Safety Share Line Superintendent Report to IAEC. The crew was doing a routine pole change out. They were “lifting ” a pole ( some of us may define it as pulling a pole). . - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/1.jpg)
Safety ShareLine Superintendent Report to IAEC
![Page 2: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/2.jpg)
The crew was doing a routine pole change out. They were “lifting” a pole
(some of us may define it as pulling a pole).
![Page 3: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/3.jpg)
The boom was nearly extended all the way out, therefore causing even more leverage on the boom. No overload protection devices operated prior to the boom failure.
![Page 4: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/4.jpg)
My best guess as to the cause of the accident was boom fatigue over time from “pulling” poles and not “lifting” poles. I also speculate that the boom failed prior to the overload protection devices sensing the
overload.
![Page 5: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/5.jpg)
This is one of those events that no one is going to say anymore than they have to and management cannot prove otherwise. There was no push-back as it was made clear that all pole removals require the use of a pole puller.It is difficult to say if our pulling/lifting actions were the cause or if there was indeed a premature mechanical failure of the boom. The possibility of the men or the truck manufacture coming forward to admit any fault is slim to none.
![Page 6: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/6.jpg)
From today on at “XYZ CO-OP”, if another bent boom comes in, it will not be because of pulling poles and a very good, proven explanation will have to be provided as to why the boom is bent.
DUECO was the manufacture. Equipment is not designed to perform this task. Twin-screw digger derrick. Estimates are around $50,000.
![Page 7: Safety Share Line Superintendent Report to IAEC](https://reader034.vdocuments.net/reader034/viewer/2022051421/56816196550346895dd141aa/html5/thumbnails/7.jpg)
WHAT ARE YOU DOING TO REMOVE POLES FROM THE EARTH?
Does your Co-op have an extra $50,000 laying around?
• Should there be disciplinary action?• Is there a need for a policy change?