Operational Sequence:
Well Type: Vertical (Exploratory - HPHT Gas Well)
Primary Target: The primary target is the Raghavapuram & Gollapali Formation expected 3600m onward till target depth.
UTM Zone 44N - WGS 84 Spheroid Surface Coordinates UTM Zone 44N - WGS 84 Spheroid
619007.79 Latitude: 16° 40' 52.54" N
1844627.85 Longitude: 82° 06' 58.00" E
Exploration Block: KG-ONN-2004/1 Spud Date: 15.10.2017 Expected Ground Elevation: 4.98 m
Location: Onshore Planned Completion Date: 15-Mar-18 KB Elevation: 16.67 m
Country: INDIA Estimated Total Rig Days: 150.00 Planned TD: 5000 m
Temperature vs Depth
PROBABLE GEOHAZARDS BHA DESIGN BITS & NOZZLESHYDRAULICS & DRILLING
PARAMETERSCASING SPECS CEMENTING PROGRAM FORMATION EVALUATION
Activity PlannedDepth(m) Planned Days Cum Planned Days
0 0
Drill 26" Hole (800m) 800 6 6
RIH 20" Casing and Cement 800 3.3 9.3
Install Wellhead, N/Up BOPs & Test 800 1.8 11.1
Drill 18.5" Hole (1500m) 1500 10 21.1
Log 18.5" Hole 1500 1.3 22.4
Open 18.5" hole to 20" 1500 4 26.4
RIH 16" Casing and Cement 1500 3.5 29.9
Install Wellhead, N/Up BOPs & Test 1500 2.5 32.4
Drill 14.75" UR 16" Hole (2800m) 2800 16 48.4
Log 16" Hole & Trip 2800 2.8 51.2
RIH 13.5/8" Casing and Cement 2800 3 54.2
Install Wellhead, N/Up BOPs & Test 2800 3 57.2
Drill 12.1/4" Hole (4000m) 3600 13 70.2
Core#1 12.1/4" Hole 3618 2 72.2
Drill 12.1/4" Hole 4000 12 84.2
Log 12.1/4" Hole & Trip 4000 4.3 88.5
RIH 9.5/8" X 9.7/8" Tapered Casing & Cement 4000 3.5 92
Install Wellhead, N/Up BOPs & Test 4000 3 95
Drill 8.1/2" Hole (5000m) 4500 8 103
Core#2 8.1/2" Hole 4518 4 107
Drill 8.1/2" Hole 4700 6 113
Core#3 8.1/2" Hole 4718 4 117
Drill 8.1/2" Hole 5000 12 129
Log 8.1/2" Hole & Trips 5000 6 135
RIH 7" Liner and Cement 5000 3 138
Liner Clean-Out, Pressure Test & Suspend 5000 12 150
150
Date: September 21, 2017
(A. Sarma)
(P. Das)
14-3/4"(UR 16") OH X 13.5/8" Casing
Conventional Casing Cementing
- 50% OH Excess
Goal: Cement to 100m inside16" csg
Shoe
Lead: 13.5 ppg
Tail: 15.8 ppg
Centralizer: as per program
0 - 4000 m -
9.7/8" 65.3 ppf VM-
110SS-D VAM-SLIJ-II
(Semi Flush)
X
9.5/8" 53.5 ppf P-110
VAM-SLIJ-II (Semi
Flush)
KG-ONN-2004/1 BLOCK MAP
LOCATION OF OFFSET WELLS
SEISMIC SECTION THROUGH THE PROPOSED WELL
PLANNED DRILLING TIME BREAKUP
8.1/2" Section (4000M - 5000M)
Mud Logging: 3 Samples / 3 m
Wireline Logs: HACRT-HGR-CAL, HDNT-HDLT-HGR-
CAL, HWST, HSFT (sample collection & pressure
points) {provisional}, GEM (provisional), CSNG
(provisional), Side-wall coring, VSP, CBL-VDL-GR-CCL
surveys are to be carried out at this depth. All HPHT
tools.
LWD: GR-Resistivity-PWD (to be used if temperature
permits)
18.1/2" UR 20" Section
Bit: NOV 18.1/2" T43
BHA: Stab 18.3/8" + (16500 Reamer) + Float Sub
9.1/2" + DC 9.1/2" + Stab 18.1/8" + XO +
Circulating Sub 8" + 6 DC 8" + Jar 8" + 3 DC 8" +
XO + 3 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO +
DP 5.1/2" to Surface
Survey: TOTCO at T.D.
SEISMIC SECTION THROUGH PROPOSED WELL
12.1/4" OH X 9.5/8"-9.7/8" Casing
Conventional Casing Cementing
- 50% OH Excess
Goal: Cement to 300m inside 13-
3/8"csg shoe
Lead: 16.8 ppg
Tail: 17.5 ppg
Centralizer: as per program
8.1/2" OH X 7" Liner
Liner Cementing
- 30% OH Excess
Goal: Cement to 200m inside 9-5/8" csg
shoe
Tail: 18 ppg
Centralizer: as per program
8.1/2" Section
Bit: NOV 8.1/2" 813M
BHA: Stab 8.3/8" + Float Sub 6.3/4" + Anderdrift
Tool + DC 6.3/4" + Jar 6.1/2" + 6 DC 6.3/4" + XO +
6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface
Survey: Anderdrift Tools
8.1/2" Turbine BHA to TD.
POSSIBLE HAZARDS & REMEDIAL ACTION BOP STACKUP SCHEMATICS
8.1/2" Section
Primary: M813 PDC
NOV 8.1/2" SKR813M
Secondary: Turbine Bits
SLB 8.1/2" Impreg K703TBPXC
Back-Up: Turbine Bits
Nozzles: 8*14/32 - TBC
8.1/2" Section
WOB: 5 - 15 klbs
RPM: 60 -100 RPM
Pump Rate: 325 - 350 GPM
ROP: 2 - 5 m/hr
8.1/2" Section
HTHP WBM
Density - 15.7 - 16.2 ppg
Yeild Point - >18 lb/100ft2
API Filtrate < 5 cc/30min
pH - 8.5 - 9.5
K+ - 40000 mg/l
3800 - 5000 m -
7" 35 ppf SM-125TT
Vam Top (T&C)
MUD SUMMARY
GEOLOGICAL PROGNOSIS AND WELL DIAGRAM
UTM X:
UTM Y:
LOCATION # 10 Well: GDK-1 Drilling Montage
Surface Coordinates
18.1/2" UR 20" Section
Lightly treated Bentonite mud
Density - 9.5 - 10.5 ppg
Yeild Point - >22 lb/100ft2
API Filtrate < 15 cc/30min
pH - 8.5-9.0
26" Section
Water Based Spud Mud
Density - 8.7 - 8.9 ppg
Yeild Point - >30 lb/100ft2
API Filtrate >15 cc/30min
pH - 9.5 - 10.0
0 to 1500 m -
16" 84 ppf VM110SS-D
DinoVAM (CT)
0 to 800 m -
20" 118.5 ppf J-55
Tenaris ER (CT)
0 - 800 m
Hydrophilic formations
Shallow Gas
Loss of returns while cementing
Lost circulation while drilling
800 - 1500 m
Time dependent shale formations
Hard Abrasive Limestones
Hole Collapse and pack off
Loss of returns while cementing
Lost circulation while drilling
26" Section
Primary: TCR w/CJet 115
Varel 26" ERIGJMRS
Secondary: TCR w/Cjet 115
Varel 26" ERIGJMRS
Nozzles: 3*22/32 + CJet 22/32
0 to 2800 m -
13.5/8" 88.2 ppf TN-
110SS Tenaris 513
(Flush)
26" Section
Bit: Varel 26" ERIGJMRS with Center Jet
BHA: Bit sub with float valve and TOTCO ring + 4
DC 9.1/2” + XO + 1 Jar 8" + 3 DC 8” + XO + 15
HWDP 5 ½” + XO + DP 5.1/2" to Surface
Survey: TOTCO at T.D.
18.1/2" UR 20" Section
Primary: TCI 435
NOV 18.1/2" T43
Secondary: TCI 545
NOV 18.1/2" T44
Back-Up: S619 PDC
NOV 18.1/2" TFR619S
Nozzles: 9*22/32 - TBC
DRILLING DAYS VERSUS DEPTH
12.1/4" Section
HTHP WBM
Density - 12.5 - 16.7 ppg
Yeild Point - >18 lb/100ft2
API Filtrate < 5 cc/30min
pH - 8.5 - 9.5
K+ - 40000 mg/l
14.3/4" UR 16" Section
Potassium Acetate / Glycol Polymer
Density - 10.5 - 12.5 ppg
Yeild Point - >18 lb/100ft2
API Filtrate < 8 cc/30min
pH - 8.5 - 9.5
K+ - 55000 mg/l
Glycol (%v/v) - 4.0
14.3/4" UR 16" Section
Primary: TCI 435
NOV 14.3/4" T43
Secondary: S616 PDC
NOV 14.3/4" RSR616S
Back-Up:TCI 445
NOV 14.3/4" T44
Nozzles: 6*14/32 - TBC
12.1/4" Section
Primary: S619 PDC
NOV 12.1/4" SKR619S
Secondary: TCI 437
NOV 12.1/4" RH12AP
Back-Up:TCI 517
NOV 12.1/4" RH22AP
Nozzles: 6*20/32 - TBC
14.3/4" UR 16" Section
WOB: 5 - 25 klbs
RPM: 60 - 100 RPM
Pump Rate: 800 - 900 GPM
ROP: 5 - 15 m/hr
12.1/4" Section
WOB: 5 - 25 klbs
RPM: 60 -100 RPM
Pump Rate: 650 - 750 GPM
ROP: 2 - 5 m/hr
14.3/4" UR 16" Section (1500m - 2800m)
Mud Logging: 3 Samples / 5 m
Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-
GR-CAL & Sonic/ Dipole Sonic and Inclinometer
(provisional) survey, RDT (provisional), Side wall coring
(provisional), VSP (provisional) & CBL-VDL-GR-CCL
surveys at 2nd isolation stage.
MWD: GR-DIRECTIONAL SURVEY (provisional)
12.1/4" Section (2800M - 4000M)
Mud Logging: 3 Samples / 3 m
Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-
GR-CAL & Sonic/ Dipole Sonic and Inclinometer ,
XRMI , MRIL , RDT , Side-wall coring , VSP , CBL-VDL-
GR-CCL and CAST (in cased hole) for Non HPHT tools
(temperature below 350°F).
HPHT tools will be used if BHT is >350° F. (For detail
please refer DDDP)
LWD: GR-Resistivity-PWD
PLANNED DRILLING PARAMETERS & DATA
14.3/4" UR 16" Section
Bit: NOV 14.3/4" T43
BHA: Stab 14.5/8" + 12000 Reamer + Float Sub 8"
+ DC 8" + Stab 14.1/2" + Circulating Sub 8" + 6
DC 8" + Jar 8" + 3 DC 8" + XO + 3 DC 6.3/4" + XO
+ 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface
Survey: TOTCO/ MWD tools
12.1/4" Section
Bit: NOV 12.1/4" SKR619S
BHA: Mud Motor + Stab 12.1/8" + Float Sub 8" +
MWD / LWD Modules 8" + NMDC 8" + Screen Sub
8" + Stab 12.1/8" + Circulating Sub 8" + 6 DC 8" +
Jar 8" + 6 DC 8" + XO + 6 DC 6.3/4" + XO + 6
HWDP 5.1/2" + XO + DP 5.1/2" to Surface
Survey: MWD Tools
18.5" UR 20" Section (800m - 1500m)
Mud Logging: 3 Samples / 5 m
Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-
GR-CAL & Sonic/ Dipole Sonic and Inclinometer
(provisional) survey, RDT (provisional), Side wall coring
(provisional), VSP (provisional) & CBL-VDL-GR-CCL
surveys at 1st isolation stage.
26" Section (800m)
Mud Logging: 3 Samples / 10 m
18.1/2" UR 20" Section
WOB: 5 - 15 klbs
RPM: 60 -100 RPM
Pump Rate: 1000 - 1100 GPM
ROP: 5 - 15 m/hr
26" Section
WOB: 5 - 25 klb
RPM: 30 - 100 RPM
Pump Rate: 1200 - 1400 GPM
ROP: 5 - 10 m/hr
(K.C. Behera)
4000 - 5000 m (TD)
High Pressures
Acid Gas CO2 (upto 18%)
Acid Gas H2S (upto 120 ppm)
Hole Pack-Off / Stuck Pipe
Extreme HTHP problems
High drilled gas readings
Balooning formation
Geological uncertainty
2800 - 4000 m
Acid Gas CO2 (upto 4%)
Acid Gas H2S (upto 40 ppm)
Hole Pack-Off / Stuck Pipe
High Pressures
High drilled gas readings
Balooning formation
Well Control - Kick
HPHT Problems
1500 - 2800 m
Acid Gas CO2 (upto 4%)
Acid Gas H2S (upto 40 ppm)
Hole Pack-Off / Stuck Pipe
High drilled gas readings
Balooning formation
Pore Pressure vs Frac Gradient
18-1/2"(UR 20") OH X 16" Casing
Inner String Cementing
- 50% OH Excess
Goal: Cement to 100m inside 20"x 16"
csg Shoe
Lead: 12.7 ppg
Tail: 15.8 ppg
Centralizer: as per program
26" OH x 20" Casing
Inner String Cementing - 100% OH Excess
Goal: Cement to Surface
Lead: 12.7 ppg
Tail: 15.8 ppg
Centralizer: 1 every joint, thoughout
HAZARD: Tight hole / connections ACTION: Specific hole issues that cause the tight hole need to be identified quickly. Pre-planning with the drilling fluids company is paramount in importance to dealing with issues related to tight hole conditions. The tight hole condition must be identified and remedied promptly in order to prevent further hole issues from
HAZARD: Loss of returns ACTION: Consult with mud company for specifics, pre-planning for losses is required.
HAZARD: Hydrophilic formations ACTION: Reduce fluid loss in the drilling fluid and consider adding inhibitive chemicals. Connections should be “worked” by reciprocating and rotating the drill string and circulating bottoms at each connection.
HAZARD: Shallow Gas ACTION: Diverter being utilized allowing shut in and circulation of gas influx. A minimum of 500 bbl of 10ppg kill mud must be mixed and readily available for the purpose of dynamic well control in the event shallow gas is encountered.
1. Mobilize rig to location. Rig up and prepare to spud. 2. Rig up over 30” Conductor pre-set to ~40 m 3. Install 30” diverter and leak test 4. Drill 26” surface hole 0 to +/- 800m KB 5. Run and cement 20” surface casing 6. Install and test casing bowl, wellhead Section-A. Install and
pressure test 18 ¾” 15k BOP stack. 7. Pressure test surface casing. Drill out shoe track and 3 m of
new 18 ½” hole. Perform LOT. 8. Drill 18 ½” intermediate hole to a total depth of +/- 1500 mKB,
and Run wireline logs as per logging program.
9. Open 18.1/2" hole to 20" using under-reamer BHA.
10. Run and cement 16” intermediate casing. 11. Lift BOPs. Install and test casing spool,
wellhead Section-B. Install and pressure test 18 ¾” 15k psi BOP stack.
12. Pressure test 16” intermediate casing. Drill out shoe track and 3 m of 14 ¾” hole. Perform LOT.
13. Drill 14 ¾ ” hole with 16” under reamer assembly to planned total depth +/- 2800 m KB.
14. Run wireline logs as per logging program. 15. Run and cement 13 5/8” casing.
16. Lift BOPs. Install and test casing spool, wellhead Section-C. Install and pressure test 15k psi BOP stack.
17. Pressure test 13 5/8” intermediate casing. Drill out shoe track and 3 m of 12 ¼” hole. Perform LOT.
18. Drill 12 ¼” hole to +/- 4000 m KB. 19. Run open hole logs as per logging program. 20. Run and cement 9 5/8” x 9 7/8” combination casing as per casing running program. 21. Lift BOPs. Install and test casing spool, wellhead Section-D. Install and pressure test 15k psi
BOP stack. 22. Pressure test 9.5/8" X 9.7/8" casing. Drill out shoe track and 3m of new 8 ½” hole. Perform
LOT/FIT (18.5 ppg).
24. Drill 8 ½” hole to basement, estimated at approximately +/- 5000 m KB. 25. Run open hole logs as per logging program. 26. Run and cement 7” production liner. 27. Run in drill pipe and casing / liner clean out assembly, circulate out cement and run to
bottom. 28. Run CBL logs to establish zonal isolation. 29. Run Casing Inspection Log within 9.5/8" X 9.7/8" casing to prove integrity. 30. Run Packer, perform positive and negative pressure test on 7" liner hanger. 31. Displace the cased hole to clean inhibited water. 32. Circulate the hole clean and pull out. 33. Run and Install 9.5/8" retrievable bridge plug.
HAZARD: Time dependent shale formations ACTION: Try and drill the entire shale with one bit run. Reduce trip speeds through the shale, especially when the collars and bit are moving through the shale zone. Trip speeds should be capped so surge and swab pressures do not exceed the current ECD while drilling. Consider adding ROP enhancer additives designed for drilling shales (usually a specially designed lubricant). Ensure the potassium salt concentration within current targets (55,000 mg/l for this well).
HAZARD: Acid Gasses CO2 ACTION: Monitor suspected CO2 zones with Garrett Gas Train (GGT) tests. Maintain mud weight overbalanced. Add lime for pH control.
HAZARD: Hole collapse and pack off ACTION: Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved.
HAZARD: Acid Gasses H2S ACTION: Run a HACH sulfide test (or equivalent) every 1-2 hours while the drilling fluid is being circulated while drilling possible H2S zones. Run a Garret Gas Train (GGT) once per tour or immediately if there is a positive or inconclusive HACH test. Any positive GGT readings should be dealt with immediately with drilling fluid additions of hydrogen sulfide scavengers and/or weighting up as required. Close consultation with the drilling fluid company and the drilling supervisor are important in order to be
HAZARD: Hole pack-off / Stuck Pipe ACTION: .Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved.
HAZARD: High drilled gas readings ACTION: High gas readings are background gas, gas shows, contamination gas and entrained gas. Try and identify the source of the high gas readings. Many times if the high gas readings are persistent then increase in mud density may be required to help control them and ease concerns over well
HAZARD: Ballooning formation ACTION: Reduce the mud weight slightly so that the ECD of the fluid is about equal to the static mud weight of the mud column prior to the ballooning issue. Increase the inhibitive nature of the drilling fluid with additions of Amine inhibitors, sulphonated asphalts, or potassium salts (to a max of 55,000 mg/l). Ream the zone if required and especially after adding any
HAZARD: High Pressures ACTION: Monitoring the well closely while drilling and running casing in the zone. Proper trip speed limits to avoid swab. Increase mud weight and kill the well if required using wait and weight method.
HAZARD: Extreme HTHP problems ACTION: Mud coolers must be operational with heat sinks filled and ready to go. Solids control equipment (shakers and centrifuges) must be at peak operational readiness, low gravity solids should be < 4% v/v of the mud system and reactive solids < 2% v/v. Centrifuges must be in “barite recovery mode” for low gravity solids control. MBT test < 10 lb/bbl in the drilling fluid (dilution or disposal of fluid may be required to maintain this parameter) Only high temperature tools, bits and mud additives are to be used from 3000m and deeper. Real Time hydraulics shall be calculated and compared to PWD data. All trips (including wiper trips) will have controlled tripping speeds as directed by the Kakinada office to avoid surge and swab well control issues. Cement slurries shall be tested by the cement vendor and
Annular / Diverter
(psi)
Annular / Diverter
(psi)
Ram (psi) Ram (psi)
1000 N/A N/A
N/A N/A N/A
10000 2000
15000 4000
10000 5000
15000 8000
10000 5000
15000 10000
10000 5000
15000 12000
10000 5000
15000 12000
Casing Prrssure
Test (psi)
N/A30"
Casing Shoe LOT /
FIT (ppg)
Test Pressures
Rated BOP
Working
PressureCasing Size
(In)
BOP & Casing Pressure Testing Schedule
LOT150020"
N/A70007"
LOT /
FIT (18.5 ppg)55009.5/8" x 9.7/8"
LOT250016"
LOT400013.5/8"
KG-15KG-16
KG-21
KLAA YS-5-1A
MMD-1KKP-1
TLK-1
DNG-1
BST-1
Loc#16
612000 616000 620000 624000 628000 632000 636000 640000 644000 648000 652000 656000 660000
612000 616000 620000 624000 628000 632000 636000 640000 644000 648000 652000 656000 660000
1824
000
1828
000
1832
000
1836
000
1840
000
1844
000
1848
000
1852
000
1856
000
18240001828000
18320001836000
18400001844000
18480001852000
1856000
0 2000 4000 6000 8000 10000m
1:200000
[327]
Casing Type: Conductor
Casing Size: 30.0", 16 mm thick
Casing Thread: Welded
Table
Beams
Rig Floor
118.11"
[3000]
Table
Beams
Rig Mat = 6"
450"
[11430]
Rig
Be
am
Rig
Be
am
Rig
Be
am
Rig
Be
am
120.00"
[3048]
84.00"
[2134]
120.
[3061]
120.00"
[3048]
138.00"
[3505]
BOP Type: Shaffer Annular
Upper Flange: 30" 1K PSI
Lower Flange: 30" 1K PSI
Drilling Crossover Spool
Upper Flange: 30” 1K PSI
Ring Gasket: BX-303
Lower Flange: 30" 1K PSI
BOP Type: Two Piece Flow Nipple
BOP Size: 30”
##
65.63"
[1667]
Oil IndiaYLK-1
BOP Stack-Up Schematic For Drilling
26" hole
Date: October 15, 2016
Revision Level: Drilling Prgrm
Revision Date: November 21, 2016
Rig: Nabors 503
118.11"
[3000]
401.89"
[10208]
383.15"
[9732]
Ground Level
Cellar Depth
Ski
d
2.00 m
219.02"
[5563.1]
##
30.92"
[785]
Casing Type: Conductor
Casing Size: 30.0"
Casing Thread: Welded
Casing Type: Surface
Casing Size: 20"
Casing Material: J-55
Casing Weight: 118.5 lb/ft
Casing Thread: CT
Detachable Base Plate: FMC
Bottom Seat: 30"
Top Seat: 20"
Table
Beams
Rig Floor
Casing Head: FMC C-29
Upper Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Lower Flange: 20" Slip-Lock
Casing Hanger: 16" C-121-S
39.7"
[1008.4]
Table
Beams
Rig Mat = 6"
450"
[11430]
8.78"
[223]
Rig
Be
am
Rig
Be
am
Rig
Be
am
Rig
Be
am
120.00"
[3048]
84.00"
[2134]
120.
[3061]
120.00"
[3048]
138.00"
[3505]
BOP Type: Annular, Cameron “DL”
BOP Size: 18 ¾” 10K PSI
Upper Flange: 18 ¾” 10K PSI
Lower Flange: 18 ¾” 15K PSI
Double Studded Adapter with
Riser Spools
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 21.1/4" 5K PSI
Ring Gasket: BX-165
Drilling Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 18 ¾” 15K PSI
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16" 15K PSI
BOP Type: Two Piece Flow Nipple
BOP Size: 18 ¾”
##
73.00"
[1854]
[327]
Oil IndiaYLK-1
BOP Stack-Up Schematic For Drilling
18.½” UR 20" hole
Date: October 15, 2016
Revision Level: Drilling Prgrm
Revision Date: November 21, 2016
Rig: Nabors 503
118.11"
[3000]
12"
[304.8]
Ground Level
Cellar Depth
1.08 m
Ski
d
66.4
[1687.2]
35.4
[899.8]
4"
101.85"
[2587]
2.00 m
####
49.00"
[1245]
36.00"
[914]
449.56"
[11419]
401.89"
[10208]
83.19"
[2113]
BOP Type: Cameron Double Type TL
Upper Flange: 18 ¾" 15K PSI
Upper Ram Type: Blind/Shear
Lower Flange: 18 ¾" 15K PSI
Lower Ram Type: Pipe
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16 15K PSI
BOP Type: Cameron
Upper Flange: 18 ¾" 15K PSI
Ram Type: Pipe
Lower Flange: 18 ¾” 15K PSI
Section-A ##
## ##
28.00"
[711]
30.92"
[785]
Casing Spool: FMC C-29
Upper Flange: 21 1/4" 10K PSI
Ring Gasket: BX-166
Lower Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Casing Hanger: 13.5/8" C-121-S
Studded Bottom
Casing Type: Conductor
Casing Size: 30.0"
Casing Thread: Welded
Casing Type: Surface
Casing Size: 20"
Casing Material: J-55
Casing Weight: 118.5 lb/ft
Casing Thread: CT
Detachable Base Plate: FMC
Bottom Seat: 30"
Top Seat: 20"
Table
Beams
Rig Floor
Casing Head: FMC C-29
Upper Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Lower Flange: 20" Slip-Lock
Casing Hanger: 16" C-121-S67.7"
[1719.6]
Table
Beams
Rig Mat = 6"
450"
[11430]
8.78"
[223]
Rig
Be
am
Rig
Be
am
Rig
Be
am
Rig
Be
am
120.00"
[3048]
84.00"
[2134]
120.
[3061]
120.00"
[3048]
138.00"
[3505]
BOP Type: Annular, Cameron “DL”
BOP Size: 18 ¾” 10K PSI
Upper Flange: 18 ¾” 10K PSI
Lower Flange: 18 ¾” 15K PSI
Double Studded Adapter with
Riser Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 13 5/8" 15K PSI
Ring Gasket: BX-159
Drilling Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 18 ¾” 15K PSI
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16" 15K PSI
BOP Type: Two Piece Flow Nipple
BOP Size: 18 ¾”
##
73.00"
[1854]
[327]
Oil IndiaYLK-1
BOP Stack-Up Schematic For Drilling
14.¾” UR 16" hole
Date: October 15, 2016
Revision Level: Drilling Prgrm
Revision Date: November 21, 2016
Rig: Nabors 503
118.11"
[3000]
12"
[304.8]
Ground Level
Cellar Depth
Section-A
Section-B
1.83 m
1.08 m
Ski
d
38.41
[975.6]
35.4
[900.4]
4"
73.86"
[1876]
2.00 m
####
49.00"
[1245]
36.00"
[914]
421.56"
[10707.6]
401.89"
[10208]
83.19"
[2113]
BOP Type: Cameron Double Type TL
Upper Flange: 18 ¾" 15K PSI
Upper Ram Type: Blind/Shear
Lower Flange: 18 ¾" 15K PSI
Lower Ram Type: Pipe
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16 15K PSI
BOP Type: Cameron
Upper Flange: 18 ¾" 15K PSI
Ram Type: Pipe
Lower Flange: 18 ¾” 15K PSI
##
## ##
## ######
27.50"
[699]
28.00"
[711]
30.92"
[785]
Casing Spool: FMC C-29
Upper Flange: 21 1/4" 10K PSI
Ring Gasket: BX-166
Lower Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Casing Hanger: 13.5/8" C-121-S
Studded Bottom
Casing Type: Conductor
Casing Size: 30.0"
Casing Thread: Welded
Casing Type: Surface
Casing Size: 20"
Casing Material: J-55
Casing Weight: 118.5 lb/ft
Casing Thread: CT
Detachable Base Plate: FMC
Bottom Seat: 30"
Top Seat: 20"
Table
Beams
Rig Floor
Casing Head: FMC C-29
Upper Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Lower Flange: 20" Slip-Lock
Casing Hanger: 16" C-121-S
95.2"
[2418]
Table
Beams
Rig Mat = 6"
450"
[11430]
8.78"
[223]
Rig
Be
am
Rig
Be
am
Rig
Be
am
Rig
Be
am
120.00"
[3048]
84.00"
[2134]
120.
[3061]
120.00"
[3048]
138.00"
[3505]
BOP Type: Annular, Cameron “DL”
BOP Size: 18 ¾” 10K PSI
Upper Flange: 18 ¾” 10K PSI
Lower Flange: 18 ¾” 15K PSI
Double Studded Adapter with
Riser Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 13 5/8" 15K PSI
Ring Gasket: BX-159
Drilling Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 18 ¾” 15K PSI
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16" 15K PSI
BOP Type: Two Piece Flow Nipple
BOP Size: 18 ¾”
##
73.00"
[1854]
[327]
Oil IndiaYLK-1
BOP Stack-Up Schematic For Drilling
12.1/4" hole and contingent 10.5/8" hole
Date: October 15, 2016
Revision Level: Drilling Prgrm
Revision Date: November 21, 2016
Rig: Nabors 503
118.11"
[3000]
12"
[304.8]
Ground Level
Cellar Depth
Section-A
Section-B
Section-C
1.81 m
1.83 m
1.08 m
Ski
d
10.91
[277.1]
35.4
[899.9]
4"
46.34"
[1177]
Casing Spool: FMC C-29
Upper Flange: 13 5/8" 15K PSI
Ring Gasket: BX-159
Lower Flange: 21 1/4" 10K PSI
Ring Gasket: BX-166
Casing Hanger: 9.7/8" C-229
Studded Bottom
2.00 m
####
49.00"
[1245]
36.00"
[914]
394.06"
[10009]
401.89"
[10208]
83.19"
[2113]
BOP Type: Cameron Double Type TL
Upper Flange: 18 ¾" 15K PSI
Upper Ram Type: Blind/Shear
Lower Flange: 18 ¾" 15K PSI
Lower Ram Type: Pipe
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16 15K PSI
BOP Type: Cameron
Upper Flange: 18 ¾" 15K PSI
Ram Type: Pipe
Lower Flange: 18 ¾” 15K PSI
##
## ##
## ######
## ######
Tubing Head: FMC TCM-ET
Upper Flange: 11" 15K PSI
Ring Gasket: BX-158
Lower Flange: 13 5/8" 15K PSI
Ring Gasket: BX-159
Tubing Hanger:
27.50"
[699]
28.00"
[711]
30.92"
[785]
Casing Spool: FMC C-29
Upper Flange: 21 1/4" 10K PSI
Ring Gasket: BX-166
Lower Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Casing Hanger: 13.5/8" C-121-S
Studded Bottom
Casing Type: Conductor
Casing Size: 30.0"
Casing Thread: Welded
Casing Type: Surface
Casing Size: 20"
Casing Material: J-55
Casing Weight: 118.5 lb/ft
Casing Thread: CT
Detachable Base Plate: FMC
Bottom Seat: 30"
Top Seat: 20"
Table
Beams
Rig Floor
Casing Head: FMC C-29
Upper Flange: 21 1/4" 5K PSI
Ring Gasket: BX-165
Lower Flange: 20" Slip-Lock
Casing Hanger: 16" C-121-S
129.57"
[3291]
Table
Beams
11.00"
[279.4]
Rig Mat = 6"
450"
[11430]
8.78"
[223]
Rig
Be
am
Rig
Be
am
Rig
Be
am
Rig
Be
am
120.00"
[3048]
84.00"
[2134]
120.
[3061]
120.00"
[3048]
138.00"
[3505]
BOP Type: Annular, Cameron “DL”
BOP Size: 18 ¾” 10K PSI
Upper Flange: 18 ¾” 10K PSI
Lower Flange: 18 ¾” 15K PSI
Double Studded Adapter
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 11" 15K PSI
Ring Gasket: BX-158
Drilling Spool
Upper Flange: 18 ¾” 15K PSI
Lower Flange: 18 ¾” 15K PSI
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16" 15K PSI
BOP Type: Two Piece Flow Nipple
BOP Size: 18 ¾”
##
####
49.00"
[1245]
73.00"
[1854]
36.00"
[914]
BOP Type: Cameron
Upper Flange: 18 ¾" 15K PSI
Ram Type: Pipe
Lower Flange: 18 ¾” 15K PSI
BOP Type: Cameron Double Type TL
Upper Flange: 18 ¾" 15K PSI
Upper Ram Type: Blind/Shear
Lower Flange: 18 ¾" 15K PSI
Lower Ram Type: Pipe
Choke Line: 3 1/16" 15K PSI
Kill Line: 2 1/16 15K PSI
[327]
Oil IndiaYLK-1
BOP Stack-Up Schematic For Drilling
8.5" hole and contingent 5.7/8" hole
Date: October 15, 2016
Revision Level: Drilling Prgrm
Revision Date: November 21, 2016
Rig: Nabors 503
118.11"
[3000]
83.19"
[2113]
12"
[304.8]
401.89"
[10208]
359.69"
[9136.1]
Ground Level
Cellar Depth
Section-A
Section-B
Section-C
Section-D
1.51 m
1.81 m
1.83 m
1.08 m
Ski
d
34.37"
[873]
10.91
[277.1]
23.46
[595.9]Casing Spool: FMC C-29
Upper Flange: 13 5/8" 15K PSI
Ring Gasket: BX-159
Lower Flange: 21 1/4" 10K PSI
Ring Gasket: BX-166
Casing Hanger: 9.7/8" C-229
Studded Bottom
4"
2.00 m
Loc # 10
GDK-1
(Loc.10)
Loc -10 TLK - 1 Loc - 10
GLK-1
YLK-1
2017
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 20 40 60 80 100 120 140 160
DEPTH VS DAY CHART, Well: GDK#1 (Loc. 10)
Logging, 13.5/8" Casing at 2800m, Wellhead
20" Casing at 800m
Logging, 9.5/8" Casing at 4000m, Wellhead
Logging, 16" Casing at 1500m, Wellhead
Logging, 7" Liner at 5000m, Wellhead
DEP
TH
(M
)
DAYS
GM (GSc)-KGB DGM (Drlng) Chief Chemist
GDK-1
GDK-1
GDK-1 GDK-1 GDK-1 DNG-1 5.19 km 3.14 km
05
00
10
00
15
00
20
00
25
00
30
00
35
00
40
00
45
00
50
00
8 9 10
11
12
13
14
15
16
17
18
19
20
21
DEP
TH (
m, T
VD
)
Pore Pressure, MW, Frac Grad (ppg)
TLK-1 PP YLK-1 PPPP prediction Planned MWTLK-1 FG YLK-1 FG
05
00
10
00
15
00
20
00
25
00
30
00
35
00
40
00
4500
50
00
55
00
0 100 200 300 400 500
De
pth
(m
, TV
D)
Temperature (F)
TLK-1 YLK-1 TEMP_PREDICTION
Depth in (m)
Surface-650
650 -920
920 - 1260
1260 - 1480
1480 - 1810
1810 - 1950
1950 - 3210
3210 - 4610
4610 - 5000
5000 +
Younger Fm & Alluvium
Matsyapuri
Bhimanapalli
Pasarlapudi
Palakollu/ Razole (?)
Tirupati
Chintalapalli
Raghavapuram
Golapalli
Basement
Formation LithologyAge
R E
C E
N T
/ M
I O
C E
N E
/O
L I
G O
C E
N E
E O
C E
N E
/
P A
L E
O C
E N
EU
P P
E R
C
R E
T A
C E
O U
S
L O
W E
R
C R
E T
A.
ARCHEAN
0 Conductor @ m
0 Csg Shoe @ 00m (hole depth : 810m)
6 Csg Shoe @ 00m(Hole depth 1510m)
/ Csg shoe @ 00m (Hole depth : 2810m)
9 / Csg shoe @4000m (Hole depth : 4010m)
Liner shoe @ 000m(Hole depth 5000m)
Casing Design
Casing Design
0 Csg Shoe @ 00m (hole depth : 810m)
6 Csg Shoe @ 00m(Hole depth 1510m)
/ Csg shoe @ 00m (Hole depth : 2810m)
9 / Csg shoe @4000m (Hole depth : 4010m)
Liner shoe @ 000m(Hole depth 5000m)
0 Conductor @ m
7" Liner hanger top @ 3800m (200m inside 9.5/8" Csg)