safe nuclear energy better life - snptc.com.cn · an integrated gen iii npp equipment supply chain...

17
SNPTC State Nuclear Power Technology Corporation SAFE NUCLEAR ENERGY BETTER LIFE

Upload: nguyenliem

Post on 05-Sep-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Contact us

86-10-58197001 86-10-58197002

Address: Building No.1, Compound

No.29, North 3rd Ring, Xicheng

District, Beijing 100029, P.R. China

http://www.snptc.com

SNPTCState Nuclear Power Technology Corporation

SAFE NUCLEAR ENERGY BETTER LIFE

Shandong Haiyang NPP

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

1

CONTENTS

ABOUT US 01OUR BUSINESS

NUCLEAR POWER 04NPP INVESTMENT AND OPERATION

NPP R&D AND DESIGN

NPP EPC

NPP INDUSTRY CHAIN

NPP OPERATION SERVICE

THERMAL POWER 20

POWER GRID 22

RENEWABLES 24

GLOBAL MARKET 26

ABOUT USState Nuclear Power Technology Corporation (SNPTC),

a SPIC Group Company.

Major nuclear power operator and supplier, leading

GEN III nuclear power technology developer, NPP

EPC and services contractor.

Global EPC and services contractor of thermal, solar

and biomass power plant, ultra-high voltage power grid.

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

2 3

OUR BUSINESSA COMPLETE NUCLEAR, THERMAL,

GRID AND RENEWABLE SOLUTION

PROVIDER.

NPP R&D AND EPC R&D and EPC of CAP1400 FOAK NPP

EPC of the world’s first batch of AP1000 NPPs

NPP Investment and Operation

GEN II+ Hongyanhe NPP

AP1000 Haiyang NPP

CAP1400 Shidao Bay NPP

Siting

NPP-related Equipment Manufacturing

AP/CAP steel containment vessel and modules

Sponge zirconium and hafnium

DCS of NPP

NEQ

Design & EPC of Thermal Power / Grid / Renewables

EPC of thermal power , grid and renewable

Thermal power and renewables operation and service

NPP Operation Service

Lifetime maintenance

One-stop supply

A la carte choices

Fundamental Research on Nuclear Power Technology

R&D of the GEN IV reactor

Development and application of reactor core design and analysis software

Global sourcing platform for AP/CAP NPP

R&D, engineering of China mainland’s first NPP - Qinshan NPP

R&D of China's first exported NPP - Chashma NPP

5 DESIGN & RESEARCH INSTITUTES10 NUCLEAR POWER

PLANT COMPANY

3 EQUIPMENT MANUFACTURING 2 ENGINEERING

COMPANY

2 SERVICE COMPANY

NUCLEARPOWER

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

4 5

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

6 7

CAP1400 SHANDONG SHIDAO BAY NPPMajority-owned by SNPTC, construction of 2 CAP1400 units at Shidao Bay, Rongcheng Shandong province in China.

AP1000 SHANDONG HAIYANG NPP

Majority-owned by SNPTC sited in Haiyang

Shandong province in China. At present,

Phase I project (a total of 2 units), which

is the world’s first AP1000 NPP is under

construction. The preparatory work for Phase

II project (a total of 2 units) is also underway.

GEN II+ LIAONING HONGYANHE NPP

Proportional holding investment by SNPTC

and CGN, and sited in Hongyanhe Liaoning

province in China. At present, the Phase I

project (a total of 4 units) has been put into

commercial operation. The Phase II project is

constructed as scheduled.

NPP INVESTMENT AND OPERATION

Holding Capacity of

Operating Units

4.48GWe

Holding Capacity of units

Under Construction

GWe4.74

Nuclear Power Projects

16

HUNAN HUANAN

GUANGXI

GUANGXI GUANGDONG

CHONGQING

SHANDONGSHANDONG

LIAONING

LIAONING

JILIN

HUBEI

FUJIAN

GUANGDONG

JIANGXI

ZHEJIANG

NPP R&D AND ENGINEERING

CAP1400 — THE WORLD'S LARGEST PASSIVE NPP

WITHOUTOPERATOR’SACTION IN

HOURS72CAP1400 applies passive safety system. Under station blackout condition, the reactors can safely shut down automatically without operator’s action within 72 hours.

DESIGN LIFE

YEARS60Design life of CAP1400 NPP and its main equipment is 60 years. The equipment is easier to operate and maintain.

SERIOUS ACCIDENTS PROBABILITY IS REDUCED

TIMES100

ANNUAL POWERGENERATION PER UNIT

BILLION kWh11.4

Output power is 1500 MWe, and each unit’s annual power generation

reaches 11.4 billion killowatt-hour.

OUTPUT POWER

MWe1500

GREATLY SHORTENNPP’S CONSTRUCTIONPERIOD TO

MONTHS48CAP1400 adopts modularization construction, which can greatly shorten NPP construction period to 48 months by fleet construction.

In February, 2016, National Nuclear Safety Administration ratified the safety review conclusion of CAP1400.

In April, 2016, IEAE Submitted Final Report on CAP1400 GRSR.

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

8 9

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

10 11

NUCLEAR INDUSTRY TECHNICALSUPPORT PLATFORM

TEST AND VERIFICATION

PLATFORM

The world's leading GEN III NPP test

and verification platform is consist

of 6 key test loops, fully verifies the

safety of CAP1400

SNPTC has established a complete scientific covering 12 key technologies, with

4 national-level, 7 province-level scientific research institutions, 8 subordinates

of national certified high and new technology enterprise, about 9000 R&D and

design staff.

COSINE SOFTWARE

PACKAGE

China's first set of GEN III

design and safety analysis

of software package with

complete independent

intellectual property rights

EQUIPMENT

AND MATERIAL

QUALIFICATION

PLATFORM

International first-rate NPP

Equipment and Material

Qualification Platform, meeting

the requirements of GEN III

NPP related equipment and

materials

DIGITAL CONTROL

SYSTEM

Nu series of NPP digital

control system, which can

control more than 300

systems, nearly ten thousand

sets of equipment

©SNPTC 2016. All rights reserved.

形成完整的“Nu系列”核电站数字化仪控系统

控制系统平台

堆内测量和堆外核测系统 棒控棒位系统

核电站全范围模拟机

辐射监测系统

新一代基于FPGA技术的反应堆保护系统平台

核电站特殊监测系统和地震监测系统

多样化驱动系统平台

® ®

®®®

®®

国核自仪主要产品介绍

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

12

NPP EPC

THE WORLD'S FIRST BATCH OF AP1000 PROJECTS

SNPTC HAS THE ABILITY TO BE A MAIN CONTRACTOR

FOR ENGINEERING, PROCUREMENT, PROJECT

MANAGEMENT, CONSTRUCTION AND COMMISSIONING

OF NPP.

Zhejiang Sanmen NPP

unit 1 will be connected

to grid in 2017

Shandong Haiyang NPP

unit 1 will be connected

to grid in 2017

Haiyang NPP Phase II project, Sanmen NPP Phase II project, Lufeng NPP Phase I project and

other CAP1000 follow-up projects are ready for construction.

PROGRESS IN THE FOLLOW-UP CAP1000 PROJECT SITES

SNPTC is the EPC contractor for AP1000 NPP, two CAP1400 FOAK units, and CAP1000 follow-up

projects (including Haiyang Phase II, Sanmen Phase II, Lufeng Phase I).

Haiyang Phase II Sanmen Phase II Lufeng Phase I

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

13

CAP1400 FOAK Project site in Shidao Bay, Rongcheng Shandong Province in China

More than 92% construction drawings of CAP1400 FOAK project are completed.

Long lead equipment manufacturing is on schedule.

Preparations for the FCD of the unit 1 NI were completed.

92%

CAP1400 FOAK PROJECT

2010

CONCEPTUAL

DESIGN

APPROVED

2017

FCD

2013

EARLY

SITE WORK

PERMITTED

2021

CONNECT TO

THE GIRD

Bottom head

Structural module

CV

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

14 15

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

16 17

GLOBAL AP/CAP NPP EQUIPMENT SUPPLY CHAIN

An integrated GEN III NPP equipment supply chain was established, including 167 foreign and domestic

suppliers in machinery, electricity, materials, engineering, I&C and operation service, which ensures reliability and

competitive price.

AP/CAP NPP INDUSTRY CHAIN

AP/CAP NPP SUPPROTING INDUSTRY

GEN III NPP module manufacturing, nuclear class zirconium material and other fields.

Capacity of supplying key equipment and materials for 6-8 AP/CAP nuclear power

units per year

6-8

AP/CAP GEN III NPPqualified suppliers

167 AP/CAP

EQUIPMENT

MODULE

MANUFACTURING

SNPTC has set up the

world’s first manufacturer

of AP1000 NPP structural

module, equipment module,

steel CV IHP, personnel air

lock, equipment hatch and

penetrations, etc..

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

19

NUCLEAR CLASS

ZIRCONIUM MATERIAL INDUSTRY CHAIN

SNPTC established China's first nuclear class zirconium material production line.

Annual output of nuclear zirconium finished products

To meet the needs of zirconium materials for 100 of 1000 MWe units

On April 15, 2016, the first refueling fuel assembly

for 2 units of Haiyang NPP Phase I Project started

production

Nuclear class zirconium production line

GEN III NPP OPERATIONSERVICE

NPP operation safety profermance evaluation, equipment reliability monitoring, equipment aging

evaluation, NI equipment maintenance and NPP technology modification, operating and service

system including NPP operation service business.

RV head inspection simulator

Pressurizer inspection simulator

SG inspection simulator

Annual output of nuclear zirconium

sponge

2000 tons tons1000 units100

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

18

CHD Laizhou Power Plant Phase I 2×1000MW Ultra-supercritical

Units Project ( Gold Medal of National Quality Engineering Award )

1000MW-CLASS SUPERCRITICAL, ULTRA-SUPERCRITICAL

PLANNING CONSULTING, SURVEY AND DESIGN, EPC, PROJECT

MANAGEMENT, COMPLETE EQUIPMENT, AND LIFETIME

TECHNOLOGY SERVICES, ETC..

THERMAL POWER

78 Project siting of the million kilowatt units 76 Thermal power EPC

projects

450 Thermal power projects 10% 10% of installed

capacity in china

EPC of Meizhou Bay phase

II Power Plant 2×1000MW

Units Project

Anhui Pingwei 2×660

MW Units Project ( China

Electric Power Engineering

Award )

Shanghai Caojing

2×1000MW Units Project

( Gold Medal of National

Quality Engineering Award )

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

20 21

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

23

LOW VOLTAGE DISTRIBUTION NETWORK, HV, EHV, UHV AC AND DC

POWER TRANSMISSION PLANNING, DESIGN AND PROJECT MANAGEMENT

TECHNOLOGY, AND SMART GRID.

1000kV Huainan – Shanghai UHV AC Power

Transmission Project

POWER GRIDThe first batch of designers of UHV AC and DC power

transmission and transformation project in China, with the core

technology of class-A package in UHV AC and DC substation.

390 Transformer substations designed

20 Planning and consulting service for more than 20 countries

1000kV Ximeng-Nanjing

EHV Power Transmission

Project

750kV Yuqia Switch

Station

Qingdao Convertor

Station, the first ±660kV

convertor station in

China

34300 Total length of transmission line designed

km

156 Substation designedkVA

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

22

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

25

RENEWABLES

BIOMASS POWER GENERATION

GAS TURBINE DESIGN

TECHNOLOGY

ONSHORE WIND POWER

SOLAER POWER DESIGN

TECHNOLOGY

DISTRIBUTED ENERGY SOURCES

EPC for Guoneng

Shanxian Biomass

Power Station ( the EPC

Contracting Silver Key

Award )

Jining 18MW solar

power project

50 Completed feasibility study and design of solar power units

30% 30% of biomass installed capacity in china

50 Completed design and consulting gas turbine units

90 Completed feasibility study and design of wind power units

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

24

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

SNPTCSTATE NUCLEAR POWER TECHNOLOGY CORPORATION

26 27

GLOBAL MARKETBUSINESS IN 40 COUNTRIES AND REGIONS AND 13 BRANCH

OFFICES.

PAKISTANDesign for Sahiwal 2×660MW Coal-fired Power plant, the first energy project on the China-Pakistan Economic Corridor

ETHIOPIADesign for GDHA Power Transmission Project, the Ethiopia largest power transmission project

BRAZILEPC for PAMPA SUL 1×345MW Coal-fired Power Plant

VENEZUELADesign for New Central Power Plant 4×193MW Gas-fired Units, the major energy cooperation project under the “China-Venezuela Fund Framework”

TURKEYDeveloping nuclear power plant in Turkey

INDIADesign for Jharsuguda 4×660MW Coal-fired Units Project, the largest per-unit installed capacity and total installed capacity of China

THAILANDDesign for Prachin NPP9 1×135MW Biomass Power Generation Project, with the largest per-unit installed capacity in Asia

VIETNAMDesign for Yongxing 2×600MW Coal-fired Power Plant. the largest project ever invested by China in Vietnam

ZAMBIADesign for MCL 2×150MW CFB Coal-fired Power Plant, the Zambia first thermal power project

INDONESIAEPC for Java No.7 2×1050MW Coal-fired Power Plant, the first overseas 1000MW class IPP thermal power plant of China

SOUTH AFRICADeveloping nuclear power project in South Africa

PHILIPPINEEPC for Puting Bato 2×135MW Coal-fired Power Plant

Contact us

86-10-58197001 86-10-58197002

Address: Building No.1, Compound

No.29, North 3rd Ring, Xicheng

District, Beijing 100029, P.R. China

http://www.snptc.com

SNPTCState Nuclear Power Technology Corporation

SAFE NUCLEAR ENERGY BETTER LIFE