SafeTrack Rail Service Plans and Customer Impacts June 1, 2016 1

Upload: others

Post on 30-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

SafeTrackRail Service Plans and Customer Impacts

June 1, 2016

1

Page 2: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Presentation Structure

• Each Surge has three slides:• First, the proposed service patterns

with changes in trains per hour (TPH)• Second, the estimated total impacted

peak period trips per day• Third, peak hour ridership demand

and estimated car crowding impacts

• All values are estimates

2

Ridership demand as presented here is “unconstrained” by

reductions in capacity due to track work. These estimates

are “first order” only and do not account for riders diverting to

other modes or reducing travel as a result of service changes.

Page 3: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

What These Number Are

• Unlike the analysis presented here, the SafeTrack plan on www.wmata.com/safetrack describes the most severe impacts only, for all day, using May 2015 data

• The analysis presented here provides data to describe the impacts broadly and to identify where mitigation may be needed:

• Peak hour and peak period• Trip counts from the month of the project the previous year• Broken out by severity of impact corresponding with the service change

maps

3

Page 4: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Understanding Railcar Crowding

• Railcar crowding is measured in average passengers per car (PPC)

• Actual PPC can vary across the cars of a train and within a given hour

PPC Impact

80 Comfortable ride, some standing but seats available

100 No seats left, but relatively comfortable

120+ Customers struggle to enter and exit trains, some are left behind on platforms, passengers block doors, increase in door malfunctions

80 PPC

100 PPC

120 PPC

4

Page 5: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

June 4 - 161

Total Days 13

Weekdays 9

Weekend Days 4

Holidays 0

East Falls Church to Ballston Single-Track

5

Page 6: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

June 4 - 161

East Falls Church to Ballston Single-Track

Total Impacted Peak Trips per DayService Change Impacted Trips20% - 49% Fewer Trains 200,000 50% - 69% Fewer Trains 24,000 70% - 83% Fewer Trains 31,000 Total 255,000

6

Page 7: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

4.5K trips166 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

12.5K trips124 PPC

June 4 - 161

East Falls Church to Ballston Single-Track

16.5K trips126 PPC

2.5K trips127 PPC

7

Where DemandSurge PPC

Excess Demand (Hour/ Period)

West Falls Church to East Falls Church

4.5K 166 1K / 2.5K

McLean to East Falls Church

2.5K 127 < 0.5K

Court House to Rosslyn

12.5K 124 < 0.5K

Metro Center to McPherson Sq

16.5K 126 0.5K / 0.5K

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Page 8: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

June 18 – July 32

Eastern Market & Minnesota Ave/Benning Rd Shutdown

Total Days 16

Weekdays 10

Weekend Days 6

Holidays 0

8

Page 9: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

June 18 – July 32

Eastern Market & Minnesota Ave/Benning Rd Shutdown

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 47,000 50% - 69% Fewer Trains 205,000 No Service 41,000 Total 293,000

9

Page 10: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Peak Hour Volumes, Inbound, 7 or 8 AM Hour12K trips147 PPC

11K trips108 PPC

7.5K trips

16.5K trips195 PPC

June 18 – July 32

Eastern Market & Minnesota Ave/Benning Rd Shutdown

Bus bridge capacity TBD

10

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Eastern Market to Benning Rd/ Minnesota Ave

7.5K N/A

Courthouse to Rosslyn

12K 147 2.5K / 2.5K

Yellow Line Bridge 11K 108McPherson Sq to Metro Center

16.5K 195 6.5K / 8.5K

Page 11: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

National Airport to Braddock Rd Shutdown

July 5 - 113

Total Days 7

Weekdays 5

Weekend Days 2

Holidays 011

Page 12: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

National Airport to Braddock Rd Shutdown

July 5 - 113

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 99,000 50% - 69% Fewer Trains 62,000 No Service 43,000 Total 204,000

12

Page 13: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

7K

Peak Hour Volumes, Inbound, 7 AM Hour

Bus bridge capacity TBD

2K trips75 PPC

6.5K trips

National Airport to Braddock Rd Shutdown

July 5 - 113

6K trips208 PPC

3K trips64 PPC

13

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Braddock Rd to National Airport

6.5K N/A

Van Dorn St to King St

2.5K 64

Eisenhower Ave to King St

2K 75

Pentagon to L’Enfant Plaza

6K 208 2.5K / 5K

Page 14: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Pentagon City to National Airport Shutdown

July 12 - 184

Total Days 7

Weekdays 5

Weekend Days 2

Holidays 0

14

Page 15: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Pentagon City to National Airport Shutdown

July 12 - 184

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 99,000 50% - 69% Fewer Trains 50,000 No Service 55,000 Total 204,000

15

Page 16: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Bus bridge capacity TBD

2K trips75 PPC

3K trips64 PPC 8K trips

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

Pentagon City to National Airport Shutdown

July 12 - 184

6K trips208 PPC

16

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

National Airport to Pentagon City

8K N/A

Van Dorn St to King St

2.5K 64

Eisenhower Ave to King St

2K 75

Pentagon to L’Enfant Plaza

6K 208 2.5K / 5K

Page 17: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

July 20 - 315

Total Days 12

Weekdays 8

Weekend Days 4

Holidays 0

East Falls Church to Ballston Single-Track

17

Page 18: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

July 20 - 315

East Falls Church to Ballston Single-Track

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 194,000 50% - 69% Fewer Trains 24,000 70% - 83% Fewer Trains 29,000 Total 247,000

18

Page 19: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

4K trips155 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

6.5K trips139 PPC

11.5K trips114 PPC

July 20 - 315

East Falls Church to Ballston Single-Track 15K trips114 PPC

2.5K trips123 PPC

19

* November data used

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide --is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

East Falls Church to Ballston*

6.5K

West Falls Church to East Falls Church

4K 155 1K / 1.5K

McLean to East Falls Church

2.5K 123 < 0.5K

Court House to Rosslyn

11.5K 114

McPherson Sq to Metro Center

15K 114

Page 20: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Silver Spring to Takoma Single-Track

August 1 - 76

Total Days 7

Weekdays 5

Weekend Days 2

Holidays 0

20

Page 21: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Silver Spring to Takoma Single-Track

August 1 - 76

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 143,000 50% - 69% Fewer Trains 1,000 70% - 83% Fewer Trains 50,000 Total 194,000

21

Page 22: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

7K trips173 PPC

7.6K trips190 PPC

10K trips92 PPC

Inbound Trains Reach 120 PPC at Silver Spring

Silver Spring to Takoma Single-Track

August 1 - 76

22

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Fort Totten to Brookland-CUA

7K 173 2K / 3K

Rhode Island Ave to NoMa

7.6K 190 3K / 3K

Dupont Circle to Farragut North

10K 92

Page 23: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Total Days 10

Weekdays 8

Weekend Days 2

Holidays 0

Shady Grove to Twinbrook Single-Track

August 9 - 187

23

Page 24: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Shady Grove to Twinbrook Single-Track

August 9 - 187

Total Impacted Peak Trips per Day

Service Change Impacted Trips50% - 69% Fewer Trains 22,000

24

Page 25: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

3.5K trips133 PPCShady Grove to Twinbrook Single-Track

August 9 - 187

25

Peak Hour Volumes, Inbound, 7 AM Hour

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

West Falls Church to East Falls Church

3.5K 133 < 0.5K

Page 26: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Franconia-Springfield to Van Dorn Single-Track

August 20 –September 68

Total Days 17

Weekdays 10

Weekend Days 6

Holidays 1

26

Page 27: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Franconia-Springfield to Van Dorn Single-Track

August 20 –September 68

Total Impacted Peak Trips per Day

Service Change Impacted Trips50% - 69% Fewer Trains 5,000 70% - 83% Fewer Trains 11,000 Total 16,000

27

Page 28: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

7K

2K trips95 PPC

3K trips68 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

Franconia-Springfield to Van Dorn Single-Track

August 20 –September 68

28

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Franconia-Springfield to Van Dorn

2K 95

Van Dorn to King St 3K 68

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Page 29: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Vienna to West Falls Church Single-Track

September 9 –October 209

Total Days 42

Weekdays 29

Weekend Days 12

Holidays 1

Transfer Required29

Page 30: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Vienna to West Falls Church Single-Track

September 9 –October 209

Service Change Impacted Trips70% - 83% Fewer Trains 20,000

Total Impacted Peak Trips per Day

30

Page 31: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Peak Hour Volumes, Inbound, 7 AM Hour

3K trips135 PPC

Vienna to West Falls Church Single-Track

September 9 –October 209

31

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Dunn Loring to West Falls Church

3K 135

Page 32: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Fort Totten to NoMa Shutdown

October 10 –November 110

Total Days 23

Weekdays 16

Weekend Days 6

Holidays 1

32

Page 33: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

October 10 –November 110

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 159,000 70% - 83% Fewer Trains 31,000 No Service 18,000 Total 208,000

33

Fort Totten to NoMa Shutdown

Page 34: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

11.5K trips136 PPC

Inbound trains reach 120 PPC at Silver Spring 6.5K trips

157 PPC

6.6K trips

*Assumes diversion of 5K trips to Green Line at Fort Totten

Inbound trains reach 120 PPC Before Dupont

October 10 –November 110

11K trips131 PPC

Inbound Red Line trains reach 120 PPC at Gallery

Place

12K trips119 PPC

34

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Takoma to Fort Totten

6.5K 157 1.5K / 2K

Rhode Island Ave to NoMa*

6.6K N/A

Dupont Circle to Farragut North

11.5K 136 1.5K / 1.5K

Gallery Pl to Metro Center

11K 131 1K / 1K

Shaw to Mt Vernon Sq*

12K 119

Fort Totten to NoMa Shutdown

Page 35: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

West Falls Church to East Falls Church Single-Track

November 3 - 1111

Total Days 9

Weekdays 6

Weekend Days 2

Holidays 1

35

Page 36: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

West Falls Church to East Falls Church Single-Track

November 3 - 1111

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 161,000 50% - 69% Fewer Trains 45,000 Total 206,000

36

Page 37: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

3.5K trips122 PPC

10K trips118 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

West Falls Church to East Falls Church Single-Track

November 3 - 1111

13K trips117 PPC2K trips

90 PPC

37

Where DemandSurge PPC

Excess Demand (Hour/ Period)

West Falls Church to East Falls Church

3.5K 122 < 0.5K

McLean to East Falls Church

2K 90

Court House to Rosslyn

10K 118

Metro Center to McPherson Sq

13K 117

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Page 38: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Greenbelt & College Park Single-Track

November 12 –December 612

Total Days 25

Weekdays 16

Weekend Days 8

Holidays 1

38

Page 39: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Greenbelt & College Park Single-Track

November 12 –December 612

Total Impacted Peak Trips per Day

Service Change Impacted Trips50% - 69% Fewer Trains 9,000

39

Page 40: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

7KAll-Day and Peak Hour Ridership Impacts, June

1.5K Trips68 PPC

Greenbelt & College Park Single-Track

November 12 –December 612

40

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Greenbelt to College Park

1.5K 68

Page 41: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Pentagon to Rosslyn Shutdown

December 7 - 2413

Total Days 18

Weekdays 13

Weekend Days 5

Holidays 0

41

Page 42: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Pentagon to Rosslyn Shutdown

December 7 - 2413

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 184,000 50% - 69% Fewer Trains 14,000

Diverted from BL to YL* 16,000 Total 198,000

42

* Not included in total to avoid double-counting

Page 43: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

2.5K trips53 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

3K trips43 PPC

Pentagon to Rosslyn Shutdown

December 7 - 2413

12K trips88 PPC

8.5K trips84 PPC

43

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Yellow Line Bridge 8.5K 84Van Dorn to King Street

2K 53

Benning Rd to Stadium-Armory

2.5K 43

McPherson Sq to Metro Center

12.5K 88

Page 44: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Braddock Rd to Huntington / Van Dorn Single-Track

January 2 – 13Jan 23 – Feb 314

Total Days 24

Weekdays 20

Weekend Days 4

Holidays 044

Page 45: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Braddock Rd to Huntington / Van Dorn Single-Track

January 2 – 13Jan 23 – Feb 314

Service Change Impacted Trips1% - 19% Fewer Trains 131,000 20% - 49% Fewer Trains 88,000 50% - 69% Fewer Trains 2,000 70% - 83% Fewer Trains 47,000 Total 268,000

Total Impacted Peak Trips per Day

45

Page 46: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

2K trips84 PPC

2K trips95 PPC

6K trips219 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

3.5K trips130 PPC

4.5K trips76 PPC

Braddock Rd to Huntington / Van Dorn Single-Track

January 2 – 13Jan 23 – Feb 314

46

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

Braddock Rd to National Airport

6K 219 2.5K / 5K

Van Dorn to King St 2K 84Eisenhower Ave to King St

2K 95

Yellow Line Bridge 4.5K 76Arlington Cemetery to Rosslyn

3.5K 130 0.5K / 0.5K

Page 47: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

Total Days 9

Weekdays 6

Weekend Days 2

Holidays 1

West Falls Church to East Falls Church Single-Track

March 6 - 1915

47

Page 48: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

West Falls Church to East Falls Church Single-Track

March 6 - 1915

Total Impacted Peak Trips per Day

Service Change Impacted Trips20% - 49% Fewer Trains 186,000 50% - 69% Fewer Trains 50,000 Total 236,000

48

Page 49: SafeTrack - PlanItMetro · 6/1/2016  · SafeTrack Rail Service Plans and Customer Impacts June 1, 2016. 1. Presentation Structure • Each Surge has three slides: • First, the

4K trips131 PPC

2K trips97 PPC

11.5K trips139 PPC

Peak Hour Volumes, Inbound, 7 or 8 AM Hour

West Falls Church to East Falls Church Single-Track

March 6 - 191515K trips133 PPC

49

Surge PPC is hypothetical and would only be observed if excess demand -- trips beyond what Metrorail can provide -- is not diverted to other modes

Where DemandSurge PPC

Excess Demand (Hour/ Period)

West Falls Church to East Falls Church

4K 131 0.5K / 0.5K

McLean to East Falls Church

2K 97

Court House to Rosslyn

11.5K 139

Metro Center to McPherson Sq

15K 133 1.5K / 1.5K