safety - ecr.indianrailways.gov.inecr.indianrailways.gov.in/uploads/files/1430307661611-ib...
TRANSCRIPT
2Consequential Train Accidents (RB Cases)
Category 2012-13 2013-14 2014-15Up to
March-13Full year
Up toMarch-14
Full yearUp to
March-15
Collision 00 00 01 01 03Derailment( At Station)
05 05 04 04 04
Derailment(Mid Section)
01 01 01 01 02
Derailment (Sub Total) 06 06 05 05 06
2
06 06 05 05 06L-Xing (Manned) 00 01 00 00 02
L-Xing (Unmanned) 01 02 05 05 05L-Xing (Sub Total) 02 03 05 05 07
Fire in trains 00 00 01 01 00Misc. 0 0 00 00 03
Grand Total 08 09 12 12 19
3
Consequential Train Accidents (HQ Cases )
Category 2012-13 2013-14 2014-15Up to
March-13Full year
Up toMarch-14
Full yearUp to
March-15
Collision 00 00 00 00 00Derailment ( At Station) 01 01 00 00 00Derailment (Mid Section) 01 01 00 00 00
Derailment (Sub Total) 02 02 00 00 00
3
Derailment (Sub Total) 02 02 00 00 00L-Xing (Manned) 01 01 00 00 00L-Xing (Unmanned) 00 00 01 01 00L-Xing (Sub Total) 01 01 01 01 00Fire in trains 00 00 00 00 00Misc. 00 00 00 00 00Grand Total 03 03 01 01 00
4
Indicative Train Accidents
2012-13 2013-14 2014-15
Type Up toMarch-13
Fullyear
Up toMarch-14
Full yearUp to
March-15
SPAD 01 01 00 00 00
Breach ofBlock Rules
02 02 00 00 00
AvertedCollision
01 01 00 00 00
4
AvertedCollision
01 01 00 00 00
Total 04 04 00 00 00
Note- All cases are Hq level.
Division-wise Divisional Cases --(Up to March-15)Divn Apr May Jun July Aug Sep Oct Nov Dec Jan Feb March Tot
DHN 03 05 06 04 09 06 05 03 05 - 07 07 60
DNR 06 02 01 02 03 03 02 02 02 04 03 03 32
SEE 02 03 04 01 - - 01 - - 01 02 01 15
SPJ 01 - 03 - - 02 02 - 03 02 02 - 15
MGS 04 01 - 01 01 01 01 01 04 01 01 - 16
Total 16 11 14 08 13 12 11 06 14 08 15 11 139
5
Comparative Figure of Yard Derailment Cases( For the year 2013-14 (Up to March-14) & 2014-15 (Up to -March-
15)DIV Apr May Jun July Aug Sept Oct Nov Dec Jan Feb March Total
YEAR
13 14
13 14 13
14 13
14 13 14 13 14 13
14 13 14 13 14 14 15 14 15 14 15 14 15
DHN 1 1 2 4 - 1 - 2 - 2 1 - - 1 1 1 2 3 1 - 2 2 2 2 12 19
DNR - 3 - 2 4 1 2 2 4 3 1 2 - 2 1 1 4 - 4 1 3 1 - 24 19
MGS 2 1 1 1 - - - - 2 1 - 1 1 - - 1 1 2 - 1 - - - - 7 8
SEE 1 1 2 2 - 4 1 1 2 - 3 - 2 2 - 1 - - 4 1 1 2 - - 16 14
SPJ 1 - 1 - - - - - 2 - - 2 2 1 1 - 1 1 1 1 5 1 5 - 19 6
6
SPJ 1 - 1 - - - - - 2 - - 2 2 1 1 - 1 1 1 1 5 1 5 - 19 6
Total 5 6 6 9 4 6 3 5 10 6 5 5 5 6 3 4 8 6 11 4 11 7 8 78 66
Yard wise derailment cases Year 2014-15 (Upto March-15)DNR Nos SPJ Nos DHN Nos MGS Nos SEE NosRNCC 3 RXL 2 KRSL 1 SSM 2 BGS 1DNR 4 JNR 1 SGRL 2 NBG 1 KPGM 2SHK 1 SBJ 1 RAY 2 GAQ 1 KUE 2GMR 1 MKPR 1 PEH 1 SEB 1 GHZ 1SLD 1 DBG 1 GMO 3 SYJ 1 SEE 1JMU 4 NMG 1 MGS 1 BJU 3KWO 1 BRKA 2 PSE 1 NNA 1NWD 1 DHN 2 MFP 2KEU 1 KTH 1 NRPA 1BKP 1 OBRA 1
7
BKP 1 OBRA 1FUT 1 KLRE 1Total 19 Total 6 Total 17 Total 8 Total 14
DIVISION - Maximum no of cases – DNR Div- 19
Minimum no of cases – SPJ Div – 06
Yard- Maximum Cases in Yard- GMO,JMU ,RNCC,BJU
Division wise - Maximum case in yard
DNR Div - DNR- 04 , JMU Yard- 04 MGS Div.- 02 SSM Yard ,
DHN - 03- GMO Yard, SEE Div.- 03-BJU YARD, SPJ Div.-02 RXL
8
Details of Consequential train accidents during 14-15(Up to March-15) (RB Cases)
SN Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
1 2.4.1423.43 hrs
DHN Train No.51676 Up(CPU-KTJ) Pass.Passed A Cabin ofObra Yard at 23.24 hrs . But due tofailure of Inner H/Signal No. 77/D of DCabin , the trainstopped at about23.30 hrs at the footof Signal No. 77D .Mean while ,anothertrain No.23345 Up(BSB-SKTN ) whichpassed Obra Yard Acabin at 23.38 hrsand dashed againstthe stationary trainNo. 51676 Up atabout 23.43 hrs
Due to errorin working ofstation by theoperatingstaff
CRS/NER
Awaited OPTG Deptt
Contd 8
Train No.51676 Up(CPU-KTJ) Pass.Passed A Cabin ofObra Yard at 23.24 hrs . But due tofailure of Inner H/Signal No. 77/D of DCabin , the trainstopped at about23.30 hrs at the footof Signal No. 77D .Mean while ,anothertrain No.23345 Up(BSB-SKTN ) whichpassed Obra Yard Acabin at 23.38 hrsand dashed againstthe stationary trainNo. 51676 Up atabout 23.43 hrs
9Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
2 1.05.1412.52 hrs
MGS Train No.18104DN (ASR-TATA)Exp. Startedfrom PF No.1 ofMGS station,after passingcross overjunction cabin,01 sleeper coachno. SER-028263(S-7), 9th
T/Engine gotderailed by allwheels at km-670/17 near EastReceivingcabin/MGS.
WheeldefectinculpritCoach
JAG –Sr.DME,Sr.DEN (Cord),Sr. DSO,&DME/TATA/SER
(i) WIT02yrs&11months
(ii)Warned
Mech-Primary(i)SriT.k.SahuJE/C&W/TATA/CKPSecondary-(ii)PWI/MGS
Contd 9
Train No.18104DN (ASR-TATA)Exp. Startedfrom PF No.1 ofMGS station,after passingcross overjunction cabin,01 sleeper coachno. SER-028263(S-7), 9th
T/Engine gotderailed by allwheels at km-670/17 near EastReceivingcabin/MGS.
10Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
3 7.6.1418.00 hrs
SPJ While theDiesel LightEngine was onrun in blocksection betweenMJL-SGL Stn,one Car(No.BR-01AG-4317,WagonR),dashedagainst it atUMLC No.181at km-196/6-7at 18.00 hrs
Negligence ofRoad User
Junior Scale-ASO/SPJ,AME(C&W),AEN/BMKI,ASC/SPJ
N/A Primary- (i)Other thanRailwayBlame worthy-(i)Sri S.Kr. SinghGuard/Goods.
Contd 10
While theDiesel LightEngine was onrun in blocksection betweenMJL-SGL Stn,one Car(No.BR-01AG-4317,WagonR),dashedagainst it atUMLC No.181at km-196/6-7at 18.00 hrs
11Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
4 22.6.145.10 hrs
SEE While the T.NDN CGS/DCEngine no.12213 LKO,Ld-42 BCN/L+MT its 5th
wagon fromMT fronttrolley 4wheelsderailedbetweenstarter & Adv.starter ofBKHR Stn
Sinkage ofTrack due
to badformation .
JAG-Sr.DSO,Sr.DME,Sr.DEN II,SrDSTE,DyCE(Cons)/SPJ
P-(i)AwaitedB-(i)Pass&PTOstopped(ii)3-setpassstopped(iii)3- setpassstopped(iv)1- setpassstopped(v)1-setpass&PTOstopped
Primary-(i)Sudhir kr. YadavIOW/Const/SPJBlameworthy-(i)Sri SatyavartMahato,PWI/Const/BGS(ii)DineshKr/LP/BJU(iii)NarayanSingh,ALP/MFP(iv)S.K.Ojha,SM/BKHR(v) B.C.Roy,Gd/MFP
Contd 11
While the T.NDN CGS/DCEngine no.12213 LKO,Ld-42 BCN/L+MT its 5th
wagon fromMT fronttrolley 4wheelsderailedbetweenstarter & Adv.starter ofBKHR Stn
P-(i)AwaitedB-(i)Pass&PTOstopped(ii)3-setpassstopped(iii)3- setpassstopped(iv)1- setpassstopped(v)1-setpass&PTOstopped
Primary-(i)Sudhir kr. YadavIOW/Const/SPJBlameworthy-(i)Sri SatyavartMahato,PWI/Const/BGS(ii)DineshKr/LP/BJU(iii)NarayanSingh,ALP/MFP(iv)S.K.Ojha,SM/BKHR(v) B.C.Roy,Gd/MFP
12Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
5 24.6.1423.53hrs
SPJ While the T.NUP/IDBR (Ld43/BOST+1MT) withIRON Coil,was startedfrom MAI at23.48 hrs,duringrunning at23.53 hrs, theabove saidengine with 18Wagonsderailed at km128/14 -13between MAI– CAAby allwheels
Sabotageby
miscreants
State Govt. N/A N/A
Contd 12
While the T.NUP/IDBR (Ld43/BOST+1MT) withIRON Coil,was startedfrom MAI at23.48 hrs,duringrunning at23.53 hrs, theabove saidengine with 18Wagonsderailed at km128/14 -13between MAI– CAAby allwheels
13Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Levelof
enquiry
Punishment
Responsibility
6 25.6.1402.15 hrs,
SEE While the T.N12236 was on runbetween CI –GJHStn, it was derailedby 12 Coaches fromTrain engine at km-319/09 at 02.15hrs.(01 Coachcapsized,06Coaches out oftrack,04 Coachesderailed by allwheels&01 coachderailed by 02wheels)
Suspected
sabotageas perjoint
note(PF)
CRSLevel
Awaited Awaited
Contd 13
While the T.N12236 was on runbetween CI –GJHStn, it was derailedby 12 Coaches fromTrain engine at km-319/09 at 02.15hrs.(01 Coachcapsized,06Coaches out oftrack,04 Coachesderailed by allwheels&01 coachderailed by 02wheels)
14Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
7 1.7.1413.30 hrs
DNR While theTrain No.12391 Up wason run in blocksectionbetween CSA-GMR Stn,dashed againstone Roadvehicle No.UP-01-1333,TataMagic at Non-InterlockedMLC Gate No.80-C/E, km680/19-21
Notproperlyclosed thegate afterexchanging privatenumberwith SMforpassingthe train12391 bygateman
JAG RemovedfromServiceswef29.07.14
Primary- Sri N.Rai,Gateman/SSE/BXRSecondary- SriShambhuPd./SSE/P.Way/BXRBlameworthy—SriS.K.Ojha.SM/GMR
Contd 14
While theTrain No.12391 Up wason run in blocksectionbetween CSA-GMR Stn,dashed againstone Roadvehicle No.UP-01-1333,TataMagic at Non-InterlockedMLC Gate No.80-C/E, km680/19-21
Notproperlyclosed thegate afterexchanging privatenumberwith SMforpassingthe train12391 bygateman
Primary- Sri N.Rai,Gateman/SSE/BXRSecondary- SriShambhuPd./SSE/P.Way/BXRBlameworthy—SriS.K.Ojha.SM/GMR
15Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Levelofenquiry
Punishment
Responsibility
8 15.07.1415.10 hrs
MGS While the DslLight Engineno.18607/WDM-2A/SPJwas on run inblock sectionbetween Piro -Garhani Stn,one School MagicVan dashedagainst it atUMLC No. 25/Cat km 35/02-03.
Negligence of
RoadUser
JuniorScale
N/A Other ThanRly
Contd 15
While the DslLight Engineno.18607/WDM-2A/SPJwas on run inblock sectionbetween Piro -Garhani Stn,one School MagicVan dashedagainst it atUMLC No. 25/Cat km 35/02-03.
16
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
9 18.08.1416.05 hrs
SPJ Dashing of15001 (MFP-DDN) RaptiGanga Exp14106 WDM-3with na tempoat Manned LCgate No. 169/Cat Semera Stn.
Gate mandid not closethe gateeven thoughhe gaveprivate no.to SM onduty
SAG-CSO,CTPM,CPDE,CSE
P-(i)&(ii)AwaitedS-(i)01stagebelowfor 01 yr(C)(ii)WIT-01 yr
Primary-(i) SriSantosh MalikGate Man , (ii)Sri Sunil Kr.SS/Semara .Secondary – (i)Sri NilmaniTiwari,TI/Crew/M,(ii)Sri Rakesh Kr.Tripathi,TI/BMKI
Contd 16
Dashing of15001 (MFP-DDN) RaptiGanga Exp14106 WDM-3with na tempoat Manned LCgate No. 169/Cat Semera Stn.
Gate mandid not closethe gateeven thoughhe gaveprivate no.to SM onduty
P-(i)&(ii)AwaitedS-(i)01stagebelowfor 01 yr(C)(ii)WIT-01 yr
Primary-(i) SriSantosh MalikGate Man , (ii)Sri Sunil Kr.SS/Semara .Secondary – (i)Sri NilmaniTiwari,TI/Crew/M,(ii)Sri Rakesh Kr.Tripathi,TI/BMKI
17
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
10 1.9.1419.40hrs
SPJ While the TrainNo. 15210 DN(ASR-SHC) wason run in theblock sectionbetween Kopariaand SimriBakhtiyarpurstations, oneBolero dashedagainst its TrainEngine at UMLCNo. 14-C, km23/01-02.at 19.40hrs.
Negligenceof RoadUsers .
Jr. ScaleEnquiry
N/A Other than Rly
Contd 17
While the TrainNo. 15210 DN(ASR-SHC) wason run in theblock sectionbetween Kopariaand SimriBakhtiyarpurstations, oneBolero dashedagainst its TrainEngine at UMLCNo. 14-C, km23/01-02.at 19.40hrs.
18
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
11 25.10.14 DHN Train No. DN/EC/BOX N/E/3533/3476 multiarrived MMLN at 22.28hrs and stopped due tobrake binding DN/DSL/BOX/E/12978 /NKJloaded over shot DNH/signal of MMLN Stnand dashed in rear ofDN/EC/BOXN/E dashedin rear of DN/EC/BOX N /E/3533/3476resulting 05 wagons + MTgot derailed and shiftedto UP line of EC/Box N/E& also infringed DSLengine +01 wagon ofDN/Dsl/BoxN/E also gotderailed at 22.55 hrs.
Overshootingof DN H/Signal byLP of DN/Dsl/BoxN/E/12978 /NKJ
SAG (i)LP-SF-5 on1.1.15(ii)ALP-SF-51.1.15(iii)SM-SF-5 on8.1.15
Mech+OPTG
Contd 18
Train No. DN/EC/BOX N/E/3533/3476 multiarrived MMLN at 22.28hrs and stopped due tobrake binding DN/DSL/BOX/E/12978 /NKJloaded over shot DNH/signal of MMLN Stnand dashed in rear ofDN/EC/BOXN/E dashedin rear of DN/EC/BOX N /E/3533/3476resulting 05 wagons + MTgot derailed and shiftedto UP line of EC/Box N/E& also infringed DSLengine +01 wagon ofDN/Dsl/BoxN/E also gotderailed at 22.55 hrs.
Overshootingof DN H/Signal byLP of DN/Dsl/BoxN/E/12978 /NKJ
(i)LP-SF-5 on1.1.15(ii)ALP-SF-51.1.15(iii)SM-SF-5 on8.1.15
19
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
12
02.12.14&18.24
hrs
SEE While the train no.55223(KIR-DBG
Passenger) startedfrom line no.01 at
Lakho station on T/369/(3b), its T/Eng
No.14931/NGC enteredin sand hump & got
derailed by 08 wheelsat about 18.20 hrs.
Trainstarted onT/369(3b)
butwithoutensuringsetting of
points
JAG Awaited OPTG+Mech
Contd 19
While the train no.55223(KIR-DBG
Passenger) startedfrom line no.01 at
Lakho station on T/369/(3b), its T/Eng
No.14931/NGC enteredin sand hump & got
derailed by 08 wheelsat about 18.20 hrs.
Trainstarted onT/369(3b)
butwithoutensuringsetting of
points
20
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
Sl Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
13
12.12.14&6.44
hrs
DNR While train no.12506 DNExpress was entering on
line 01 at Barh(RH) stationfor issue of authority DNStarter & Adv starter dueto locking of BI at PHKstation in the meanwhile
73203 UP Demu Passengerafter starting pass startersignal at danger resulting
derailment of 01 DPC (unitno.97879) by all wheels&01 TC was derailed by 01wheel of delhi end trolley
of 73203 UPPassenger(Collision)
Disregardof startersignal bythe LP of73203 UPPassenger
SAG Awaited Mech
Contd 20
While train no.12506 DNExpress was entering on
line 01 at Barh(RH) stationfor issue of authority DNStarter & Adv starter dueto locking of BI at PHKstation in the meanwhile
73203 UP Demu Passengerafter starting pass startersignal at danger resulting
derailment of 01 DPC (unitno.97879) by all wheels&01 TC was derailed by 01wheel of delhi end trolley
of 73203 UPPassenger(Collision)
21
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
Sl Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
14
16.12.14& 8.57
hrs
DNR While the train no. 13023up (HWH-GYA EXP.) wason run in between WRS-
NWD stations, it wasdashed with a Bolero no.
JH-12F-4003 at km 55/0-5at unauthorized crossing at
08.55 hrs of DNRdivision.
Suddenentry of
Bolero onrailwaytrack
withoutconsidering
theapproachin
g train
JAG NA Otherthan Rly
Contd 21
While the train no. 13023up (HWH-GYA EXP.) wason run in between WRS-
NWD stations, it wasdashed with a Bolero no.
JH-12F-4003 at km 55/0-5at unauthorized crossing at
08.55 hrs of DNRdivision.
Suddenentry of
Bolero onrailwaytrack
withoutconsidering
theapproachin
g train
22
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
SN
Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
15
23.12.14&12.02
hrs
DHN Dashing of CRS Spl with aMotor trolley in a new line
between Koderma-Hazaribagh section at
during CRS inspection of(newly constructed
line)(Misc.)
LP andALP
failed tonotice
obstructionon track
and controlthe train in
the time
JAG Awaited Mech+OPTG+
Engg
Contd 22
Dashing of CRS Spl with aMotor trolley in a new line
between Koderma-Hazaribagh section at
during CRS inspection of(newly constructed
line)(Misc.)
LP andALP
failed tonotice
obstructionon track
and controlthe train in
the time
23
Details of Consequential train accidents during 14-15(Upto March-15)(RB Cases)
Sl Date& Time
Div Particulars Cause Level ofenquiry
Punishment
Responsibility
16
22.1.15&23.38 hrs
DNR While train no.13132(ANVT-KOAA Exp.)was entering Khusroopur(KOO) in the mean time
front SLRD no.08701D/ER first from train
engine got derailed by fourwheels (DLI end) near DNH/Sig KOO at km-513/22
at 23.38 hrs.
One Buffalodashed &
runover by
train engine
JAG NA Incidental
Contd 23
While train no.13132(ANVT-KOAA Exp.)was entering Khusroopur(KOO) in the mean time
front SLRD no.08701D/ER first from train
engine got derailed by fourwheels (DLI end) near DNH/Sig KOO at km-513/22
at 23.38 hrs.
24
Details of Consequential train accidents during 14-15(Upto March-15) (RB Cases)
Sl Date& Time
Div Particulars Cause Levelofenquiry
Punish
ment
Responsibility
17 27.1.15&
15.15hrs
SPJ While the L/Engine passingthrough AWAPUR HALT blocksection between Bajjpati (BJT)-Janakpur (JNR) at KM-86/4-5
dashed with Maruti Van at UMLCNo. 42/C at 15.15 hrs
Negligenceof Road
User(PF)
Sr.Scale NA Other thanRly
Contd 24
18 21.02.15 DNR While the trani No. 73256 waspassing between Biharsarif-
Pawapuri stations of DNR division itdashed with Tata Magic no. BR-
02T8530 at unauthorised trespassnear Tungi halt at KM 31/06 at
18.25
Unauthorized trespass
JAG NA Other thanRly
19 05.03.15 SPJ While the train no. 12204 waspassing through between SBM-SHC
dashing with tempo no. BR 43-G2577 at UNMLC No. 30/C/Eat Km
40/7-8 at 11.20
Negligenceof Tempo
driver
JAG NA Other thanRly
25
Details of Indicative train accidents during 14-15( Up to March-15)
SN
Date &Time
Div. Description Cause Level ofenquiry
Punishment Responsibility
NIL
25
26Safety Drives For 2014-15 (Up to March-15)
Sl Subject Duration Month
1Safety drive for counseling to SM, Cabin Master & Lever men regardingstrict exchange of P.N as per SWR for prevention of accident fromcollision
30 days April
2 Safety drive for prevention of fire in trains 15 days April
3 Safety drive targeting derailment 30 days May
4Safety drive for regular TXR examination of ART/ARMV/TRD Van. 07 days May
5 Safety drive for ensuring provision of yellow circle at station 15 days June
6Safety drive to check failure of H/Signal as well as “Calling ON Signal” at atime
7 days June
26
6Safety drive to check failure of H/Signal as well as “Calling ON Signal” at atime
7 days June
7Safety drive on Examination of private number in on non –inter lockedgates normally open to road traffic.
7 days July
8 Safety derive on exchange of private Number in non interlocked gatesnormally Open to road traffic
7 days July
9 Safety drive on safety calendar. - Aug
10 Safety drive regarding proper training and refresher course of gateman. 15 days Aug
11 Safety drive on Targeting manned /unmanned level crossing (Hq) 10 days Sept
27
Safety Drives For 2014-15 (Up to March-15)SN Subject Duration Month
12 Safety drive for observance of shunting rules 15 days Oct
13 Spl Safety drive on joint inspection register of points & crossing. 30 days Oct
14 Safety drive on Safety Calendar 2014-15(HQ) 30 days Oct
15 Safety drive on items incorporated in safety calendar 14-15 for the Nov-14
30 daysNov
16 Safety drive for painting of Yellow circle on the station platform 15 days Dec
17 Safety drive on items incorporated in Safety Calendar 2014-15(HQ) 30 days Dec
18 Safety drive on items in corporate in Safety Calender 14-15 for themonth of January-15(HQ)
30 daysJan
27
18 Safety drive on items in corporate in Safety Calender 14-15 for themonth of January-15(HQ)
30 daysJan
19 Safety drive on items incorported in safety calendar 2014-15 for themontho of Feb-15
15 daysFeb
20 Safety drive for working of Push trolley,motor trolley/Cycle trolley 15 days Feb
21 Safety drive for awareness of the users at L/C gates 10 days Feb
22 Safety drive to improve the condition of the road surface at unmannedL/C
30 daysFeb
23 Safety drive on items incorporated in safety calendar 2014-15 for themonth of March-15.
30 daysMarch
24 Safety drive to prevent reception of trains on blocked line and setting ofpoints against blocked lines.
15 daysMarch
25 Safety drive on repetation of signal aspect 10 days March
Action Taken to Improve Safety
SL Content Safety Awareness programs for March-15
DHN DNR MGS SEE SPJ TOT 2014-15(Up to
March)
1. Nukkad Natak 06 04 - - - 10 228
2. Safety Pamphlet/Hand Bill
2500 10000 6000 1200 4050 23750 465035
3. Safety Poster/Flexi Poster
725 250 - 260 353 1638 23689
4. Ambush Check - 06 23 75 121 225 2657
28
4. Ambush Check - 06 23 75 121 225 2657
5. SMS 4400 - - - 815 5215 68417
6. Cinema Slidein Cinema Halls
01 - - - - 01 189
7. Safety Seminar 08 04 - 01 01 14 228
29Action Plan to Improve Safety
• Infrastructural improvement of Unmanned / Manned level crossing gates.
• Rewarding Railway staff for showing alertness on duty for preventing the
accidents.
• Campaign through print media on following subjects: Fire in trains Safety at unmanned level crossing
• Advertisement of safety precaution on foot note of tender notice of ECR.
29
• Infrastructural improvement of Unmanned / Manned level crossing gates.
• Rewarding Railway staff for showing alertness on duty for preventing the
accidents.
• Campaign through print media on following subjects: Fire in trains Safety at unmanned level crossing
• Advertisement of safety precaution on foot note of tender notice of ECR.
ASSISTANCE REQUIRED
1 Proposal for Sanctioning of SPART (01 each for each div.)2. Posting of one ASO is pending since long in DNR Div& MGS div.