100+10.00 - 103+00.00
FROM STA. TO STA.
4" YELLOW LINE (D0UBLE)
AT STA. 101+97 TO STA. 102+48 RT.
THE FOUR (4)GRANITE POSTS LOCATED
THE CONTRACTOR SHALL NOT DISTURB
NOTE:
RETAIN
R 16.0’
100+10.00 RT - 103+00.00 RT
100+10.00 LT - 103+00.00 LT
FROM STA. TO STA.
4" WHITE LINE
100+10.00 - 100+60.00
FROM STA. TO STA.
COLD PLANING, BITUMINOUS PAVEMENT
101+63.00 LT (WIDTH 10’)
CONSTRUCT DRIVE (GRAVEL)
R 16.0’
BARN
GUY
WIRE
BM#1
ALDERS
ALDERS
GRAVEL
DRIVE
SIGN
HCTRL
COMB
7/59.9
COMB 7
GARAGE HOUSE
STONE POSTS
NAIL IN POLE COMB #7
ELEV. 601.89
B.M. #1
18" CMP
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
100+00 101+00 102+00 103+00
100+00.00
POB
ANC.
12’
12’
ANC.
STA. 101+35.00
BEGIN PROJECT
STA. 100+10.00
BEGIN APPROACH
SOUTH TO BARNARD
VT ROUTE 12N 12°12’28.68" E
N
VT STATE P
LANE GRID
N
VT STATE P
LANE GRID
SCALE 1" = 20’-0"
20 0 20
MA
TC
H
LIN
E S
TA. 10
3+00.0
0
31-AUG-2011
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF11 64
BETHEL
sc002bdr.dgn
M. EVANS-MONGEON
U. STANLEY
G. ROKES
U. STANLEY
LAYOUT SHEET 1
BHF 0241 (30)
SHEET MODEL "LAYOUT 1"
7
77
HH
4D
b
Y
HH
D
STA. 106+31.00 RT 18’(GREEN)
STA. 106+25.00 LT 18’(BLUE)
STA. 104+15.00 RT 18’(BLUE)
STA. 103+88.00 LT 18’(GREEN)
DELINEATOR WITH STEEL POST
105+89.08 - 106+18.50 RT
105+78.17 - 106+07.58 LT
104+39.78 - 104+69.20 RT
104+28.79 - 104+58.29 LT
FROM STA. TO STA.
GALVANIZED NETC 2 RAIL
GUARDRAIL APPROACH SECTION,
104+69.20 - 105+89.08 RT
104+58.29 - 105+78.17 LT
FROM STA. TO STA.
BRIDGE RAILING, GALVANIZED NETC 2 RAIL
INDICATED.
ALL TIMES. THE FLOW OF DITCH IS AS
DITCH TO BE FREE OF OBSTRUCTIONS AT
THIS INCLUDES THE PIPES OVER FLOW
FLOWING AT ALL PHASES OF THE PROJECT.
STA. 104+23.00 (58.0 RT)TO BE FREE
FROM STA. 103+92.00 (61.0 RT)TO
WATER OVER FLOW PIPE AND SUMP LINE;
THE CONTRACTOR WILL ALLOW THE WELL
NOTE:
103+00.00 - 108+00.00
FROM STA. TO STA.
4" YELLOW LINE (DOUBLE)
L
EXISTING BRIDGE DATA
SIMPLE SPAN WITH CONCRETE DECK
YEAR BUILT: 1939
CLEAR SPAN: 58 FT.
VERTICAL CLEARANCE: 9.5 FT.
WATERWAY OF FULL OPENING: 440 SQ. FT.
EXISTING BRIDGE RAIL: TEMPORARY CONCRETE BARRIER
R 16.0’R 16.0’
105+73.00 - 105+86.00 RT
105+51.00 - 105+63.00 LT
104+47.00 - 104+89.00 RT
103+73.00 - 104+67.00 LT
FROM STA. TO STA.
REMOVAL AND DISPOSAL OF GUARDRAIL
106+37.00 RT
106+28.00 LT
104+20.00 RT
103+85.00 LT
ANCHOR FOR STEEL BEAM RAIL VT 12
103+28.50 RT (WIDTH 12’)
CONSTRUCT DRIVE (GRAVEL)
106+18.50 - 106+42.30 RT
106+07.58 - 106+28.22 LT
104+15.42 - 104+39.78 RT
103+80.00 - 104+28.79 LT
FROM STA. TO STA.
STEEL BEAM GUARDRAIL, GAVANIZED VT 12
103+00.00 RT - 108+00.00 RT
103+00.00 LT - 108+00.00 LT
FROM STA. TO STA.
4" WHITE LINE
103+89.10 34.93 RT
103+49.93 24.65 RT
STA. OFFSET
TRANSPLANTING SHRUBS
HOUSE
WELL
GUY
WIRE
SHRUB
S.POP
S.ELM
S.POP
LOCUST CREEK
MM 0120/
1404/0100
WOODS
GRAVEL
DRIVE
HCTRL
HCTRL
HCTRL
COMB 1/2/59-6
COMB6/4/9-7
9
D
4
D
(TRANSPLANT)
LILAC
(TRANSPLANT)
SHRUB
SUMP LINE
WATEROVER FLOW
12" CPEP
EXISTING ROW
EXISTING ROW EXISTING R.O.W.
EXISTING R.O.W.
103+00 104+00 105+00 106+00 107+00 108+00
200
+00
200
+65
400+00
402+75
402+00
401+00
ANC.
ANC.
12’
RETIRE
RETIRE
14’
12’
ANC.
TEMPORARY DETOUR LIMITS
(TYP.)
TEMPORARY DETOUR C
STA 104+62.87
BEGIN BRIDGE
STA 105+83.42
END BRIDGE
~ = 55.000°
CHANNEL STA 401+00.00
MAINLINE STA 105+90.00=
N 12°12’28.68" E
AT 90°(RIGHT)
AND DRIVE 200+00.00
VT 12 STA.103+28.50
DRIVE INTERSECTION
N
VT STATE P
LANE GRID
SCALE 1" = 20’-0"
20 0 20
MA
TC
H
LIN
E S
TA. 10
3+00.0
0
MA
TC
H
LIN
E S
TA. 10
8+00.0
0
12 64
BETHEL
sc002bdr.dgn
M. EVANS-MONGEON
U. STANLEY
G. ROKES
U. STANLEY
LAYOUT SHEET 2
31-AUG-2011
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
BHF 0241 (30)
SHEET MODEL "LAYOUT 2"
b
YY
H
HH
b
YY
H
H
H
V
b
108+00.00 - 109+50.00
FROM STA. TO STA.
4" YELLOW LINE (DOUBLE)
MA
TC
H
LI
NE
ST
A. 108
+00.00
108+00.00 RT - 109+50.00 RT
108+00.00 LT - 109+50.00 LT
FROM STA. TO STA.
4" WHITE LINE
M.PINEBM#2
SIGN
SIGN
2-MM
HCTRL
EXISTING
GUARD RAILCOMB 3/5
D
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
B.M. #2
NAIL IN M.PINE
EL=590.621
CONCRETE
BOUND
IP
CONCRETE
BOUND
B
108+00 109+00 109+84
109
+84.25
PO
E
ANC.
12’
NEW P.B.
STATION 108+25.00
END PROJECT STATION 109+50.00
END APPROACH
N 12°12’28.68" E
VT ROUTE 107
NORTH TO BETHEL/
VT ROUTE 12
N
VT STATE P
LANE GRID
SCALE 1" = 20’-0"
20 0 20
13 64
BETHEL
sc002bdr.dgn
M. EVANS-MONGEON
U. STANLEY
G. ROKES
U. STANLEY
LAYOUT SHEET 3
31-AUG-2011
DESIGNED BY:
PROJECT LEADER: DRAWN BY:
PLOT DATE:
CHECKED BY:
PROJECT NAME:
PROJECT NUMBER:
FILE NAME:
SHEET OF
BHF 0241 (30)
SHEET MODEL "LAYOUT 3"
77 HH
7
b
S2
YY
YY