safe and secure public transport

37
May 29, 2008 1 SAFE AND SECURE PUBLIC TRANSPORT E-DOCA & DOCA AMSTERDAM Prof. Ir. Johan W. Bosch Chair of Underground Space Technology Social safety: Case Amsterdam metro system.

Upload: others

Post on 03-Feb-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

May 29, 2008

Vermelding onderdeel organisatie

1

SAFE AND SECURE PUBLIC TRANSPORT

E-DOCA & DOCA

AMSTERDAM

Prof. Ir. Johan W. Bosch

Chair of Underground Space Technology

Social safety:

Case Amsterdam metro system.

May 29, 2008 2

Social safety

Case Metro system Amsterdam.

• Metro plans• Lessons learned East metro line• Basic principles North/South metro line• Social safety: other concepts / systems

May 29, 2008 3

1964

Main network

Additional network

Study of network

2013

May 29, 2008 4

Social safety : case

Metro East line principles (1970’s):• Functional design• More civil engineering than architecture• Strong appearance, “built to last”• Transfer between transport systems without crossing

the street: • Relatively large number of entrances• Large intermediate levels

May 29, 2008 5

Metro Amsterdam: central station

Platform

May 29, 2008 6

Metro Amsterdam: Weesperplein station

Platform

Exit

May 29, 2008 7

Metro Amsterdam: Weesperplein station

Control line

Transfer hall

May 29, 2008 8

Metro Amsterdam: Weesperplein station

Plan

May 29, 2008 9

Exit

May 29, 2008 10

Entrances

Old

Modified

May 29, 2008 11

Entrance

May 29, 2008 12

Entrance

May 29, 2008 13

Station Nieuwmarkt

May 29, 2008 14

May 29, 2008 15

May 29, 2008 16

Lessons learned

Metro east line Amsterdam:• No or insufficient overview• Spreading of the passengers• (To) Many entrances/exits• Maintenance difficult due to chosen materials• Many control lines• Many places to hide• Loss of direction for the passenger

May 29, 2008 17

North South metro line

May 29, 2008 18

• 200.000 passengers / day

• 9 km long new infrastructure

• 6 km subsurface

• 4 complex deep stations

• 2x3 km single track twin bored tunnels

• in operation: 2013

The Project: key figures

May 29, 2008 19

South Inner City North

Twin bored tunnelsIn situ tunnel LevelIn situ tunnel

caissonsimmersed tunnel

Overview of the construction methods

May 29, 2008 20

Vertical alignment bored tunnels

May 29, 2008 21

North/South metro line

• Overview, logical layout• No thinning of the passengers• Maintain orientation and sense of direction• Clear control line• Same layout for different stations• If possible: day light at exits• Finishing materials that can be maintained

May 29, 2008 22

Station Rokin

May 29, 2008 23

Entrance Rokin station

24

May 29, 2008 25

Platform design

May 29, 2008 26

Station Ceintuurbaan

May 29, 2008 27

Social safety: other concept

• Metro Sur• Space• Colors• Double track tunnels: side platforms

• Japan, South-Korea• Construction technology decisive

May 29, 2008 28

Metrosur

May 29, 2008 29

Metrosur

May 29, 2008 30

Metrosur

May 29, 2008 31

Metrosur

May 29, 2008 32

Metro Seoul, Korea

May 29, 2008 33

Metro Seoul, Korea

May 29, 2008 34

Metro Moscow, Russia

May 29, 2008 35

Metro Moscow, Russia

May 29, 2008 36

Metro Moscow, Russia

May 29, 2008 37

Metro Moscow, Russia