  • 7/30/2019 SA Painting

    1/11

    From To

    Divisional Engineer

    EM & MRT

    KTPS V Stage

    Dear Sir,

    S.No Description Qty

    1 Inspection of 6.6KV,1500KW PA 9A Motor internals and Replacement

    of motor with spare motor if necessary.

    The work involves decoupling of Motor, removing the cable connections,

    dismantling the motor, checking of bearings, replacement of bearings if

    necessary, Checking of the stator & rotor,Replacement of the motor with

    spare one if necessary, conducting trial run and painting of motor including

    alignment and assembling the existing motor in complete shape after

    rectification if any.

    1 Nos

    Note APGENCO TERMS AND CONDITIONS APPLICABLE

    EPF,GI& service tax Extra.

    DIVISIONAL ENGINEER

    EM&MRT/KTPS V

    PALONCHA.

    Enq.No:04/07:DE/EM & MRT/KTPS V/Sub-Div: EM -1/D.No: 4/07, Dt: 25.07.2007

    Sub: EM & MRT/KTPS V-Inspection of 6.6KV,1500KW PA 9A Motor

    Internals and Replacement of motor with spare motor if necessary-reg

    Sealed quotations are invited for the following works so as to reach this office on

    or before 03:00 PM of Dt: 25.07.2007

    The quotations shall be super scribed with Enquiry No: and Date of opening and

    will be opened on the same day at 17:00 hrs.

  • 7/30/2019 SA Painting

    2/11

  • 7/30/2019 SA Painting

    3/11

    SCHEDULE OF WORK

    S.No Description Qty

    2 Letters with black paint on white back ground

    ( US 9A(B),US 9B(B) and US 9B(T) Boards) &Local push buttons of HT motors) Size less than

    1436 Nos.

    Note:-

    2. Department is not responsible for any accidents to the labour engaged

    4. APGENCO rules and regulations are applicable

    DIVISIONAL ENGINEER

    EM&MRT/KTPS-V Stage

    PALONCHA.

    1.The work should be take up immediately after issuing PLOI

    3.Required material like paint ,brushes and other consumables have to be

    purchased by the contractor only.

    Name of the work:Painting & Lettering of 6.6 KV US 9A(B),US 9B(B) and US

    9B(T) Boards

    1 Painting of outer surface of 6.6 KV US

    9A(B),US 9B(B) and US 9B(T) Boards with

    two coats of opaline green enamel paint.

    Opaline green enamel paint area (US 9A(B),US

    9B(B) and US 9B(T) Boards)

    365 Sq.Mtrs

  • 7/30/2019 SA Painting

    4/11

  • 7/30/2019 SA Painting

    5/11

    Detailed Estimate

    Name of the work : Writeing of slogans Boards at various locations of KTPS-VI Stage.

    1 Painting of surface of slogan ( Boards/wall)

    with two coats of opaline yellow enamelpaint.

    400 47.14 4.714 51.854 20742 2822.932 757.0684 WE.No.752 / 11-

    12

    2 Letters with black paint on opaline yellow

    back ground for safety slogans plant wise Size

    less than 100mm

    1600 4 0 4 6400 871.04 233.6

    W.E.NO.

    752 /11-

    12

    3 Cost of the paint to be supplied by the

    Contractor for 500 Sq.mtrs ( opaline yellow

    enamil paint)

    400 15.37 1.53 16.9 6760

    W.E.

    No.752/1

    1-12

    Total 33902 3693.972 990.6684

    ANNEXURE

    Sl. Description1 Labour Inclusive of Supervision charges

    2 Material

    3 Consumables to be su lied b the contractor4 Provision towards EPF:5 Provision towards GI:

    6 Service tax@ 10.3% on Sl.No. ( 1 )

    Total: Rs:

    Say Rs. = (Rupees Forty One Thousand Three Hundred Eight Two only )

    The new labour rate are corporated in the estimate Vide Memo.No.D(HR)/LO/PO/71/2012-1,dated 28-03-2012

    Rema

    rksSl.

    No

    Description of work Qty intimes

    Basic

    Wages

    Provision

    towards

    EPF (Qty x

    BW x

    13.61%

    Provision

    towardGI

    (Qtyx BWx

    3.65%)

    Supervisi

    on

    charges

    (SC)

    Refere

    nces

    Amount27141.6

    0

    Total

    Rate per

    (BW +

    SC)

    Total

    amount

    (Rs.)

    41382/-

    6760

    ide M

    3693.97176

    990.6684

    2795.5848

    41382

  • 7/30/2019 SA Painting

    6/11

    DATA SHEET

    1. a) Basic wages for one coat of Red Oxide paint

    1) 0.2 MD (mandays) Painter Ist class 310.70 62.14

    2) 0.5 MD(mandays) Painter IInd class 253.00 126.50

    1) 0.3 MD (mandays) Painter Ist class 310.70 93.00

    2) 0.75 MD(mandays) Painter IInd class 253.00 189.75

    Total cost of labour charges for 10 squre mtrs 471.39

    47.1418856

    2. Lettering with black paint on white background

    Description Letters Rate per Amount

    Rs.1600 4 6400

    SSR of civil /Item-231/page 44letter cost less than

    100mm

    Total cost of labour charges for 1 square mtr. Rs.=

    b) Basic wages for two coats of Enamil paint

    Total cost of labour charges for 400 square mtr. Rs.=

  • 7/30/2019 SA Painting

    7/11

    47

    97.5

  • 7/30/2019 SA Painting

    8/11

    From To

    The Divisional EngineerSafety/ KTPS -V&VI Stage

    New Paloncha - 507115

    Enq.No 6/2012-13 of CE/O&M/KTPS-VI STAGE/Safety/F.No.Dkt/D.No. /12dt 14-06-

    TERMS AND CONDITIONS:

    07. The work shall be carried out strictly as per the specification and instructions of departmental

    Engineer and to their entire satisfaction.

    08. The power supply will be made available at free of cost to one point only.

    09. The work should be commenced immediately

    01. The contractor is expected to inspect the equipment/ site before quoting and to

    evaluate the quantum of work.

    02. The Chief Engineer/O&M / KTPS-V&VI Stage reserve the right to reject any or all other with

    out assigning any reason therefore.03. The APGENCO is not responsible for any accident to the workers employed by the contractor

    and the contractor has to indemnity the APGENCO from the obligation of paying any

    compensation to workers employed by the contractor on account of accident what so everduring

    the course of the work and during the period of contract.

    04. If there is any loss to the APGENCOs property due to negligence of the workers employed

    by the contractor, the contractor has to make good the loses as assessed by the DE/Safety/ KTPSV

    & VI.

    05. Any materials to be supplied by the APGENCO will be handed over to the contractor at

    Departmental stores and the transportation is to be arranged by the contractor himself only.

    06. The work should be guaranteed for a satisfactory performance for a period of six months from

    the date of completion of work.

    ANDHRA PRADESH POWER GENERATION CORPORATION

    LIMITED

    KOTHAGUDEM THERMAL POWER STATION::STAGE-

    VI::1X500MW:: PALONCHA.

    Sub: - KTPS-VI Stage,safety slogans sign board ,fixing of slogan's at various

    locations for safety awareness-reqest-regard.

    *-*-*-*

    Quotations are invited for the above subject work as per schedule so as to reach this

    office at 16:00hrs. On or before 21.06.2012

  • 7/30/2019 SA Painting

    9/11

    TERMINATION OF CONTRACT:

    S,NO Qty Rate Per Amount

    1

    2

    3

    4

    5

    6

    7

    8

    SAFETYI/KTPS STAGE - V&*VI

    NEW PALONCHA

    Sticking or lettering with safety

    slogans.

    DIVISIONAL ENGINEER

    Transportation of plate from stores

    to location.

    30 Jobs

    Cleaning the M.S. plate.

    Making scaffolding if necessary.

    Cutting the plate by 0.5mx1.5m sizeSetting, posting and welding the

    plate at location.

    Cleaning the surrounding area.

    Painting the plate/painting the wall

    with border.

    Engineer/O&M/KTPS-V &VI Stage may terminate the contract giving (3) days notices. The order

    of the Chief Engineer/O&M/KTPS-VI is final and binding on the contractor no dispute will be

    11. Any work to be done to obtain as responsibility of facility for carrying out the works

    mentioned in the schedules will be treated as part of the main work mentioned in the schedule. No

    separate claim for such works will be entertained.

    Schedule of work

  • 7/30/2019 SA Painting

    10/11

    12

  • 7/30/2019 SA Painting

    11/11