WSP Canada Inc. 101 – 14th Avenue Hanover, ON N4N3W1 TEL: 519-364-5700 FAX: 519-364-6937
www.wspgroup.com
SAUGEEN RIVERSIDE DEVELOPMENTS INC.
STORMWATER MANAGEMENT REPORT HANOVER SUBDIVISION
TOWN OF HANOVER
MARCH 2015
Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
TABLE OF CONTENTS
1. INTRODUCTION ................................................... 1
1.1 Location ................................................................................. 1
1.2 Development Proposal ......................................................... 1
1.3 Scope of Work ....................................................................... 1
2. DRAINAGE CHARACTERISTICS ........................ 3
2.1 Regional ................................................................................. 3
2.2 Local ....................................................................................... 3
2.3 Soils ........................................................................................ 3
3. STORMWATER CONTROL .................................. 3
3.1 Design Guidelines ................................................................. 3
3.2 Methodology for Computing Stormwater Runoff .............. 4
3.3 Existing Conditions .............................................................. 4
3.4 Proposed Conditions ............................................................ 4
4. SWM MODELLING ............................................... 4
4.1 Quality Control ...................................................................... 4 Lot Level Control Measures .................................................... 5 Conveyance Control Measures ............................................... 5 End-of-Pipe Control Measures ................................................ 5
4.2 Quantity Control .................................................................... 5 Previous Modelling .................................................................. 6 Post Development Conditions ................................................. 6
4.3 Overland Flows ..................................................................... 7
WSP No 141-17431-00
5. ON-SITE EROSION AND SEDIMENT CONTROL 7
6. CONCLUSIONS AND RECOMMENDATIONS ..... 8
LIST OF TABLES
Table 1: Allowable Flows ........................................................................... 6 Table 2: Modelling Results ........................................................................ 6 Table 3: Minor / Major Peak Flow Summary ............................................. 7
LIST OF FIGURES
Figure 1 - Site Location Map ..................................................................... 2
APPENDICES
A – Drawings Map 1 – Development Site Plan Map 2 – Existing Conditions Map 3 – Post Development Catchment Areas Overall Drainage Map (from Gath SWM Report) B – Post Development Modelling
1 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
1. INTRODUCTION WSP Canada Inc. was retained by Saugeen Riverside Developments to complete a preliminary stormwater management report as part of the application for Draft Plan Approval.
1.1 LOCATION
The proposed subdivision development is located on Part of Lot 7, Concession 1 SDR, in the Town of Hanover, Ontario (described herein as the “site”). A Site Location Map is included as Figure 1.
1.2 DEVELOPMENT PROPOSAL
The proposed development plan for the subdivision consists of 32 residential lots and a single block to be used as a trail connection.
An overall plan showing the lot and block configuration has been included as Appendix A as Map 1.
1.3 SCOPE OF WORK
The stormwater management report addresses the design and implementation of drainage and stormwater management facilities for the development.
The report includes:
Details for erosion protection and sedimentation control for short term, construction phase and the long term;
Quantity Control;
Quality Control;
Establish preliminary lot grading requirements for the proposed subdivision;
Provisions for major flows through the development.
50000 feet
15000 metres
10000 0 20000
5000 500025000 1000
20000
SCALE 1:500,000
Client/Project
Figure No.
Title
–
SITE
3 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
2. DRAINAGE CHARACTERISTICS
2.1 REGIONAL
There are no formal natural surface water drainage courses located near the site. The Beatty Saugeen River is located approximately 1 km south of the site. The Beatty Saugeen River will be the eventual receiver of stormwater runoff from the site.
2.2 LOCAL
A man made drainage ditch traverses the west side of the site draining to a ditch inlet catchbasin at the northwest corner of the property. The runoff from the property is conveyed via storm sewer through the Gath Subdivision to the west. As noted in the design of the Gath Subdivision, the infrastructure was sized accordingly.
The Town of Hanover recently constructed a drainage ditch along the 2nd Street Right of Way (ROW) to the south of the property to convey stormwater runoff from the recently constructed Industrial Park.
To the east of the property the Town of Hanover will be constructing 18th Avenue to connect the Industrial Park to the existing 18th Avenue which currently ends at 6th Street. This road, which is expected to be constructed in the spring, will have storm sewers to convey runoff from the roadway to an outlet at the intersection of 18th Avenue and 6th Street.
2.3 SOILS
According to the Soils Survey of Grey County (Report No. 17), the native soils on the site are Sullivan Sand. This soil consists of well sorted sandy outwash and is typically associated with the Hydrologic Soil Group A.
The geotechnical investigations completed by Golder and Associates indicate the native soils to be predominately silt with some clays and sands.
3. STORMWATER CONTROL The design guidelines and methodology utilized in the stormwater management review for the Saugeen Riverside Developments – Hanover Subdivision are as follows:
3.1 DESIGN GUIDELINES
The main design guideline utilized in the review is the Ministry of the Environment’s Stormwater Management Planning and Design (SWMP&D) Manual, dated March 2003.
The SWMP&D Manual details the methodologies for the preparation and evaluation of urban/suburban stormwater management measures. The document provides direction on the design of drainage/ stormwater management facilities required to meet the goals and objectives of the various Municipal/ Provincial Review Agencies.
The SWMP&D Manual also provides information on the long-term operation and maintenance techniques for stormwater management facilities that may be implemented in the development of the subdivision.
The storm sewer design criteria to be used are as follows:
Runoff from the 5 year storm is to be conveyed to a sufficient outlet via a combination of storm sewers and grass swales/ditches;
4 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
Major storm runoff (i.e. >5 years) is to be contained within specified drainage corridors and not impact any of the proposed units within the development.
3.2 METHODOLOGY FOR COMPUTING STORMWATER RUNOFF
As noted previously, the objectives of the Stormwater Management (SWM) Plan for the development is to ensure that there is an adequate outlet to convey the runoff from the minor and major storm systems. The objectives are to be achieved by completing the following tasks:
i. Determining the existing drainage conditions;
ii. Determining the post-development drainage conditions;
iii. Designing stormwater management measures that meet the criteria of the Town of Hanover,
Saugeen Valley Conservation Authority (SVCA) and the MOE;
iv. Summarize the analysis by identifying conclusions and recommendations.
3.3 EXISTING CONDITIONS
The existing land use of the site currently consists of agricultural lands. The surrounding land use consists of agricultural lands to the north and east with residential land use to the west and the Industrial Park to the south of the site. The agricultural lands to the north are a future development area and the lands to the east are currently proposed to be the site of a new institutional building.
The existing conditions are shown in Map 2 attached in Appendix A.
3.4 PROPOSED CONDITIONS
The proposed subdivision will outlet to a single location located at the northwest corner of the property. The site will discharge via a previously installed 675mm diameter outlet constructed specifically for the development of the site. The pipe is connected to the storm sewer network within the Gath Subdivision. The lots on the east side of the internal road will drain via sheet flow from back to front. The lots on the west side of the internal road will be split drainage lots. The existing ditch along the rear of the property will be utilized to convey flows to the outlet. A storm sewer system will be used to convey minor flows that discharge onto the internal road way. The roadway will also function as an overland flow route during major storm events.
The proposed drainage catchments are delineated in Map 3 attached in Appendix A.
4. SWM MODELLING The hydrologic modelling software PCSWMM was used to determine the post-development peak flows for the 5 yr., and 100 yr. storm events (6 Hour SCS storm). The post development modelling has been included as Appendix B.
4.1 QUALITY CONTROL
The SVCA requires that stormwater treatment must meet ‘Enhanced Protection’ as defined by the MOE’s SWMP&D Manual.
5 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
The 2003 Stormwater Management Planning and Design Manual (SWMP&D Manual, 2003) recommends that the required level of water quality protection be associated with the habitat sensitivity of the receiving watercourse. The ultimate receiving watercourse for the subject lands is the Beatty Saugeen River. For the purposes of this report, an ‘Enhanced’ water quality protection level will be implemented in accordance to the MOE 2003 Guidelines.
In keeping with the approach suggested in the SWMP&D manual however, a ‘treatment train’ approach to stormwater quality management has been proposed for this development. This approach consists of three (3) levels of treatment which are described as follows:
Lot level control measures;
Conveyance control measures;
End-of-Pipe control measures.
A review of each measure and it’s suitability for use in the subdivision is discussed below:
LOT LEVEL CONTROL MEASURES
The Municipality’s design standards require minimum grades of 2% from the back of curb to the property line. Therefore, reduced lot grading of the front, side and rear yards to less than 2% is not feasible.
It is proposed that all runoff draining from rooftops be directed overland across the grass lawns to encourage infiltration and filtering of pollutants from this runoff.
CONVEYANCE CONTROL MEASURES
The Municipality’s standard road cross section only allows for the use of curb and gutter in new urban type subdivisions. Therefore, the use of grass swales as a conveyance control measure for runoff from the subdivision streets cannot be implemented.
The use of pervious storm sewer pipes can be considered as a storm sewer quality control option however due to seasonal fluctuations in groundwater levels, this option will likely not be feasible.
A grassed drainage ditch proposed to be constructed in the rear yards of the lots west of the internal road. This ditch will provide rear yard drainage for the proposed lots. The ditch may be left in its current condition with established vegetation. If modifications are required the ditch will be re-seeded. This will assist with removing pollutants and sediment from the runoff prior to draining into the municipal storm sewer system.
All catchbasins/manholes within the subdivision will be provided with minimum 600 mm sumps which will assist in removing a portion of the sediment contained in the runoff from the street.
END-OF-PIPE CONTROL MEASURES
The use of an Oil Grit Separator (OGS) was examined as a possible ‘end-of-pipe’ treatment alternative. This type of treatment system would be placed as part of the proposed storm sewer system and be designed to treat the runoff from the water quality storm event (25 mm storm). One large OGS will be able to handle the entire flow from the upstream catchment area and treat this runoff to the required ‘Enhanced’ water quality protection levels.
As a result of the above assessment, a combination of rear yard and side yard swales in combination with an OGS will be used to meet the ‘Enhanced’ water quality protection level at the Saugeen Riverside Development.
4.2 QUANTITY CONTROL
The intent of stormwater quantity control is to limit the peak flows under proposed conditions to protect the downstream watercourses and infrastructure.
6 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
PREVIOUS MODELLING
The outlet for this development was previously constructed as part of the Gath Subdivision. The design and Stormwater Management report was completed by George Davis and Associates in 1991. As part of the stormwater management report for that development, the lands upstream (approximately 11.22 ha.) were accounted for. The report also considered future development (approximately 46.72 ha.) for surrounding lands as well as the downstream infrastructure.
The report considered the drainage channel that is the ultimate outlet for the proposed subdivision plus the stormwater retention facility located in the park between 16th Avenue Crescent and 17th Avenue as well as the proposed works as part of the Gath Subdivision SWM Plan.
The design of the stormwater management report set out a target flow rate for all upstream lands that discharge into the drainage channel. The overall drainage map attached in Appendix A shows the proposed subdivision lands as Area 6. The construction of the Industrial Park to the south and 18th Avenue to the east, has limited the flows to only the subdivision lands. Based on this the allotted flows for Area 6 will solely be from the proposed development.
The SWM report for the Gath Subdivision provided the following target flows for Area 6:
Table 1: Allowable Peak Flows
Storm Event 6 Hour SCS (m3/s)
2 Hour SCS (m3/s)
5 Year Storm 0.26 0.584
100 Year Storm
0.47 1.027
Based on the approved SWM report for the Gath subdivision, the above flows will be the target flows for the Saugeen Riverside Development. The 6 hour SCS Type II storm will be used for determining peak discharge as this is the more restrictive peak flow requirement.
POST DEVELOPMENT CONDITIONS
It is proposed that the existing storm sewer system be retained discharging into the storm sewer on 17th Avenue. The connection to the existing storm sewer will be made with a structure which will have a “non-clogging” agricultural grate installed. It has been determined that the existing 675 mm diameter storm sewer at 0.52% has a capacity of 0.606 m3/s. Therefore, as long as the peak discharge rate is below the allotted value, the outlet pipe will have sufficient capacity to function as the outlet for the subdivision. The results of the modelling are shown below:
Table 2: Modelling Results
Storm Event 6 Hour SCS (m3/s)
Allowable Peak Flow Peak Discharge
5 Year Storm 0.26 0.207
100 Year Storm 0.47 0.413
7 Stormwater Management Report Saugeen Riverside Developments – Hanover Subdivision
WSP No 141-17431-00
As seen in the above table, the peak discharge rates from the proposed development are below the target rates set out in the previously approved stormwater management report for the Gath Subdivision.
Therefore, quantity control is not required for this development as it has been accounted for in the previously approved downstream developments.
4.3 OVERLAND FLOWS
During major storm events, runoff will exceed the capacity of the storm sewers and overland flow will occur within the R.O.W. The highest peak flow is generated by the 100 year storm event. The minor and major peak flows are summarized below in Table 3: Minor / Major Peak Flow Summary.
Table 3: Minor / Major Peak Flow Summary
CATCHMENT MAJOR STORM PEAK FLOW
(m3/s)
MINOR STORM PEAK FLOW
(m3/s)
OVERLAND FLOW (100YR – 5 YR)
(m3/s)
201 0.413 0.207 0.206
The R.O.W. with the lowest overland flow conveyance capacity will be prior to the low points near the drainage easement where the road centerline has a slope of 0.5%. The conveyance capacity of the roadway is estimated to be 3.3 m3/s using PCSWMM. The maximum depth of flow on the roadway will be approximately 0.09 m.
Based on the peak overland flow rate (100 year – 5 year), all runoff will remain within the ROW and will not impact any of the proposed lots.
The outlet of the subdivision is designed to convey the 100 year storm. Storm events that exceed the capacity of the outlet pipe will flow overland through the easement. The easement may require drainage improvements to better convey runoff that cannot be conveyed via the storm sewer outlet.
5. ON-SITE EROSION AND SEDIMENT CONTROL Erosion and sediment controls shall meet the requirements of the most recent version of the MOE Stormwater Management Planning and Design Manual at the time of construction. Controls must include a silt fence around the downstream perimeter (north, south and west sides) of the property boundary
This silt fence must be installed prior any work being completed and shall remain in place for the entire duration of the project, until reinstatement. A temporary sedimentation pond will be constructed at the outlet to allow for settling of suspended solids. This sedimentation pond will be constructed at the start of construction and removed after 75% of the lots have been constructed.
As area grading will likely be required, all disturbed areas will be re-seeded soon after being brought to pre-grade. This will limit the sediment transport away from the site.
Erosion and sediment controls shall be the responsibility of the contractor and are to be further developed during the detailed design phase.
Appendix A
DRAWINGS
STORMWATER MANAGEMENT REPORT SAUGEEN RIVERSIDE DEVELOPMENTS HANOVER SUBDIVISION TOWN OF HANOVER
1 2 3 4 5 6 7 8 9 10 11 12 13
171819202122232425262728
17TH
A
VE
NU
E
17T
H A
VE
NU
E
STREET A
BLO
CK
33
29
18TH AVENUE
14 1615
3032 31
16th S
TR
EE
T
PROPOSED SUBDIVISION
AND EXTENT OF
OWNER'S LANDS
1.
SCALE 1:10,000
–
TLB
SJC
JAF
DEC 2014
141-17431-MAP1
SAUGEEN RIVERSIDE DEVELOPMENTS
PRELIMINARY SUBMISSION
JAN 6/150 TLB SJC
Benchmark Information
Notes
1:750
SAUGEEN RIVERSIDE DEVELOPMENTS
Hanover, Ontario
PROPOSED SUBDIVISION
DEVELOPMENT SITE PLAN
TOPOGRAPHICAL INFORMATION DERIVED FROM FIELD SURVEY BY WSP
CANADA INC. COMPLETED ON DECEMBER 12, 2013.
17TH
A
VE
NU
E
17T
H A
VE
NU
E
18TH AVENUE
16th S
TR
EE
T
PROPOSED SUBDIVISION
AND EXTENT OF
OWNER'S LANDS
1.
SCALE 1:10,000
–
TLB
SJC
JAF
DEC 2014
141-17431-MAP2
SAUGEEN RIVERSIDE DEVELOPMENTS
PRELIMINARY SUBMISSIONJAN 7/150 TLB SJC
Benchmark Information
Notes
1:750
SAUGEEN RIVERSIDE DEVELOPMENTS
Hanover, Ontario
PROPOSED SUBDIVISION
EXISTING CONDITIONS SITE PLAN
TOPOGRAPHICAL INFORMATION DERIVED FROM FIELD SURVEY BY WSP
CANADA INC. COMPLETED ON DECEMBER 12, 2013.
1 2 3 4 5 6 7 8 9 10 11 12 13
171819202122232425262728
17TH
A
VE
NU
E
17T
H A
VE
NU
E
STREET A
BLO
CK
33
29
18TH AVENUE
14 1615
3032 31
16th S
TR
EE
T
PROPOSED SUBDIVISION
AND EXTENT OF
OWNER'S LANDS
1.
SCALE 1:10,000
–
TLB
SJC
JAF
DEC 2014
141-17431-MAP3
SAUGEEN RIVERSIDE DEVELOPMENTS
PRELIMINARY SUBMISSIONJAN 7/150 TLB SJC
Benchmark Information
Notes
1:750
SAUGEEN RIVERSIDE DEVELOPMENTS
Hanover, Ontario
PROPOSED SUBDIVISION
POST DEVELOPMENT
TOPOGRAPHICAL INFORMATION DERIVED FROM FIELD SURVEY BY WSP
CANADA INC. COMPLETED ON DECEMBER 12, 2013.
CATCHMENT AREAS
EDGE OF EXISTING PAVEMENT
EXISTING PROPERTY/STREET LINE
PROPOSED SUBDIVISION BOUNDARY
EXISTING CONTOUR
EXISTING HYDRO POLE
EXISTING HYDRO GUY WIRE
IRON BAR
EXISTING TELEPHONE PEDESTAL
STANDARD IRON BAR
EXISTING TREE LINE
EXISTING FIREHYDRANT
EXISTING CATCH BASIN
EXISTING MANHOLE
PROPOSED LOT LINE
STORM DRAINAGE AREA BOUNDARY
Appendix B
POST DEVELOPMENT MODELLING
STORMWATER MANAGEMENT REPORT SAUGEEN RIVERSIDE DEVELOPMENTS HANOVER SUBDIVISION TOWN OF HANOVER
Table B.1 Parameter Summary Table
Post Conditions
Outlet LocationModel (MIDUSS)
Catchment IDDescription
Area
(ha)
Drainage
Channel
(m)
Flow
Length
(m)
Gradient
(%)
Total
Imperv. (%)
Total
Imperv.
Not
Connected
(%)
Manning's
'n'
(Perv.)
CN
(Perv.)
Initial
Abstractions
201 Site 3.035 320 47 5.0 33.21 14.8 0.21 65.4 13.4
Table B.2 Site Soils: (as per Ontario Soil Survey Report No. 16 for Bruce County)
Soil Type Hydologic Soil Group
Sullivan Sand (Geotech - Silty Clay Loam) A
TABLE OF CURVE NUMBERS (CN's)
Land Use Hydrologic Soil Type
A AB B BC C CD D
Manning's
'n'
Meadow 50 54 58 64.5 71 74.5 78 0.4 continuous grass
Woodlot 50 55.3 60.5 67 73.5 76.8 80 0.4 forests
Long Grass 55 60 65 72 79 81.5 84 0.3 natural, not maintained
Lawns 60 65.5 71 77 83 86 89 0.25 maintained
Pasture/Range 58 61.5 65 70.5 76 78.5 81 0.17 farm pasture
Crop 66 70 74 78 82 84 86 0.13 farm land
Fallow (bare) 77 82 86 89 91 93 94 0.05 idle farm land (bare)
Built-up 60 65.5 71 77 83 89 89 0.25 Lawns post development
Streets, paved 98 98 98 98 98 98 98 0.01
North portion of Subdivision
HYDROLOGIC SOIL TYPE (%) - Post Development Conditions
Catchment Hydrologic Soil Type
A AB B BC C CD D TOTAL
201 100 0 0 0 0 0 0 100
LAND USE (%) - Post Development Conditions
Catchment Meadow WoodlotLong
GrassLawns
Pasture
RangeCrop
Fallow
(Bare)
Imperv. Not
Connected
(Rooftops)
Imperv.
ConnectedTotal
201 0 0 0 67 0 0 0 14.8 18.5 100
CURVE NUMBER (CN) - Post Development Conditions
Catchment Meadow WoodlotLong
GrassLawns
Pasture
RangeCrop
Fallow
(Bare)Built-up
Imperv. Not
Connected
(Rooftops)
Weighted
CN -
Pervious
IA -
Pervious
Manning's
'n'
201 50 50 55 60 58 66 77 60 90 65.4 13.4 0.21
Table B.3: Impervious Area Determination for Subcatchment 201 - 205
Post Development Conditions
Total Area Total
(ha) (%)
(ha) (%) (ha) (%)
201 3.035 0.56 18.5 0.45 14.8 33.2
Area of
Concern
Impervious Area
Not Connected (Rooftops)
Impervious Area
Connected
Table B.3 - Impervious Area Determination for Post-development Catchments 201 - 205
Catchment Imperv. Area Imperv %
201 320 m of 20 m wide ROW @ 55% imperv. 0.35 ha 11.6 %
32 Driveways 65 m2 @ 100% imperv. 0.21 ha 6.9 %
32 Roof Area 140 m2 @ 100% imperv. 0.45 ha 14.8 %
1.01 ha
1 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – MODEL DETAILS
[TITLE]
[OPTIONS]
;;Options Value
;;------------------ ------------
FLOW_UNITS CMS
INFILTRATION GREEN_AMPT
FLOW_ROUTING DYNWAVE
START_DATE 11/17/2014
START_TIME 00:00
REPORT_START_DATE 11/17/2014
REPORT_START_TIME 00:00
END_DATE 11/18/2014
END_TIME 00:00
SWEEP_START 1/1
SWEEP_END 12/31
DRY_DAYS 0
REPORT_STEP 00:01:00
WET_STEP 00:05:00
DRY_STEP 00:05:00
ROUTING_STEP 5
ALLOW_PONDING NO
INERTIAL_DAMPING PARTIAL
VARIABLE_STEP 0.75
LENGTHENING_STEP 0
MIN_SURFAREA 0
NORMAL_FLOW_LIMITED BOTH
SKIP_STEADY_STATE NO
FORCE_MAIN_EQUATION H-W
LINK_OFFSETS ELEVATION
MIN_SLOPE 0
[EVAPORATION]
;;Type Parameters
;;------------- ----------
CONSTANT 0.0
DRY_ONLY NO
[RAINGAGES]
;; Rain Time Snow Data
;;Name Type Intrvl Catch Source
;;-------------- --------- ------ ------ ----------
SCS_6h_100_Yr INTENSITY 0:05 1.0 TIMESERIES SCS_6h_76.3mm
SCS_6h_5_Yr INTENSITY 0:05 1.0 TIMESERIES SCS_6h_49mm
[SUBCATCHMENTS]
;; Total Pcnt. Pcnt. Curb Snow
;;Name Raingage Outlet Area Imperv Width Slope Length Pack
;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- --------
S1 SCS_6h_100_Yr J1 3.035 33.21 645.745 5 0
[SUBAREAS]
;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted
;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
S1 0.013 0.21 1 2.5 25 PERVIOUS 14.8
[INFILTRATION]
;;Subcatchment Suction HydCon IMDmax
;;-------------- ---------- ---------- ----------
S1 273 2 0.263
[JUNCTIONS]
;; Invert Max. Init. Surcharge Ponded
;;Name Elev. Depth Depth Depth Area
;;-------------- ---------- ---------- ---------- ---------- ----------
J1 280 1.5 0 0 0
J2 100.02 0 0 0 0
J3 99.52 0 0 0 0
[OUTFALLS]
;; Invert Outfall Stage/Table Tide
;;Name Elev. Type Time Series Gate
;;-------------- ---------- ---------- ---------------- ----
OF1 279.875 FREE NO
2 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – MODEL DETAILS
[CONDUITS]
;; Inlet Outlet Manning Inlet Outlet Init. Max.
;;Name Node Node Length N Offset Offset Flow Flow
;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- -----
-----
C1 J1 OF1 24 0.01 0 0 0 0
Roadway J2 J3 100 0.01 0 0 0.206 0
[XSECTIONS]
;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels
;;-------------- ------------ ---------------- ---------- ---------- ---------- ----------
C1 CIRCULAR 0.675 0 0 0 1
Roadway IRREGULAR Roadway 0 0 0 1
[TRANSECTS]
NC 0.027 0.027 0.013
X1 Roadway 13 5.25 14.75 0.0 0.0 0.0 0.0 0.0
GR 100 0 100 5.25 99.895 5.25 99.895 5.4 99.745 5.45
GR 99.77 5.75 99.855 10 99.77 14.25 99.745 14.55 99.895 14.6
GR 99.895 14.75 100 14.75 100 20
;[LE: 5.25][RE: 14.75]
NC 0.027 0.027 0.013
X1 Roadway(orig) 11 5.25 14.75 0.0 0.0 0.0 0.0 0.0
GR 100 0 99.895 5.25 99.895 5.4 99.745 5.45 99.77 5.75
GR 99.855 10 99.77 14.25 99.745 14.55 99.895 14.6 99.895 14.75
GR 100 20
[LOSSES]
;;Link Inlet Outlet Average Flap Gate
;;-------------- ---------- ---------- ---------- ----------
[TIMESERIES]
;;Name Date Time Value
;;-------------- ---------- ---------- ----------
;SCS_6h_49mm design storm, total rainfall = 49 mm, rain units = mm/hr.
;SCS_6h_76.3mm design storm, total rainfall = 76.3 mm, rain units = mm/hr.
1 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 5 YEAR STORM EVENT
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... GREEN_AMPT
Flow Routing Method ...... DYNWAVE
Starting Date ............ NOV-17-2014 00:00:00
Ending Date .............. NOV-18-2014 00:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 00:05:00
Routing Time Step ........ 5.00 sec
*************
Element Count
*************
Number of rain gages ...... 2
Number of subcatchments ... 1
Number of nodes ........... 4
Number of links ........... 2
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data Recording
Name Data Source Type Interval
-------------------------------------------------------------
SCS_6h_100_Yr SCS_6h_76.3mm INTENSITY 5 min.
SCS_6h_5_Yr SCS_6h_49mm INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage Outlet
-------------------------------------------------------------------------------------------------------
S1 3.03 645.75 33.21 5.0000 SCS_6h_5_Yr J1
************
Node Summary
************
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
------------------------------------------------------------------------------
J1 JUNCTION 280.00 1.50 0.0
J2 JUNCTION 100.02 0.25 0.0
J3 JUNCTION 99.52 0.25 0.0
OF1 OUTFALL 279.88 0.68 0.0
************
2 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 5 YEAR STORM EVENT
Link Summary
************
Name From Node To Node Type Length %Slope Roughness
------------------------------------------------------------------------------------------
C1 J1 OF1 CONDUIT 24.0 0.5208 0.0100
Roadway J2 J3 CONDUIT 100.0 0.5000 0.0130
*********************
Cross Section Summary
*********************
Full Full Hyd. Max. No. of Full
Conduit Shape Depth Area Rad. Width Barrels Flow
---------------------------------------------------------------------------------------
C1 CIRCULAR 0.68 0.36 0.17 0.68 1 0.79
Roadway Roadway 0.25 1.79 0.18 20.00 1 3.10
****************
Transect Summary
****************
Transect Roadway
Area:
0.0002 0.0007 0.0016 0.0029 0.0045
0.0071 0.0112 0.0168 0.0238 0.0323
0.0422 0.0537 0.0665 0.0809 0.0967
0.1140 0.1327 0.1529 0.1746 0.1977
0.2223 0.2482 0.2744 0.3005 0.3267
0.3529 0.3791 0.4053 0.4315 0.4583
0.4854 0.5125 0.5395 0.5666 0.5937
0.6208 0.6479 0.6750 0.7021 0.7291
0.7562 0.7833 0.8104 0.8375 0.8646
0.8917 0.9187 0.9458 0.9729 1.0000
Hrad:
0.0133 0.0267 0.0400 0.0533 0.0631
0.0577 0.0638 0.0735 0.0848 0.0969
0.1095 0.1224 0.1356 0.1489 0.1623
0.1759 0.1894 0.2031 0.2167 0.2304
0.2442 0.2639 0.2913 0.3188 0.3462
0.3735 0.4007 0.4280 0.4551 0.4679
0.4950 0.5221 0.5491 0.5761 0.6030
0.6299 0.6567 0.6834 0.7101 0.7367
0.7633 0.7898 0.8163 0.8427 0.8690
0.8953 0.9216 0.9478 0.9739 1.0000
Width:
0.0063 0.0126 0.0189 0.0252 0.0334
0.0590 0.0847 0.1104 0.1360 0.1617
0.1874 0.2130 0.2387 0.2644 0.2901
0.3157 0.3414 0.3671 0.3927 0.4184
0.4441 0.4587 0.4589 0.4591 0.4593
0.4594 0.4596 0.4598 0.4599 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 1.0000
Transect Roadway(orig)
Area:
0.0001 0.0005 0.0012 0.0022 0.0034
0.0054 0.0086 0.0128 0.0182 0.0247
0.0323 0.0410 0.0509 0.0618 0.0739
0.0871 0.1014 0.1169 0.1334 0.1511
0.1699 0.1897 0.2097 0.2297 0.2498
0.2698 0.2898 0.3098 0.3299 0.3505
0.3724 0.3955 0.4196 0.4448 0.4712
0.4987 0.5273 0.5570 0.5878 0.6197
0.6527 0.6869 0.7221 0.7585 0.7959
0.8345 0.8742 0.9150 0.9570 1.0000
Hrad:
0.0178 0.0356 0.0534 0.0711 0.0842
0.0769 0.0850 0.0980 0.1130 0.1292
0.1461 0.1633 0.1809 0.1986 0.2166
0.2346 0.2527 0.2709 0.2891 0.3074
3 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 5 YEAR STORM EVENT
0.3257 0.3520 0.3886 0.4252 0.4617
0.4982 0.5346 0.5709 0.6071 0.6240
0.6579 0.6893 0.7183 0.7453 0.7702
0.7934 0.8149 0.8350 0.8537 0.8712
0.8876 0.9030 0.9175 0.9312 0.9441
0.9564 0.9681 0.9792 0.9898 1.0000
Width:
0.0063 0.0126 0.0189 0.0252 0.0334
0.0590 0.0847 0.1104 0.1360 0.1617
0.1874 0.2130 0.2387 0.2644 0.2901
0.3157 0.3414 0.3671 0.3927 0.4184
0.4441 0.4587 0.4589 0.4591 0.4593
0.4594 0.4596 0.4598 0.4599 0.4900
0.5155 0.5410 0.5665 0.5920 0.6175
0.6430 0.6685 0.6940 0.7195 0.7450
0.7705 0.7960 0.8215 0.8470 0.8725
0.8980 0.9235 0.9490 0.9745 1.0000
************************** Volume Depth
Runoff Quantity Continuity hectare-m mm
************************** --------- -------
Total Precipitation ...... 0.149 49.008
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 0.084 27.737
Surface Runoff ........... 0.064 21.111
Final Surface Storage .... 0.001 0.249
Continuity Error (%) ..... -0.181
************************** Volume Volume
Flow Routing Continuity hectare-m 10^6 ltr
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 0.064 0.641
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 0.064 0.641
Internal Outflow ......... 0.000 0.000
Storage Losses ........... 0.000 0.000
Initial Stored Volume .... 0.003 0.033
Final Stored Volume ...... 0.004 0.045
Continuity Error (%) ..... -1.810
***************************
Time-Step Critical Elements
***************************
None
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.00 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 2.00
***************************
Subcatchment Runoff Summary
***************************
--------------------------------------------------------------------------------------------------------
Total Total Total Total Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Coeff
4 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 5 YEAR STORM EVENT
Subcatchment mm mm mm mm mm 10^6 ltr CMS
--------------------------------------------------------------------------------------------------------
S1 49.01 0.00 0.00 27.74 21.11 0.64 0.21 0.431
******************
Node Depth Summary
******************
---------------------------------------------------------------------
Average Maximum Maximum Time of Max
Depth Depth HGL Occurrence
Node Type Meters Meters Meters days hr:min
---------------------------------------------------------------------
J1 JUNCTION 0.02 0.24 280.24 0 02:25
J2 JUNCTION 0.00 0.10 100.12 0 00:00
J3 JUNCTION 0.16 0.16 99.68 1 00:00
OF1 OUTFALL 0.02 0.24 280.11 0 02:25
*******************
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------
Maximum Maximum Lateral Total
Lateral Total Time of Max Inflow Inflow
Inflow Inflow Occurrence Volume Volume
Node Type CMS CMS days hr:min 10^6 ltr 10^6 ltr
-------------------------------------------------------------------------------------
J1 JUNCTION 0.207 0.207 0 02:25 0.641 0.641
J2 JUNCTION 0.000 0.000 0 00:00 0.000 0.000
J3 JUNCTION 0.000 0.205 0 00:00 0.000 0.026
OF1 OUTFALL 0.000 0.207 0 02:25 0.000 0.641
**********************
Node Surcharge Summary
**********************
No nodes were surcharged.
*********************
Node Flooding Summary
*********************
No nodes were flooded.
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg. Max. Total
Freq. Flow Flow Volume
Outfall Node Pcnt. CMS CMS 10^6 ltr
-----------------------------------------------------------
OF1 28.63 0.026 0.207 0.641
-----------------------------------------------------------
System 28.63 0.026 0.207 0.641
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CMS days hr:min m/sec Flow Depth
-----------------------------------------------------------------------------
C1 CONDUIT 0.207 0 02:25 1.86 0.26 0.35
Roadway CHANNEL 0.205 0 00:00 0.63 0.07 0.39
5 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 5 YEAR STORM EVENT
***************************
Flow Classification Summary
***************************
-----------------------------------------------------------------------------------------
Adjusted --- Fraction of Time in Flow Class ---- Avg. Avg.
/Actual Up Down Sub Sup Up Down Froude Flow
Conduit Length Dry Dry Dry Crit Crit Crit Crit Number Change
-----------------------------------------------------------------------------------------
C1 1.00 0.00 0.00 0.00 0.71 0.29 0.00 0.00 0.45 0.0000
Roadway 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.0000
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Thu Mar 12 11:31:43 2015
Analysis ended on: Thu Mar 12 11:31:43 2015
Total elapsed time: < 1 sec
1 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 100 YEAR STORM EVENT
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022)
--------------------------------------------------------------
*********************************************************
NOTE: The summary statistics displayed in this report are
based on results found at every computational time step,
not just on results from each reporting time step.
*********************************************************
****************
Analysis Options
****************
Flow Units ............... CMS
Process Models:
Rainfall/Runoff ........ YES
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ NO
Water Quality .......... NO
Infiltration Method ...... GREEN_AMPT
Flow Routing Method ...... DYNWAVE
Starting Date ............ NOV-17-2014 00:00:00
Ending Date .............. NOV-18-2014 00:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:05:00
Dry Time Step ............ 00:05:00
Routing Time Step ........ 5.00 sec
*************
Element Count
*************
Number of rain gages ...... 2
Number of subcatchments ... 1
Number of nodes ........... 4
Number of links ........... 2
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data Recording
Name Data Source Type Interval
-------------------------------------------------------------
SCS_6h_100_Yr SCS_6h_76.3mm INTENSITY 5 min.
SCS_6h_5_Yr SCS_6h_49mm INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage Outlet
-------------------------------------------------------------------------------------------------------
S1 3.03 645.75 33.21 5.0000 SCS_6h_100_Yr J1
************
Node Summary
************
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
------------------------------------------------------------------------------
J1 JUNCTION 280.00 1.50 0.0
J2 JUNCTION 100.02 0.25 0.0
J3 JUNCTION 99.52 0.25 0.0
OF1 OUTFALL 279.88 0.68 0.0
************
2 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 100 YEAR STORM EVENT
Link Summary
************
Name From Node To Node Type Length %Slope Roughness
------------------------------------------------------------------------------------------
C1 J1 OF1 CONDUIT 24.0 0.5208 0.0100
Roadway J2 J3 CONDUIT 100.0 0.5000 0.0130
*********************
Cross Section Summary
*********************
Full Full Hyd. Max. No. of Full
Conduit Shape Depth Area Rad. Width Barrels Flow
---------------------------------------------------------------------------------------
C1 CIRCULAR 0.68 0.36 0.17 0.68 1 0.79
Roadway Roadway 0.25 1.79 0.18 20.00 1 3.10
****************
Transect Summary
****************
Transect Roadway
Area:
0.0002 0.0007 0.0016 0.0029 0.0045
0.0071 0.0112 0.0168 0.0238 0.0323
0.0422 0.0537 0.0665 0.0809 0.0967
0.1140 0.1327 0.1529 0.1746 0.1977
0.2223 0.2482 0.2744 0.3005 0.3267
0.3529 0.3791 0.4053 0.4315 0.4583
0.4854 0.5125 0.5395 0.5666 0.5937
0.6208 0.6479 0.6750 0.7021 0.7291
0.7562 0.7833 0.8104 0.8375 0.8646
0.8917 0.9187 0.9458 0.9729 1.0000
Hrad:
0.0133 0.0267 0.0400 0.0533 0.0631
0.0577 0.0638 0.0735 0.0848 0.0969
0.1095 0.1224 0.1356 0.1489 0.1623
0.1759 0.1894 0.2031 0.2167 0.2304
0.2442 0.2639 0.2913 0.3188 0.3462
0.3735 0.4007 0.4280 0.4551 0.4679
0.4950 0.5221 0.5491 0.5761 0.6030
0.6299 0.6567 0.6834 0.7101 0.7367
0.7633 0.7898 0.8163 0.8427 0.8690
0.8953 0.9216 0.9478 0.9739 1.0000
Width:
0.0063 0.0126 0.0189 0.0252 0.0334
0.0590 0.0847 0.1104 0.1360 0.1617
0.1874 0.2130 0.2387 0.2644 0.2901
0.3157 0.3414 0.3671 0.3927 0.4184
0.4441 0.4587 0.4589 0.4591 0.4593
0.4594 0.4596 0.4598 0.4599 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 0.4750
0.4750 0.4750 0.4750 0.4750 1.0000
Transect Roadway(orig)
Area:
0.0001 0.0005 0.0012 0.0022 0.0034
0.0054 0.0086 0.0128 0.0182 0.0247
0.0323 0.0410 0.0509 0.0618 0.0739
0.0871 0.1014 0.1169 0.1334 0.1511
0.1699 0.1897 0.2097 0.2297 0.2498
0.2698 0.2898 0.3098 0.3299 0.3505
0.3724 0.3955 0.4196 0.4448 0.4712
0.4987 0.5273 0.5570 0.5878 0.6197
0.6527 0.6869 0.7221 0.7585 0.7959
0.8345 0.8742 0.9150 0.9570 1.0000
Hrad:
0.0178 0.0356 0.0534 0.0711 0.0842
0.0769 0.0850 0.0980 0.1130 0.1292
0.1461 0.1633 0.1809 0.1986 0.2166
0.2346 0.2527 0.2709 0.2891 0.3074
3 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 100 YEAR STORM EVENT
0.3257 0.3520 0.3886 0.4252 0.4617
0.4982 0.5346 0.5709 0.6071 0.6240
0.6579 0.6893 0.7183 0.7453 0.7702
0.7934 0.8149 0.8350 0.8537 0.8712
0.8876 0.9030 0.9175 0.9312 0.9441
0.9564 0.9681 0.9792 0.9898 1.0000
Width:
0.0063 0.0126 0.0189 0.0252 0.0334
0.0590 0.0847 0.1104 0.1360 0.1617
0.1874 0.2130 0.2387 0.2644 0.2901
0.3157 0.3414 0.3671 0.3927 0.4184
0.4441 0.4587 0.4589 0.4591 0.4593
0.4594 0.4596 0.4598 0.4599 0.4900
0.5155 0.5410 0.5665 0.5920 0.6175
0.6430 0.6685 0.6940 0.7195 0.7450
0.7705 0.7960 0.8215 0.8470 0.8725
0.8980 0.9235 0.9490 0.9745 1.0000
************************** Volume Depth
Runoff Quantity Continuity hectare-m mm
************************** --------- -------
Total Precipitation ...... 0.232 76.311
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 0.096 31.570
Surface Runoff ........... 0.135 44.631
Final Surface Storage .... 0.001 0.249
Continuity Error (%) ..... -0.183
************************** Volume Volume
Flow Routing Continuity hectare-m 10^6 ltr
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 0.135 1.355
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 0.135 1.354
Internal Outflow ......... 0.000 0.000
Storage Losses ........... 0.000 0.000
Initial Stored Volume .... 0.003 0.033
Final Stored Volume ...... 0.004 0.045
Continuity Error (%) ..... -0.869
***************************
Time-Step Critical Elements
***************************
Link C1 (1.20%)
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 4.65 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
Percent in Steady State : 0.00
Average Iterations per Step : 2.00
***************************
Subcatchment Runoff Summary
***************************
--------------------------------------------------------------------------------------------------------
Total Total Total Total Total Total Peak Runoff
Precip Runon Evap Infil Runoff Runoff Runoff Coeff
4 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 100 YEAR STORM EVENT
Subcatchment mm mm mm mm mm 10^6 ltr CMS
--------------------------------------------------------------------------------------------------------
S1 76.31 0.00 0.00 31.57 44.63 1.35 0.41 0.585
******************
Node Depth Summary
******************
---------------------------------------------------------------------
Average Maximum Maximum Time of Max
Depth Depth HGL Occurrence
Node Type Meters Meters Meters days hr:min
---------------------------------------------------------------------
J1 JUNCTION 0.03 0.35 280.35 0 02:25
J2 JUNCTION 0.00 0.10 100.12 0 00:00
J3 JUNCTION 0.16 0.16 99.68 1 00:00
OF1 OUTFALL 0.03 0.35 280.22 0 02:25
*******************
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------
Maximum Maximum Lateral Total
Lateral Total Time of Max Inflow Inflow
Inflow Inflow Occurrence Volume Volume
Node Type CMS CMS days hr:min 10^6 ltr 10^6 ltr
-------------------------------------------------------------------------------------
J1 JUNCTION 0.413 0.413 0 02:24 1.355 1.355
J2 JUNCTION 0.000 0.000 0 00:00 0.000 0.000
J3 JUNCTION 0.000 0.205 0 00:00 0.000 0.026
OF1 OUTFALL 0.000 0.413 0 02:25 0.000 1.354
**********************
Node Surcharge Summary
**********************
No nodes were surcharged.
*********************
Node Flooding Summary
*********************
No nodes were flooded.
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg. Max. Total
Freq. Flow Flow Volume
Outfall Node Pcnt. CMS CMS 10^6 ltr
-----------------------------------------------------------
OF1 28.76 0.055 0.413 1.354
-----------------------------------------------------------
System 28.76 0.055 0.413 1.354
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CMS days hr:min m/sec Flow Depth
-----------------------------------------------------------------------------
C1 CONDUIT 0.413 0 02:25 2.23 0.52 0.51
Roadway CHANNEL 0.205 0 00:00 0.63 0.07 0.39
5 SAUGEEN RIVERSIDE DEVELOPMENTS – HANOVER SUBDIVISION – POST DEVELOPMENT – 100 YEAR STORM EVENT
***************************
Flow Classification Summary
***************************
-----------------------------------------------------------------------------------------
Adjusted --- Fraction of Time in Flow Class ---- Avg. Avg.
/Actual Up Down Sub Sup Up Down Froude Flow
Conduit Length Dry Dry Dry Crit Crit Crit Crit Number Change
-----------------------------------------------------------------------------------------
C1 1.00 0.00 0.00 0.00 0.70 0.30 0.00 0.00 0.47 0.0001
Roadway 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.0000
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Thu Mar 12 11:25:30 2015
Analysis ended on: Thu Mar 12 11:25:30 2015
Total elapsed time: < 1 sec