Operational Sequence: Well Type: Vertical (Exploratory - HPHT Gas Well) Primary Target: The primary target is the Raghavapuram & Gollapali Formation expected 3600m onward till target depth. UTM Zone 44N - WGS 84 Spheroid Surface Coordinates UTM Zone 44N - WGS 84 Spheroid 619007.79 Latitude: 16° 40' 52.54" N 1844627.85 Longitude: 82° 06' 58.00" E Exploration Block: KG-ONN-2004/1 Spud Date: 15.10.2017 Expected Ground Elevation: 4.98 m Location: Onshore Planned Completion Date: 15-Mar-18 KB Elevation: 16.67 m Country: INDIA Estimated Total Rig Days: 150.00 Planned TD: 5000 m Temperature vs Depth PROBABLE GEOHAZARDS BHA DESIGN BITS & NOZZLES HYDRAULICS & DRILLING PARAMETERS CASING SPECS CEMENTING PROGRAM FORMATION EVALUATION Install Wellhead, N/Up BOPs & Test 800 1.8 11.1 Install Wellhead, N/Up BOPs & Test 2800 3 57.2 Drill 8.1/2" Hole 4700 6 113 (A. Sarma) (P. Das) Conventional Casing Cementing - 50% OH Excess Goal: Cement to 100m inside16" csg Shoe Lead: 13.5 ppg Tail: 15.8 ppg Centralizer: as per program - 9.7/8" 65.3 ppf VM- 110SS-DVAM-SLIJ-II (Semi Flush) X 9.5/8" 53.5 ppf P-110 VAM-SLIJ-II (Semi Flush) KG-ONN-2004/1 BLOCK MAP LOCATION OF OFFSET WELLS SEISMIC SECTION THROUGH THE PROPOSED WELL PLANNED DRILLING TIME BREAKUP Mud Logging: 3 Samples / 3 m Wireline Logs: HACRT-HGR-CAL, HDNT-HDLT-HGR- CAL, HWST, HSFT (sample collection & pressure points) {provisional}, GEM (provisional), CSNG (provisional), Side-wall coring, VSP, CBL-VDL-GR-CCL surveys are to be carried out at this depth. All HPHT tools. LWD: GR-Resistivity-PWD (to be used if temperature permits) Bit: NOV 18.1/2" T43 BHA: Stab 18.3/8" + (16500 Reamer) + Float Sub 9.1/2" + DC 9.1/2" + Stab 18.1/8" + XO + Circulating Sub 8" + 6 DC 8" + Jar 8" + 3 DC 8" + XO + 3 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface Survey: TOTCO at T.D. SEISMIC SECTION THROUGH PROPOSED WELL Conventional Casing Cementing - 50% OH Excess Goal: Cement to 300m inside 13- 3/8"csg shoe Lead: 16.8 ppg Tail: 17.5 ppg Centralizer: as per program Liner Cementing - 30% OH Excess Goal: Cement to 200m inside 9-5/8" csg shoe Tail: 18 ppg Centralizer: as per program Bit: NOV 8.1/2" 813M BHA: Stab 8.3/8" + Float Sub 6.3/4" + Anderdrift Tool + DC 6.3/4" + Jar 6.1/2" + 6 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface Survey: Anderdrift Tools 8.1/2" Turbine BHA to TD. POSSIBLE HAZARDS & REMEDIAL ACTION BOP STACKUP SCHEMATICS Primary: M813 PDC NOV 8.1/2" SKR813M Secondary: Turbine Bits SLB 8.1/2" Impreg K703TBPXC Back-Up: Turbine Bits Nozzles: 8*14/32 - TBC WOB: 5 - 15 klbs RPM: 60 -100 RPM Pump Rate: 325 - 350 GPM ROP: 2 - 5 m/hr HTHP WBM Density - 15.7 - 16.2 ppg Yeild Point - >18 lb/100ft2 API Filtrate < 5 cc/30min pH - 8.5 - 9.5 K+ - 40000 mg/l 3800 - 5000 m - 7" 35 ppf SM-125TT Vam Top (T&C) MUD SUMMARY GEOLOGICAL PROGNOSIS AND WELL DIAGRAM UTM X: UTM Y: LOCATION # 10 Well: GDK-1 Drilling Montage Surface Coordinates Lightly treated Bentonite mud Density - 9.5 - 10.5 ppg Yeild Point - >22 lb/100ft2 API Filtrate < 15 cc/30min pH - 8.5-9.0 Water Based Spud Mud Density - 8.7 - 8.9 ppg Yeild Point - >30 lb/100ft2 API Filtrate >15 cc/30min pH - 9.5 - 10.0 - 16" 84 ppf VM110SS-D DinoVAM (CT) - 20" 118.5 ppf J-55 Tenaris ER (CT) 0 - 800 m Hydrophilic formations Shallow Gas Loss of returns while cementing Lost circulation while drilling Time dependent shale formations Hard Abrasive Limestones Hole Collapse and pack off Loss of returns while cementing Lost circulation while drilling Primary: TCR w/CJet 115 Varel 26" ERIGJMRS Secondary: TCR w/Cjet 115 Varel 26" ERIGJMRS Nozzles: 3*22/32 + CJet 22/32 - 13.5/8" 88.2 ppf TN- 110SSTenaris 513 (Flush) Bit: Varel 26" ERIGJMRS with Center Jet BHA: Bit sub with float valve and TOTCO ring + 4 DC 9.1/2” + XO + 1 Jar 8" + 3 DC 8” + XO + 15 HWDP 5 ½” + XO + DP 5.1/2" to Surface Survey: TOTCO at T.D. Primary: TCI 435 NOV 18.1/2" T43 Secondary: TCI 545 NOV 18.1/2" T44 Back-Up: S619 PDC NOV 18.1/2" TFR619S Nozzles: 9*22/32 - TBC DRILLING DAYS VERSUS DEPTH HTHP WBM Density - 12.5 - 16.7 ppg Yeild Point - >18 lb/100ft2 API Filtrate < 5 cc/30min pH - 8.5 - 9.5 K+ - 40000 mg/l Potassium Acetate / Glycol Polymer Density - 10.5 - 12.5 ppg Yeild Point - >18 lb/100ft2 API Filtrate < 8 cc/30min pH - 8.5 - 9.5 K+ - 55000 mg/l Glycol (%v/v) - 4.0 Primary: TCI 435 NOV 14.3/4" T43 Secondary: S616 PDC NOV 14.3/4" RSR616S Back-Up:TCI 445 NOV 14.3/4" T44 Nozzles: 6*14/32 - TBC Primary: S619 PDC NOV 12.1/4" SKR619S Secondary: TCI 437 NOV 12.1/4" RH12AP Back-Up:TCI 517 NOV 12.1/4" RH22AP Nozzles: 6*20/32 - TBC WOB: 5 - 25 klbs RPM: 60 - 100 RPM Pump Rate: 800 - 900 GPM ROP: 5 - 15 m/hr WOB: 5 - 25 klbs RPM: 60 -100 RPM Pump Rate: 650 - 750 GPM ROP: 2 - 5 m/hr 14.3/4" UR 16" Section (1500m - 2800m) Mud Logging: 3 Samples / 5 m Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT- GR-CAL & Sonic/ Dipole Sonic and Inclinometer (provisional) survey, RDT (provisional), Side wall coring (provisional), VSP (provisional) & CBL-VDL-GR-CCL surveys at 2nd isolation stage. MWD: GR-DIRECTIONAL SURVEY (provisional) Mud Logging: 3 Samples / 3 m Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT- GR-CAL & Sonic/ Dipole Sonic and Inclinometer , XRMI , MRIL , RDT , Side-wall coring , VSP , CBL-VDL- GR-CCL and CAST (in cased hole) for Non HPHT tools (temperature below 350°F). HPHT tools will be used if BHT is >350° F. (For detail please refer DDDP) LWD: GR-Resistivity-PWD PLANNED DRILLING PARAMETERS & DATA Bit: NOV 14.3/4" T43 BHA: Stab 14.5/8" + 12000 Reamer + Float Sub 8" + DC 8" + Stab 14.1/2" + Circulating Sub 8" + 6 DC 8" + Jar 8" + 3 DC 8" + XO + 3 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface Survey: TOTCO/ MWD tools Bit: NOV 12.1/4" SKR619S BHA: Mud Motor + Stab 12.1/8" + Float Sub 8" + MWD / LWD Modules 8" + NMDC 8" + Screen Sub 8" + Stab 12.1/8" + Circulating Sub 8" + 6 DC 8" + Jar 8" + 6 DC 8" + XO + 6 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface Survey: MWD Tools Mud Logging: 3 Samples / 5 m Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT- GR-CAL & Sonic/ Dipole Sonic and Inclinometer (provisional) survey, RDT (provisional), Side wall coring (provisional), VSP (provisional) & CBL-VDL-GR-CCL surveys at 1st isolation stage. Mud Logging: 3 Samples / 10 m WOB: 5 - 15 klbs RPM: 60 -100 RPM Pump Rate: 1000 - 1100 GPM ROP: 5 - 15 m/hr WOB: 5 - 25 klb RPM: 30 - 100 RPM Pump Rate: 1200 - 1400 GPM ROP: 5 - 10 m/hr (K.C. Behera) High Pressures Acid Gas CO2 (upto 18%) Acid Gas H2S (upto 120 ppm) Hole Pack-Off / Stuck Pipe Extreme HTHP problems High drilled gas readings Balooning formation Geological uncertainty Acid Gas CO2 (upto 4%) Acid Gas H2S (upto 40 ppm) Hole Pack-Off / Stuck Pipe High Pressures High drilled gas readings Balooning formation Well Control - Kick HPHT Problems Acid Gas CO2 (upto 4%) Acid Gas H2S (upto 40 ppm) Hole Pack-Off / Stuck Pipe High drilled gas readings Balooning formation Pore Pressure vs Frac Gradient Inner String Cementing - 50% OH Excess Goal: Cement to 100m inside 20"x 16" csg Shoe Lead: 12.7 ppg Tail: 15.8 ppg Centralizer: as per program Inner String Cementing - 100% OH Excess Goal: Cement to Surface Lead: 12.7 ppg Tail: 15.8 ppg Centralizer: 1 every joint, thoughout Tight hole / connections ACTION: Specific hole issues that cause the tight hole need to be identified quickly. Pre-planning with the drilling fluids company is paramount in importance to dealing with issues related to tight hole conditions. The tight hole condition must be identified and remedied promptly in order to prevent further hole issues from Loss of returns Consult with mud company for specifics, pre- planning for losses is required. HAZARD: Hydrophilic formations Reduce fluid loss in the drilling fluid and consider adding inhibitive chemicals. Connections should be “worked” by reciprocating and rotating the drill string and circulating bottoms at each connection. HAZARD: Shallow Gas Diverter being utilized allowing shut in and circulation of gas influx. A minimum of 500 bbl of 10ppg kill mud must be mixed and readily available for the purpose of dynamic well control in the event shallow gas is encountered. 1. Mobilize rig to location. Rig up and prepare to spud. 2. Rig up over 30” Conductor pre-set to ~40 m 3. Install 30” diverter and leak test 4. Drill 26” surface hole 0 to +/- 800m KB 5. Run and cement 20” surface casing 6. Install and test casing bowl, wellhead Section-A. Install and pressure test 18 ¾” 15k BOP stack. 7. Pressure test surface casing. Drill out shoe track and 3 m of new 18 ½” hole. Perform LOT. 8. Drill 18 ½” intermediate hole to a total depth of +/- 1500 mKB, and Run wireline logs as per logging program. 9. Open 18.1/2" hole to 20" using under-reamer BHA. 10. Run and cement 16” intermediate casing. 11. Lift BOPs. Install and test casing spool, wellhead Section-B. Install and pressure test 18 ¾” 15k psi BOP stack. 12. Pressure test 16” intermediate casing. Drill out shoe track and 3 m of 14 ¾” hole. Perform LOT. 13. Drill 14 ¾ ” hole with 16” under reamer assembly to planned total depth +/- 2800 m KB. 14. Run wireline logs as per logging program. 15. Run and cement 13 5/8” casing. 16. Lift BOPs. Install and test casing spool, wellhead Section-C. Install and pressure test 15k psi BOP stack. 17. Pressure test 13 5/8” intermediate casing. Drill out shoe track and 3 m of 12 ¼” hole. Perform LOT. 18. Drill 12 ¼” hole to +/- 4000 m KB. 19. Run open hole logs as per logging program. 20. Run and cement 9 5/8” x 9 7/8” combination casing as per casing running program. 21. Lift BOPs. Install and test casing spool, wellhead Section-D. Install and pressure test 15k psi BOP stack. 22. Pressure test 9.5/8" X 9.7/8" casing. Drill out shoe track and 3m of new 8 ½” hole. Perform LOT/FIT (18.5 ppg). 24. Drill 8 ½” hole to basement, estimated at approximately +/- 5000 m KB. 25. Run open hole logs as per logging program. 26. Run and cement 7” production liner. 27. Run in drill pipe and casing / liner clean out assembly, circulate out cement and run to bottom. 28. Run CBL logs to establish zonal isolation. 29. Run Casing Inspection Log within 9.5/8" X 9.7/8" casing to prove integrity. 30. Run Packer, perform positive and negative pressure test on 7" liner hanger. 31. Displace the cased hole to clean inhibited water. 32. Circulate the hole clean and pull out. 33. Run and Install 9.5/8" retrievable bridge plug. HAZARD: Time dependent shale formations Try and drill the entire shale with one bit run. Reduce trip speeds through the shale, especially when the collars and bit are moving through the shale zone. Trip speeds should be capped so surge and swab pressures do not exceed the current ECD while drilling. Consider adding ROP enhancer additives designed for drilling shales (usually a specially designed lubricant). Ensure the potassium salt concentration within current targets (55,000 mg/l for this well). HAZARD: Acid Gasses CO2 Monitor suspected CO2 zones with Garrett Gas Train (GGT) tests. Maintain mud weight overbalanced. Add lime for pH control. Hole collapse and pack off Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved. HAZARD: Acid Gasses H2S Run a HACH sulfide test (or equivalent) every 1-2 hours while the drilling fluid is being circulated while drilling possible H2S zones. Run a Garret Gas Train (GGT) once per tour or immediately if there is a positive or inconclusive HACH test. Any positive GGT readings should be dealt with immediately with drilling fluid additions of hydrogen sulfide scavengers and/or weighting up as required. Close consultation with the drilling fluid company and the drilling supervisor are important in order to be HAZARD: Hole pack-off / Stuck Pipe .Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved. High drilled gas readings ACTION: High gas readings are background gas, gas shows, contamination gas and entrained gas. Try and identify the source of the high gas readings. Many times if the high gas readings are persistent then increase in mud density may be required to help control them and ease concerns over well Ballooning formation ACTION: Reduce the mud weight slightly so that the ECD of the fluid is about equal to the static mud weight of the mud column prior to the ballooning issue. Increase the inhibitive nature of the drilling fluid with additions of Amine inhibitors, sulphonated asphalts, or potassium salts (to a max of 55,000 mg/l). Ream the zone if required and especially after adding any High Pressures Monitoring the well closely while drilling and running casing in the zone. Proper trip speed limits to avoid swab. Increase mud weight and kill the well if required using wait and weight method. HAZARD: Extreme HTHP problems Mud coolers must be operational with heat sinks filled and ready to go. Solids control equipment (shakers and centrifuges) must be at peak operational readiness, low gravity solids should be < 4% v/v of the mud system and reactive solids < 2% v/v. Centrifuges must be in “barite recovery mode” for low gravity solids control. MBT test < 10 lb/bbl in the drilling fluid (dilution or disposal of fluid may be required to maintain this parameter) Only high temperature tools, bits and mud additives are to be used from 3000m and deeper. Real Time hydraulics shall be calculated and compared to PWD data. All trips (including wiper trips) will have controlled tripping speeds as directed by the Kakinada office to avoid surge and swab well control issues. Cement slurries shall be tested by the cement vendor and Annular / Diverter (psi) Annular / Diverter (psi) Ram (psi) Ram (psi) 1000 N/A N/A N/A N/A N/A 10000 2000 15000 4000 10000 5000 15000 8000 10000 5000 15000 10000 10000 5000 15000 12000 10000 5000 15000 12000 Casing Prrssure Test (psi) N/A 30" Casing Shoe LOT / FIT (ppg) Test Pressures Rated BOP Working Pressure Casing Size (In) BOP & Casing Pressure Testing Schedule LOT 1500 20" N/A 7000 7" LOT / FIT (18.5 ppg) 5500 9.5/8" x 9.7/8" LOT 2500 16" LOT 4000 13.5/8" KG-15 KG-16 KG-21 KLAA YS-5-1A MMD-1 KKP-1 TLK-1 DNG-1 BST-1 Rig Floor ## BOP Stack-Up Schematic For Drilling 26" hole ## Rig Floor ## BOP Stack-Up Schematic For Drilling 18.½UR 20" hole ## ## ## ## ## Rig Floor ## BOP Stack-Up Schematic For Drilling 14.¾UR 16" hole ## ## ## ## ## ## ## ## ## Rig Floor ## BOP Stack-Up Schematic For Drilling 12.1/4" hole and contingent 10.5/8" hole ## ## ## ## ## ## ## ## ## ## ## ## ## Tubing Head: FMC TCM-ET Upper Flange: 11" 15K PSI Ring Gasket: BX-158 Lower Flange: 13 5/8" 15K PSI Ring Gasket: BX-159 Tubing Hanger: 27.50" [699] 28.00" [711] 30.92" [785] Casing Spool: FMC C-29 Upper Flange: 21 1/4" 10K PSI Ring Gasket: BX-166 Lower Flange: 21 1/4" 5K PSI Ring Gasket: BX-165 Casing Hanger: 13.5/8" C-121-S Studded Bottom Casing Type: Conductor Casing Size: 30.0" Casing Thread: Welded Casing Type: Surface Casing Size: 20" Casing Material: J-55 Casing Weight: 118.5lb/ft Casing Thread: CT Detachable Base Plate: FMC Bottom Seat: 30" Top Seat: 20" Table Beams Rig Floor Casing Head: FMC C-29 Upper Flange: 21 1/4" 5K PSI Ring Gasket: BX-165 Lower Flange: 20" Slip-Lock Casing Hanger: 16" C-121-S 129.57" [3291] Table Beams 11.00" [279.4] Rig Mat = 6" 450" [11430] 8.78" [223] Rig Beam Rig Beam Rig Beam Rig Beam 120.00" [3048] 84.00" [2134] 120. [3061] 120.00" [3048] 138.00" [3505] BOP Type: Annular, Cameron DLBOP Size: 18 ¾10K PSI Upper Flange: 18 ¾10K PSI Lower Flange: 18 ¾15K PSI Double Studded Adapter Upper Flange: 18 ¾15K PSI Lower Flange: 11" 15K PSI Ring Gasket: BX-158 Drilling Spool Upper Flange: 18 ¾15K PSI Lower Flange: 18 ¾15K PSI Choke Line: 3 1/16" 15K PSI Kill Line: 2 1/16" 15K PSI BOP Type: Two Piece Flow Nipple BOP Size: 18 ¾## ## ## 49.00" [1245] 73.00" [1854] 36.00" [914] BOP Type: Cameron Upper Flange: 18 ¾" 15K PSI Ram Type: Pipe Lower Flange: 18 ¾15K PSI BOP Type: Cameron Double Type TL Upper Flange: 18 ¾" 15K PSI Upper Ram Type: Blind/Shear Lower Flange: 18 ¾" 15K PSI Lower Ram Type: Pipe Choke Line: 3 1/16" 15K PSI Kill Line: 2 1/16 15K PSI [327] Oil India BOP Stack-Up Schematic For Drilling 8.5" hole and contingent 5.7/8" hole 118.11" [3000] 83.19" [2113] 12" [304.8] 401.89" [10208] 359.69" [9136.1] Ground Level Cellar Depth Section-A Section-B Section-C Section-D 1.51 m 1.81 m 1.83 m 1.08 m Skid 34.37" [873] 10.91 [277.1] 23.46 [595.9] Casing Spool: FMC C-29 Upper Flange: 13 5/8" 15K PSI Ring Gasket: BX-159 Lower Flange: 21 1/4" 10K PSI Ring Gasket: BX-166 Casing Hanger: 9.7/8" C-229 Studded Bottom 4" 2.00 m Loc # 10 GDK-1 (Loc.10) Loc -10 TLK - 1 Loc - 10 GLK-1 YLK-1 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 0 20 40 60 80 100 120 140 160 DEPTH VS DAY CHART, Well: GDK#1 (Loc. 10) Logging, 13.5/8" Casing at 2800m, Wellhead 20" Casing at 800m Logging, 9.5/8" Casing at 4000m, Wellhead Logging, 16" Casing at 1500m, Wellhead Logging, 7" Liner at 5000m, Wellhead DEPTH (M) DAYS GM (GSc)-KGB DGM (Drlng) Chief Chemist GDK-1 GDK-1 GDK-1 GDK-1 GDK-1 DNG-1 5.19 km 3.14 km 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 8 9 10 11 12 13 14 15 16 17 18 19 20 21 DEPTH (m, TVD) Pore Pressure, MW, Frac Grad (ppg) TLK-1 PP YLK-1 PP PP prediction Planned MW TLK-1 FG YLK-1 FG 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 0 100 200 300 400 500 Depth (m, TVD) Temperature (F) TLK-1 YLK-1 TEMP_PREDICTION Depth in (m) Surface-650 650 -920 920 - 1260 1260 - 1480 1480 - 1810 1810 - 1950 1950 - 3210 3210 - 4610 4610 - 5000 5000 + Younger Fm & Alluvium Matsyapuri Bhimanapalli Pasarlapudi Palakollu/ Razole (?) Tirupati Chintalapalli Raghavapuram Golapalli Basement Formation Lithology Age R E C E N T / M I O C E N E / O L I G O C E N E E O C E N E / P A L E O C E N E U P P E R C R E T A C E O U S L O W E R C R E T A. ARCHEAN 0 Conductor @ m 0 Csg Shoe @ 00m (hole depth : 810m) 6 Csg Shoe @ 00m (Hole depth 1510m) / Csg shoe @ 00m (Hole depth : 2810m) 9/ Csg shoe @4000m (Hole depth : 4010m) Liner shoe @ 000m (Hole depth 5000m) Casing Design Casing Design 0 Csg Shoe @ 00m (hole depth : 810m) 6 Csg Shoe @ 00m (Hole depth 1510m) / Csg shoe @ 00m (Hole depth : 2810m) 9/ Csg shoe @4000m (Hole depth : 4010m) Liner shoe @ 000m (Hole depth 5000m) 0 Conductor @ m 7" Liner hanger top @ 3800m (200m inside 9.5/8" Csg)

Upload: vanthuan

Post on 21-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Operational Sequence:

Well Type: Vertical (Exploratory - HPHT Gas Well)

Primary Target: The primary target is the Raghavapuram & Gollapali Formation expected 3600m onward till target depth.

UTM Zone 44N - WGS 84 Spheroid Surface Coordinates UTM Zone 44N - WGS 84 Spheroid

619007.79 Latitude: 16° 40' 52.54" N

1844627.85 Longitude: 82° 06' 58.00" E

Exploration Block: KG-ONN-2004/1 Spud Date: 15.10.2017 Expected Ground Elevation: 4.98 m

Location: Onshore Planned Completion Date: 15-Mar-18 KB Elevation: 16.67 m

Country: INDIA Estimated Total Rig Days: 150.00 Planned TD: 5000 m

Temperature vs Depth

PROBABLE GEOHAZARDS BHA DESIGN BITS & NOZZLESHYDRAULICS & DRILLING

PARAMETERSCASING SPECS CEMENTING PROGRAM FORMATION EVALUATION

Activity PlannedDepth(m) Planned Days Cum Planned Days

0 0

Drill 26" Hole (800m) 800 6 6

RIH 20" Casing and Cement 800 3.3 9.3

Install Wellhead, N/Up BOPs & Test 800 1.8 11.1

Drill 18.5" Hole (1500m) 1500 10 21.1

Log 18.5" Hole 1500 1.3 22.4

Open 18.5" hole to 20" 1500 4 26.4

RIH 16" Casing and Cement 1500 3.5 29.9

Install Wellhead, N/Up BOPs & Test 1500 2.5 32.4

Drill 14.75" UR 16" Hole (2800m) 2800 16 48.4

Log 16" Hole & Trip 2800 2.8 51.2

RIH 13.5/8" Casing and Cement 2800 3 54.2

Install Wellhead, N/Up BOPs & Test 2800 3 57.2

Drill 12.1/4" Hole (4000m) 3600 13 70.2

Core#1 12.1/4" Hole 3618 2 72.2

Drill 12.1/4" Hole 4000 12 84.2

Log 12.1/4" Hole & Trip 4000 4.3 88.5

RIH 9.5/8" X 9.7/8" Tapered Casing & Cement 4000 3.5 92

Install Wellhead, N/Up BOPs & Test 4000 3 95

Drill 8.1/2" Hole (5000m) 4500 8 103

Core#2 8.1/2" Hole 4518 4 107

Drill 8.1/2" Hole 4700 6 113

Core#3 8.1/2" Hole 4718 4 117

Drill 8.1/2" Hole 5000 12 129

Log 8.1/2" Hole & Trips 5000 6 135

RIH 7" Liner and Cement 5000 3 138

Liner Clean-Out, Pressure Test & Suspend 5000 12 150

150

Date: September 21, 2017

(A. Sarma)

(P. Das)

14-3/4"(UR 16") OH X 13.5/8" Casing

Conventional Casing Cementing

- 50% OH Excess

Goal: Cement to 100m inside16" csg

Shoe

Lead: 13.5 ppg

Tail: 15.8 ppg

Centralizer: as per program

0 - 4000 m -

9.7/8" 65.3 ppf VM-

110SS-D VAM-SLIJ-II

(Semi Flush)

X

9.5/8" 53.5 ppf P-110

VAM-SLIJ-II (Semi

Flush)

KG-ONN-2004/1 BLOCK MAP

LOCATION OF OFFSET WELLS

SEISMIC SECTION THROUGH THE PROPOSED WELL

PLANNED DRILLING TIME BREAKUP

8.1/2" Section (4000M - 5000M)

Mud Logging: 3 Samples / 3 m

Wireline Logs: HACRT-HGR-CAL, HDNT-HDLT-HGR-

CAL, HWST, HSFT (sample collection & pressure

points) {provisional}, GEM (provisional), CSNG

(provisional), Side-wall coring, VSP, CBL-VDL-GR-CCL

surveys are to be carried out at this depth. All HPHT

tools.

LWD: GR-Resistivity-PWD (to be used if temperature

permits)

18.1/2" UR 20" Section

Bit: NOV 18.1/2" T43

BHA: Stab 18.3/8" + (16500 Reamer) + Float Sub

9.1/2" + DC 9.1/2" + Stab 18.1/8" + XO +

Circulating Sub 8" + 6 DC 8" + Jar 8" + 3 DC 8" +

XO + 3 DC 6.3/4" + XO + 6 HWDP 5.1/2" + XO +

DP 5.1/2" to Surface

Survey: TOTCO at T.D.

SEISMIC SECTION THROUGH PROPOSED WELL

12.1/4" OH X 9.5/8"-9.7/8" Casing

Conventional Casing Cementing

- 50% OH Excess

Goal: Cement to 300m inside 13-

3/8"csg shoe

Lead: 16.8 ppg

Tail: 17.5 ppg

Centralizer: as per program

8.1/2" OH X 7" Liner

Liner Cementing

- 30% OH Excess

Goal: Cement to 200m inside 9-5/8" csg

shoe

Tail: 18 ppg

Centralizer: as per program

8.1/2" Section

Bit: NOV 8.1/2" 813M

BHA: Stab 8.3/8" + Float Sub 6.3/4" + Anderdrift

Tool + DC 6.3/4" + Jar 6.1/2" + 6 DC 6.3/4" + XO +

6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface

Survey: Anderdrift Tools

8.1/2" Turbine BHA to TD.

POSSIBLE HAZARDS & REMEDIAL ACTION BOP STACKUP SCHEMATICS

8.1/2" Section

Primary: M813 PDC

NOV 8.1/2" SKR813M

Secondary: Turbine Bits

SLB 8.1/2" Impreg K703TBPXC

Back-Up: Turbine Bits

Nozzles: 8*14/32 - TBC

8.1/2" Section

WOB: 5 - 15 klbs

RPM: 60 -100 RPM

Pump Rate: 325 - 350 GPM

ROP: 2 - 5 m/hr

8.1/2" Section

HTHP WBM

Density - 15.7 - 16.2 ppg

Yeild Point - >18 lb/100ft2

API Filtrate < 5 cc/30min

pH - 8.5 - 9.5

K+ - 40000 mg/l

3800 - 5000 m -

7" 35 ppf SM-125TT

Vam Top (T&C)

MUD SUMMARY

GEOLOGICAL PROGNOSIS AND WELL DIAGRAM

UTM X:

UTM Y:

LOCATION # 10 Well: GDK-1 Drilling Montage

Surface Coordinates

18.1/2" UR 20" Section

Lightly treated Bentonite mud

Density - 9.5 - 10.5 ppg

Yeild Point - >22 lb/100ft2

API Filtrate < 15 cc/30min

pH - 8.5-9.0

26" Section

Water Based Spud Mud

Density - 8.7 - 8.9 ppg

Yeild Point - >30 lb/100ft2

API Filtrate >15 cc/30min

pH - 9.5 - 10.0

0 to 1500 m -

16" 84 ppf VM110SS-D

DinoVAM (CT)

0 to 800 m -

20" 118.5 ppf J-55

Tenaris ER (CT)

0 - 800 m

Hydrophilic formations

Shallow Gas

Loss of returns while cementing

Lost circulation while drilling

800 - 1500 m

Time dependent shale formations

Hard Abrasive Limestones

Hole Collapse and pack off

Loss of returns while cementing

Lost circulation while drilling

26" Section

Primary: TCR w/CJet 115

Varel 26" ERIGJMRS

Secondary: TCR w/Cjet 115

Varel 26" ERIGJMRS

Nozzles: 3*22/32 + CJet 22/32

0 to 2800 m -

13.5/8" 88.2 ppf TN-

110SS Tenaris 513

(Flush)

26" Section

Bit: Varel 26" ERIGJMRS with Center Jet

BHA: Bit sub with float valve and TOTCO ring + 4

DC 9.1/2” + XO + 1 Jar 8" + 3 DC 8” + XO + 15

HWDP 5 ½” + XO + DP 5.1/2" to Surface

Survey: TOTCO at T.D.

18.1/2" UR 20" Section

Primary: TCI 435

NOV 18.1/2" T43

Secondary: TCI 545

NOV 18.1/2" T44

Back-Up: S619 PDC

NOV 18.1/2" TFR619S

Nozzles: 9*22/32 - TBC

DRILLING DAYS VERSUS DEPTH

12.1/4" Section

HTHP WBM

Density - 12.5 - 16.7 ppg

Yeild Point - >18 lb/100ft2

API Filtrate < 5 cc/30min

pH - 8.5 - 9.5

K+ - 40000 mg/l

14.3/4" UR 16" Section

Potassium Acetate / Glycol Polymer

Density - 10.5 - 12.5 ppg

Yeild Point - >18 lb/100ft2

API Filtrate < 8 cc/30min

pH - 8.5 - 9.5

K+ - 55000 mg/l

Glycol (%v/v) - 4.0

14.3/4" UR 16" Section

Primary: TCI 435

NOV 14.3/4" T43

Secondary: S616 PDC

NOV 14.3/4" RSR616S

Back-Up:TCI 445

NOV 14.3/4" T44

Nozzles: 6*14/32 - TBC

12.1/4" Section

Primary: S619 PDC

NOV 12.1/4" SKR619S

Secondary: TCI 437

NOV 12.1/4" RH12AP

Back-Up:TCI 517

NOV 12.1/4" RH22AP

Nozzles: 6*20/32 - TBC

14.3/4" UR 16" Section

WOB: 5 - 25 klbs

RPM: 60 - 100 RPM

Pump Rate: 800 - 900 GPM

ROP: 5 - 15 m/hr

12.1/4" Section

WOB: 5 - 25 klbs

RPM: 60 -100 RPM

Pump Rate: 650 - 750 GPM

ROP: 2 - 5 m/hr

14.3/4" UR 16" Section (1500m - 2800m)

Mud Logging: 3 Samples / 5 m

Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-

GR-CAL & Sonic/ Dipole Sonic and Inclinometer

(provisional) survey, RDT (provisional), Side wall coring

(provisional), VSP (provisional) & CBL-VDL-GR-CCL

surveys at 2nd isolation stage.

MWD: GR-DIRECTIONAL SURVEY (provisional)

12.1/4" Section (2800M - 4000M)

Mud Logging: 3 Samples / 3 m

Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-

GR-CAL & Sonic/ Dipole Sonic and Inclinometer ,

XRMI , MRIL , RDT , Side-wall coring , VSP , CBL-VDL-

GR-CCL and CAST (in cased hole) for Non HPHT tools

(temperature below 350°F).

HPHT tools will be used if BHT is >350° F. (For detail

please refer DDDP)

LWD: GR-Resistivity-PWD

PLANNED DRILLING PARAMETERS & DATA

14.3/4" UR 16" Section

Bit: NOV 14.3/4" T43

BHA: Stab 14.5/8" + 12000 Reamer + Float Sub 8"

+ DC 8" + Stab 14.1/2" + Circulating Sub 8" + 6

DC 8" + Jar 8" + 3 DC 8" + XO + 3 DC 6.3/4" + XO

+ 6 HWDP 5.1/2" + XO + DP 5.1/2" to Surface

Survey: TOTCO/ MWD tools

12.1/4" Section

Bit: NOV 12.1/4" SKR619S

BHA: Mud Motor + Stab 12.1/8" + Float Sub 8" +

MWD / LWD Modules 8" + NMDC 8" + Screen Sub

8" + Stab 12.1/8" + Circulating Sub 8" + 6 DC 8" +

Jar 8" + 6 DC 8" + XO + 6 DC 6.3/4" + XO + 6

HWDP 5.1/2" + XO + DP 5.1/2" to Surface

Survey: MWD Tools

18.5" UR 20" Section (800m - 1500m)

Mud Logging: 3 Samples / 5 m

Wireline Logs: DLL-MSFL-GR-SP-CAL, SDLT-DSNT-

GR-CAL & Sonic/ Dipole Sonic and Inclinometer

(provisional) survey, RDT (provisional), Side wall coring

(provisional), VSP (provisional) & CBL-VDL-GR-CCL

surveys at 1st isolation stage.

26" Section (800m)

Mud Logging: 3 Samples / 10 m

18.1/2" UR 20" Section

WOB: 5 - 15 klbs

RPM: 60 -100 RPM

Pump Rate: 1000 - 1100 GPM

ROP: 5 - 15 m/hr

26" Section

WOB: 5 - 25 klb

RPM: 30 - 100 RPM

Pump Rate: 1200 - 1400 GPM

ROP: 5 - 10 m/hr

(K.C. Behera)

4000 - 5000 m (TD)

High Pressures

Acid Gas CO2 (upto 18%)

Acid Gas H2S (upto 120 ppm)

Hole Pack-Off / Stuck Pipe

Extreme HTHP problems

High drilled gas readings

Balooning formation

Geological uncertainty

2800 - 4000 m

Acid Gas CO2 (upto 4%)

Acid Gas H2S (upto 40 ppm)

Hole Pack-Off / Stuck Pipe

High Pressures

High drilled gas readings

Balooning formation

Well Control - Kick

HPHT Problems

1500 - 2800 m

Acid Gas CO2 (upto 4%)

Acid Gas H2S (upto 40 ppm)

Hole Pack-Off / Stuck Pipe

High drilled gas readings

Balooning formation

Pore Pressure vs Frac Gradient

18-1/2"(UR 20") OH X 16" Casing

Inner String Cementing

- 50% OH Excess

Goal: Cement to 100m inside 20"x 16"

csg Shoe

Lead: 12.7 ppg

Tail: 15.8 ppg

Centralizer: as per program

26" OH x 20" Casing

Inner String Cementing - 100% OH Excess

Goal: Cement to Surface

Lead: 12.7 ppg

Tail: 15.8 ppg

Centralizer: 1 every joint, thoughout

HAZARD: Tight hole / connections ACTION: Specific hole issues that cause the tight hole need to be identified quickly. Pre-planning with the drilling fluids company is paramount in importance to dealing with issues related to tight hole conditions. The tight hole condition must be identified and remedied promptly in order to prevent further hole issues from

HAZARD: Loss of returns ACTION: Consult with mud company for specifics, pre-planning for losses is required.

HAZARD: Hydrophilic formations ACTION: Reduce fluid loss in the drilling fluid and consider adding inhibitive chemicals. Connections should be “worked” by reciprocating and rotating the drill string and circulating bottoms at each connection.

HAZARD: Shallow Gas ACTION: Diverter being utilized allowing shut in and circulation of gas influx. A minimum of 500 bbl of 10ppg kill mud must be mixed and readily available for the purpose of dynamic well control in the event shallow gas is encountered.

1. Mobilize rig to location. Rig up and prepare to spud. 2. Rig up over 30” Conductor pre-set to ~40 m 3. Install 30” diverter and leak test 4. Drill 26” surface hole 0 to +/- 800m KB 5. Run and cement 20” surface casing 6. Install and test casing bowl, wellhead Section-A. Install and

pressure test 18 ¾” 15k BOP stack. 7. Pressure test surface casing. Drill out shoe track and 3 m of

new 18 ½” hole. Perform LOT. 8. Drill 18 ½” intermediate hole to a total depth of +/- 1500 mKB,

and Run wireline logs as per logging program.

9. Open 18.1/2" hole to 20" using under-reamer BHA.

10. Run and cement 16” intermediate casing. 11. Lift BOPs. Install and test casing spool,

wellhead Section-B. Install and pressure test 18 ¾” 15k psi BOP stack.

12. Pressure test 16” intermediate casing. Drill out shoe track and 3 m of 14 ¾” hole. Perform LOT.

13. Drill 14 ¾ ” hole with 16” under reamer assembly to planned total depth +/- 2800 m KB.

14. Run wireline logs as per logging program. 15. Run and cement 13 5/8” casing.

16. Lift BOPs. Install and test casing spool, wellhead Section-C. Install and pressure test 15k psi BOP stack.

17. Pressure test 13 5/8” intermediate casing. Drill out shoe track and 3 m of 12 ¼” hole. Perform LOT.

18. Drill 12 ¼” hole to +/- 4000 m KB. 19. Run open hole logs as per logging program. 20. Run and cement 9 5/8” x 9 7/8” combination casing as per casing running program. 21. Lift BOPs. Install and test casing spool, wellhead Section-D. Install and pressure test 15k psi

BOP stack. 22. Pressure test 9.5/8" X 9.7/8" casing. Drill out shoe track and 3m of new 8 ½” hole. Perform

LOT/FIT (18.5 ppg).

24. Drill 8 ½” hole to basement, estimated at approximately +/- 5000 m KB. 25. Run open hole logs as per logging program. 26. Run and cement 7” production liner. 27. Run in drill pipe and casing / liner clean out assembly, circulate out cement and run to

bottom. 28. Run CBL logs to establish zonal isolation. 29. Run Casing Inspection Log within 9.5/8" X 9.7/8" casing to prove integrity. 30. Run Packer, perform positive and negative pressure test on 7" liner hanger. 31. Displace the cased hole to clean inhibited water. 32. Circulate the hole clean and pull out. 33. Run and Install 9.5/8" retrievable bridge plug.

HAZARD: Time dependent shale formations ACTION: Try and drill the entire shale with one bit run. Reduce trip speeds through the shale, especially when the collars and bit are moving through the shale zone. Trip speeds should be capped so surge and swab pressures do not exceed the current ECD while drilling. Consider adding ROP enhancer additives designed for drilling shales (usually a specially designed lubricant). Ensure the potassium salt concentration within current targets (55,000 mg/l for this well).

HAZARD: Acid Gasses CO2 ACTION: Monitor suspected CO2 zones with Garrett Gas Train (GGT) tests. Maintain mud weight overbalanced. Add lime for pH control.

HAZARD: Hole collapse and pack off ACTION: Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved.

HAZARD: Acid Gasses H2S ACTION: Run a HACH sulfide test (or equivalent) every 1-2 hours while the drilling fluid is being circulated while drilling possible H2S zones. Run a Garret Gas Train (GGT) once per tour or immediately if there is a positive or inconclusive HACH test. Any positive GGT readings should be dealt with immediately with drilling fluid additions of hydrogen sulfide scavengers and/or weighting up as required. Close consultation with the drilling fluid company and the drilling supervisor are important in order to be

HAZARD: Hole pack-off / Stuck Pipe ACTION: .Action is required immediately to reduce chances of getting stuck. The well should be swept with high viscosity sweeps while working and rotating the pipe. Wiper trip the hole prior to drilling ahead. Mud properties should be adjusted to help clean the hole. Do not continue to drill ahead until the situation is resolved.

HAZARD: High drilled gas readings ACTION: High gas readings are background gas, gas shows, contamination gas and entrained gas. Try and identify the source of the high gas readings. Many times if the high gas readings are persistent then increase in mud density may be required to help control them and ease concerns over well

HAZARD: Ballooning formation ACTION: Reduce the mud weight slightly so that the ECD of the fluid is about equal to the static mud weight of the mud column prior to the ballooning issue. Increase the inhibitive nature of the drilling fluid with additions of Amine inhibitors, sulphonated asphalts, or potassium salts (to a max of 55,000 mg/l). Ream the zone if required and especially after adding any

HAZARD: High Pressures ACTION: Monitoring the well closely while drilling and running casing in the zone. Proper trip speed limits to avoid swab. Increase mud weight and kill the well if required using wait and weight method.

HAZARD: Extreme HTHP problems ACTION: Mud coolers must be operational with heat sinks filled and ready to go. Solids control equipment (shakers and centrifuges) must be at peak operational readiness, low gravity solids should be < 4% v/v of the mud system and reactive solids < 2% v/v. Centrifuges must be in “barite recovery mode” for low gravity solids control. MBT test < 10 lb/bbl in the drilling fluid (dilution or disposal of fluid may be required to maintain this parameter) Only high temperature tools, bits and mud additives are to be used from 3000m and deeper. Real Time hydraulics shall be calculated and compared to PWD data. All trips (including wiper trips) will have controlled tripping speeds as directed by the Kakinada office to avoid surge and swab well control issues. Cement slurries shall be tested by the cement vendor and

Annular / Diverter

(psi)

Annular / Diverter

(psi)

Ram (psi) Ram (psi)

1000 N/A N/A

N/A N/A N/A

10000 2000

15000 4000

10000 5000

15000 8000

10000 5000

15000 10000

10000 5000

15000 12000

10000 5000

15000 12000

Casing Prrssure

Test (psi)

N/A30"

Casing Shoe LOT /

FIT (ppg)

Test Pressures

Rated BOP

Working

PressureCasing Size

(In)

BOP & Casing Pressure Testing Schedule

LOT150020"

N/A70007"

LOT /

FIT (18.5 ppg)55009.5/8" x 9.7/8"

LOT250016"

LOT400013.5/8"

KG-15KG-16

KG-21

KLAA YS-5-1A

MMD-1KKP-1

TLK-1

DNG-1

BST-1

Loc#16

612000 616000 620000 624000 628000 632000 636000 640000 644000 648000 652000 656000 660000

612000 616000 620000 624000 628000 632000 636000 640000 644000 648000 652000 656000 660000

1824

000

1828

000

1832

000

1836

000

1840

000

1844

000

1848

000

1852

000

1856

000

18240001828000

18320001836000

18400001844000

18480001852000

1856000

0 2000 4000 6000 8000 10000m

1:200000

[327]

Casing Type: Conductor

Casing Size: 30.0", 16 mm thick

Casing Thread: Welded

Table

Beams

Rig Floor

118.11"

[3000]

Table

Beams

Rig Mat = 6"

450"

[11430]

Rig

Be

am

Rig

Be

am

Rig

Be

am

Rig

Be

am

120.00"

[3048]

84.00"

[2134]

120.

[3061]

120.00"

[3048]

138.00"

[3505]

BOP Type: Shaffer Annular

Upper Flange: 30" 1K PSI

Lower Flange: 30" 1K PSI

Drilling Crossover Spool

Upper Flange: 30” 1K PSI

Ring Gasket: BX-303

Lower Flange: 30" 1K PSI

BOP Type: Two Piece Flow Nipple

BOP Size: 30”

##

65.63"

[1667]

Oil IndiaYLK-1

BOP Stack-Up Schematic For Drilling

26" hole

Date: October 15, 2016

Revision Level: Drilling Prgrm

Revision Date: November 21, 2016

Rig: Nabors 503

118.11"

[3000]

401.89"

[10208]

383.15"

[9732]

Ground Level

Cellar Depth

Ski

d

2.00 m

219.02"

[5563.1]

##

30.92"

[785]

Casing Type: Conductor

Casing Size: 30.0"

Casing Thread: Welded

Casing Type: Surface

Casing Size: 20"

Casing Material: J-55

Casing Weight: 118.5 lb/ft

Casing Thread: CT

Detachable Base Plate: FMC

Bottom Seat: 30"

Top Seat: 20"

Table

Beams

Rig Floor

Casing Head: FMC C-29

Upper Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Lower Flange: 20" Slip-Lock

Casing Hanger: 16" C-121-S

39.7"

[1008.4]

Table

Beams

Rig Mat = 6"

450"

[11430]

8.78"

[223]

Rig

Be

am

Rig

Be

am

Rig

Be

am

Rig

Be

am

120.00"

[3048]

84.00"

[2134]

120.

[3061]

120.00"

[3048]

138.00"

[3505]

BOP Type: Annular, Cameron “DL”

BOP Size: 18 ¾” 10K PSI

Upper Flange: 18 ¾” 10K PSI

Lower Flange: 18 ¾” 15K PSI

Double Studded Adapter with

Riser Spools

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 21.1/4" 5K PSI

Ring Gasket: BX-165

Drilling Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 18 ¾” 15K PSI

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16" 15K PSI

BOP Type: Two Piece Flow Nipple

BOP Size: 18 ¾”

##

73.00"

[1854]

[327]

Oil IndiaYLK-1

BOP Stack-Up Schematic For Drilling

18.½” UR 20" hole

Date: October 15, 2016

Revision Level: Drilling Prgrm

Revision Date: November 21, 2016

Rig: Nabors 503

118.11"

[3000]

12"

[304.8]

Ground Level

Cellar Depth

1.08 m

Ski

d

66.4

[1687.2]

35.4

[899.8]

4"

101.85"

[2587]

2.00 m

####

49.00"

[1245]

36.00"

[914]

449.56"

[11419]

401.89"

[10208]

83.19"

[2113]

BOP Type: Cameron Double Type TL

Upper Flange: 18 ¾" 15K PSI

Upper Ram Type: Blind/Shear

Lower Flange: 18 ¾" 15K PSI

Lower Ram Type: Pipe

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16 15K PSI

BOP Type: Cameron

Upper Flange: 18 ¾" 15K PSI

Ram Type: Pipe

Lower Flange: 18 ¾” 15K PSI

Section-A ##

## ##

28.00"

[711]

30.92"

[785]

Casing Spool: FMC C-29

Upper Flange: 21 1/4" 10K PSI

Ring Gasket: BX-166

Lower Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Casing Hanger: 13.5/8" C-121-S

Studded Bottom

Casing Type: Conductor

Casing Size: 30.0"

Casing Thread: Welded

Casing Type: Surface

Casing Size: 20"

Casing Material: J-55

Casing Weight: 118.5 lb/ft

Casing Thread: CT

Detachable Base Plate: FMC

Bottom Seat: 30"

Top Seat: 20"

Table

Beams

Rig Floor

Casing Head: FMC C-29

Upper Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Lower Flange: 20" Slip-Lock

Casing Hanger: 16" C-121-S67.7"

[1719.6]

Table

Beams

Rig Mat = 6"

450"

[11430]

8.78"

[223]

Rig

Be

am

Rig

Be

am

Rig

Be

am

Rig

Be

am

120.00"

[3048]

84.00"

[2134]

120.

[3061]

120.00"

[3048]

138.00"

[3505]

BOP Type: Annular, Cameron “DL”

BOP Size: 18 ¾” 10K PSI

Upper Flange: 18 ¾” 10K PSI

Lower Flange: 18 ¾” 15K PSI

Double Studded Adapter with

Riser Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 13 5/8" 15K PSI

Ring Gasket: BX-159

Drilling Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 18 ¾” 15K PSI

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16" 15K PSI

BOP Type: Two Piece Flow Nipple

BOP Size: 18 ¾”

##

73.00"

[1854]

[327]

Oil IndiaYLK-1

BOP Stack-Up Schematic For Drilling

14.¾” UR 16" hole

Date: October 15, 2016

Revision Level: Drilling Prgrm

Revision Date: November 21, 2016

Rig: Nabors 503

118.11"

[3000]

12"

[304.8]

Ground Level

Cellar Depth

Section-A

Section-B

1.83 m

1.08 m

Ski

d

38.41

[975.6]

35.4

[900.4]

4"

73.86"

[1876]

2.00 m

####

49.00"

[1245]

36.00"

[914]

421.56"

[10707.6]

401.89"

[10208]

83.19"

[2113]

BOP Type: Cameron Double Type TL

Upper Flange: 18 ¾" 15K PSI

Upper Ram Type: Blind/Shear

Lower Flange: 18 ¾" 15K PSI

Lower Ram Type: Pipe

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16 15K PSI

BOP Type: Cameron

Upper Flange: 18 ¾" 15K PSI

Ram Type: Pipe

Lower Flange: 18 ¾” 15K PSI

##

## ##

## ######

27.50"

[699]

28.00"

[711]

30.92"

[785]

Casing Spool: FMC C-29

Upper Flange: 21 1/4" 10K PSI

Ring Gasket: BX-166

Lower Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Casing Hanger: 13.5/8" C-121-S

Studded Bottom

Casing Type: Conductor

Casing Size: 30.0"

Casing Thread: Welded

Casing Type: Surface

Casing Size: 20"

Casing Material: J-55

Casing Weight: 118.5 lb/ft

Casing Thread: CT

Detachable Base Plate: FMC

Bottom Seat: 30"

Top Seat: 20"

Table

Beams

Rig Floor

Casing Head: FMC C-29

Upper Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Lower Flange: 20" Slip-Lock

Casing Hanger: 16" C-121-S

95.2"

[2418]

Table

Beams

Rig Mat = 6"

450"

[11430]

8.78"

[223]

Rig

Be

am

Rig

Be

am

Rig

Be

am

Rig

Be

am

120.00"

[3048]

84.00"

[2134]

120.

[3061]

120.00"

[3048]

138.00"

[3505]

BOP Type: Annular, Cameron “DL”

BOP Size: 18 ¾” 10K PSI

Upper Flange: 18 ¾” 10K PSI

Lower Flange: 18 ¾” 15K PSI

Double Studded Adapter with

Riser Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 13 5/8" 15K PSI

Ring Gasket: BX-159

Drilling Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 18 ¾” 15K PSI

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16" 15K PSI

BOP Type: Two Piece Flow Nipple

BOP Size: 18 ¾”

##

73.00"

[1854]

[327]

Oil IndiaYLK-1

BOP Stack-Up Schematic For Drilling

12.1/4" hole and contingent 10.5/8" hole

Date: October 15, 2016

Revision Level: Drilling Prgrm

Revision Date: November 21, 2016

Rig: Nabors 503

118.11"

[3000]

12"

[304.8]

Ground Level

Cellar Depth

Section-A

Section-B

Section-C

1.81 m

1.83 m

1.08 m

Ski

d

10.91

[277.1]

35.4

[899.9]

4"

46.34"

[1177]

Casing Spool: FMC C-29

Upper Flange: 13 5/8" 15K PSI

Ring Gasket: BX-159

Lower Flange: 21 1/4" 10K PSI

Ring Gasket: BX-166

Casing Hanger: 9.7/8" C-229

Studded Bottom

2.00 m

####

49.00"

[1245]

36.00"

[914]

394.06"

[10009]

401.89"

[10208]

83.19"

[2113]

BOP Type: Cameron Double Type TL

Upper Flange: 18 ¾" 15K PSI

Upper Ram Type: Blind/Shear

Lower Flange: 18 ¾" 15K PSI

Lower Ram Type: Pipe

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16 15K PSI

BOP Type: Cameron

Upper Flange: 18 ¾" 15K PSI

Ram Type: Pipe

Lower Flange: 18 ¾” 15K PSI

##

## ##

## ######

## ######

Tubing Head: FMC TCM-ET

Upper Flange: 11" 15K PSI

Ring Gasket: BX-158

Lower Flange: 13 5/8" 15K PSI

Ring Gasket: BX-159

Tubing Hanger:

27.50"

[699]

28.00"

[711]

30.92"

[785]

Casing Spool: FMC C-29

Upper Flange: 21 1/4" 10K PSI

Ring Gasket: BX-166

Lower Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Casing Hanger: 13.5/8" C-121-S

Studded Bottom

Casing Type: Conductor

Casing Size: 30.0"

Casing Thread: Welded

Casing Type: Surface

Casing Size: 20"

Casing Material: J-55

Casing Weight: 118.5 lb/ft

Casing Thread: CT

Detachable Base Plate: FMC

Bottom Seat: 30"

Top Seat: 20"

Table

Beams

Rig Floor

Casing Head: FMC C-29

Upper Flange: 21 1/4" 5K PSI

Ring Gasket: BX-165

Lower Flange: 20" Slip-Lock

Casing Hanger: 16" C-121-S

129.57"

[3291]

Table

Beams

11.00"

[279.4]

Rig Mat = 6"

450"

[11430]

8.78"

[223]

Rig

Be

am

Rig

Be

am

Rig

Be

am

Rig

Be

am

120.00"

[3048]

84.00"

[2134]

120.

[3061]

120.00"

[3048]

138.00"

[3505]

BOP Type: Annular, Cameron “DL”

BOP Size: 18 ¾” 10K PSI

Upper Flange: 18 ¾” 10K PSI

Lower Flange: 18 ¾” 15K PSI

Double Studded Adapter

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 11" 15K PSI

Ring Gasket: BX-158

Drilling Spool

Upper Flange: 18 ¾” 15K PSI

Lower Flange: 18 ¾” 15K PSI

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16" 15K PSI

BOP Type: Two Piece Flow Nipple

BOP Size: 18 ¾”

##

####

49.00"

[1245]

73.00"

[1854]

36.00"

[914]

BOP Type: Cameron

Upper Flange: 18 ¾" 15K PSI

Ram Type: Pipe

Lower Flange: 18 ¾” 15K PSI

BOP Type: Cameron Double Type TL

Upper Flange: 18 ¾" 15K PSI

Upper Ram Type: Blind/Shear

Lower Flange: 18 ¾" 15K PSI

Lower Ram Type: Pipe

Choke Line: 3 1/16" 15K PSI

Kill Line: 2 1/16 15K PSI

[327]

Oil IndiaYLK-1

BOP Stack-Up Schematic For Drilling

8.5" hole and contingent 5.7/8" hole

Date: October 15, 2016

Revision Level: Drilling Prgrm

Revision Date: November 21, 2016

Rig: Nabors 503

118.11"

[3000]

83.19"

[2113]

12"

[304.8]

401.89"

[10208]

359.69"

[9136.1]

Ground Level

Cellar Depth

Section-A

Section-B

Section-C

Section-D

1.51 m

1.81 m

1.83 m

1.08 m

Ski

d

34.37"

[873]

10.91

[277.1]

23.46

[595.9]Casing Spool: FMC C-29

Upper Flange: 13 5/8" 15K PSI

Ring Gasket: BX-159

Lower Flange: 21 1/4" 10K PSI

Ring Gasket: BX-166

Casing Hanger: 9.7/8" C-229

Studded Bottom

4"

2.00 m

Loc # 10

GDK-1

(Loc.10)

Loc -10 TLK - 1 Loc - 10

GLK-1

YLK-1

2017

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

0 20 40 60 80 100 120 140 160

DEPTH VS DAY CHART, Well: GDK#1 (Loc. 10)

Logging, 13.5/8" Casing at 2800m, Wellhead

20" Casing at 800m

Logging, 9.5/8" Casing at 4000m, Wellhead

Logging, 16" Casing at 1500m, Wellhead

Logging, 7" Liner at 5000m, Wellhead

DEP

TH

(M

)

DAYS

GM (GSc)-KGB DGM (Drlng) Chief Chemist

GDK-1

GDK-1

GDK-1 GDK-1 GDK-1 DNG-1 5.19 km 3.14 km

05

00

10

00

15

00

20

00

25

00

30

00

35

00

40

00

45

00

50

00

8 9 10

11

12

13

14

15

16

17

18

19

20

21

DEP

TH (

m, T

VD

)

Pore Pressure, MW, Frac Grad (ppg)

TLK-1 PP YLK-1 PPPP prediction Planned MWTLK-1 FG YLK-1 FG

05

00

10

00

15

00

20

00

25

00

30

00

35

00

40

00

4500

50

00

55

00

0 100 200 300 400 500

De

pth

(m

, TV

D)

Temperature (F)

TLK-1 YLK-1 TEMP_PREDICTION

Depth in (m)

Surface-650

650 -920

920 - 1260

1260 - 1480

1480 - 1810

1810 - 1950

1950 - 3210

3210 - 4610

4610 - 5000

5000 +

Younger Fm & Alluvium

Matsyapuri

Bhimanapalli

Pasarlapudi

Palakollu/ Razole (?)

Tirupati

Chintalapalli

Raghavapuram

Golapalli

Basement

Formation LithologyAge

R E

C E

N T

/ M

I O

C E

N E

/O

L I

G O

C E

N E

E O

C E

N E

/

P A

L E

O C

E N

EU

P P

E R

C

R E

T A

C E

O U

S

L O

W E

R

C R

E T

A.

ARCHEAN

0 Conductor @ m

0 Csg Shoe @ 00m (hole depth : 810m)

6 Csg Shoe @ 00m(Hole depth 1510m)

/ Csg shoe @ 00m (Hole depth : 2810m)

9 / Csg shoe @4000m (Hole depth : 4010m)

Liner shoe @ 000m(Hole depth 5000m)

Casing Design

Casing Design

0 Csg Shoe @ 00m (hole depth : 810m)

6 Csg Shoe @ 00m(Hole depth 1510m)

/ Csg shoe @ 00m (Hole depth : 2810m)

9 / Csg shoe @4000m (Hole depth : 4010m)

Liner shoe @ 000m(Hole depth 5000m)

0 Conductor @ m

7" Liner hanger top @ 3800m (200m inside 9.5/8" Csg)