1
Outline
1.Origins: from ATS over Model Based Testing to MTSv2.0
2.Parts: the scope and content
3.Operation: how do the tests work?
4.Delivery
2
2
ORIGINSPart1
3
LPIS Workshop : Applications and Quality, 6-8 th October, 2009, Tallinn 4
Objective
Model Conformance TestConformance Statement (ICS)
Abstract Test Suite (ATS)
Data Conformance TestExecutable Test Suite
(ETS)Additional Information for Testing
Conformance Test Report
Analysis of results
Application Schema or
Feature Catalogue of the implementation
under test
ISO 19105 Conformance and testing
conformancefulfilment of specified requirements
conforming implementationimplementation which satisfies the requirement
3
LPIS Workshop : Applications and Quality, 6-8 th October, 2009, Tallinn 5
ATS Structure
Abstract test suite structureModules and tests: e.g.
Module A.1.1 can be assigned ‘Conformant’ value if one of the tests A.1.1.1.1 OR A.1.1.1.2 OR A.1.1.1.3 OR A.1.1.2.1 is
‘Conformant’
Test purpose: verify definition of reference parcel: reference parcel demarcated by the farmer, who
cultivates it (manage/execute his tenure rights: ownership, rent etc.) on multi-annual basis
Test method: Inspect the documentation of the application schema or feature catalogue, verify
consistency with ICS
ATS NOTE: Conformant with Farmer’s block definition
Test reference: LCM specification
Test type: Basic test
A.1.1Basic test
A.1.1.1 A.1.1.2
A.1.1.1.1 A.1.1.1.2 A.1.1.1.3 A.1.1.2.1
Baveno 2015
ABSTRACT & EXECUTABLE TEST CASES act Prepare MTS executable test cases within ETS su ite
MS Testing labaratory
Integrated
administration and
control system :
Perform MTS
Prepare schema definition tests
Prepare extended code list tests
Prepare: encoding tests
Prepare feature type completeness tests
Prepare: attribute / association
completeness tests
Prepare: multiplicity tests
Prepare: value type tests
Prepare: constraint tests
Startpreparingexecutabletest cases
Finishpreparingexecutabletest cases
«FeatureType»Base types::ExecutableTestCase
«FeatureType»Base types::AbstractTestCase
Retrieve all abstract test cases
Retrieve: eligibility profile
documentation
«FeatureType»Quality assessment framework::
MtsItemUnderInspection
Prepare schema mapping test
«trace»
«trace»
«trace»
«trace»
«trace» «trace»
«trace»
«trace»
«trace»
«trace»
BASIS GML...
6
4
Baveno 2015
MODEL BASED TESTING MESSAGES
MTS outputs:LOG of conformance assessment
FAIL: The source element (x) do not have corresponding target element.
FAIL: The type of target element (x) do not match the type of source element (x).
FAIL: The target element (x) do not have documentation.
FAIL: The multiplicity of target element (x) do not match the multiplicity of source element (x).
....
TESTING REPORT of conformance testing.... Overall testing report:
Application schema: (FAIL/PASS)Leaf: (FAIL/PASS)Feature type: (FAIL/PASS)Type: (FAIL/PASS)Data type: (FAIL/PASS)CodeList: (FAIL/PASS)Union: (FAIL/PASS)Enumeration: (FAIL/PASS)Property (classes): (FAIL/PASS)Relationships: (FAIL/PASS)Generalization: (FAIL/PASS)Assosciation: (FAIL/PASS)Aggregation: (FAIL/PASS)Composition: (FAIL/PASS)Property (Relationships): (FAIL/PASS)
7
Baveno 2015 WS and later
1. during the WS:� lot’s of feasibility concerns expressed by MS
� three volunteers: DE, HU and ES
2. meeting in ISPRA (April 2015):� Result of tests by the volunteers
� Main issues:
• Eligibility profile: catalogue of LC types > set of all system choices,
• MTS scope too broad: MMU, EFA
• LCM bases tests might require database redesign or SW recoding
• Implementation: software, user interface, cost-efficiency,
multilingual support
3. formal request to downsize UML on TG ETS (June 2015)4. ….and then everybody became busy (Autumn 2015+).
8
5
PARTSPart2
9
Information on implementation choices: TG IXITimplementation extra information for testing
Why TG IXIT?
The ETS inspection procedure was conceptually quite simple:1. Detect critical defects
2. Map agricultural land of the RP that is physically visible
3. Compare observations with SUT records
4. Perform pass/fail test for 5 quality expectations
But over time, upon request of the MS, a number of design dependencies were introduced in the procedure for:
• CD application• waiver use• contamination
The module A111 was no longer sufficient� structured approach needed
10
6
Data model test
Why data model tests?Support correct mapping of SUT to the TG ETS documentation1. the scoping query of the RP population
� “reference parcel”
� “non-zero MEA”
� “declared last year for direct payment”
2. The comparison of ETS observations� “recorded referenceArea”
3. The correct reporting and data exchange� lpisPointZerostate.gml
� lpisPolygonZerostate.gml
� updateEvidence.xml
If not correctly done: � comparing apples to pears
11
MetadataWhy metadata?
� Not new, first initiative in 2009 Sofia WS
(start LPIS QA portal)
� Annual questionnaire of DGAgri
� ECoA questionnaire
What is asked?� Not the INSPIRE metadata record for
cataloguing, but selected elements thereof.
� What is needed for understanding SUT
during screening
� “LPIS” + supporting sources (ortho/DEM)
This is the more dynamic part of TG MTS � standalone report: metadata.xsd
12
7
OPERATIONPart3
13
Performing the IXIT
What are the key Regulation choices (features) of an LPIS design?� A Who authors the primary RP boundary, the perimeter of the
identified unit of land? � defines the reference parcel type
� B What process delineates the physical borders of the agricultural
land (generate the MEA/referenceArea)?
� C How are eligible landscape feature (under GAEC) adjudicated?
� D How are RPs assembled (optional further processing choices)?
� E Is there pro rata reduction on PG with scattered ineligible features?
� F Is there (Y/N) validation evidence of the required positional
accuracy requirements for each individual reference parcel perimeter?
by 6 poly(cho)tomy questionnaires A to F
� Each SUT is described by 6 adjectives
14
8
Data model tests 1
Based on model testing methodology with 3 abstract test cases
1.featureTypeCompletness : Is this spatial object represented?
2.attributeTypeCompleteness: Does it have this information element?
3.codeListEnumerationCompleteness: Does it respect conventional naming?
Is the list complete?
“this spatial object”, ”this information element”, “naming” are abstract parameters. To obtain executable tests they need to appropriately rephrased in terms of both
� ETS data element (e.g. referenceParcel, referenceArea, CP)
� SUT (is “it” a feature type, an attribute, a method (combination, query)?)
The description of the 41 ETS data elements is stored in � UML (online)
� An xls log file15
Data model tests 2
To generate the SUT contribution to generate your 41 executable
tests, revise your 2010 ATS archive package, in terms of either� The SUT feature catalogue
� The SUT application schema
DG JRC already proposes 41 “starter” executable tests.
But then comes the tricky part:� Each starter’s may work “as is” for your SUT
� But “it” may not work for your SUT, in which case you will need to
rephrase that executable test to obtain the correct result
If not:
� you could test pears disguised as apples > papple!
� your ETS results become unreliable, i.e. non-conforming!
16
9
Data model tests: an exampleLCM refers to1. an area value2. in hectares3. as maximum for DP-payment≡ input for IACS process
LPIS 2012 answer describes 1. an area value √2. in hectares √3. polygon of eligible land Х≡ output of a mapping process
This is a partial match� Potentially incorrect as it
misses the reference to DP application/payment
Example (LCM)
referencedAbstractTestCaseId 14
executableTestCaseId 1412
executableTestName checkReferenceArea
referencedAbstractTestCaseName attributeAndAssociationCompleteness
executableTestResultDescription
Feature class "referenceParcel" within
LCM has attribute field "ReferenceArea".
Value in this field corresponds to the
maximum area, for which an application
can be made and it is reported in
hectares
Example (LPIS 2012)
referencedAbstractTestCaseId 14
executableTestCaseId 1412
executableTestName checkReferenceArea
referencedAbstractTestCaseName attributeAndAssociationCompleteness
executableTestResultDescription
Feature class "ELG_AREAS" within SUT
has attribute field "GR_AREA". Value in
this field corresponds to the total
geometric area of all polygons
representing eligible lands (GAC
compliant) for a given reference parcel
and it is reported in hectares
consequence of incomplete matchfree adaptation from various real experiences
1. How to scope (non-zero MEA)?� No problem if there are no other mechanisms between this eligible area
and pre-printed form/crosscheck/payment
� But what if “eligible area” includes to 2nd pillar conditions?
� JRC: “wrong scoping”
� MS: “no problem, because not available for payment”
� JRC: sample size not respected (650 + 150 ≠ 800 )
2. How to assess observed area conformity?� No problem if “eligible area” relates to all 1st pillar conditions
� But in this case:
• MS: “Pre-printed form populated with last year application area”
• MS: “crosscheck done with intersection of AP and RP”
� MS: “no problem because no impact on payment”
� JRC: LPIS is not performing its basic roles at all! 18
10
Metadata collection setup
This is a data model test, but reference descriptions located in:• Not LCM• Inspire Implementing Rules on metadata• Inspire Common Data Specification for orthoimagery (CP, DEM)• Ad hoc: ixitQualifier, sensorPlatform, demPlatform
Why different reference models and templates?The LPIS (perimeter1 and/or border2) vector data
supported by orho-imagery3
supported by digital elevation model4 (DEM/DSM)
Expectation: 2-4 or more metadata records in 2 data formats:� Vector
� Raster/grid
19
Metadata content
For each named dataset (from IR MD):temporalExtent/phenomenonTime: to which time period it refers to?
resourceLocator: where does it reside?
identifier: what’s its content/role?
lineage: what is the production line?
spatialResolution: what scale or GSD?
responsibleParty: who’s behind?
metadataPointOfContact: who to contact?
The regulations imply at least two metadata records1.LPIS: the vector dataset of polygons that hold MEA > 0
2.orthoimagery: the background(s) used during the assessment year
But applicable third party geospatial data (cadastre / land cover / dem) also need to be reported.
20
11
MTS dynamics
IXIT, data model and LPIS vector metadata relate to a single SUT (≡lot) that is subject the TG ETS
� TO DO for 2016� Until upgrade: only temporalExtent will be dynamic through update
Aerial imagery is often subject to a 3 year update cycle � one record by separate specification/lineage/contractor� annual deliveries (and geographic extent) are not requested
Supporting and Source data are independent� Monitor the update of these external sources
21
2016 DELIVERYPart4
22
12
Typical MTS data volumes
TG IXIT: 6 values (outcomes)
Data model test 41 values (local references/descriptions)41 x 4 codes (internal date/pass)
Metadata 10 values/codes x 3 (vector/ortho/source)
GRAND TOTAL 6 + 41 + 30 ≈ 80 values
23
MTS package and update deliveryDeadlines:
MTS package is synchronous with ETS reporting package.
Data exchange:
For 2016 (@31 Dec 2017) 1st complete delivery: 2 options• Either 3 xsd’s package upload (benefit: immediate validation by portal)
• Or 1 xls followed by manual entry in LPIS QA portal (disadvantage: 2 edits)
After upgrade of SUT (@31 Dec 2018,2019,2020): package re-upload
After update of dynamic data values (@31 Dec 2018,2019,2020) for� temporalExtent of SUT� change of image specification/lineage/contractor� change of third party metadataUpdate of affected values via LPIS QA portal application
24
13
Questions?
25