z:s.~_c> _ . BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED ~ (Wholly owned by Government of Karnataka Undertaking) ;~~;ESCOM/BC-9/CGM(CA)/2016-1710-.U _ .~s- O/o'OhiefGenerat Manager (Ete), Encl: I' (J Corporate Affairs, . Corporate Office, K.R. Circle, Bangalore-560 001 Date: Ok lcs] OWlb Proceedings of the Monthly Works Progress Review meeting held on 18.07.2016 @ 10.30 AM at 2nd Floor, Conf\erence Hall, Corporate Office, BESCOM, K. R. Circle, Bangalore. Session I From 11 AMto 12 PM Managing Director, BESCOM, welcomed all the officers present in the meeting. Managing Director, BESCOMreviewed the action taken on the proceedings of the meeting conducted on 18.06.2016 and the accident statistics of BESCOM for the month of June - 2016. The followingpoints were discussed: • Accidents: • By next meeting, all the accident cases upto today has to be closed. DEI reports shall be sent with in a period of one month and if any cases are pending for more than a month, then the concerned SE will be. held responsible for the pending compensation cases. • Analysis has to be done for all accident cases by all the circles and the action taken for reducing such accident cases shall be furnished to Q,S&S section along with statistics. The same may be presented in the next meeting. • Instructed to all SEEs to write a DO letter to. CEIG with a copy to MD regarding pending reports for releasing the compensation for the fatal accidents as per BESCOM norms, as it was noticed that the payment of compensation for FY2015-16 are still pending because of DEI reports. •--Instructed ··te__:'GM: . (QS&S) to' issue a circular=regarding+analyzing all the accidents by the concerned SEEs within 15 days of the accident and furnish the detailed report to'GM(Q,S&S)section. • All SEE's have to come out with their own policies for safety measures to be taken for reducing accidents and also to fix responsibility. Page 1 of 22

Upload: ngokiet

Post on 23-Apr-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

z:s.~_c>_ . BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED~ (Wholly owned by Government of Karnataka Undertaking);~~;ESCOM/BC-9/CGM(CA)/2016-1710-.U_ .~s- O/o'OhiefGenerat Manager (Ete),Encl: I' (J Corporate Affairs,

. Corporate Office, K.R. Circle,Bangalore-560 001

Date: Ok lcs] OWlb

Proceedings of the Monthly Works Progress Review meeting held on18.07.2016 @ 10.30 AM at 2nd Floor, Conf\erence Hall, Corporate Office,

BESCOM, K. R. Circle, Bangalore.

Session I From 11 AMto 12 PMManaging Director, BESCOM, welcomed all the officers present in the

meeting.

Managing Director, BESCOMreviewed the action taken on the proceedings of

the meeting conducted on 18.06.2016 and the accident statistics of BESCOM for

the month of June - 2016.

The followingpoints were discussed:

• Accidents:• By next meeting, all the accident cases upto today has to be closed. DEI

reports shall be sent with in a period of one month and if any cases are

pending for more than a month, then the concerned SE will be. held

responsible for the pending compensation cases.

• Analysis has to be done for all accident cases by all the circles and the action

taken for reducing such accident cases shall be furnished to Q,S&S section

along with statistics. The same may be presented in the next meeting.

• Instructed to all SEEs to write a DO letter to. CEIG with a copy to MD

regarding pending reports for releasing the compensation for the fatal

accidents as per BESCOM norms, as it was noticed that the payment of

compensation for FY2015-16 are still pending because of DEI reports.

• - -Instructed ··te__:'GM: . (QS&S) to' issue a circular=regarding+analyzing all the

accidents by the concerned SEEs within 15 days of the accident and furnish

the detailed report to'GM(Q,S&S)section.

• All SEE's have to come out with their own policies for safety measures to be

taken for reducing accidents and also to fix responsibility.

Page 1 of 22

Page 2: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

• Compulsory .action has to he taken by S$~'s for System improvement worlcs,",---""._.,'''. , " ,', " ",_. ." .

safety workshops-eo educate field .,staff,and public especially in rural areas

and conducting: safety Day. B~dget "Cll\~~ prov~ded on request for theseworks.

• Every THI~D SATURDAYshall be conducted as safety day and the main

agenda will be to educate staff and public also to discuss the system

improvement (minor) of at least one feeder (end to end) at a time. If the work

is major then it can be done by calling tender. I

• Instructed to GM (QS'S)to issue a circular for conducting safety day on third

Saturday of every month for awareness and implementation of safety in

BESCOMin concurrence with Nodal officers.

• This month on 23rd safety day has to be done and all the nodal officers have

to visit their jurisdiction and furnish the report to MD,BESCOM.

• Iron poles: Informed all SEE's to furnish the revised details of iron poles for

this year if any and take up the work to replace the deteriorated iron poles and

submit the photographs (before and after) for the rectified works to Q,S&S

section.

• Hazardous locations: Instructed all SEE's / EE's to take up the works, rectify

the same and submit the photographs (before and after) for the rectified works

to Q,S&S section. concerned SEE's gave the target for next month as follows:

Kolar-50, KGF-2S-30, CB Pura-30, Chintamani-to complete all, Nelamangala

and Hoskote (Yelahanka)-SO, Chandapura-30, Ramanagara-to Complete all,

Kanakapura-SO, Tumkur Circle-50 (Tumkur+Tiptur+Madhugiri) and Davangere

Circle-70 (Davangere, Harihara, Chitradurga and Hiriyur).

• Spacers: Informed to all SEE's to utilize the spacers and to be provided to only

Lengthy spans like valleys, where intermediate. poles' cannot be erected /

inserted and in high wind zone / storm areas and also to the spans, wherever it

is necessary to avoid danger which are likely to cause the short circuits and

results in -conductor damage and snapping ana---nof to all the L.T. Lines byawarding labour contract or by departmentally.

The progress for fixing of LT spacers shall be furnished to Q,S&S section

every month along with the statistics.

• Feeder inspections b,. Blectrical Inspectorate:-

Page 2 of 22

Page 3: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

• Instructed to all SEEs and EEs to take action for attending the discrepancies

mentioned by Electrical inspectorate department and furnishing the compliance for

the inspected feeders in urban and rural areas to Q,S&S section.

• Also instructed to all SEEs and EEs to take action to clear the payments of

Electrical Inspectorate department.

• Surprise checks: Instructed that all CEEsj SEE's and EEs has to conduct

minimum 20 Nos. of Surprise checks every month and informed to conduct

more checks and educate the staff and create awareness and also to check the

safety equipment's while working and -taking the attendance regularly and to

furnish the details of the inspections along with statistics as the same has to be

furnished to KERC.

• HT/LT lines over the Govt. schools and DTCs in Govt. Schools Premises:

Informed all SEEs to get the details at the earliest and also to prepare estimates

for the same and told to utilize the AB cable which is available in the stores.

Further to take up the works on top priority and progress of the works has to be

furnished to Q,S&S section from this month.

• More than 5a% loadin·g on feeders: (subject pertains to Operation section)Instructed to all SEE's to furnish the details of more than 50% loading of all the

feeders within their jurisdiction and also the No. of interruptions of all the

feeders in concurrence with CGM(Operations). The same has to be mailed to MD

within a week time.

Session II from 12 PM to 2 PM

1. Electrical Inspectorate issues: No Issues.

2. KPTCLISSUES:No issues.3. Proposals for Railway crossings.! Highway crossings and Forest clearance:

The EE of works division have. informed that the list of railway crossing,

National Highway, State highway crossings and forest clearances coming in way

of 11 KV NJY feeder works under taken for NJY phase-3 works for which

approval/clearances are required --from .Railway./Naticnal highway lstate

highway and forest authorities have been submitted with all documents. The

abstract for each category is given below.

Page 3 of22

Page 4: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

a. Abstract of pro.posals fe.t Railw,aycl'o$~ing~:-

"Railway Cr,esshigSl Name of the Lot No AgeJlcy .(.p.~posed) . Details of Proposal SubmittedlNo. circle 'No''of Ne)or present status

Ipc;~fjioU' 'Feeders .1 Kolar Circle

. .ProposalMis Pavani submitted to railway

PTK-95 Controls & Panels 5 4 ~uthority vide Ltr. No. SEEILtd., ~E(O)/ AEE.(T)jF-107116-17/

~220-23 Dated:23.06.20162 BRC (other than Propo!>al submitted to senior

Magadi and PTK-93 Mis BVG India 8 6 ~ivisional electrical south westernKudur) Ltd. ailway Bangalore vide Ltr No.

1362~65 dtd: 16.06.163 Magadi & Kudur , Proposal submitted to Railway

which belongs to PTK-93 MI s BVa India 7 5 authority on 21.06.2016~amanagara Ltd.Circle)

4 ~amanagar PTK-94 Mis Asian Fab 11 8 Proposal submitted to RailwayCircle Tech Ltd., authority on 23.05.16. & 06.06.16

5 Tumkur& Tiptur MI s Transglobal Proposal has submitted andDivision PTK-96 . 2 2 nspection done by Railways onPower Ltd 11.0.7.16

6 DVGCircle ~ Nos. of revised proposals~ubmitted to DE, Mysore on10.06.16 & waiting for spot

PTK-97 Mis Asian Fab 6 5 nspection.Tech Ltd ~" Nos. of revised proposals

submitted to DE, Hubli on~O.O4.16 & waiting for spotnspection.

TOTAL 39 30

Hon'ble Managing Director directed the EE works divisions of O&Mcircles to

submit the proposals for all the 39 locations identified in the prescribed formats~ s-

with relevant details to Railway authorities and follow up to get the clearances at

the earliest possible so that works should not be delayed beyond target date.

b. Abstract of proposals for National/State Highway crossings:-1:..

NatfC)nalHighway State HigliViaySl Name of Lot No Agency Cro$sin,g (:proRqsed.) CrolSiling(:)~9;pOSecn Details of ProposalNo. the circle No of Noof No of Noof Submitted/present status

locations Feeders locations Feeder.s1 Kolar Circle Proposal submitted to NHIA

vide Ltr No. SEE/EE(O)j

.PTK~ Mis Pavani AEE(T)/JE-3/F-I07 116-17 I----- ----- , 'Controls-& " , l4 7 14 - _. 8 17r3::T9'Dated': -08.06.16

95 Panels Ltd., To SH vide This office Ltr No.EE(W)/AEE(T)/JE-3/F-107116-17/732 Dated: 30.4.16

2 BRC (other Proposal submitted to projecthan PTK- Mis BVGlMagadi and 93 India Ltd. 8 5 6 3 director NHAIvide letter No.

lKudur) 1354 116.06.16

Page 40f22

Page 5: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

3 ~agadi &lKudurwhich PTK- M/sBVG 7 5 0 0 Proposal submitted to NHIAonbelongs to 93 India Ltd. 21.06.2016~amanagar

, ~ircle)4 ~amanagar For NH Crossing Proposal has

Circle MIs Asian been submitted to NHAIonPTK- 09.06.201694 Fab Tech 1 1 7 2 State highway road crossing.Ltd., issues will be resolved locally

with concerned authority.5 Turnkur & PTK- MIs Proposal submitted to NHIAonTiptur Transglobal 3 3 3 2

Division 96 Power Ltd 16.7.16

6 DVGCircle Proposals submitted to PO,

PTK- MIs Asian NHAI,CTAon 26.05.16 for 13

97 Fab Tech 16 9 Nil Nil locations. Revised ProposalsLtd submitted to EE, NH, CTAon

11.07.16 for 03 locations.TOTAL 49 30 30 15

Hon'ble ManagingDirector, directed the EE works divisions of O&Mcircles to

submit the proposals along with Bank Guarantee for all the 49 locations identified

in the prescribed formats with relevant details to NationalHighwayauthorities andfollowup to get the clearances at the earliest possible so that works should not bedelayed because of non-approval for crossings. In respect of state Highwaycrossings directed to contact the concerned Executive Engineer(Ele) PWD forgettingapproval for state highwaycrossings.

c. Abstract of 'proposals for Forest Clearance :-

Forest Clearance (proposed)Present Status of ProposalSI Name of the

No. circle Lot No AgencyNo of Length No of

Submission to Forest

locations inKm Feeders Authority

1 Kolar Circle ~/s Pavani Proposals submitted vide~ontrols & Ltr No. SEE/EE(OJ/Panels Ltd., AEE(TJ/JE-3/F-107/1737-

PTK-95 6 37.0 6 39 Dated: 09.06.2016,Kms And

Ltr No. EE(WJ/AEE(TJ/JE-3/F107/16-17/365-67Dated: 16.04.2016

~--- Turnkur & ~ / s Transglobal - --- _- -- - _f'\pprovaLobtained.from localTiptur PTK-96 Power LTd 12 55 Kms 8 forest authorities.Division

TOTAL 18 92 14

The Hon'ble ManagingDirector, directed EE works divisions-ofrespective O&M

circles to analyze the requirement of village loads along with the Agri loads and-------- - --

Page 5 0[22

Page 6: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

possibility of arranging power supply without much expenditure for feeders passing

through forest areas and villages near forest areas.

The EE works divisions were requested to furnish the details III the below

format immediately.Connected load details on existing_Rural areas which I'eq;uires forest clearance

Name of Connected load Connected Name ofName Name Name the load after the81. of the of PrK of the Existing Before Forest area Forest area ProposedNo Circle Division NO station Rural IP in Others In IP in Others NJY

feeder HP KW HP InKW feeder123

Total

4. Pro.gress ofNJYPhase-2

• The NJY phase- 2 works were reviewed by Hon'ble Managing Director and

progress as on date are noted below.

Noof NoOF Noof .Name/No of Name/No of

SI. Name LOTNotalQk name Nameof the Proposed feeders feeders feed~r to be feeder to beof DIVISION / LOIDllte Firm (M/s) NJY Com-pletecODlQlis-Completed Commissione Remarks

No. Circle before 12th d before 12thfeeders d sioned AQll2016 Aug2016

1 Nelamangala LOT-Ol[Dodda- Maruti 11 11 11~ ballapur)/22.09.11 Electricals - -

-~OT-02Nelamangala) Transglobal2 IIQ Nelamangala 7 7 7/20.11.2012 Power Ltd - -

~

Maruthi

3 Ramanagar Lot-03 (Bidadi) Mechanical 1 1 1/18.10.2012 & Electricals - -

- (P) Ltd

4 ! Ramanagara LOT-4(Channa- ME 13 13 13.patnal/ .0~:()7.2013 Electricals - -

LOT-16(Gouri- Godrej &5 Chikaballapura bidanur)1 02.09.n Boyace 19 19 19 - -

Mfg.Ltd-Sealwel

6 Chickaballapura Lot 15 (Chickaba- Corporation 11 11 11llapura) 120.11.12 - -Ltd~

Macrovision7 Chickaballapura Lot!7 (Gudibandae 3 3 3PH 2)/2.11.2012 Network - -- Godrej &:; LOT-13(Chin!amani)8 - Chintamani Boyace . 15 15 140 122.09.2011 - -::,.: Mfg.Ltd- Pawani9 Kolar Lot-12 (Kolar)/ Controls & 20 20 19.2.Q,U~l2 - -

- -Paners-Wi - _._- _-- - --- LOT-14(Sriniva10 Kolar sapura) 1.20.05.13 Transglobal 13 13 13 - -- Pawani11 KGF Lotll(Mulbagalu) 1 Controls & 12 12 1220.11.2012 - -

"-- -, Panels Ltd

Page 60f22

Page 7: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

Name/No Name/No

No of No of No of of feeder of feederName to be to beSL of Division LOT No Taluk Name Name oftbe Proposed feeders feeders Complete Commissi Remarks

NO Circle / LOI Date Firm NJY complete commiss d before onedfeeders d oned 12th Aug ~efore 12th'i. I 2016 AUl!:2016

12 Tumkur Lot- 05 (Gubbi) Transglobal 14 14 14120.11.2012 Power Ltd - --LOT-24/(Tumukur Sri Lakshmi

13 Tumkur Part3) 129.05.13 narasimha 9 9 9 - --

LOT-07/(Chikka-iii: KGN14

~Tiptur nayakanahalli Part-

Electricals 7 7 7 - -1)/ 3.10.2012- :e

15 ~ Tiptur LOT-06 (Turuvekere) Transglobal 14 14 14120.05.2013 - --

Manju16 Madhugiri LOT-09 (Korategere) 11 11 11122.09.2011 Electricals - -I---

Raja17 Tiptur

Lot- 25 (CNHalti)18 8 818.7.14 pnd Stage) Electricals - -

18 Hiriyur LOT-20 (Challakere) Shivachethana 11 11 11QI . /27.07.2013f-- ..QI

Prakash111) LOT-23 (Davanagere) 18 18 1819 c:: Davanagere

! 129.07.2013 Motors - -f--20 ~ Harihara Lot-22 (Harihara) 8 8 8120;11.2012 Shivachethana - -

21 Hiriyur Lot -21 (Molakal- Deepak Cable 3 3 3 short closede muru 1 20.11.12 (India) Ltd retendered for balance feeders- QI111) LOT-18 (Chitradurga) Inland22 c:: Chitradurga 16 16 16! 110.06.2013 Surveyors - -

-KGN23 ~ Chitradurga LOT-19 Holalakere 14 14 1410-10-13 Electricals - -

Total 258 258 258 0 0Phase-2, 2nd Stal e

No of No of No of Name/No of Name/No of

SL Nam~ LOT No taluk Name of the proposed feeders feeders feeder to be feeder to be

NO of 'DMSION name / LOI Firm (M/s) NJY Comple commis- Completed Commisstone RemarksCircle Pate before 12th d before 12thfeeders ted sioned Aug 2016 Aug 2016

LOT-26 11 KGF (KGF) Pavani controls 5 5 5 - -

11.12.14f--

~ LOT-271 Pavani2 0 KGF (Bangarpet-1)pontrols 5 5 5 - -

~ 11.2.2015f--LOT-28 Gowtham

3 KGF (Bangarpet-2)Electricals 6 6 6 - -

8.4.2015Proposal

submitted to

~Lot-30 1 No. 1 No. forest

4 Hiriyur (Molkalmuru) RK associates 7 6 6 JB Halli JB Haiti department both8.4.2015 in online and

hard copy,approval awaited

Total 23 22 22 1 1Grand Total 281 280 280 1 1~ ---- -- --_,_--- -- .. -f-- --- - -_ .. ~---.-

Hon'ble Managing Director, directed the Chief Engineer Elecy Chitradurga Zone

to pursue and complete the JB Halli feeder work by the end of this month without

further delay.

Page70f22

Page 8: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

5. Phase-3

• The ongoing works were reviewed and commitments .made by the contractors

along with progress as. on date are noted below.t

..... = PTKNo./ No of No of J'f(u~f :' Name/No of feeder to be ~ame/No of feeder to beSI. QI 0 Name of the :reedet;a_-I'QPosedN.,J feedeD ~emar'k:u III DWA/ ,91l1:pieted'before 12thAu Commissioned beforeNo. .!:IE bidder (M/s) " commis-

C)~ LOI date feeders ompietec . sioned 201·6 12thAug 2016

~osPTK-90/ ~ Nos

Giriyammanapalya2. Bukkapatna rural:E LOI 1. Byadanur 3, Jadegondanhallieo 21.10,15 ~. Ponnasamudra

1 .E DWA KGN 51 26 16 ~. Budibetta 4. Mangalavada"g 26.11.15 Electricals f4. Maridasanhalli

b, Rangantahapura::E SDC ~. Arasikere p. Bhupura

7. Kodamadagu21.1.17 ~. Siddarabetta ~. Ryapte~. Valluru

9 Nos 10Nos

1. Pandithapura 1. HonnapuraPTK-93/ ~. Hebalalu, LOI 2. Gobbargunte p. Nerlekere3. Chakrabhavi

C,) 21.10.15 BVG India 4. Jodugatte ~. Hulikatte2 ~ DWA Pvt. Ltd, 49 9 4 p. Agalkote Hand Post

CO 26.11.15 Pune 5. Bhaktharahalli p. KaehohalliSDC 6. Bhavapura tl. Attibele

21.1.17 7. Gangapura ~. Gobbargunte8. Kachohalli9. Agalkote Hand Post ~. Bhavapura

10. Bhaktharahalli. '

13 Nos11 Nos 1. Lakkasandra

1. Lakkasandra p. Mankunda

PTK-94/ tl· Byranayakanahalli p. KunamudanahallicrS p. Hunasedoddi ~. Thadikavagilu..... LOI~ 21.10.15 ~. Kyasapura p. Harokoppa (Nunnor)oj Asian Fab 15· Harokoppa (Nunnor) p. Bilaganakuppe3 § DWA Tee Ltd., 62 18 10

16· Bilaganakuppe fl. Attibele(Maysandra)

~26.11.15 t7. Attibele(Mayasandra) ~. MylanayakanahalliSDC

~. Vabsandra(Ragihalli) p. Sadenahalli21.1.179. Shivanahalli 10. Byranyakanhalli10. KYLNJY 11. Byramangala11. Byramangala 12. Hookunda

13. Chikkalahally11 NOS 13 NOS

1. Kurutahalli Hirekatiganahalli2. Idludu p. Kodadavadi

PTK-95/ 3. Melur p. KurutahalliLOI ~. Guramadugu

21.10.15Pawani 4. Nagasandra ~. Nadampalli

~ Controls & ~. Pommarahalli b. Mittahalli4 0 DWAPanels Ltd,

62 18 10 ~. Pethandlahalli 7. Adigal~ 26.11.15Hyderabad [7. Vishranthi 8. Avalabetta

SDC ~. Jayamangala 9. Somenahalli21.1.17 f.J. Vatrakunte 10. Pethandlahalli

11. Vishranti10. Somenahalli 12. Navalagurki11. Chikkaneharalu 13. Melur

Page 8 of 22

Page 9: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

~~----------------------------------------- - - --- -----------------------------------------

-= PTKNo./ Name of No of No of No of ~ame/No of feeder to be ame/No of feeder to beSl. III 0 feeders

(j- DWA/ the bidder proposed feeders' Completed before 12th Commissioned before ItemarksNo. !l~ LOI date (M/s) JY feeders ompleted commis- Aug 2016 12thAug 2016UQ sioned

11 Nos12Nos

1. Rajendrapura1~, S. Kempanahalli

2. Venktapura2. Tarikere

PTK-96j 3. Ramagatta3. Raitharapalya

Lor 4. Venktapura&:! :> 4. Sadarahalli 5. Rajendrapura....is 16.12.15 Transglobal 5. R G Halli

5 ~ .... DWA 58 28 21 6. R G HalliS .8 Power Ltd., 6. Narasapura

7. Halevoor';l .S< 20.1.16

Bangalore 7. HalevoorE-< E-< SDC 8. Byadrakodegehalli

8. Byadrakodegehalli16.3.17 9. Sulekere

9. Sulekere 10. Nelagondanalli10. Hosahalli11. Bukasagara

11. Hosahalli12. Bukasagara

16Nos15Nos 1. Kadabagere

1. Nandhi halli 2. Nallur2. Uppaharatti 3. Kunabevu3. Kunabevu 4. Avinatty4. Avinahatty 5. Astapanahalli

PTK-97 j 5. Chikkaujjini 6. MagadiLor 6. Heggere 7. Palavanahalli

16.12.15Asian Fab 7. Palavanahally 8. HeggerebD 98 8 16 > DWA 8. Adivala 9. Hunsekatte,0 Tee Ltd.,

20.1.16 9. K N Halli 10. HireguntanuruSDC 10. Hireguntanuru 11.KN Halli

16.3.1711. Gowrasamudra 12. Nandihalli12. H Kadada katte 13. Ujjanipura13. Ujjanipura 14.0blapura14.0blapura 15. Hulikunte15. Hulikunte 16.Matadadyamenhall

i

Total 380 107 62 63 73

6. Hon'ble Managing Director has directed to take action in 'respect of thefollowing

.:. 'All the contractors were directed to adhere to the commitment as per the action

plan for complete & commissioning of the feeders, if not DWAsissued for works

will be short closed and Black listed and the action will be initiated as per rules .

•:. All the Superintending Engineers (Ele) were directed to book the 100%

expenditure, in respect of NJY Phase-II by the end of Aug-2016 and to send the

pending final budget proposal if any to the corporate Office in respect of NJY

phase-2 Scheme.- -- -~ - _- ------ .. - -.-_ .. -- --_"_------+.-.-_.-

.:. The Chief Engineer's (Electy) C, O&M CTAZ/BRAZ Zone and" All the

Superintending Engineers (Ele), C O&MCircle were directed to fix target for the

Section officers/Assistant Executive Engineer (Ele.,) C, O&MSub divisions and

givedeadline to furnish the NJY phase-1 and 2 Pre and post analysis along with

reasons if NJY scheme objectives are not achieved. All the Superintending

Engineers (Ele], C O&M_Circle_have_b.e_en_directed to furnish the.consolidated

Page9 of22

Page 10: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

NJY phase-1 and 2 Pre and post analysis to this office with in 5th of every

month, as per the formats already mailed to all divisions/ Circles .

•:. All the Superintending Engineers (ETe), C O&M Circle were directed to furnish

the target of fixing and commissioning of OLP relays for'NJY phase-1 and 2

works and directed to adhere to the targets .

•:. The firm Ashida is directed to complete 100%work in respect of Fixing/wiring of

OLP relays for NJY phase-I and Phase-2 Schemes in all the circles by the end of

Aug-16 .

•:. The Chief General Manager(Ele.,), projects informed that additional 12 Nos of

relays and required for NJY phase-1 and phase- 2 for Ramanagara circle will be

arranged after verifying the unused relay panels available in other divisions .

•:. Executive Engineer(Ele.,) works Division are expressing difficulties in view of

non-furnishing of information and related data pertaining to the NJY scheme by

Executive Engineer (Ele.,) C, O&MDivisions, due to which pre and post analysis

couldn't be done for NJY Phase-I and II schemes. In addition to that important

parameters related to safety and operations are being dis,cussed and reviewed in

the absence of O&MExecutive Engineers. Hence Chief General Manager (Electy)

Projects requested Hon'ble Managing Director here afterwards to .invite O&M

Executive Engineers. also along with Executive Engineer works for the Monthly

review meetings. Hon'-ble Managing Director and Dir.~ctor Technical BESCOMagreed for the same .

•:. All the EE works divisions were directed to furnish NJY phase-3 feeder wise

progress 1stweek of every month, as per the format already furnished .

•:. The Hon'ble Managing Director expressed displeasure that the project works of

Davangere awarded to Asian Fab Tech Ltd and BRC awarded to BVGIndia Ltd.,

is not progressing as per the commitments given by them even though LOI have

been issued during December 2015 and October 2015 respectively. The firms

have deviated from the actual work schedule given in the OWA. SCN shall be

-is-sued-to boththe firmsasking for explanations for the- delay-in executing the

works within 30.07.2016. Also, PERTchart schedule shall be obtained from both

the firms for the remaining works to be completed. If there is any deviation in the

work completed from next month as per the PERT chart submitted, then action

will be taken to short close the project and blacklist the firm.

Page 10 of 22

Page 11: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

.:. The Hon'ble Managing Director fu-rther noted that the feeder loads in respect of

many of the NJY feeders are more and over loaded and directed the Chief

Engineers O&MZone to analyze the same and to take corrective action to reduce

the loads' 'immediately .

•:. The Hon'ble Managing Director further directed to review the progress of NJY

phase-3 works once in every fifteen days and directed to take suitable action

against the agencies who failed to adhere to the targets .

•:. The Chief General Manager, Projects .presented revised monthly action plan fo~

balance feeders for all the lots in order to complete the projects well within the

target date. The Hon'ble Managing Director directed to get the commitments

in writing from the agencies .

•:. The Hon~ble Managing Director directed to resubmit the proposal to the GOK

for 40% equity for NJY phase-3 works.

Please Note: All the Field Officers were instructed to furnish the Agendanotes as, per the format before 5th of every month so as to enable CorporateOffice to consolidate and present, the same in the monthly,'works reviewmeeting scheduled on 10th of every month.

Session III From 2 PM to 3 PMRGGVY XII Plan:

The Chief General Manager, Projects explained the progress achieved by the

firm. The abstract of cumulative progress achieved in all the districts of BESCOM

is as follows:

PHYSICALPROGRESSREPORTOF RGGVYXII PLANSCHEME

Name of the Project: RGGVYXII Plan

Qtyas Qtyas Progress as Target Progress % PhysicalSl. Name of the on prev fixed for for the Cumulativ progressNo Work Unit per per month the month month ot e Progress against

DWA Survey (May-161 of June-16 June-16 Survey Qty

1 11 KV3 phase KM's 269.80 78.28 32.63 25.00 3.907 36.54 46.67%overhead LineLT single phase

2 3 wire overhead Kms 422.55 425.46 110.88 75.00 17.765 128.65 30.24%- --Line . - ------ -- - - - -_.- -- - ---

3 Erection New No's 961 568 345 75 20 365 64.26%DTC 25 KVA

4 Erection New No's 23 0 0 0 0 0 0.00%DTC 63 KVA

5 DP Structure . No's 589 0 0 0 0 0 0.00%

6 Servicing of BPL No's 60531 99671 55566 15000 3695 59261 59.46%Households

. --

Page II of 22

Page 12: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

Financial Progress und.e~ RGGVY,'l'I,I Plan. Sche~e' in BESCOM .as on June-2016.• '. "" I , ~. ~\N •

(Amount in Rs. Crores)

SI. Name oftlte REC DWA MC Name ofNo. district Sanctioned Amount Released. DivisionAmount Amount

1 2 3 4 5 6

1 Davanagere 11.9612 15.745 2.89

Expenditure progressbooked . against DW

Cost

01 Fi i I % Financial70 nanc a progress

against RECReleased

8=7-4Amount9=7-5

15.12% 82.37%

2 Chikkaballapure, 12.2764 15.742 3.35 17.91% 84.18%

3BangaloreRural 4.0048 5.1941 1.07 17.26% 83.79%

4 11.2406 13.8937 3.1 11.23% 50.32%

5 Kolar 13.0726 16.5542 3.56 7.56% 35.16%

NOTE: Expenditure incurred shown above is exclusive of Rs.134.21 Lakhs paid to. REC PDCLtowards charges for preparation & submission of DPR pertaining to RGGVYXli plan & Rs.l1.07Lakhs is paid as an advance amount to . RECPDCLtowards TPIAcha~ges.

The Chief. General Manager, Projects informed that, on reviewing the

progress, BPL energization is 97.9% to DWA quantity whereas 59.5% against

survey quantity. But in' respect of infrastructure creation progress is not

happening as per the, commitments given by the agency. CGM (Projects) further

informed that, the agency have agreed to complete the project physically 100% by

. end of _Octobe_r 2016 and financially by._the end.of .December 2016 during the _

reviewwith agency representatives on 12.07.2016 in the CGM(Projects) chamber.

The Hon'ble Managing Director has directed the agency representative to

speed up the work and to complete the physical and financial work within the time

of schedule as committed by them, and directed to get the commitments in writing

from the agency.. Further, instructed the agency representative to submit all the

Page 12 of22

Page 13: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

~~~-------------------------------------------------------------

balance files pertaining to the energization of BPL households to the concerned

sub-divisions for assigning of the RR nos.

The Chief General Manager, Projects informed that the observations/

deviations noticed by M/s REC PDCL TPIA, ;hall be attended by the agency and

the compliance shall be submitted to Projects, Corporate office duly certified by the

concerned Division/ Sub division officers.

The General Manager, M/s Sealwel Corporation Private Ltd., (Agency) has

assured and agreed to give commitments to complete the physical works in all 5

districts by the end of October 2016 and the financial progress by the end of

December 2016.

DDUGJY Scheme:The Chief General Manager (Ele), Projects informed that, earlier tenders were

floated for BEE 3 star rated distribution transformers but as per committee-B

report of MoP, BEE 4 star rated distribution transformers shall be proposed for

DDUGJYscheme. As such, directions were iss'ued to drop the earlier called tenders

and to re-tender duly adopting the technical specifications for BEE 4 Star rated

Distribution Transformers as per SBD/Committee-B report of MoP/Gol (along

with the modifications stated there on).

Accordingly, earlier called tenders were dropped and process of re-tendering

is under progress.

Hon'ble M.D directed to float the tenders immediately duly adopting SBD of

MOP/ REC.

R-APDRP Part-B:The Hon'ble MD, BESCOMhas reviewed the progress of works in respect of R­

APDRP Part-B Project and noted that the works in all 24 towns has been

completed.

The Chief General Manager(Projects) explained as per the review with AOs of

O&Mdivisions and Agencies concerned, there is a pendency of Rs. 12.5 Crores for---------- __ ._-_" _- --_ - --------- -~~-~. "_"_ -~- - -----

which bills to be submitted by the agencies and payment to be made:' It is also

informed there is a savings of Rs. 49.5 crores during execution' against the

sanctioned cost of the total project. The Hon'ble MD, BESCOM has directed to

reconcile the pending bills and to book 100% expenditure within one months' time.

IPDS Scheme.:

Page 130[22

Page 14: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

The Chief General.Manager (E,;le),Projectsinforrned that, earlier tenders were

floated for BEE 3 star rated distribution transformers but as per committee-B

report of MoP, BEE 4 star rated distribution transformers shall be proposed for

lPDS scheme. As such, d;irec:;tionswere'-'iseued to drop the earlier called tenders

and to re-tender duly adopting the technical specifications for BEE 4 Star rated

Distribution Transformers as per SBD/Committee-B .report of MoP/Gol, (along

with the modifications stated. there on).

Accordingly, earlier, called tenders were dropped and process of re-tendering

is under progress.

The Hori'ble MD, BESCOM has directed to call the tenders as per the

guidelines of GOl/MOP immediately and also directed the Chief Engineers of,BMAZ/BRAZ/CTAZ &_ Superintending Engineers of Kolar/Davanagere circles to

conduct the DEC meeting in co-ordination with the concerned DCs in the

respective districts, so as to submit the report to PFC/MoP., ,

High Voltage DistribJutiQQ'.System (HVDS):'_ - -,-,- :. \.' '" : .' . ..-

The chairman of the ..my~ting welcomed all the members and discussed the

physical & financial progress sub division wise under HVOS project in BESCOMas

detailed below.

The progress of completed feeders in respect of Tumkur-RS_D1, ~SD-2 and

Kyathsandra, Chikkaballapura and Doddaballapura divisions and ongoing projects

in respect of .Kanakapura and Kunigal RSD-Huliyurdurga section, Tumkur

divisions was discussed, the Horr'ble MD, BESCOM reviewed the physical and

financial progress of the sub divisions.

Chief General Manager(Ele.,), Projects informed that initially project was

delayed for 3 months because of communicating approval for the usage of 9.1 Mtr,

280Kg W/L PSCC poles, which is being utilized 1st time in Karnataka duly making

study at Andhra Pradesh as cost saving measure in place of 9mtr RCC poles.. .The Superintending Engineer (Ele.,), Ramanagara stated works are being

),.

---delayed because of delay in supplYIng-25KVAtransformers.

Page 140f22

Page 15: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

Physical Progress of HVDS:

i) Physical & Financial Progress in respect of HVDSworks entrusted on TTKbasisunder Rate Contract '.,

No. of

No. ofRe- - feedets Reviseddesignated revised in No. of Expendit

Name of . Project feeders Project No. ofSI. Name of feeders order to Feeders ure

the Sub the Firm Cost of Proposed from D.B take up one Cost as Feeders Commissi IncurredNo Division LOI in Cr. for HVDS per RC in Completedpura & taluk as oned in croresoriginally Kenged pilot Cr

project.

1 Tumkur 17 8 25 25 25RSD 1Tumkur

146.252 8 15 23 389.27 23 23 364.05

RSD 2

3 KyathsaAsian Fab 0 0 5 5 5 5ndraTech.

4 Chikkab Bangalore 34.8 6 6 74.62 6 6 52.17allapura -

5 Doddaba 193 - 31 -22 9 87.64 9 9 87.64llapura

6 Kengeri 34.8 6 -6 0 0 - - -Total 408.85 68 0 68 551.53 68 68 503.86

• Hori'ble MD, directed to book the 100% expenditure within 30 days time so that

project shall be closed .

• Further CGM, projects informed as per the KERC directives pre and post

analysis for all the feeders have to be submitted. Accordingly financial bids have

been opened and award will be issued within 10 days.

ii) Physical & Financial Progress as on 16.07.2016 in respect of HVDSworksentrusted on -nK basis.

Total BESCOM No. of No. of No. of No. of ExpenditProject feedersSI. Name of the Name of the cost Rs. in DWA portion feeders Feeders Feeders work ureNo Sub Division firm (MIs) Crores as issued on . Rs.ln Proposed Complet Commissi under Incurred

per DWA Crores forHVDS ed oned Iprogress in crores

Kanakapura SPR1 Construction 24.14 04.12.2015 20.44 14 1 1 3 5.23Urban s, Hyderabad

.Kanakapura Rajaf-T Electricals, -20.37 -- 20.n.20"15 15:-64- .. 10 ·0 0 --- ---4 -----

Rural -Tumkur

3 Harohally Shivachetana 20.03 06.10.2015 -14.68 14 0 0 3 0.23Electricals,Sindhanur

Manju4 Sathnur Electricals, 17.05 06.10.2015 12.28 11 0 0 3 -

- --- - Tumkur - - --- .. ---------

Page 15 of22

Page 16: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

.' -

Lakshminara

5 Huliyurdurga simha16.65 06.10.2015 10.48 12 0 .I

Electricals, 0 4 -Tumkur

,

Total 9'8.2 73.51 61 1 1 17 5.46.•:. Details 25KVATransformers,.requbeme-nt/ Allotment for the Project

section:

50

N f No of IS K~"',; Balance 25No.of 25 D;R~S DTR's - KVADT;R's to

KVADTR's allocated be allocated- requestedrequired as for fromper DWA 11 ti Procurement Procurement

. a oca on section sectton

No of 25 BalanceKVADTR's 25 KVA

DTR's toLifted be Lifted

SI Name of the'No Sub Division

Name of theAgency (MIs) from

Kanakapura SPR Constructions, -Urban Hyderabad1 3171 240

KanakapuraRural-

Raja Electricals,Tumkur2 2426 220

6901700 1010ShivachetanaElectricals,Sindhanur

1303 Harohally 2278 40

Manju Electricals,Tumkur 19054 Sathnur 60

Lakshminarasimha'1401626 400 190 2105 Huliyurdurga Electricals,

Tumkur

700Total 2100 18011406 880 1220

Hon'ble MD, BESCOM .has directed to take action in re.spect ofthe following

.:. Hon'ble MD, BESCOM has directed the Superintending Engineer (Ele.,),

Tumkur to make analysis in failure of transformers in respect of completed

feeders under HVDS scheme .

•:. All the contractors were directed to adhere to the commitment dates already

furnished and complete and commission the feeders, if not DWAs will be short

dosed and Black listed and -the action will be initiated as per contract

conditions .

•:. CGM, projects requested all the field officers to furnish the details and to co­

operate with CPRI, TPIAfor the HVDS scheme .

•:. Hon'ble MD, BESCOM has instrueted all the agencies to speed-up the -work-anft-·

directed to fix the month wise targets for completion and commission, so that

works should be completed well within target date. Accordingly following

month wise targets have fixed.

-----.~---

Page 16 of22

Page 17: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

DTC'sFixed for the months for

Target for0/0 erection of transformers

erection of Achievement Achievement Commission structures including allstructures ed other connected works

Name of Name of No of ComSl the sub the Agency DTC's !Achieve Cumula pleteNo division (MIs) propose For Achieve Cumula ment tive Issued d

d the Cumul ment tive for the Achieve by the and July Aug. Sept. Oct Novmont ative for the !Achieve month ment in BESCOh month ment M com

in% % missioned

SPR

1Kanakpura Construe-

3171 300 700 164 398 54.67 56.86 240 205' 600 600 600 580 557Urban tions,

Hyderabad

Kanakpura Raja2 Electricals, 2426 300 700 157 533 52.33 76.14 220 100 450 400 400 400 40(

Rural TumkurShiva-

3 Harohally chetana2278 400 700 174 345 43.5 49.29 40 40* 700' 700 707 - -

Electricals,SindhnurManju

4 Sathnur Electricals, 1905 300 700 159 361 53 51.57 60 - 600 550 553 - -Tumkur

Lakshminar

5Huliyur- asimha

1626 400 700 230 613 57.5 87.57 140 20* 400 450 446 - -durga Electricals,

TumkurTotal 11406 1700 3200 884 2197 52 64.3 700 325 2750 2700 2706 980 95'i

Note: * Electricall:nspectorate approval awaited for commissioning

Session IVCro·m4 PMto 5 PMPower point presentation presented by CGM(Op) in respect of Water Works,

Gangakalyana, Un-Authorised IP sets, Transformers, Thermography & Enumeration

of IP sets & D'I'Cs, The following are the observations & instructions given in the

meeting by MD, BESCOM:

I. Drinking water supply:(i) Progress of water supply installations as on June-16 are as follows:

OBat the Applications Bore Total Energised Pending PendingCIRCLE end of received well valid during the from from Total

previous dul'ing the dried Applicati month- BESCOMs Local pendingmonth month-2016 ons 2016 side Bodies

1 2 3 4=1+2-3 5 6 7 8=4-5North 38 32 0 70 33 0 37 37

-- South 12 --------12 ---r---- - - 23 7 - - 0-------- - 16---------16

East 49 44 0 93 27 0 66 66West 104 49 4 149 23 3 123 126

Bangalore29 7 0 36 12 11 13 24Rural

Ramanagara 57 21 0 78 69 8 1 9Kolar 77 23 7 93 7 83 3 86

Davanagere 307 124 5 426 133 197 96 293Tumkur 277 46 13'- - - -3:-10 - 44 71 195 266---- -

-TOTAL -- 950- - - - 358 -30- -l278~ - 355 -"--- ~373 550 --92'3-Page 17 of22

Page 18: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

(ii)Metering status of DWS installations as on .June-Lo are shown below:~

81. Circle Total number of installations ,Balance to beNo. Existing Metered metered % of Metering

1 North ·4552 4554. 0 1002 South 4110 4110 ·0 100

3 East 2565 2565 0 1004 West 3645 3645 0 1005 Bangalore Rural 4592 4592 0 1006 Ramanagara 6201 6201 0 1007 Kolar 10866 10778 88 99.198 Davanagere 8252 8227 25 99.69

9 Tumkur 10512 9908 604 94.25

TOTAL 55295 54578 717 98.7

• Instructed to SEE's of Kolar, Davangere & Tumkur to take necessary action

to complete balance metering before 31.07.2016.

(iii) Reviewed the age wise pending applications in respect of DWS installations as

on June-16 are as follows:

Pendenc;y status

Sl. o to > 21 >2 > >4No. Circle days & months 3months months >62..1 Total

days <2' &<3 &<4 &<6 monthsmontbs months months months

i-)

1 North 0 0 0 0 0 0 02 South 0 0 0 0 0 0 03 East 0 0 0 0 0 0 04 West 3 0 0 0 0 0 35 BRC 5 1 2 0 1 2 116 Ramanagara 3 5 0 0 0 0 8

--7 Kolar 9 14 60 0 0 0 838 Davanagere 0 19 178 0 0 0 1979 Tumkur 2 67 2 0 0 0 71

TOTAL 2!a 106 242 0 1 2 373• Directed all SEEs of C, O&M circles to furnish the Weekly progress of age wise

pendency and to complete .the works which are pending for more than 21 days

as per oorporate-offiee-eireularvide No: C¥S-91 dated..g4;-09;20 15-.----- --

• Directed all SEE's of C, O&Mcircles to furnish the list of transformers required toGM(Proc)for completion ofworks with a copy to D(T)& CGM(Op)

• The SEE's of C,O & M circles are directed to conduct reconciliation meeting with

local bodies & submit the reconciled statement with joint signature of Local

Bodies to CGM(Op) every-Ftl~flth;--._--------

Page 18 of22

Page 19: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

• Directed GM(A&HR)to issue notice to SE, Davangere & EE(E), works unit

Davangere circle for not properly followup of work because of which 178 Nos are

pending which is more than 2 months.

• Instructed SEE, Davangere to issue show cause noti~e to the concerned AEE's

for poor performance in completion of 178 nos which are more than 2 months.

• SEE's of C, O&MCircles should furnish the reason for pending of 550 Nos of

applications from local bodies within 25.07.2016 and to complete the pending

applications of 373Nos at BESCOMend on top priority.

• Regarding issue of circular No: 47.36-40 dated 08.03.2016 by GM (Q S & S),

explanation has to be submitted to MD within 26.07.2016 for issuing circular

without competent authority approval.

II. Gangakalya1la Works:Reviewed the progress in respect of Gangakalyana Works

• Reviewed the circle wise target & achievement for the month of June-16 are as

follows:

Circle wise pendency is as below:

Target Target Progress Pending No. Ofworks toCircle for FY for June- of June - Applieations be energized by

16-17 16 16 as on June -16 12.08.20161 2 3 4 5 6

BMAZ 5 a a 1 aBRe 110 4 27 59 25

Ramanagar 315 14 78 47 30Kolar 614 23 37 253 100

Davangere 1954 81 73 1880 100Tumkur 1093. 49 93 469 100BESeOM 4091 171 308 2709 355

• During discussion, it was noticed that, the No.·of pending applications is more,

for which the SEEs of C, O&M Circles stated that there is requirement of

transformers to complete the works.

• Further, it was instructed SEE, Davangere to submit the action plan to-----_ - ---- - -~--- - --~-- - - -- -- . -------- _.

complete the pending works of 1880 Nos. as there is huge pending applications

in Davanagere Circle.

• Directed all SEE's of C, O&Mcircles to furnish the list of major materials like

transformers, poles & conductors required to GM(Proc)for completion of works

with a copy to D(T)&CGM(Op).

Page 20: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

• Directed GM(Proc) to. make necessary, arrangements to allocate the

transformers required for which .the line works .are completed & the SEE's

should monitor closely on weekly basis the progress of the works so as to

achieve the target as per tpe commitment given by SEE's.

III. ·'Unautborized IP s.et,s:

Reviewed the power point presentation of Regularization of Un-authorized IP

sets:

• The applications registered, regularized, infrastructure created, balance to be

created as on June-16 ofGoK orders 2005,2011 & 2014 are as follows:

Particulars Gok Order Gok Order Gok Order Total2005 2011 2014Registered 1,18,234 85,241 50,785 2,54,260Regularized 1,18,234 84,078 50,234 2,52,546

Rs. 10,000& other deposits paid 69,024 44,438 50,234 1,63,661Rs. 10,000& other deposits to 49,210 39,640 551 89,436be paid

Infrastructure Created 68,838 40,632 17,580 1,27,050Balance infrastructure to be

created for those who have paid 186 3,805 32,654 36,645Rs.I0,000 & other deposits.

From the above, out of regularized .2.53 lakhs IP sets, only 1.64 lakhs IP sets"\

have paid Rs.10,000 & other deposits, out of which infrastructure created for only

1.27 lakhs, balance 0.37 lakhs -of IP sets are yet to be created with infrastructure.

• Further, it was instructed that, a drive has to be conducted to regularize all the

un-authorized IP sets existing in the field by collecting Rs.50/ - from the farmers

by issuing the RRNos.

• SEE's of C,O&MCircles has to prepare the action plan to organize the drive in

their respective circles by fixing the target for AEE/AE/ JE / SO of sub division,

linemen, meter reader and if necessary line mens from the city can also be

deputed and the drive should be completed by 31.08.2016 without fail.

; --EsHniates has to-be prepared as such min-imum of 3- to4IP-sets' depending' on\

the capacity of the IP sets for one transformers and give priority for these types

of IP sets to create infrastructure.

• While reveiwing the tender status of UNIP sets in respect of Davangere circle,

displeasure was expressed for uploading the bid document aganist common PQR--- ~- ---

issued by corporate office,__.consequeut tojhis the work was hampered, SEE,_Page 20 of 22

Page 21: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

Davangeere & EE(O) should have scrutanized properly before uploading the

tender document. However in the interest of work, it was decided to consider the

2 lots aganist each notification & issue corporate approval to SEE, Davangere to

issue work award .

• It was instructed to complete the process of RR Nos painting to the IP sets at the

earliest.Directed all SEE's of C, O&M circles to furnish the list of transformers

required to GM(Proc)for completion of works with a copy to D(T)& CGM(Op)

IV. Enumer,ation of IP Sets & DTCsEnzen Global Solutions Pvt Ltd presented the power point ppt about the

project,scope, objectives, attributes and the progress of reconciled RR Nos of IP

sets.

CircleEnumerated RR Nos reconciled RR Nos reconciled % progress

IP Sets earlier as on 15.07.16BRe 71508 41332 59926 83.80Ramanagara 66318 38865 55160 83.18Kolar 160712 ·75211 102919 64.04Davangere 201989 109999 111178 55.04Tumkur 221019 94077 110419 49.96Total 721546 359484 439602 60.93

• It was observed that, after uploading the details of DTRs in the google map, if

that DTR failed and replaced by another one and failed DTR will get repaired

and returned to store and put it in some other location, that details will not get

uploaded in the google map. Tracking of DTRs has to be done and also noticed

that the updated/ addition of assets was not carried out by the firm and also

instructed to complete the 100% reconcilication of RR Nos of IP sets including

additional quantity .

• PPT has to be presented by Enzen Global Solutions Pvt Ltd about the project,

progress achieved on Enumearion of IP Sets & DTCs & Distribution

Transformers Tracking System seperately.

v. --Distrlbuti~b~alisrormers: -------HOn'ble\MD, ,;iESCOM, viewed the Power point presentation of Distribution

transformers existing and number of DTRs failed m BESCOM and also viewed

the Division wise Percentage failure of Distribution Transformer for the month of

June-20 16 are as follows:

Page 21 of22

Page 22: ~s- O/o'OhiefGenerat Manager (Ete), I' (J . Corporate ...bescom.org/wp-content/uploads/2016/08/Proceedings.compressed.pdf• Compulsory.actionhas tohe taken by S$~'sforSystemimprovement

No.of'Jr's No. of Cumulative % failure Target toExisting Failed Existing Tr's restrict

81. Division Name during the Faiied FY261S-16 FY2016-17 for failureNo as on as' on (upto the end ofJune-.lS month of J,upe-,l6 duriJlg JuP to ,Jun-1S) DTRsfor

jun~-lS " Jun'e;i6 ~ ~ :1" ; JQn-16} June-16'. , No.s.· % Nos % ~

1 Nelamangala 12458 21 10244 11 46 0.37 25 0.24 19

2 Yelahanka 10645 34 11640 27 128 1.20. 54 0.46 31

3 Ramanagara 6047 46 10559 37 143 2.36 205 1.94 414 Kanakapura 5676 35 6382 41 127 2.24 136 2.13 325 Chandapura 7012 30 7282 37 83 1.18 80 1.10 27

-

6 Kolar 9298 67 10137 66 205 2.20 227 2.24 607 KGF 11527 116 12792 77 324 Z:·81 246 1.92 1048 Chikkaballapura 11991 152 13840 203 272 2.27 466 3.37 137

9 Chintamani 9527 75 10679 154 189 1.98 385 3.61 68

10 Tumkur 16152 251 23663 189 779 4.82 698 2.95 22611 Tiptur 9336 127 9707 86 426 4.56 440 4.53 11412 Madhugiri 14543 270 15664 269 710 4.88 820 5.23 243

13. Davanagere 14690 90 17876 121 240 1.63 283 1.58 81

14 Harihara 9308 115 10719 105 352 3.78 346 3.23 104

15 Chitradurga 128!j6 l68 14173 106 449 3.49 384 2.71 151

16 Hiriyur 11019 274 12374 180 615 5.58 486 3.93 247

CTAZ 87904 1295 104176 1056 3571 4.06 3457 3.32 1166

BRAZ 84181 57\6 93555 6.53 1517 1.80 1824 1.95 519

BMAZ 42043 0 44854 3 8 0.02 3 0.01 0

BESCOM 214128 1871 242585 1712 5096 2.38 5284 2.178 16$5

The % failure rate of Distribution Transformers of FY 2015-16 as on June-15

& FY 2016-17 as on June-16 are noticed. The % failure rate is increased in Kolar,

Chikkaballapura, Chinthamani, Madhugiri divisions.

Necessary action is to be taken to reduce the failure rate as per the target

fixed by Corporate office vide circular No: CGM(O)jDGM(Op-l)j AGM(Op-2)j 16-17 j

CYS-31 Dt: 16.07.20,16.

Meeting concluded with vote of thanks from the chair.