Page 1: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

ID: 125 From Start to Finish: Electrical How-to for Revit MEP Projects

MEP – Intermediate

1:00PM-2:00PM

Page 2: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Short Description:Session Description: Do you feel like you are just scratching the surface with Revit MEP for Electrical projects? If so this course is for you. This course is designed to show you how to use Revit MEP from start to finish on a project for Electrical design.Revit MEP is a very powerful production and design tool but a lot of that functionality is underused because of the lack of out of the box families, parameters and schedules. I will show you how to make better models, streamline documentation, and produce better schedules on your Electrical Revit project with lots of how-tos and live demonstrations.

Some of the features we will focus on will be: • Design Phase Considerations • General Electrical Considerations

o Settings o Equipment / Fixtures / Devices o Parameters

• Device Schedule Usage & M/P Coordination • Circuiting / Panel Schedules / Load Analysis • Calculations o Photometric o Power Density • Tips / Tricks / and Problems

This class is based around Revit MEP users who are looking to leverage the full capabilities of the software or gain understanding of tools they have no yet worked with.

Page 3: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot
Page 4: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

About the SpeakerJoe Kerfoot, P.E.

Project Experience:

• Healthcare, Education, Commercial and Residential.

• 15 Fully Revit projects, ranging in size from 20,000 to 200,000sf.

• Over three years of dedicated Revit experience

• 6 years of experience in the consulting industry

• Responsible for company standards and educational procedures for 3 firms

Page 5: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot
Page 6: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Outline OptionsNew Revit Workflow:1. How To Learn

2. SD3. DD4. CD5. Advanced6. Demonstration

7. Template8. Training9. Workflow10. Quality Control11. Families12. Schedules13. Your Standards14. Your Defaults

Session 1• Introduction to BIM and Revit

Platform• User Interface and

Terminology• Project Setup• Modifying and Editing

Commands• Spaces and Zones

Session 2• Utilizing Schedules as a

Design Tool• Panelboard• Lighting Fixtures• Circuits• Switch Systems

Session 3• Power Circuits• Panelboard• Creating Electrical Distribution

Systems

Session 4• Sheets• Drafting Views• Legends• Worksets and Worksharing

• General Electrical• Device Layout• Schedules• Circuiting• Panel Schedules• Families

Other Ideas:

Page 7: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Philosophy: Common MEP Naming ConventionGeneral Explanation of naming conventions applies to below list unless special case indicated below:

Family NamesGrouping TitlesFiltersProject ParametersLegend Titles

“_.@_” for Generic used my all disciplines“_@_” for Discipline

@ = g for Generic; b for BIM Manager; c for Coordination; e for Electrical; m for Mechanical; p for Plumbing; t for Technology

Browser OrganizationViews: Group by (Phase / Discipline / Sub-Discipline)Sheets: Group by (Phase / Sheet Category

SYS or Sub Discipline Variables:Electrical Systems:

PWR; LTG; FIRE; ROOF; UNIT; RISER; GRD; COM; SITE; DETAIL NOTESMechanical Systems:

M-HVAC; M-DUCT; M-PIPE; M-UNIT; M-RISER; M-DETAIL; M-NOTESP-WASTE; P-DOM; P-STORM; P-UNIT; P-RISER; P-FP; P-DETAILS; P-NOTES

Electrical Productivity Packwww.cadtechnologycenter.com

Page 8: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Philosophy: Common MEP Naming ConventionView Titles:

“#_SYS_IND” for Independent Views (# is for Floor)“#_SYS” for Dependent Views

Detail View Titles:“_@_#_SYS_DESCRIPTION” (# for number for detail in system)

Shared Parameters“_@_S_”

Additional Phasing Convention:View TemplatesView Titles

Schedules Convention:“_@_” for Schedules on Sheet“_@ W_” for Working Schedules not on Sheets

Special Application Naming Convention:Annotation Families: “_@_tag SYS NAME”Work sets:

Architectural and other consultants linked as separate work set with an “x” before the link description.

Page 9: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

How to Learn: Outline1.1 General Electrical

.1 Tutorials

.2 General Calculations

.3 General Electrical Settings

.4 General View Templates

.5 Items Needing Development

.6 Revit Electrical Families

.7 View Template Filters

1.2 Device Layouts.1 Placing Devices.2 Electrical Fixtures.3 Electrical Equipment.4 Lighting Devices.5 Lighting Fixtures.6 Fire Alarm Devices.7 Special Systems.8 Conduit and Busways

1.3 Schedules.1 General Schedules.2 Electrical Device Schedules.3 Electrical Equipment Schedules.4 Lighting Fixture Schedules.5 Lighting Device Schedules.6 Feeder and Transformer Schedules.7 Embedded Schedules.8 Schedule Formulas

1How to Learn

1.4 Circuiting.1 General Circuiting.2 To Edit Existing Circuits

1.5 Panel Schedules.1 General Panel Schedules.2 Electrical Settings.3 Load Classifications.4 Demand Factors.5 Panel Schedules

1.6 Families.1 General Family Editing.2 Special Family Settings.3 Copying from Web.4 Manufacturer Revit Families

Page 10: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: TutorialsYouTube Training:

There are a lot of individual training videos on YouTube at the kink below.http://www.youtube.com/watch?v=MdKDH5ZHBZY

Just make sure that you search Revit MEP when on YouTube.

Autodesk Tutorials:http://docs.autodesk.com/RVTMPJ/2011/ENU/landing.html

1.1How to Learn

Page 11: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: General CalculationsPanel board Load Analysis: Refer to Panel Schedules section.

Panel board Phase Balancing: Refer to Panel Schedule section.

Wire Sizes per voltage drop: This is done automatically. Revit will find the longest distance between devices and source based on the Max voltage drop set in the electrical settings. Refer to Electrical Settings documents.

Lighting Fixture Quantities: This will need some development. Using the space schedule, you can create an imbedded schedule to schedule the light fixtures in the space. Then you can define a parameter for each of the spaces that is associated with the ComCheck space classifications. You can group the spaces and automatically count the fixtures in each type of space for quickly entering into ComCheck. The thing to confirm is that the fixtures are actually mounted inside of the space. You may need to adjust the space height as the default is 8’.

Electrical Equipment Starter Sizes: This would require some development, but the starter selection can be automatically calculated similar to the standard excel schedule for mechanical equipment.

Electrical Equipment Fuse and Disconnect Sizes: This would require some development, but the fuse and switch selection can be automatically calculated similar to the standard excel schedule for mechanical equipment.

Point to point Short Circuit: This is a rudimentary Point-To-Point calculation family that is in the template file. This family does not take into account transformer let-thru or large motor contributions. This is only used for simple system calculations.bimproductivity.com

How to Learn 1.2

Page 12: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: General Electrical SettingsThe electrical settings should be set and default in the template file.Go to Manage Tab > then MEP Settings >

There are 3 Important Sections:Electrical SettingsLoad ClassificationsDemand Factors

Theses Sections are detailed in other documents.

How to Learn 1.3

Page 13: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: General View TemplatesThe view templates are instrumental in maintaining consistency of views.There are a few electrical default view templates set up in the template file.Ensure that you set the view templates the way that you want. If there are temporary modification that are needed, use “VG”, but then go back and

“Apply Default Template to Current View” when you are finished.These view templates are used to control the project browser organization and the typical visibility in the views.When adding new views to the project, ensure that you map these view to the appropriate view template.

How to Learn 1.4

Page 14: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: Items Needing DevelopmentThere is one thing that is currently not functioning in the current panel schedule load analysis.The connected and calculated panel totals will not exclude the smaller of Heating or Cooling loads.

This can be developed, but has not been at present.

You would need to modify the panel schedule template and add below the Total Est. Demand.Add “Non-Coincident Heating/Cooling:”Then, use calculated value Name: HeatingCoolingNC; Discipline: Electrical; Type: CurrentFormula “if(heating estimated demand current > cooling estimated demand current, cooling estimated demand current, heating estimated demand

current)

Then add new total “Total Est. Demand – NC”New folrmula is “total estimated demand current – previous formula

How to Learn 1.5

Page 15: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: Revit Electrical FamiliesKeep them Separate

How to Learn 1.6

Page 16: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

General Electrical: View Template FiltersThe filter to controls the color of the wires relative to the “Panel” name associated with that panel.

The filter to controls the color of the devices or equipment relative to the shared parameter for the panel branch that the family should be fed from.

How to Learn 1.7

Page 17: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Placing Devices

Before hosting and placing the devices, check the Properties window to insure that you are placing the correct device that you want to.

Once the devices has been placed, check the “Constraints” section of the properties window. This is were you would indicate the TAG, mounting height, of the branch that the device is placed on.

How to Learn 2.1

Page 18: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Electrical Fixtures_e_tag PWR DEV – Circuit

This is used if you want to have the circuit number placed adjacent to the receptacle.

_e_tag PWR DEV – DescriptionThis is used for a general description of the fixture (misc. open for whatever).

_e_tag PWR DEV – EM BranchThis is controlled by the checkbox of the fixture properties (Critical = C, Life Safety = LS).

_e_tag PWR DEV – EquipmentThis is a Mechanical formatted tag that is used when associating with Mechanical/Plumbing Equipment.

_e_tag PWR DEV – MountingThis is a tag to indicate the Mounting Height. It is controlled in the properties of the device.This tag does not reflect the true mounting height in the model, just a tag.

_e_tag PWR DEV – Special EquipmentThis is used for tagging special equipment (Copier, Fax, Ref., or Medical Equipment) anything that has a special load.

How to Learn 2.2

DO NOT USE TEXT!!!!

Page 19: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Electrical EquipmentDisconnects/Starters are used for powering the associated Mechanical / Plumbing Equipment.

Panel boards or Transformers, you must define the “Primary” Distribution System as indicated below before you can start circuiting.

For Transformers only, you will also need to select the Secondary Distribution System from the properties window.

The default tag for this equipment is the Panel name.When placing these, the only additional information that you need to provide would be the branch from the checkboxes in the properties window

(Critical, Life Safety, and Equipment).

How to Learn 2.3

Page 20: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Lighting Devices

How to Learn 2.4

Page 21: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Lighting Fixtures

How to Learn 2.5

Page 22: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Fire Alarm Devices

How to Learn 2.6

Page 23: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Special Systems

How to Learn 2.7

Page 24: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Device Layout: Conduit and Busway

How to Learn 2.8

Page 25: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: General SchedulesThe parameters in the schedules should be set and mapped for all of the families. Refer to

family editing and parameters documents for more information.

There are view templates for working schedule and sheet schedules. Refer to View Template documents.

Working Schedules:The working schedules are intended to show all appropriate information and sort by the tag.They are intended to itemize every instance and used as the primary input schedule.

Sheet Schedules:The sheet schedules are scheduling the same information as the working schedules.They do not itemize every instance and have some parameters hidden.

Note: The primary think to consider is the “Electrical Data” parameter. This information must be correct for proper circuiting and can only be adjusted by changing other parameters (e_S_VOLTS, e_S_POLES, e_S_ACTUAL WATTS).

Note: The Load Analysis will only function is the correct “e_S_LOAD CLASS” parameter has been correctly defined.

How to Learn 3.1

Page 26: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Electrical Device Schedules

The Electrical Devices are scheduled in the “…SPECIAL EQUIPMENT SCHEDULE…”

Fill out the appropriate information for each device. If it is not tagged then it will be considered General Use.You should be able to edit all the parameter information until the device has been circuited.Some parameters will have a window for selection like “e_S_LOAD CLASS”.Confirm that the schedule is properly filled out prior to circuiting and use this schedule while circuiting.

How to Learn 3.2

Page 27: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Electrical Equipment Schedules

The Electrical Equipment (Disconnects and Starters) are scheduled in the “…MECHANICAL EQUIPMENT SCHEDULE…” and filtered per the “e_S_SCHEDULE KEY” parameter that has the default value of “”DISC/START”.

Fill out the appropriate information for each device.You should be able to edit all the parameter information until the device has been circuited.Some parameters will have a window for selection like “e_S_LOAD CLASS”.Confirm that the schedule is properly filled out prior to circuiting and use this schedule while circuiting.

How to Learn 3.3

Page 28: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Lighting Fixture Schedules

The Lighting Fixtures are scheduled in the “…LIGHTING FIXTURE SCHEDULE…”

Fill out the appropriate information for each fixture. You should be able to edit all the parameter information until the fixture has been circuited.Some parameters will have a window for selection like “e_S_LOAD CLASS”.Confirm that the schedule is properly filled out prior to circuiting and use this schedule while circuiting.

How to Learn 3.4

Page 29: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Lighting Devices Schedules

The Lighting Devices are scheduled in the “…LIGHTING DEVICE SCHEDULE…”

This schedule is primarily only used for trouble shooting the “e_S_LOAD CLASS” parameter when the Load Analysis on the Panel Schedule has additional classifications that you are not expecting.

You should be able to edit all the parameter information until the device has been circuited.Some parameters will have a window for selection like “e_S_LOAD CLASS”.

How to Learn 3.5

Page 30: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Feeder and Transformer SchedulesSchedules Keys

How to Learn 3.6

Page 31: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Embedded SchedulesPower Density Calculations / Fixture Counts / ComCheck

How to Learn 3.7

Page 32: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schedules: Schedule FormulasAddition— +

Subtraction— -

Multiplication—*

Division—/

Exponentiation—^: x^y, x raised to the power of y

Logarithm—log

Square root—sqrt: sqrt(16)

Sine—sin

Cosine—cos

Tangent—tan

Arcsine—asin

Arccosine—acos

Arctangent—atan

e raised to an x power—exp

Absolute Value—abs

How to Learn

The following are some sample formulas that use conditional statements.

Simple IF: =IF (Length < 3000mm, 200mm, 300mm)

IF with logical AND: =IF ( AND (x = 1 , y = 2), 8 , 3 )

IF with logical OR: =IF ( OR ( A = 1 , B = 3 ) , 8 , 3 )

IF with Yes/No condition: =IF (Long, 50, 60) where Long is a Yes/No parameter defined as Long = Length > 40

Embedded IF statements: =IF ( Length < 35' , 2' 6" , IF ( Length < 45' , 3' , IF ( Length < 55' , 5' , 8' ) ) )

3.8

Page 33: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Circuiting: General Circuiting

How to Learn 4.1

Page 34: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Circuiting: To Edit Existing Circuits

How to Learn 4.2

Page 35: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: General Panel Schedules

How to Learn 5.1

Page 36: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Electrical Settings

How to Learn 5.2

Page 37: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Load Classifications

How to Learn 5.3

Page 38: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Demand Factors

How to Learn 5.4

Page 39: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Demand Factors

How to Learn 5.4

Page 40: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Panel Schedules

How to Learn 5.5

Page 41: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Panel Schedules: Panel Schedules

Add Heating and Cooling Non-Coincident Load Calculations:http://www.screencast.com/users/MartinSchmidADSK/folders/Revit%20MEP/media/017e1720-9b7f-4ac8-a05c-3bba243800b3

Calculate Non-Coincident HVAC Load:if(HEATING Estimated Demand Current > COOLING Estimated Demand Current, COOLING Estimated Demand Current, HEATING Estimated

Demand Current)

Calculate Total Load - Non-Coincident HVAC Load:Total Estimated Demand Current - if(HEATING Estimated Demand Current > COOLING Estimated Demand Current, COOLING Estimated

Demand Current, HEATING Estimated Demand Current)

How to Learn 5.5

Page 42: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Families: General Family Editing

Shared Parameterse_S_ACTUAL WATTS Electrical

e_S_BRANCH Visibility

e_S_DESCRIPTION Electrical

e_S_LOAD CLASSIFICATION Electrical

e_S_MNTG. HEIGHT Contraints

e_S_MOUNTING Electrical

s_S_PANEL BRANCH Electrical

e_S_POLES Electrical

e_S_SCHEDULE KEY Electrical

e_S_TAG Contraints

e_S_VOLTS Electrical

How to Learn 6.1

Page 43: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Families: Special Family SettingsSpecific Families will require special settings to function.

e_S_BRANCH = if(CRITICAL, "C", if(LIFE_SAFETY, "LS", if(EQUIPMENT, "EQ", "N")))This parameter is used to change the color and filter of the families during the DD phase and then used as a quality control check when circuiting

in the CD phase.

e_S_SCHEDULE KEY This parameter is used by the schedules to sort and filter the appropriate equipment into different schedules. Disconnect and Starter Families = DISC/STARTTransformer Families= XFMRPanelboard = PNL

e_S_PANEL BRANCHApplies to Electrical Equipment (Panelboards, Transfromers, and Transfer Switches)e_S_PANEL BRANCH = if(CRITICAL, "CRITICAL", if(LIFE_SAFETY, "LIFE SAFETY", if(EQUIPMENT, "EQUIPMENT", "NORMAL")))

Fire Alarm Devices:This family has a visibility parameter to control the viewing of the area of coverage for the candela value.

Lighting Devices: Occupancy SensorsThis family has a visibility parameter to control the viewing of the area of coverage of the specific sensor.

How to Learn 6.2

Page 44: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Families: Copying from Web

How to Learn 6.3

Page 45: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Families: Manufacturer Revit FamiliesAcuity Brands Lighting (http://www.acuitybrandslighting.com/BIM)

Beta-Calco (http://www.betacalco.com/news/news-detail.php?id=31)

Cashman CAT Generators (http://www.cashmanequipment.com/BIM.htm)

Cooper B-Line (http://www.cooperbline.com/engineer/BIM/index.asp)

Eaton (http://www.eaton.com/EatonCom/Markets/Electrical/Tools/BuildingInformationModelBIM/DownloadableBIMFiles/index.htm)

Focal Point (http://www.focalpointlights.com/resources/BIM.html)

Hubbell (http://www.arcat.com/bim/clients/hubbell.html?coid=33138)

alternate site (http://www.hubbelllighting.com/resources/bim_files.php)

Kenall Lighting (http://www.kenall.com)

Lightolier (http://www.lightolier.com/resources/downloads.jsp#BIM)

Lutron (http://seek.autodesk.com/search/lutron?source=SearchBox)

Philips Day-Brite (http://www.daybrite.com/day-brite/BIMDownload.cfm)

Philips Ledalite (http://www.ledalite.com/service/revit)

Q-Tran (http://www.q-tran.com/3d-revit-files)

Siemon (http://www.siemon.com/us/download/bim.asp)

Visa Lighting (http://www.visalighting.com/site/res...ling-files-bim)

WattStopper (http://wattstopper.com/products/bim-resources.html)

MiscAutodesk Seek (http://seek.autodesk.com)

CADdetails.com (http://www.caddetails.com/2004/product.asp?itm=3dcontentlisting)

RevitCity.com (http://www.revitcity.com)

Reed Construction SmartBIM (http://smartbim.reedconstructiondata.com)

Not free Revit MEP familiesAndekan (http://andekan.com)

CADworks BIMXchange (http://www.cadworks.net/Revit.htm)

Mono-Systems Electrical fixtures (http://smartbim.reedconstructiondata.com/ObjectFinder.aspx#area=2&id=1775|ElectricalFixtures)

How to Learn 6.4

Page 46: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schematic Design (SD) PhaseAll Revit Projects: Yes there is work to be done in SD Phase to define efficient project workflow.1. Per Project Standards (Internally Defined):

a) Define Drafting Standards – Are there Sheets based Annotations / Notes or placed in working view?b) What Template files – does it need minor (or major) modifications?c) Is this a Revit Server Project for sharing outside of office?d) Who will be project BIM Manager?e) (Natural) Family Planning?

i. Make obvious family additions/deletions. ii. What symbols will be used for Life-Safety,

Critical and GFCIs and receptacles of variousheights.

iii. Are Panel Schedules sufficient? iv. Families need to be created?v. Tags to be created?

f) Are Device/Equipment Schedules sufficient?g) Do Legends & Details need to be put into Revit

Model?h) Do we need AutoCAD X-Ref’s linked in?

SD

Page 47: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Schematic Design (SD) Phase2. Per Project Standards (Externally Defined):

a) Establish interface with client and consultant BIM managersi. Critical relationship at beginning of project

b) Establish timelines and methods for model updatesc) Define who updates (BIM Manager) and were tod) Will the files be purgede) Issue / Revision Schedule format?f) View Creation / Modification

i. RCP’s necessary?ii. How many floor plans?iii. Working views vs. Sheet Views?iv. Scope Boxes?

g) Title Block / Key Plan format?h) Special formatting for sheet lists?

i. Will we have sheet list on our plans?ii. Will the architect automatically pull our sheet list to their file?

i) Default Plot settings/sheet size?

SD

Page 48: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Design Development (DD) PhaseDD Phase should be bulk of work effort if project is managed properly.1. Hosting Activities (hors d’oeuvres optional):

a) Lighting Fixture Selection and Hostingi. Select View and Roomii. Select fixture and host to ceiling grid

a. Flip across host plan (prior to hosting)b. Rotating on axis (Prior to hosting)c. Changing type (after hosting)

iii. Tag Lighting Fixturesb) Lighting Device Selection and Hosting

a. Switches

DD

Page 49: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Design Development (DD) Phase2. Electrical Gear Selection and Hosting:

a) Gear Selection and Hostingi. Transformers hosted to Floor

a. Flip across host plan (prior to hosting)b. Rotating on axis (Prior to hosting)c. Changing type (after hosting)

ii. Panel Boards hosted to Walla. Flip across host plan (prior to hosting)b. Rotating on axis (Prior to hosting)c. Changing type (after hosting)

iii. Gear Taggingiv. Create Panel Schedules and Place on Sheets

DD

Page 50: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Design Development (DD) Phase3. Electrical Device Selection and Hosting:

a) Electrical Device Selection and Hostingi. Receptacles hosted to Walls

a. Flip across host plan (prior to hosting)b. Rotating on axis (Prior to hosting)c. Changing type (after hosting)

ii. Disconnect Switches hosted to Walla. Flip across host plan (prior to hosting)b. Rotating on axis (Prior to hosting)c. Changing type (after hosting)

iii. Electrical Device Tagging

DD

Page 51: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Design Development (DD) Phase4. Schedule Management (Most Important Part of ALL!!!!!):

a) Lighting Fixture Schedulesb) Electrical Equipment Schedulesc) Electrical Device Schedulesd) Place Schedules on Sheet for Review

DD

Page 52: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Construction Documents (CD) PhaseCD Phase should be focused on confirming assumptions from DD for layouts, loads, and schedules, then circuiting, and finally QC if project is

managed properly.1. Powering Electrical Gear:

a) Power Equipmenti. Generate Wiresii. Circuit Modification

a. Delete Wires and Regenerateb. Modify Circuits by Combiningc. Modify Circuits by Removing

iii. Tagginga. Tag Wire Sizeb. Tag Home Runs

b) Review Panel Schedules / Analysis for Confirmation

CD

Page 53: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Construction Documents (CD) Phase2. Powering Lighting Fixtures / Devices:

a) Power Lighting Circuitsi. Generate Wiresii. Circuit Modification

a. Delete Wires and Regenerateb. Modify Circuits by Combiningc. Modify Circuits by Removing

iii. Tagginga. Tag Wire Sizeb. Tag Home Runs

b) Review Panel Schedules / Analysis for Confirmation

CD

Page 54: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Construction Documents (CD) Phase3. Powering Electrical Devices:

a) Power Electrical Devicesi. Generate Wiresii. Circuit Modification

a. Delete Wires and Regenerateb. Modify Circuits by Combiningc. Modify Circuits by Removing

iii. Tagginga. Tag Wire Sizeb. Tag Home Runs

b) Review Panel Schedules / Analysis for Confirmation

CD

Page 55: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Advanced Options4. Advanced Options (Project Standards):

a) Review Load Classifications and Analysisb) Concealed Conduitc) Voltage Dropd) Tick Marks

5. Feeder / Conduit Routing????6. NO WIRES!!!!! MAKE FOR FASTER PRODUCTION!!!!!

ADVANCED

Page 56: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

DEMONSTRATION

DEMONSTRATION

Page 57: S14 From Start to Finish Electrical How - To for Revit MEP Projects-Joe Kerfoot

Contact Joe [email protected]

QUESTIONS?