity Card Reader for 'Exit'. Please refer corrigendum Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020 Page 1 of 35

Upload: others

Post on 22-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

1 75/110 Annexure -13 A General: 5. Powering Off, dismantling the Servers,

Storage & Network devices from respective racks at BKC

and installing the devices in racks, Powering ON at

proposed location will be done by Bank’s ITSP team in

consultation with Bank and OEM / AMC vendors.

We understand this is bank's ITSP team scope and

not the part of Data Center Service provider, please

confirm.

No change in RFP terms.

Bidder's understanding is correct.

Bank's ITSP team in coordination

with respective OEM's shall jointly

do the activity

2 75/110 Annexure -13 The Bank may in future require additional space at the

Near DR site. The bidder will provide the additional

space to the Bank within the same Near DR site / floor

or building.

Request IDBI to share the road map for further

expansion.

No change in RFP terms.

Bank shall share the additional

requirements as and when it

evolves

3 76/110 Annexure -13 B. Server Room Area - Bank envisages requirement of a

dedicated clear space to accommodate 8 Racks (42U).

This information doesn’t match with Annexure-23

where max. Rack heights is 45U. Also 2 nos. Racks

dimensions are missing

The rack specification is 42U as

mentioned in RFP Annexure 13,

Clause B.2

Rack height of 45U mentioned in

Annexure 23 includes height of the

castor attached to the rack.

Rack dimension is 800 mm X 1000

mm. Please refer the corrigendum

Out of 8 racks, 2 are spare

4 76/110 Annexure -13 B. Server Room Area - 3. The specification for the 8 no.

of Racks to be shifted are mentioned below,

i. 2 no. of network Racks would require 2x16A/1P &

4x32A/1P sockets per rack

ii. 1 no. of Netapp Rack would require 4x32A/1P sockets

iii. 1 no. of IBM Rack would require 4x32A/3P sockets

iv. 4 no. of Racks would require 2x16A sockets per rack.

We understand the 2x16A/1P sockets will be

provisioned thru rack PDU thru C13/C19 connections

and 4x32 Amp/1P circuits will be terminating directly

in the Banks switch. Please confirm.

No change in RFP terms.

2x16A/1P sockets will be

provisioned through rack PDU and

4x32 Amp/1P circuits will be

terminating directly in the Banks

switch.

However necessary power sockets

should be provided for connecting

the equipment.5 76/110 Annexure -13 B. Server Room Area - 6. Bidder should provide two

factor authentications to the caged area for entry and

exit (Combination of any two- Card and Pin or

Biometric)

We shall provide Biometric+PINPAD reader for

server area 'Entry' and Proximity Card Reader for

'Exit'.

Please refer corrigendum

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

Page 1 of 35

Page 2: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

6 76/110 Annexure -13 B. Server Room Area - 7. The Server room should have

precision air conditioning with redundancy. The

temperature in the server hall (caged area) should be

maintained at 20 +/- 4deg C, i.e. the temperature

should be in the range of 16 to 24deg C. The humidity in

the server room (caged area) should be maintained at

50 % +/- 10% RH and monitored periodically and

maintain logs of the same for Bank’s internal / external

/ statutory audit purposes.

Request Bank to accept ASHRAE TC9.9 guidelines of

24+/2 deg Celcius.

No change in RFP terms

7 76/110 Annexure -13 B. Server Room Area - 10. Bidder needs to provide inter-

rack Ethernet copper cabling (supporting 1/10 Gbps)

and fibre cabling at the proposed location for LAN

connections. Only the fibre cables for SAN cabling can

be shifted from the current BKC site. Bidder needs to

ensure that the cables are laid properly as per

structured cabling guidelines and standards.

A. We understand inter-rack cabling will be CAT-6

and fiber cabling will be Multi mode.please confirm.

B. As we understand existings SAN interrack Fiber

cabling can be used Please confirm.

No Change in RFP terms

A. Inter rack cabling will be CAT-6A

and fibre cabling will be multi mode

as mentioned in the RFP Annexure-

13 clause no. G.3 and Annexure -24

clause no 5.2

B. Existing SAN inter rack fibre cable

can be used as mentioned in RFP

Annexure 13 clause no. B.10

8 77/110 Annexure -13 B. Server Room Area - 11. The service provider will be

responsible for terminating the network links at DC and

Near Site premises

CtrlS is a carrier neutral DC, with all the ISP present

in our DC. Bank will have choice to select any

number of ISP directly from Banks side. CtrlS ( SP)

take care of all will be responsible for providing

cross connect between MMR/telecom room - BANK

cage area & Seating area.

No change in RFP terms

9 77/110 Annexure -13 C. Seating Area: 4. The SP shall provide adequate power

points in the Seating area.

Powerpoints shall be provided as per out standard

offering for required no. of seats

No change in RFP terms

10 77/110 Annexure -13 The access logs to the bank specific cage area, seating

area and the server room area need to be maintained

for the period of the contract. The log reports of bank’s

specific server cage area and seating area are to be

provided on a monthly basis.

Log reports shall be maintained for 90 days and

against request from Bank it will be made available

to Bank on Qtrly basis.Bank to provide the storage

media and maintain the same.

Please refer corrigendum

Page 2 of 35

Page 3: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

11 77/110 Annexure -13 E. Building Management Systems (BMS): 4. There

should be CCTV monitoring for surveillance of the

server hall area. The CCTV surveillance should cover

Bank's Server area and other critical areas where Bank's

components are placed. Activities to be recorded and

kept for at-least 90 days. Bidder should provide Remote

Monitoring Facility of CCTV recordings for Bank’s Server

area where Bank's components are placed.

SP to share the live remote sharing of CCTV of the

Bank cage area remotely to Bank. SP to share the

remote feed within Bank cage area and bank shall be

resposnible for transferring the data further.

No change in RFP terms

12 78/110 Annexure -13 E. Building Management Systems (BMS): 6. The SP shall

provide Fire detection & suppression system exclusively

for the server room which will cover Bank caged area.

Fire detection and suppression can be common

however the areas allocated to the Bank should be well

within the coverage of fire detection and suppression.

No change in RFP terms

13 78/110 Annexure -13 E. Building Management Systems (BMS): 7. The facility

areas proposed for the Bank should be well within the

coverage of water leak detection system.

No change in RFP terms

14 78/110 Annexure -13 F. Miscellaneous: 5.The service provider must ensure all

the necessary support and permissions in this regard

for laying such cables beneath the false flooring is

provided to the system integrator. The system

integrator chosen by the bank will do this cabling

activity in consultation with the service provider.

Bank will appoint its own Structural cabling vendor,

please confir.

a) All Data Cable will run from Top over the shared

Data cable trays of cabofil and DC SP will additionally

only provide permission and approvals to the Bank

appointed Structural cabling vendor.

Please refer Corrigendum

15 78/110 Annexure -13 F. Miscellaneous: 6. Bank cannot provide any time

frame to inform SP for taking up additional space. The

additional seating space if required should be in the

same building

Additional space shall be provided based on the

availability, however bank will receive first right of

refusal

No change in RFP terms

16 81/110 Annexure -13 F. Miscellaneous:11. The service provider is required to

make provision for power meter / dedicated measuring

equipment / dedicated PDU to measure power

consumption by the Bank. Payments will be made by

the bank only on the basis of consumed power. The

Bidder shall provide power readings

Bank to advice on the requirement of dedicated PDU

since all the Mechnaical and electrical equipments

are generally shared resources offered by SP.We

also assume that power consumption shall be

metered at PDU level by using BCPM software for

rackwise power consumption. Bank to confirm.

No change in RFP terms

Bidder has to provide power meter

/ dedicated measuring equipment /

dedicated PDU's for Bank's cage

area / racks.

Page 3 of 35

Page 4: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

17 81/110 Annexure -13 F. Miscellaneous: 12. The Bank requires a dedicated

power meter that can measure the actual power

consumption by the Bank’s equipment. This power

usage will be ONLY for the racks that are setup for Bank

and not any other environmental devices such as

precision air conditioners etc. The factor considered for

conversion from KV to KW is (0.9).

Request Bank to accept Power metering from PDU

BCPM( Branch Circuit Power Monitoring ). Please

Confirm.

No change in RFP terms

Bidder has to provide power meter

/ dedicated measuring equipment /

dedicated PDU's for Bank's cage

area / racks.

18 108/110 Annexure -23 Inventory to be shifted from NDR BKC to Proposed site. A. Only 6 racks details are available, requesting IDBI

to provide the details of remaining 2 nos. of racks

B. Is rack supply part of bidder's scope, please clarify

No change in RFP terms

A. Out of 8 racks, 2 are spare

B. Existing Racks to be shifted from

the current NDR site to the

proposed site by the Bidder.

19 108/110 Annexure -23 Row 1 Rack no 4 Storage rack, 32 A/1P/4S for 22kW rack

SAN storage.

32A, single phase 4 sockets (2+2) are not sufficient

to cater 22kW. Please clarify and confirm the rating.

No change in RFP terms.

In the existing setup four single

phase sockets are available.

Bidder may visit the exisiting NDR

site for obtaining more clarity as

mentioned in the RFP Annexure 13,

clause A.6

20 108/110 Annexure -23 Row 1 Rack no 4 Storage rack. Rack 1 Row no. 1 - 32A/1P/4S switch is mentioned.

We understand that here we have to provide 4

circuits of 32A, please confirm.

No change in RFP terms.

In the existing setup four single

phase sockets are available.

Bidder may visit the exisiting NDR

site for obtaining more clarity as

mentioned in the RFP Annexure 13,

clause A.6

21 27/110 Section 2 1. Payment Terms Please provide Bank's preferred payment terms. No change in RFP terms.

Page 4 of 35

Page 5: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

22 10/110 Security Deposit/PBG Successful Bidder/s will have to give Security Deposit of

10% of 1st year cost (One Time Cost+ Annual Recurring

Cost) in the form of Performance Bank Guarantee (PBG)

Issued by a scheduled commercial bank (other than IDBI

Bank Ltd) with a validity of 72 months (60 months

contract period + 12 months claim period) from the

date of issue of PBG and directly forwarded to the Bank.

The PBG will have to be renewed / resubmitted with

fresh validity of Six months (includes Six months

Supplementary Contract Period and a claim period of 12

months (total 18 months) at the end of five year of

original contract period in case of extension of the

contract.

The PBG will be issued for a period of one year and

will be renewed every year subsequently, request

Bank to accept the same.

Please refer corrigendum

24 27/110 Section 2 - 1. Payment

Terms

1.4. Cost of the One Time charges and transit insurance

at actuals would be payable on successful

commissioning and completion of the acceptance test

exercise by the Bank from the new site for all the

activities/ services deemed to be one time installations

in this RFP document. The transit insurance (original

policy to be purchased in the name of the Bank) will be

reimbursed at actuals after commissioning the Near DR

and full acceptance by the Bank

Request Bank to accept advance for the OTC

charges.

No change in RFP terms

25 27/110 Section 2 - 1. Payment

Terms

1.5. The payment for hosting of the NDR Centre

including network link charges will be divided into four

equal installments for the year and paid quarterly in

arrears post the successful commissioning of the

cohosting site, acceptance of all the relevant

requirements under this tender and delivery of services

as per the RFP

Request Bank to accept quarterly in advance for the

recurring charges. And Power charges to be paid in

Monthly in arrears.

No change in RFP terms

26 29/110 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

5.1. The Delivery and time limit for commencement of

work shall be done at the specified locations (NDRBKC

to proposed Data Center site) within 6 Weeks from the

issuance of Purchase Order. The Bidder should deliver

services to the Bank as per the requirement of this RFP

as per below mentioned timelines:

Request Bank to accept delivery and time limit

within 6-8 weeks from the issuance of Purchase

order.

No change in RFP terms

Page 5 of 35

Page 6: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

27 The bidder must have

provided co-hosting space for

at least 10 rack space area per

customer in

Tier III Data Centre colocation

facility at the

PROPOSED SITE for the bank

in India (Banks of Indian origin).

Marks shall be given as detailed below

based on the project

Credentials submitted.

Bidder will have to submit copy of PO

and reference contact details as per

Annexure-22.

Kindly ammedn this clause as:-

The bidder must have

provided co-hosting space for

at least 10 rack space area per

customer in

Tier III Data Centre colocation

facility at the

PROPOSED SITE for the bank

in India (Banks of Indian origin).

Marks shall be given as detailed below

based on the project

Credentials submitted.

Bidder will have to submit copy of PO

and reference contact details as per

Annexure-22.

No change in RFP terms

28 One customer with at least 10 racks - 5 Mark One customer with at least 10 racks - 20 Marks No change in RFP terms

29 Two customer with at least 10 racks - 10 Mark One customer with at least 08 racks - 15 Marks No change in RFP terms

30 Three customer with atleast10 racks - 15 mark One customer with at least 05 Racks - 10 Marks No change in RFP terms

31 More than three customer with at least 10 racks - 20

Mark

One customer with at least 02 Racks- 05 Marks No change in RFP terms

32 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

1. Making the server area ready and available for

installation of the Bank’s IT infrastructure (Site should

be ready with electrical and network cabling and other

facilities like CCTV, access control system etc. as

mentioned in SoW)

3 weeks from the date of issuing the purchase order to

the SP

Kindly Ammend the Clause as:-

Making the server area ready and available for

installation of the Bank’s IT infrastructure (Site

should be ready with electrical and network cabling

and other facilities like CCTV, access control system

etc. as mentioned in SoW)

4 weeks from the date of issuing the purchase order

to the SP

No change in RFP terms

33 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

2. Shifting of empty server racks & spare switches and

installation of same in the proposed server area.

4 weeks from the date of issuing the purchase order to

the SP

Kindly Ammend the Clause as:-

Shifting of empty server racks & spare switches and

installation of same in the proposed server area.

6 weeks from the date of issuing the purchase order

to the SP

No change in RFP terms

22 B. Bidders Past Experience

Page 6 of 35

Page 7: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

34 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

3. NW links commissioning between DC and Near DR,

DR and Near DR

5 weeks from the date of issuing the purchase order to

the SP

Kindly Ammend the Clause as:-

NW links commissioning between DC and Near DR,

DR and Near DR

8 weeks from the date of issuing the purchase order

to the SP

No change in RFP terms

35 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

4. Shifting of all IT related equipment from BKC to

proposed Data Center site.

6 weeks from the date of issuing the purchase order to

the SP

Kindly Ammend the Clause as:-

Shifting of all IT related equipment from BKC to

proposed

Data Center site.

10 weeks from the date of issuing the purchase

order to the SP

No change in RFP terms

36 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

Actual Switch off the devices from BKC and switch on at

the proposed Hosting Site & activation of Data

connectivity Links

The proposed Near DR to be up and functional within

48 hours from switch off at BKC.

Kindly Ammend the Clause as:-

Actual Switch off the devices from BKC and switch

on at the proposed Hosting Site & activation of Data

connectivity Links

The proposed Near DR to be up and functional

within 1 week from switch off at BKC.

No change in RFP terms

37 30 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

5. Hosting & power-on will be effective only after

shifting of IT related equipment inside server room of

proposed Data Center site

6 weeks from the date of issuing the purchase order to

the SP. (Site readiness in all aspects including NW links

commissioning between DC and Near DR, DR and Near

DR)

KIndly Ammend the Clause As:-

Hosting & power-on will be effective only after

shifting of IT related equipment inside server room

of proposed Data Center site

10 weeks from the date of issuing the purchase

order to the SP. (Site readiness in all aspects

including NW links commissioning between DC and

Near DR, DR and Near DR)

No change in RFP terms

38 30 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

6. Project Commissioning Timeline

6 Weeks from the date of issuing the purchase order to

the SP

Kindly Ammend the Clause As:-

Project Commissioning Timeline

10 Weeks from the date of issuing the purchase

order to the SP

No change in RFP terms

Page 7 of 35

Page 8: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

39 76 A. General 11. 99.982% Uptime is required for the Near DR

Environmental Infrastructure and services. 99.99%

Uptime is required

for the network availability.

As per the RFP Tier III compliance the required

infrastructure should be 99.982%, Request you to

kindly considred the same.

No change in RFP terms

40 76 B. Server Room Area Bank envisages requirement of a dedicated clear space

to accommodate 8 Racks (42U).In case the racks are

arranged in two rows, the distance of 3 ft. should be

maintained between the rows of the racks. Also there

should

be at least 3 ft. gap kept between Racks and caged area

in front and back side. However, if there is requirement

of

additional space in the future the SP should be able to

provide the same (within the same facility) as per the

agreed rate contract.

Kindly confirm the additional total no. of racks which

is required for future expansion.

No change in RFP terms.

Bank shall share the additional

requirements as and when it

evolves

41 85 14. (SERVICE LEVEL

EXPETATIONS AND

PENALTY - ANNEXURE

14)

Level

I. Critical

Type of Infrastructure

Environmental

Infrastructure

Function Technology

a. Access controls

b. UPS supply

c. Precision Air

conditioning

d. Fire Detection System

e. Water detection

systems

f. Humidity Controllers

g. Gen-sets

h. Building Management

Systems

i. LAN cabling

j. Power

Expected Response Time

Immediate

Resolution

Within 10

minutes

It seems it is very less time to react to the

mentioned scenario for the critical infrastructure, so

kindly changes the satement from 10 minutes to 30

minutes

Please refer the corrigendum

Page 8 of 35

Page 9: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

42 86 14. (SERVICE LEVEL

EXPETATIONS AND

PENALTY - ANNEXURE

14)

Level

II. Key

Type of Infrastructure

Environmental

Infrastructure

Function Technology

All other environmental

infrastructure being a

part of SP solution and

not considered as

critical.

Expected Response Time

Minimum 30 Minutes

Resolution

Within 10

minutes

It seems it is very less time to react for the

mentioned scenarion i.e Key enviornmental

infrastructure, so kindly changes the satement from

30 Minutes to 1 Hour.

Please refer corrigendum

43 88 B. Service level

definitions for

Network Bandwidth

Level

II. Critical

Type of Infrastructure

(Network Bandwidth Fibre)

Function Technology

a. Links between DC & Near

DR

b. Links between DR and

Near DR

c. Links between DC,

Belapur to Hosting

location for Monitoring

purpose

Expected Response Time

within 10 Minutes

It seems it is very less time to react to the

mentioned scenario for the critical infrastructure, so

kindly changes the satement from 10 minutes to 30

minutes

Please refer corrigendum

44 General Queries General Queries Kindly Provide the Commercial Format Details as it is

not mentioned in the RFP.

No change in RFP terms

Page 9 of 35

Page 10: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

45 21 5. TECHNICAL BID EVALUATION (SECOND STAGE)2. Bidders Past Experience – detailed below in 5.11.B-

20 Marks

The bidder must have provided co-hosting space for at

least 10 rack space area per customer in

Tier III Data Centre colocation facility at the

PROPOSED SITE for the bank in India (Banks of Indian

origin).

Marks shall be given as detailed below based on the

project Credentials submitted.

a. One customer with at least 10 racks- 5 Marks

b.Two customer with at least 10 racks-10 marks

c. |Three customer with atleast 10 racks-15 Marks

d. More than three customer with at least 10 racks- 20

Marks

We request the Bank to modify the clause as " The

bidder must have provided co-hosting space for at

least 10 rack space area per customer in

Tier III Data Centre colocation facility at any of the

Bidder's Datacenter in India for BFSI/Banking

Customers.

Marks shall be given as detailed below based on the

project Credentials submitted.

a. One customer with at least 10 racks- 5 Marks

b.Two customer with at least 10 racks-10 marks

c. |Three customer with atleast 10 racks-15 Marks

d. More than three customer with at least 10 racks-

20 Marks "

Please refer corrigendum

46 21 5. TECHNICAL BID EVALUATION (SECOND STAGE)5. If the proposed data center is Tier IV standard-

5 marks

We request the Bank to change this to Tier III

standard .

No change in RFP terms

47 29 5. DELIVERY AND TIME

LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

The Delivery and time limit for commencement of work

shall be done at the specified locations (NDR-

BKC to proposed Data Center site) within 6 Weeks from

the issuance of Purchase Order

We request the Bank to modify the clause as " The

Delivery and time limit for commencement of work

shall be done at the specified locations (NDR-

BKC to proposed Data Center site) within 8 Weeks

from the issuance of Purchase Order "

No change in RFP terms

48 57 4. UNCONDITIONAL

ACCEPTANCE OF

TERMS & CONDITIONS

OF THE RFP

(ANNEXURE – 4)

This is to confirm that we absolutely & unconditionally

accept all the terms and conditions (including scope of

work) as mentioned

We request Bank to allow the bidders to propose

some deviations in the terms and conditions (

including scope of work) , which can be mutually

discussed and agreed at the time of contract

finalization

No change in RFP terms

49 75 13. PROJECT SCOPE

AND TECHNICAL

CAPABILITIES

(ANNEXURE – 13)

A. General

1. The proposed Near DR site should be located within

25 km radius from Banks Data Centre in CBD BELAPUR,

Navi Mumbai.

We are one of the leading Datacenter Services

Providers and our proposed Datacenter is located in

MMR region . We request the Bank to modify the

clause as " The proposed Near DR site should be

located within 50 km radius from Banks Data Centre

in CBD BELAPUR, Navi Mumbai." This would allow

more Datacenter Services Providers to participate in

the RFP.

No change in RFP terms

Page 10 of 35

Page 11: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

50 94 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

The Bidder to provide an undertaking on his letter head

that all the technical requirements highlighted as part

of Technical Scope are covered in totality in the

proposal submitted by the bidder.

We request the Bank to allow the Bidder to propose

few deviations, which and be mutually discussed

and agreed at the time of contract finalization

No change in RFP terms

51 94 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

The Bidder should comply with all the

mandatory technical requirement as

mentioned in Annexure 13

We request the Bank to allow the Bidder to propose

few deviations, which and be mutually discussed

and agreed at the time of contract finalization

No change in RFP terms

52 94 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

Self-declaration regarding compliance of

RBI /Govt. guidelines

Request Bank to share the RBI guidelines that the

bidders are required to adhere to.

No change in RFP terms

53 96 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

The SP should have at least three of the

below certifications / compliance document:

a) ISO 27001 or BS 7799–3 Certified (Compulsory)

b) NFPA 70 & 75

c) IS 1893:1984 Seismic Compliance

d) TIA 942 compliance (for at least two of

the following – Architectural, Electrical,

cooling and network

The Proposed Datacenter has recently gone live. The

proposed Datacenter is an extension of our existing

Datacenetrs at our Chandivali Datacenter Campus .

We have all these certifications for our Other

Datacenters located in the same campus. . We will

extend the same certifications to the proposed

Datacenter as well. We request the Bank to allow us

to submit the certifications in next 2-3 months.

No change in RFP terms

54 96 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

The Service Provider's proposed site should

be within a maximum of 25 km radius from

our Data Centre in CBD Belapur, Navi

Mumbai

We are one of the leading Datacenter Services

Providers and our proposed Datacenter is located in

MMR region . We request the Bank to modify the

clause as " The proposed Near DR site should be

located within 50 km radius from Banks Data Centre

in CBD BELAPUR, Navi Mumbai." This would allow

more Datacenter Services Providers to participate in

the RFP.

No change in RFP terms

Page 11 of 35

Page 12: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

55 17. ELIGIBILITY

CRITERIA COMPLAINCE

SHEET (ANNEXURE –

17)

a) Bidder must have provided DC or DRC or

Near DR / DC co-hosting facility to at least

10 Companies co-hosting sites in India,

b) Out of which there should be at least 1

credentials of Schedule Commercial Banks

and 1 BFSI in India who have co–hosted

their data center or disaster recovery site or

Near DR site with the service provider at

proposed Near DR.

c) Minimum of 4 Racks or 200 sqft. area for

each of these 2 sites referred in point (b)

above and should have been co-hosted as

on RFP date. It should have been hosted for

at least for 1 year).

We request the Bank to modify the clause as

" a) Bidder must have provided DC or DRC or

Near DR / DC co-hosting facility to at least

10 Companies at any of the Bidder's co-hosting sites

in India,

b) Out of which there should be at least 1

credentials of Schedule Commercial Banks

and 1 BFSI in India who have co–hosted

their data center or disaster recovery site or

Near DR site with the service provider at any of the

Bidder's Datacenter in India .

c) Minimum of 4 Racks or 200 sqft. area for

each of these 2 sites referred in point (b)

above and should have been co-hosted as

on RFP date. It should have been hosted for

at least for 1 year).

No change in RFP terms

56 75 Annex 13: A.4 The Bank may in future require additional space at the

Near DR site.

Can bank suggest the indicative sizing for this

expansion requirement?

No change in RFP terms.

Bank shall share the additional

requirements as and when it

evolves

57 76 Annex 13: B.3 The specification for the 8 no. of Racks…. Client to share details:

1. What are the physical dimensions (WxDxH) of the

racks?

2. Who provides the physical racks and rPDUs?

3. What is the indicative consumed IT load per rack?

1. Rack dimension is 800 mm X 1000

mm. Please refer the corrigendum.

2. The Bank will provide the racks

as mentioned in the RFP Annexure

13 clause no. A.4. Please refer the

corrigendum for more clarity

3. No change in RFP terms. Please

refer the RFP Annexure 23.

Page 12 of 35

Page 13: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

58 76 Annex 13: B.7 The temperature in the server hall (caged area) should

be maintained at 20 +/- 4deg C, i.e. the temperature

should be in the range of 16 to 24deg C.

Request client to consider 22 to 26C (i.e. 22 +/- 2C)

temperature range

No change in RFP terms

59 76 Annex 13: B.10 ….inter-rack Ethernet copper cabling (supporting 1/10

Gbps) and fibre cabling…..

Client to share details:

1. Which rack to which racks how many cables of

each type (CAT6/CAT6A/SMF/MMF)?

2. Is it a top of rack switch/patch panel

arrangement?

3. Any specific arrangement of rack placement?

No change in RFP terms.

1. Rack to rack details & Cable type

(CAT 6A & Multi Mode Fiber) are

already mentioned in the RFP

Annexure 13 clause no G.3

2. Bidder to decide as the patch

panel is in bidders scope.

3. Please refer Annexure 13 clause

1.10 page no. 82

60 77 Annex 13: D.2 The link extension from the DC/DR service provider’s

communication, MUX room to the server cage area at

Near DR Site shall be done by the Near DR Site service

provider without involving any commercials.

As a standard practice, there is a monthly recurring

charge (MRC) fee applicable for cross-connect

services.

No change in RFP terms.

Please refer the Indicative

commercial bid- Bill of material

format. Bidder to include this cost

in commercials as per the RFP terms

61 77 Annex 13: E.4 Bidder should provide Remote Monitoring Facility of

CCTV recordings for Bank’s Server area where Bank's

components are placed.

Request bank to remove this sentence as remote

monitoring/ video sharing is a potential security risk.

All videos are available for audits/ security screening

on site at the facility premises

No change in RFP terms

62 78 Annex 13: F.5 The cabling within / between the racks will be done by

the system integrator chosen the Bank.

This is contradicting para B.10 of Annex 13. Please

suggest.

Please refer Corrigendum

63 80 Annex 13: H.10 The power protection devices maybe capable of SNMP

communications and with the facility to issue alarms via

text SMS and emails.

Alarms are monitored locally by the facility

operations staff and actioned upon as required.

These alarms are not extended to clients. Request to

please remove this sentence.

No change in RFP terms

power protection devices should

issue alarms via text SMS and emails

to the facility operations staff

posted at the DC

Page 13 of 35

Page 14: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

64 80 Annex 13: H.11 The service provider is required to make provision for

power meter / dedicated measuring equipment /

dedicated PDU to measure power consumption by the

Bank.

Power consumption is monitored at BMS level using

BCPM enabled PDUs; and hence dedicated PDUs/

Meters is not required.

Please share concurrence.

No change in RFP terms

Bidder has to provide power meter

/ dedicated measuring equipment /

dedicated PDU's for Bank's cage

area / racks.

65 Annex 14: 4 The SLA charges will be subject to an overall cap of 10%

of the Annual Recurring Charges (ARC) then the Bank

will have the right to cancel the contract.

This is very steep as it means a single outage

resulting in uptime <=97%, can result in contract

termination.

Termination should be considered an option only for

3 such incidents in a 6 months rolling period.

In case of one or two incidents (instead of

termination), alongside penalty,and EGM

(emergency general meeting) of senior personnel

from both parties should try to discuss and resolve

the persistent issue

Request bank to reconsider.

No changes in RFP terms.

The SLA charges will be subject to

an overall cap of 10% of the Annual

Recurring Charges (ARC), after

which the Bank will have the right

to cancel the contract.

66 11 3.1 Consortium Any type of formation of consortium, sub-contracting

and joint assignments will not be allowed/ considered

for the submission of the proposal. Such proposals will

be disqualified.

We request the Bank to allow subcontracting. No change in RFP terms

67 25 13.1. Signing of

Contract

After the Bank notifies the Successful Bidder that its bid

has been accepted; the Bidder should sign the Contract

and complete the execution of all other documents to

the satisfaction of the Bank.

Terms of proposed contract should be mutually

discussed and agreed upon between the Parties. The

Bidder shall not be compelled to execute a contract

containing unilateral terms. Failure/ dealy in

executing such contract containing unilateral terms

shall not be deemed to be a failure on behalf of the

Bidder.

No change in RFP terms

68 27 1. Payment Terms Suggest to add:

In case of any delay/ non payment of fees by the

Bank, the Bidder shall be entitled to suspend the

services or terminate the agreement by issuing a

written notice of 5 days.

No change in RFP terms

Page 14 of 35

Page 15: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

69 33 7.1 Indemnity The Bidder shall execute and furnish to the

Bank/Purchaser, a deed of indemnity in favor of the

Purchaser in a form and manner, as given in Annexure

10, indemnifying the Purchaser its directors, employees,

agents and representatives from and against any costs,

loss, damages, expense, claims, litigations, suits,

actions, judgments, and or otherwise including but not

limited to those from third parties or liabilities of any

kind howsoever suffered, arising out of or incurred inter

alia during and after the Contract period including but

not limited to third-party claims due to infringement of

Intellectual Property Rights including but not limited to

patent, trademark, logo, copy-rights or industrial

drawings and designs arising from use of the Services or

any part thereof and/or otherwise. . The Bidder has to

execute the indemnity in the format prescribed by the

Bank and provide in Annexure - 10 of this RFP.

We suggest to modify indemnity clause with a view

that either party to indemnify each other for the

following:

1. For third party IPR infringement claims

2. For Wilful misconduct or gross negligence, causing

loss or damages to a person resulting into personal

injury or death.

3. Third party claims if arises due to the intentional

wrongs committed by either party.

Provided that the indemnification obligations shall

be subject to following :-

a) Immediate notice to be sent by the Indemnified

party.

b) Control of the defence of the claim by the

indemnifying party.

c) Assistance by the indemnified party in the defence

at the expense of the indemnifying party.

No change in RFP terms

70 34 8.1 Intellectual

Property Rights

The Bank/ Purchaser shall own and have a right in

perpetuity to use all Intellectual Property Rights which

have arisen out of or in connection with the

implementation of this Contract, including all processes

and products which have been developed by the Bidder

during the performance of Services and for the

purposes of inter-alia use or sub-license of such

Services under this Contract.

The Bidder shall retain all rights and title to the

intellectual property belonging or introduced by the

Bidder. Execution of this agreement does not

envisage any transfer of IP rights from the Bidder to

the Bank.

No change in RFP terms

71 34 8.4 Intellectual

Property Rights

If the Successful Bidder fails to comply and the Bank is

required to pay compensation to a third party resulting

from such infringement, the Successful Bidder shall be

responsible for the compensation including all

expenses, court costs and lawyer fees. The Bank will

give notice to the Successful Bidder of such claim, if it is

made, without delay

The Bidder shall not be liable to pay any

compensation in case the Bank itself has contributed

to the breach of IP rights. In such a case, the Bank

shall be liable to indemnnify the Bidder for the claim

amount made on the Bidder including but not

limited to all expenses, court costs and lawyers fees.

No change in RFP terms

Page 15 of 35

Page 16: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

72 36 15.1 Liquidated

damages

If the Vendor fails to deliver any or all of the Service(s) /

Systems or perform the Services within the time

period(s) specified in the Contract / Agreement / fails to

meet the Service Level Requirements, the Bank /

Purchaser shall, without prejudice to its other rights

and remedies under and in accordance with the

Contract / Agreement, deduct from the Contract price,

as liquidated damages, a sum equivalent to 1% per

week or part thereof of 1st year cost (One Time Cost+

Annual Recurring Cost) subject to maximum deduction

of 5% of ‘of 1st year cost (One Time Cost+ Annual

Recurring Cost)’ of the delayed Service(s) or

unperformed Service(s). However, Bank reserves the

right to terminate the contract at any time, if the

project is not delivered as per scheduled timelines.

We suggest to remove the liquidated damages

clause. Anyways Bank is proposing to terminate the

contract in case project is not delivered as per

scheduled timelines.

No change in RFP terms

73 36 15.1.2 Liquidated

damages

The Bank / IDBI / the Purchaser may without prejudice

to its right to effect recovery by any other method,

deduct the amount of liquidated damages from any

money belonging to the Vendor in its hands (which

includes IDBI's/ the Purchaser’s right to claim such

amount against Vendor's Bank Guarantee) or which

may become due to the Vendor. Any such recovery or

liquidated damages shall not in any way relieve the

Vendor from any of its obligations to complete the

works / service(s) or from any other obligations and

liabilities under the Contract / Agreement.

We suggest that the Bank shall not unilaterally

adjust and/ or deduct any amount from the amount

belonging to Vendor. Any such adjustment or

deduction shall be only after discussing and mutually

agreeing with the Bidder.

No change in RFP terms

74 39 21.1. Successful Bidder

Obligation

The Successful Bidder will abide by the job safety

measures prevalent in India and will free / indemnify

Purchaser from all demands or responsibilities arising

from accidents or loss of life, the cause of which is the

Bidder’s negligence.

Generic job safety measures will be carried out.

However in case there are any specific measures to

be taken then the Bank to intimate the same to the

Bidder prior hand in writing, failing which the Bank

shall be liable for any incident.

No change in RFP terms

75 39 22.1 Subcontracting Any type of formation of consortium, sub-contracting

and joint assignments will not be allowed/ considered

for the submission of the proposal. Such proposals will

be disqualified

We request the Bank to allow subcontracting. No change in RFP terms

Page 16 of 35

Page 17: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

76 40 24.3 No set off,

Counter claims, cross

claims

However, IDBI Bank shall have such rights against the

successful Bidder up to maximum of 100% of the

contact value.

Bank shall not unilaterally set off or deduct any

amount. This shall be discussed and mutually agreed

with the Bidder.

No change in RFP terms

77 40 25.1 Tri partite

Agreement

The Bidder shall enter into relevant agreement covering

all related Parties at a later date, if required,

incorporating the requisite terms and conditions herein

in the form and manner and to the satisfaction of

Purchaser

Need clarity on this requirement. Which related

parties are referred here?

No change in RFP terms

78 40 27.1 Statutory

requirements

During the tenure of this Contract nothing shall be done

by the Bidder in contravention of any law, act and/ or

rules/regulations, there under or any amendment

thereof governing inter-alia customs, foreign exchange,

etc., and shall keep Purchaser indemnified in this

regard.

We suggest that this should be a mutual clause. No change in RFP terms

79 40 27. 2 Statutory

requirements

Successful Bidder undertakes to promptly produce all

records and information relating to the Contract/this

RFP for the purpose of inspection and audit of IDBI

Bank. Successful Bidder shall provide access, to officers

/ employees / representatives / agents or auditors of

the Bank to the premises / places where such records

are kept / maintained. The Bank shall not be duty

bound to give any prior notice to Successful Bidder

before carrying out the said inspection or audit

1. Information only w.r.t. this project will be

provided to the Bank.

2. Books of accounts will not be provided to the

Bank;

3. Bank shall provide a prior notice of at least 7 days

before any inspection.

4. Person conducting inspection shall be governed

by confidentiality obligations which shall not be less

stringent then the terms contained herein.

No change in RFP terms

80 41 28.1 Purchasers right

of inspection and

periodic audit

The Purchaser reserves the right to inspect and

monitor/assess the progress of the project at any time

during the course of the Contract. The Purchaser may

demand and upon such demand being made, the

Purchaser shall be provided with any document, data,

material or any other information, which it may require,

to enable it to assess the progress of the project.

1. Information only w.r.t. this project will be

provided to the Bank.

2. Books of accounts will not be provided to the

Bank;

3. Bank shall provide a prior notice of at least 7 days

before any inspection.

4. Person conducting inspection shall be governed

by confidentiality obligations which shall not be less

stringent then the terms contained herein.

No change in RFP terms

Page 17 of 35

Page 18: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

81 41 29.3 Contract Price The Bank reserves the right to re-negotiate the prices in

the event of change in the international market prices

of both the hardware and software.

Even the Bidder should be entitled to revise the

prices due to changes in foreign exchange

fluctuations, taxes, rates etc.

No change in RFP terms

82 42 30.5 Information

Security

Bidder shall provide certificate/assurance from

application providers/OEMs that the application is free

from embedded malicious / fraudulent code.”

Such warranty can only be given on the date of

installation.

No change in RFP terms

83 42 31.1 Ownership and

retention

The Purchaser shall own the documents, information,

materials etc. prepared by or for the Bidder arising out

of or in connection with this Contract.

Ownership of all docuemnts, information, materials

prepared by Bidder shall be retained with the Bidder

only.

No change in RFP terms

84 43 32.7 Representations

and warranties

That the Bidder shall procure insurance policies for all

its present and future property and assets that are

developed, procured and created during the term of

this Contract with financially sound and reputable

insurers to the satisfaction of the Purchaser and shall

pay all premium in relation thereto and shall ensure

that nothing is done to make such insurance policies

void or voidable. The Bidder shall also furnish to the

Purchaser a certificate evidencing such insurance, risks

covered, names of beneficiaries, expiration dates,

names of insurers and all other features of the

insurance policy, both original and renewed and shall

keep the same alive during the term of this Contract.

Bank to obtain insurance of all assets belonging to

the Bank.

No change in RFP terms

85 44 32.16 Representations

and warranties

That the Bidder confirms that there has not and shall

not occur any execution, amendment or modification of

any agreement/contract without the prior written

consent of the Purchaser, which may directly or

indirectly have a bearing on the Contract or the project.

Any changes required by the Bidder will be discussd

with the Bank, which the Bank shall reasonably

consider.

No change in RFP terms

Page 18 of 35

Page 19: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

86 45 33 Confidentiality 1. Confidenitality provisions to survive for a period

of 3 years after the expriy or termination of contract;

2. Bank shall also be bound by similar confidentilty

provisions for the confidential information shared by

the Bidder with the Bank.

No change in RFP terms

87 45 34.4 Term and

extension of contract

The Bank reserves the right to exit the contract after

serving due notice of 3 months without assigning any

reason

There shall be a fixed lock in period for the Bank,

within which if the Bank intends to terminate for

convenience, then the Bank shall be liable to pay

termination charges.

Even the Bidder shall be entilted to terminate for (i)

convenience, (ii) for non payment/ delayed payment

of fees.

No change in RFP terms

88 48 37.i(c) Termination Notwithstanding the provisions of the Contract and/or

the Bid Documents, the Purchaser at its sole discretion

and without prejudice to any other right or remedy and

without assigning any reasons, by written 90 days’

notice sent to the Bidder, may terminate the Contract,

in whole or in part, at any time for its convenience. The

There shall be a fixed lock in period for the Bank,

within which if the Bank intends to terminate for

convenience, then the Bank shall be liable to pay

termination charges.

Even the Bidder shall be entilted to terminate for (i)

convenience, (ii) for non payment/ delayed payment

of fees.

No change in RFP terms

89 49 38.3 Cosequenses of

termination

..... the Purchaser may retain such amounts from the

payment due and payable by the Purchaser to the

Bidder as may be required to offset any direct losses

caused to the Purchaser as a result of any act/omissions

of the Bidder. In case of any loss or damage due to

default on the part of the Bidder in performing any of

its obligations with regard to executing the scope of

work under this Contract [as laid down in the Service

Specifications,] the Bidder shall compensate the

Purchaser for any such direct loss, damages or other

costs, incurred by the Purchaser.

1. Bank shall make full payment for which services

are already provided.

2. Bank shall not retain / deduct any amount to

offset and losses to the Bank.

3. Bidder shall not be liable to compensate the Bank

for any direct loss, damages or other cost

whatsoever incurred by the Bank.

No change in RFP terms

Page 19 of 35

Page 20: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

90 51 48.1 Limitation of

liablity

We suggest to modify clause for limitation of liability

as follows:

1. Notwithstanding what is mentioned in RFP,

Contract form or in any other document, in no event

shall either party be liable to the other for any

indirect, incidental, special, consequential,

exemplary or punitive damages including, but not

limited to, damages for lost revenue, lost profits,

loss of goodwill, loss of data, technology, equipment

or types of damages whatsoever, whether or not

caused by any acts of omission or commission and

regardless whether such party has been informed of

the possibility or the likelihood of such damages.

2. Maximum liablity cap as mentioned in clause

48.1(a) shall also include liablity under indemnities

and shall be limited to annual contract value.

3. For breach of services, maximum liability shall be

as per the agreed SLAs.

No change in RFP terms

91 52 49.1 Solicitation of

Employees

The selected Bidder, during the term of the contract

shall not without the express written consent of the

Bank, directly or indirectly: a) recruit, hire, appoint or

engage or attempt to recruit, hire, appoint or engage or

discuss employment with or otherwise utilize the

services of any person who has been an employee or

associate or engaged in any capacity, by the Bank in

rendering services in relation to the contract; or b)

induce any person who shall have been an employee or

associate of the Bank at any time to terminate his/ her

relationship with the Bank.

This clause shall not be applicable in case hiring is

done pursuant to notice issued to public at large.

No change in RFP terms

Page 20 of 35

Page 21: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

92 88 Annex 14B ( Network

Services) 1 Vi

Response and Resolution Time

The Response and Resolution time for NW links is

mentioned as 10 mins

This is very steep and practically not possible.

We request Response time to be 20 Mins which shall

basically be the ticket logging and response time

from our Helpdesk.

and Resolution time ( MTTR) for each link to be 4

hours from time of call log.

Please refer corrigendum

93 89 Annexure 14B -3 (

Availability

Mesurements)

Replication Link Availability

Uptime for Each replication link is mentioned as 99.99%

per month

This is very steep on each link basis.

On per link basis we can give availability of 99.5%

per month and if both replicaiton links are taken

together for overall site uptime then we can give

99.8% as uptime considering either of two links as

available for site uptime.

No change in RFP terms.

Bidder has to ensure Uptime

availability of 99.99% for each

replication links as mentioned in the

RFP Annexure 14 clause no. B.3

94 90 Annexure 14B -3 (

Availability

Mesurements)

Latency

1Gbps link Round trip time to be less than 2 msec

2 millisecond latency over 25 kms distance should be

possible but it is still very steep on 365*24*7basis.

We request it to be make it to 4 millisecond atleast

for pentalty calculation purpose

No change in RFP terms.

Bidder has to ensure the latency of

<2ms as mentioned in the RFP

Annexure 14 clause no. B.3

95 90 Annexure 14B -3 (

Availability

Mesurements)

Latency

Link between DR in Chennai and links to DC in Mumbai

region

We request 75millisecond to be made as 95 ms No change in RFP terms.

Bidder has to ensure the latency as

mentioned in the RFP Annexure 14

clause no. B.3

Page 21 of 35

Page 22: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

96 90 Annexure 14B -5 (

Penalty Charges)

Penalty Calcuation for Each Replication Link The penalty is very steep and we humbly requst for

following Penalty as percentate of Monthly reucrring

charges basis ( MRC)

100%-99.5% - No credit

< 99.5% to 99.0% - 3% of MRC

< 99.0% to 98.5% - 5% of MRC

< 98.5% to 98.0% - 8% of MRC

< 98.0% to 97.5% - 12% of MRC

< 97.5 % to 97.0% - 15% of MRC

< 97%- 25% of MRC value

Right to cancel contract below 97% is steep as even

one outage for 97% can result in cancellation. We

request to have it 3 incidents below 97% in 6 rolling

months as this criteria.

Further the annual cap of 10% is very high and we

request it to be not more than 5% of annual charges

in case of any case whatsoever

No change in RFP terms.

Page 22 of 35

Page 23: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

97 90 Annexure 14B -5 (

Penalty Charges)

Penalty Calcuation for Each Monitoring Link The penalty is very steep and we humbly requst for

following Penalty as percentate of Monthly reucrring

charges basis ( MRC)

100%-99.5% - No credit

< 99.5% to 99.0% - 2% of MRC

< 99.0% to 98.5% - 4% of MRC

< 98.5% to 98.0% - 6% of MRC

< 98.0% to 97.5% - 10% of MRC

< 97.5 % to 97.0% - 12% of MRC

< 97%- 20% of MRC value

Right to cancel contract below 97% is steep as even

one outage for 97% can result in cancellation. We

request to have it 3 incidents below 97% in 6 rolling

months as this criteria.

Further the annual cap of 10% is very high and we

request it to be not more than 5% of annual charges

in case of any case whatsoever

No change in RFP terms.

98

Pg 94 Bidder must be in Data Centre Co-hosting business for a

minimum period of 4 yrs. (As on RFP date)

Please Consider OEM / Bidder must be in Data

Centre Co-hosting business for a minimum period of

4 yrs. (As on RFP date)

No change in RFP terms.

99

a) Bidder must have provided DC or DRC or

Near DR / DC co-hosting facility to at least

10 Companies co-hosting sites in India,

Requesting Bank to consider has OEM/bidder for

this criteria.

No change in RFP terms.

100

b) Out of which there should be at least 1

credentials of Schedule Commercial Banks

and 1 BFSI in India who have co–hosted

their data center or disaster recovery site or

Near DR site with the service provider at

proposed Near DR.

No change in RFP terms.

101

) Minimum of 4 Racks or 200 sqft. area for

each of these 2 sites referred in point (b)

above and should have been co-hosted as

on RFP date. It should have been hosted for

at least for 1 year)

No change in RFP terms.

Pg 94

Page 23 of 35

Page 24: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

102

22 / 110 B. Bidders Past ExperienceThe bidder must have provided co-hosting space for at

least 10 rack space area per customer in Tier III Data

Centre colocation facility at the PROPOSED SITE for the

bank in India (Banks of Indian origin). Marks shall be

given as detailed below based on the project

Credentials submitted.

Request to modify this clause as. The bidder

must have provided co-hosting space to 5 customers

from any segment - vertical which includes BFSI /

Corporates / Pvt Organizaitons in their owned Tier III

Data Center colocation facilities.

Please refer the corrigendum

103

27 / 110 Clause No. 1.8 / 1.9 / 1.10The Bank requires a dedicated power meter that can

measure the actual power consumption by the Bank’s

equipment. The charges towards the consumed power

will be payable by the Bank quarterly in arrears after

due verification of the metered units and the electricity

rate as per the formula defined in clause 1.6 above. This

power usage will be ONLY for the racks that are setup

for Bank and not any other environmental devices such

as precision air conditioners etc.

Request change as follows for the wordings marked

in Bold. The charges towards the consumed power

will be payable by the bank monthly in arrears. This

is because the power bills from MSEB is raised - to

be paid by service providers every month and thus

suggest the abave changes

No change in RFP terms

104

27 / 110 Clause No. 1.12 The Bank will pay invoices within a period of 45 days

from the date of receipt of undisputed invoices.

Request changes as follow for the wordings marked

in Bold. The Bank will pay invoices within a period

of 15 days from the date of receipt of undisputed

invoices.

No change in RFP terms

105

29 / 110 Clause No. 5 & 5.1 The Delivery and time limit for commencement of work

shall be done at the specified locations (NDRBKC to

proposed Data Center site) within 6 Weeks from the

issuance of Purchase Order

Sugges to change the delivery period from 6 weeks

to within 8 to 10 weeks from the issuance of

Purchase Order.

No change in RFP terms

106

30/110 Clause No. 5 & 5.5 Bidder will have to pay late delivery charges to the Bank

@ 1% of the total contract value inclusive of all taxes,

duties, levies etc., per week or part thereof, for late

delivery beyond due date of delivery, to a maximum of

5% of the total contract value inclusive of all taxes,

duties, levies etc. If delay exceeds 5 weeks from due

date of delivery / commissioning or late delivery

charges exceeds the maximum percentage of 5%, Bank

reserves the right to cancel the order.

Suggest the change as below. Bidder will have to pay

late delivery charges to the Bank @ 0.5% of the total

contract value inclusive of all taxes, duties, levies

etc., per week or part thereof, for late delivery

beyond due date of delivery, to a maximum of 2% of

the total contract value inclusive of all taxes, duties,

levies etc. If delay exceeds 5 weeks from due date of

delivery / commissioning or late delivery charges

exceeds the maximum percentage of 2%, Bank

reserves the right to cancel the order.

No change in RFP terms

Page 24 of 35

Page 25: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

107

36/110 Clause No. 15 & 15.1 LIQUIDATED DAMAGES. the Bank / Purchaser shall,

without prejudice to its other rights and remedies

under and in accordance with the Contract /

Agreement, deduct from the Contract price, as

liquidated damages, a sum equivalent to 1% per week

or part thereof of 1st year cost (One Time Cost+ Annual

Recurring Cost) subject to maximum deduction of 5% of

‘of 1st year cost (One Time Cost+ Annual Recurring

Cost)’ of the delayed Service(s) or unperformed

Service(s).

Suggest the change as below. a sum equivalent to

0.5% per week or part thereof of 1st year cost only

(Annual Recurring Cost) subject to maximum

deduction of 2%

No change in RFP terms

108

55/110 Clause No. 2 -

INDICATIVE

COMMERCIAL BID-

BILL OF MATERIAL

(ATTACHED as

Annexure 2 WITH RFP)

Attached separate file with hyperlink:

IndicativeCommercialBidformat-BOM.xlsx

Kindly provide us the indicative commercial bid

format - BOM, since provided hyper link doesn't

open

No change in RFP terms

109

74/110 Clause No. 13 & A

General Sr. No. 4

Bidder should provide space for 8 numbers of racks. The

said number of racks will be shifted from Near DR, BKC.

In order to minimize the Near DR down time, the empty

Racks at Near DR, BKC will be shifted first and the

remaining equipments will be shifted subsequently,

after ensuring that the empty racks shifted initially are

properly erected and fixed at the proposed site. The

equipments to be shifted from Near DR, BKC are

mentioned in the Annexure 23

Give details explanation since the clause is not giving

any clarity related to lift and shift of the racks &

server hardware / assets which will be done by SP or

the bank

No change in RFP terms

Please refer Annexure 13 clause A

110

75/110 Clause No. 13 & A

General Sr. No. 11

99.99% Uptime is required for the network availability Is this clause pertaining to cross connects. Network

availability related to inter-rack cabling is assumed

to be done by the Bank network team

No changes in RFP terms

Existing SAN inter rack fibre cable

can be used as mentioned in RFP

Annexure 13 clause no. B.10

Inter rack cabling / cross connect is

bidders responsibility and hence

included in uptime.

111

76/110 Clause No. 13 & B

Server Room Area Sr.

No. 3

The specification for the 8 no. of Racks to be shifted Kindly provide us the each rack dimension ie of n/w

& server racks, Netapp & IBM racks

Please refer corrigendum

Page 25 of 35

Page 26: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

112

76/110 Clause No. 13 & B

Server Room Area Sr.

No. 5

Bidder should provide biometric access to the common

entry to the Server room

The clause should read as "The access to be

provided to the Bank caged area & to the common

entry to the server room

No change in RFP terms

113

77/110 Clause No. 13 & E BMS

Sr. No. 1

The SP shall provide Access cards, Gate passes to the 6

personnel who would be regularly visiting the site

Is this clause pertaining to cross connects. Network

availability related to inter-rack cabling is assumed

to be done by the Bank network team

No change in RFP terms

114

78/110 Clause No. 13 & F

Miscellaneous Sr. No. 5

The cabling within / between the racks will be done by

the system integrator chosen the Bank. The service

provider must ensure all the necessary support and

permissions in this regard for laying such cables

beneath the false flooring is provided to the system

integrator. The system integrator chosen by the bank

will do this cabling activity in consultation with the

service provider

Kindly ellaborate further on why your SI will require

access to the false flooring since bank will be doing

inter-rack cabling between the racks

Please refer corrigendum

115

78/110 Clause No. 13 & F

Miscellaneous Sr. No.

13

The Bidder shall provide power readings. Kindly clarify that power would require on rated

basis or consumed. Do you require a separate meter

box for meter reading

Please refer the RFP Annexure 13

clause H.11

116

79/110 Clause No. 13 & G

Network Link and

Bandwidth

Network link requirement Please be informed that the links are to be procured

by the Bank since SP are not an ISP & secondly the

same is not transferable to any third party as per the

ISP norms / DOT guidelines

No change in RFP terms

117

79 & 109/110 Clause No. 13 & E

Network Link and

Bandwidth

Network link requirement - Annexure 24 Kindly provide us your 6 ISPs details for us to check

the feasibility

No changes in RFP terms.

118

80/110 Clause No. 3. Network Cabling Kindly give clarification related to the bifercation of

all the 8 racks since it contradicts the number of

racks ie of of n/w & server racks, Netapp & IBM

racks

Please refer the corrigendum

Rack dimension is 800 mm X 1000

mm.

Out of 8 racks, 2 are spare.

119

80/110 Clause No. 3. H.

POWER SUPPLY

REQUIREMENTS

Minimum 6KVA of power is provided for each standard

rack

Since you have mentioned on page number 80 / 110

(Desirable Technical Requirements Sr. No. 4) Rated

Power of approximate 80 KVA to the Bank's cage

area in the server room which contracdicts the total

power requirement of 6 KVA each rack

No changes in RFP terms.

Consider the power requirements

mentioned in the inventory. Billing

has to be done on actual usage

basis

120

81/110 Clause No. 3. H.

POWER SUPPLY

REQUIREMENTS Point

No. 12

The factor considered for conversion from KV to KW is

(0.9)

As per the data center standard the power factor to

be considered for convesion from KV to KW is 0.8

No change in RFP terms

Page 26 of 35

Page 27: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

121

84/110 Clause no. 2 Desirable

Technical

Requirements point

number 12

Proposed Data center to maintain the PUE (Power

Utilisation Efficiency) from 1.2 to 1.8

As per the data center standard the PUE is

maintained between 1.5 to 1.8

No change in RFP terms

122

84/110 Clause no. 2 Desirable

Technical

Requirements point

number 13

64 amps 3 phase power sockets will be made available

by Service provider as and when required by Bank

The socket will be 63 amps & not 64 amps Please refer corrigendum

123

84/110 Clause no. 2 Desirable

Technical

Requirements point

number 15

Latency for the 1 Gbps point to point link should be less

than or equal to 1 ms

The latency is completely dependent on ISP provider

& feasibility / availability at both the link POP / sites

No change in RFP terms

124

86/110 Clause No. 4 - Penalty

Charges

The SLA charges will be subject to an overall cap of 10%

of the Annual Recurring Charges (ARC) then the Bank

will have the right to cancel the contract

The SLA charges will be subject to an overall cap of

5% of the Annual Recurring Charges (ARC) then the

Bank will have the right to cancel the contract

No changes in RFP terms.

The SLA charges will be subject to

an overall cap of 10% of the Annual

Recurring Charges (ARC), after

which the Bank will have the right

to cancel the contract.

125

87/110 Clause No. 7 Fault

Reporting, Trouble

Ticketing and Call

Closure Procedure

Any call, which is not resolved within 10 minutes of

reporting, must be informed to Bank

We will share the escalation / resolution matrix

which is a standard process followed by all SP's

No change in RFP terms

126

88/110 B. Service level

definitions for

Network Bandwidth

(vi). Typical Resolution time will be applicable only if

any equipment or Infrastructure is down.

This will be third party dependancies and thus we

can not commit a specific resolution time, however

we will ensure to resolve any such services required

as per escalation matrix

Please refer corrigendum

127

96/110 D. Experience &

Support Infrastructure

b) Out of which there should be at least 1 credentials of

Schedule Commercial Banks and 1 BFSI in India who

have co–hosted their data center or disaster recovery

site or Near DR site with the service provider at

proposed Near DR.

b) Out of which there should be at least 1

credentials of Schedule Commercial Banks / 1

Schedule Bank / 1 Co-operative Bank in India who

have co–hosted their data center or disaster

recovery site or Near DR site with the service

provider at proposed Near DR.

No change in RFP terms

128

98/110 Sr. No. 19 Point No. 10 Information Security Certificate This IS Cerification is not pertaining to the colocation

services proposed to be colocation services & thus

request to remove the same

No change in RFP terms

129

109/110 24. THE TASKS AND

RESPONSIBILITIES

RELATED TO

NETWORKING

Shifting (1st Phase) Please provide us the details pertaining to each row

ownership since it deviates from each other

No chnages in RFP terms

Activity list and Ownership are

clearly mentioned in the RFP -

Annexure 24

Page 27 of 35

Page 28: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

130

109/110 24. THE TASKS AND

RESPONSIBILITIES

RELATED TO

NETWORKING

Rack Installation - Sr. 14, Cabling, Inter rack connectivity

(patch panel to patch panel), Inter rack Fibre

connectivity (LIU to LIU)

It should be a joint responsibility between IDBI / SP No changes in RFP terms

As mentioned in RFP (Cable laying

should be done by bidder,

connections with devices will be

done by IDBI)

131

94 1 Bidder must be a Government Organization / PSU / PSE

/ partnership firm / LLP or private / public limited

company in India at least for the last 5 years.

Bidder must be a Government Organization / PSU /

PSE / partnership firm / LLP or private / public

limited company in India at least for the last 5 years.

OR

Live and operating data centres having an already

sunk in investment of Rs. 600 cr. or more,  but

registered as 'Start up' with Department for

Promotion of Industry and Internal Trade

No change in RFP terms

132

94 2 Bidder must be in Data Centre Co-hosting business for a

minimum period of 4 yrs.

(As on RFP date)

Bidder must be in Data Centre Co-hosting business

for a minimum period of 4 yrs.

(As on RFP date)

OR

Live and operating data centres having an already

sunk in investment of Rs. 600 cr. or more,  but

registered as 'Start up' with Department for

Promotion of Industry and Internal Trade

No change in RFP terms

133

95 9 a)The bidder providing the DC facility should have an

annual turnover of at least Rs. 50 Crores per annum in

last three

completed financial years i.e. 2017-18, 2018-19 and

2019-20 (Exclusive of the turnover of associate

companies

Live and operating data centres having an already

sunk in investment of Rs. 600 cr. or more,  but

registered as 'Start up' with Department for

Promotion of Industry and Internal Trade

No change in RFP terms

134

95 10 The Bidder should have positive net- worth for 2 years

out of the last 4 financial years i.e. F.Y.2016-17,2017-18,

2018-19 and 2019-20, the Bidders must compulsorily

have a positive net-worth for FY 2019-20

Live and operating data centres having an already

sunk in investment of Rs. 600 cr. or more,  but

registered as 'Start up' with Department for

Promotion of Industry and Internal Trade

No change in RFP terms

135

76 13 The data centre facility building should have clear and

marketable title and the Bidder should possess /hold

the same under valid agreement/contracts

The data centre facility should have clear and

marketable title and the Bidder should possess /hold

the same under valid agreement/contracts

No change in RFP terms

Page 28 of 35

Page 29: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

136

24 7.2 Successful Bidder (L1) will be arrived at through an

Online Reverse Auction (ORA) on Total Cost of

Ownership (TCO). Bank reserves the right to negotiate

the price with the final successful bidder before

awarding the contract.

Request to remove online reverse auction No change in RFP terms

137

78 F. Miscellaneous

Point 3

The SP shall provide for staging area at the Near DR site

for 4 weeks for initial hardware deployment. However,

for further additional activities, if the staging area is

required by the Bank, the Bank shall inform the service

provider at least 7 days in advance and the service

provider will be expected to provide the staging area

for Bank’s use.

Yotta can offer secured storage rooms of

appropriate sizes in the Data Center premises for the

period of 4 weeks.

There is a shared staging area on server hall floor

that can be reserved for use by IDBI bank, before

deployment of their IT hardware inside the

designated racks, after advanced notification of 7

days.

No change in RFP terms

138

78 F. Miscellaneous

Point 5

The cabling within / between the racks will be done by

the system integrator chosen the Bank. The service

provider must ensure all the necessary support and

permissions in this regard for laying such cables

beneath the false flooring is provided to the system

integrator. The system integrator chosen by the bank

will do this cabling activity in consultation with the

service provider

Please note that Yotta data center is planned to

route passive copper/fiber networking cables from a

set of overhead basket trays and not under the false

floor.

Please refer corrigendum

139

78 F. Miscellaneous

Point 6

The Bank may in future require additional space at the

Near DR site. The SP agrees that in the event the Bank

wants additional space for expansion; the same will be

provided to the Bank within the same Near DR site /

floor or building. The per rack rate would be as per the

contract rate. Bank cannot provide any time frame to

inform SP for taking up additional space. The additional

seating space if required should be in the same

building.

It is recommended to provide for the additional

required space within the designated cage area on

day 1 to factor before development of caged

environment.

Yotta can offer to hold back the per rack rate for a

period of maximum 12 months.

No change in RFP terms

Page 29 of 35

Page 30: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

140

78 F. Miscellaneous

Point 5

The cabling within / between the racks will be done by

the system integrator chosen the Bank. The service

provider must ensure all the necessary support and

permissions in this regard for laying such cables

beneath the false flooring is provided to the system

integrator. The system integrator chosen by the bank

will do this cabling activity in consultation with the

service provider

Please note that Yotta data center is planned to

route passive copper/fiber networking cables from a

set of overhead basket trays and not under the false

floor.

Please refer corrigendum

141

77 D. Communication

Area

Point 3

As part of telecom facility, bidder is expected to provide

necessary junction box / space in the telecom room for

multiplexer/s, and other equipment. Bidder needs to

also make provision for extending the links (fibre /

copper) up to the server room network racks where

routers will be placed.

Elaboration on the equipments that the bank is

expecting the bidder to provide like junction boxes,

multiplexers etc. in the communication room is

needed. Please specify

No change in RFP terms

Network Team Response:

Any equipment which will be

required for end to end connectivity

and bidder to make the

arrangement for same which is

clearly mentioned in the RFP

142

89 3. Availability

measurements:

Point first

Critical->Network Bandwidth – DC and Near

DR,Network Bandwidth – DR and Near DR->Availability

of each replication link ->99. 99%

We can commit expected service level 99.99% with

redundant replication links.

No change in RFP terms

Page 30 of 35

Page 31: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

143

85 1. Detailed Service

Level and Definition

(vi). Typical Resolution

time will be applicable

only if any equipment

or Infrastructure is

down.

Critical->Environmental Infrastructure->

a. Access controls

b. UPS supply

c. Precision Air conditioning

d. Fire Detection System

e. Water detection systems

f. Humidity Controllers

g. Gen-sets

h. Building Management Systems

i. LAN cabling

j. Power

->Immediate->Within 10 minutes

Generally, 10 minutes is the response time for most

of the events, faults occuring in the data center.

After identification of the fault, the resolution time

may vary depending upon the nature of failure and

designed redundancy of the equipment.

For all the critical equipments like UPSs, PACs,

electrical panels etc. the DC facility is provisioned

with redundant infrastructure components

confirming to Uptime Tier IV.

In certain cases such as Access devices, Cameras etc,

while the response time could be 10 mins and the

fact that the spares will be maintained at site, its

replacement/putting back to service may vary

between 30 mins to 45 mins.

Please refer corrigendum

144

27 1.2 The bidder must accept the payment terms

proposed by the Bank. The commercial bid submitted

by the bidders must be in conformity with the payment

terms proposed by the Bank. Any deviation from the

proposed payment terms would not be accepted. The

Bank shall have the right to withhold any payment due

to the bidder, in case of delays or defaults on the part

of the bidder. Such withholding of payment shall not

amount to a default on the part of the Bank.

Withholding of payment should be only for the

reasons solely attributable to service provider.

No change in RFP terms

145

28 1.13 Any objection / dispute to the amounts invoiced in

the bill shall be raised by the Bank within reasonable

time from the date of receipt of the invoice. Upon

settlement of disputes with respect to any disputed

invoice(s), the Bank will make payment within

reasonable time of the settlement of such disputes.

Word 'reasonable' should be quanitified likewise in

preceding clause no. 1.12 ( 15 days and 45 days)

No change in RFP terms

SECTION 2

1. Payment Terms

Page 31 of 35

Page 32: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

146

30 6. ORDER

CANCELLATION

6.1. The Bank reserves its right to cancel the order in

the event of one or more of the following situations,

that are not occasioned due to reasons solely and

directly attributable to the Bank alone:

i. Delay in shifting, site readiness, switch on at the

proposed new site and handing over the site to the

Bank.

ii. Discrepancy in the quality of service / facility /

security.

"Delay" should exclude any force majeure situations.

However the RFP document doesn’t not contain

Force-majeure clause requesting bank to

incorporate.

No change in RFP terms

147

30 6.2. In case of order cancellation, any payments made

by the Bank to the SP would necessarily have to be

returned to the Bank with interest @ 15% per annum,

further the SP would also be required to compensate

the Bank for any direct loss incurred by the Bank due to

the cancellation of the contract and any additional

expenditure to be incurred by the Bank to appoint any

other SP. This is after repaying the original amount paid.

Not acceptable.

Bank is liable to pay for the service rendered by the

bidder.

please refer corrigendum

148

33 7. INDEMNITY 7.2. The provisions under this clause and indemnity

shall survive the termination of the Contract.

Survival is open ended in present clause. Request

Bank to put survival period of maximum three

months post termination/expiry of the contract.

No change in RFP terms

149

34 9. INSPECTION &

QUALITY CONTROL

TESTS/CHECK

9.3. IDBI Bank reserves the right to evolve a procedure

of quality checking to ensure that the Services are

according to the prescribed specifications and

standards.

Bank has to provide an advance procedural

guidelines for any evolution of quality checks during

the period of contract.

No change in RFP terms

15036 15. LIQUIDATED

DAMAGES

Liquidated Damages Request you to exempt bidder for reasons not

attributable to bidder or Force majeure.

No change in RFP terms

151

37 17. DISPUTE

RESOLUTION

17.3. The Vendor shall not be entitled to suspend the

provision of the Services or the completion of the job,

pending resolution of any disputes between the Parties

and shall continue to render the Services in accordance

with the provisions of the Contract notwithstanding the

existence of any dispute between the Parties or the

subsistence of any arbitration or other proceedings.

Bank shall also continue to pay the Bidder for

services rendered notwithstanding existence of any

dispute.

Please rephrase the clause accordingly.

No change in RFP terms

Page 32 of 35

Page 33: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

152

39 23. SURVIVAL 23.2. The provisions of the clauses of this Contract in

relation to documents, data, processes, property,

Intellectual Property Rights, indemnity, publicity and

confidentiality and ownership survive the expiry or

termination of this Contract and in relation to

confidentiality, the obligations continue to apply unless

the Purchaser notifies the Bidder of its release from

those obligations.

Survival is open ended in present clause. Request

Bank to put survival period of maximum three

months post termination/expiry of the contract.

No change in RFP terms

153

71 7. INDEMNITY 7. This indemnity shall survive the aforesaid Contract. Survival is open ended in present clause. Request

Bank to put survival period of maximum three

months post termination/expiry of the contract.

No change in RFP terms

154

84 1.7 Delivery 1. Introduction

Rated Power of approximate 80 KVA to the Bank's cage

area in the server room. Additional power if required to

be made available. If additional Racks are shifted in

future, the SP should have the provision to provide

sufficient power during the contract period.

Please clarify about whether 80KVA is rated total or

power for all 8 Racks. So Per Rack will be 10KVA

Rated power or Actual consumption power

No change in RFP terms

Please refer the power

requirements mentioned in

inventory (Annexure 23). Billing to

be done on actual consumption of

power units (Annexure 13 Clause

H.11)

155

21 5. TECHNICAL BID

EVALUATION (SECOND

STAGE)

5.3.5 If the proposed data center is Tier IV standard Kindly amend as follows----If the proposed data

center is Tier III/IV standard

No change in RFP terms

156

22 5. TECHNICAL BID

EVALUATION (SECOND

STAGE)

5.11.B. Bidders Past Experience

The bidder must have provided co-hosting space for at

least 10 rack space area per customer in Tier III Data

Centre colocation facility at the PROPOSED SITE for the

bank in India (Banks of Indian origin).

Kindly amend as follows---The bidder must have

provided co-hosting space for at least 10 rack space

area per customer in Tier III Data Centre colocation

facility at the PROPOSED SITE for the bank/BFSI

Customers in India (Banks/BFSI Customers of Indian

origin).

Please refer corrigendum

157

5 5.1. DELIVERY AND

TIME LIMIT FOR

COMMENCEMENT OF

WORK: PERIOD &

LOCATION

1. Introduction

1.

Making the server area ready and available for

installation of the Bank’s IT infrastructure (Site should

be ready with electrical and network cabling and other

facilities like CCTV, access control system etc. as

mentioned in SoW)

Kindly amend the Delivery timelines for all

Colocation Passive Infra or Power readiness

timelines to atleast 6 weeks from PO Date

No change in RFP terms

158

84 2. Desirable Technical

Requirements

Technical Requirement

Remote Monitoring Facility for Caged Area

CCTV Survelliance will be present along with 90 days

archival. Kindly confirm if this will cater the

requirement

No change in RFP terms

Page 33 of 35

Page 34: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

159

29 5.1 # 3 NW links commissioning between DC and Near DR, DR and

Near DR - 5 weeks from the date of issuing the purchase

order to the SP

Sify request Bank to consider commissioning of link to

standard 8 weeks from date of issuing the purchase

order. Accordingly other timeline to revised.

No change in RFP terms

16076 Annex-13 A #11 99.99% Uptime is required for the network availability. Sify request to consider the uptime of 99.90% No change in RFP terms

161

79 G # 1 a. 1 Gbps (Two Links) dedicated point to point fibre links from

DC, Belapur to Hosting location from two different ISP having

latency ≤2 mili second.

Sify seek clarification on the required 1Gbps dedicated

point to point link:

1. is the link going to utilize for the SAN replication and

need FC? Or

2. will it be used for normal data transfer?

3. Is MACsec required in the proposed P2P service?

4. How many VLAN and MAC address will be passed?

No change in RFP terms

Dedicated Point to point fiber link

for data replication is required so

points 1-4 are not relevant.

162

79 G # 1 b. 10 Mbps (Two Links) dedicated point to point link from DR,

Chennai to Hosting location from two different ISP.

Sify seek clarification to understand the number of VLAN

and MAC to be considered in the proposed Point to Point

service.

Sify also needs to give clarification, this 10Mbps P2P link

will be considered without requirement of MACsec, and

the handoff will be over Copper.

No change in RFP terms

Dedicated Point to point for data

replication is required.

163

79 G # 2 B Both 1 Gbps links should be provided from link service

providers MUX having optical port (1/10G) & bidder has to

arrange fibre cable connectivity from that MUX to IDBI

network devices installed at proposed location.

Sify request Bank to freeze on the require module. Sify

recommeneds if the bandwidth requirement is of 1Gbps,

optical port and its modules shall be only on 1Gbps and

not 10Gbps or kindly confirm if it is okay to upgrade the

module from 1G to 10G in future when there is

requirement of higher bandwidth of more than 10Gbps

bandwidth.

No Change in RFP terms, bidder to

make arrangement for same

164

79 G # 2 C Switch Sify request to amend this clause for following:

1. Sify network standard policy of delivering the optical

handoff is over SM,LR

2. Since the required bandwidth size is of 1Gbps, the

optical module of SM,LR from Sify shall be 1G,SM,LR with

option to upgrade in the Future as per Future scalability

with applicable downtime.

No Change in RFP terms, bidder to

make arrangement for same

165

80 3 # D. Optical fibre cables should be Multi Mode (LC-LC) Sify Network policy for the WAN service link over optical

handoff is Single Mode - Long Range.

For DC Network or its LAN network, it will be as per DC

Network policy.

No change in RFP terms

166

84 2 S.N. 15 Latency for the 1 Gbps point to point link should be less than

or equal to 1 ms

Sify request Bank to kindly change the latency to same

figure across all the technical clause.No change in RFP terms

This is part of desirable technical

point & if any bidder is able to

provide the same, marks will be

given accordingly

Page 34 of 35

Page 35: S. No RFP Ref Page RFP Clause no Existing clause Details ... · S. No RFP Ref Page no RFP Clause no Existing clause Details Change Sought Bank's Response 1 75/110 Annexure -13 A General:

S. No RFP Ref Page

no

RFP Clause no Existing clause Details Change Sought Bank's Response

Bank's Respone to Prebid Queries to RFP for Engagement of Service Provider for Relocation of Near Disaster Recovery Site (NDR) Under Hosting Model

REF No: IDBIBank/ITD/VMG/RFP/2020-21/22, September 08, 2020

16785 A SLA

Point 1 # (i)

"Scheduled operation time” means the scheduled operating

hours of the System for the month.

Sify request Bank to kindly consider the standard SLA

cycle of Quarterly over Monthly.No change in RFP terms

Date 19-Sep-20

Place Navi Mumbai