sagemcom system integration

19
TELECOM SYSTEMS INTEGRATOR AET/GE 2009, November 19th

Upload: storpi

Post on 23-Jan-2016

54 views

Category:

Documents


0 download

DESCRIPTION

Telecommunicatons

TRANSCRIPT

Page 1: Sagemcom System Integration

TELECOM SYSTEMS INTEGRATOR

AET/GE

2009, November 19th

Page 2: Sagemcom System Integration

SAGEM COMMUNICATIONS PRESENTATION

Page 3: Sagemcom System Integration

RADIO SITES INFRASTRUCTURESREFERENCES

Page 4: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 4

• France Telecom Itineris

• Deployment of BTS, MSC Motorola,

Nokia, Alcatel

• Radio Cell Engineering

• SFR

• Deployment of BTS, MSC Motorola,

Nokia, Alcatel

• Radio Cell Engineering

• TDF

• Radio Site Construction

• Bouygues Telecom

• GSM/GPRS Site Negotiation & Site

Construction

• Radio Cell Engineering

FOCUS ON FRANCEMore than 5000 Radio Sites in the last 12 years

Page 5: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 5

UTILITIES SITES

• HUNGARY HIGHWAYS

• Emergency Phone Systems

• Weather Forecast Stations

• Traffic Monitoring Systems

• Digital Announcement Boards

• SUBWAY TELECOM NETWORK

• Optical Fibre deployment

• SDH & Ethernet Node Equipment I&C

• VoIP Dispatcher & Emergency Systems

• Video Surveillance

• Internal Radio Communication Systems

FOCUS ON HUNGARYMore than 3000 Radio Sites deployed

RADIO SITES

• TELENOR (2001-2003)

• Deployment of BTS Nokia

• Radio Cell Engineering

• Civil Works, Shelter, Cabling, I&C

• 3000 GSM Radio Sites realised

• MAGYAR TELECOM (2007)

• Site Negotiation & Site Construction

• Civil Works, Shelter, Cabling, I&C

• Security & CCTV

• 300 Tetra Radio Sites realised

• INVITEL ex-VIVENDI (2004)

• GSM Network Planning BTS Siemens

• Site Acquisition

• 200 Point of Service (VoIP access)

HUNGARY

Page 6: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 6

DEPLOYMENT OF SDH TRUNK RADIO LINKS

NETWORK

• A Turnkey project including survey,

engineering, installation, commissioning and

local management, warehousing, training

and support services.

• Period: 2008- 2009, 2 phases, 6 months per

phase including manufacturing and

deliveries

• 5 Centers (Covering the all country)

• 400 SDH MW Sites

• Full indoor configuration, 40 000m of

waveguides EW77

• 200 ADM equipment (ADR ranges)

• DC power supply, 8H autonomy

• NMS for each Centre

• 24H Hepldesk service

• Factory and on site training

FOCUS ON VIETNAM400 Radio Sites delivered between 2008 and 2009 for VMS MOBIPHONE

Page 7: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 7

DEPLOYMENT OF A SDH TRUNK RADIO LINKS NETWORK

• A Turnkey project including engineering, installation,

commissioning and local management, training.

• Period: 2008 – 2009

• 50 Microwave Sites

• Big size antennas including space diversity (1.8m,

2.4m, 3m)

• ADM (ADR ranges)

• Electrical adequacy including battery, power

generating unit, earth grounding, 29 sites

• Sites adequacies including shelter installation,

minors reparation like painting, roof reparations,

cables infrastructures, 50 sites

• Factory and on site training

FOCUS ON COLOMBIA50 Radio Sites delivered between 2008 and 2009 for FUERZAS MILITARES

Page 8: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 8

DEPLOYMENT OF A RADIO LINKS NETWORK FOR A NEW INTERNET

& MOBILE OPERATOR (CDMA – EVDO 3G)

• A Turnkey project including engineering, installation,

commissioning and local management, training and support

services.

• Period: 2006 – 2009

• More than 3000 radio site

• More than 250 ADM (ADR ranges)

• On site training

• Local and remote Hotline support

• Embedded engineers in customer’s NOC, experts on

management system

FOCUS ON MOROCCO3,000 Radio Sites delivered between 2006 and 2009 for Wana

Page 9: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 9

DEPLOYMENT OF PDH AND SDH ACCESS

RADIO LINKS

• A Turnkey project including engineering,

installation, commissioning and local

management, training.

• Period: 2006 – 2008

• 800 PDH MW Sites (SLF)

• SDH ADM (ADR ranges)

• NMS

• Factory and on site training

FOCUS ON GHANA800 Radio Sites delivered between 2008 and 2008 for TIGO

Page 10: Sagemcom System Integration

OPTICAL SITES INFRASTRUCTURESREFERENCES

Page 11: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 11

Mali

2475 kmGhana

1400 kmKenya

3400 km

Tunisia

1295 km

Benin

650 kmZimbabwe

1380 km

Algeria

2275 km

Senegal

3231 km

Ivory Coast

3000 km

Madagascar

2700 km

Cameroon

150 kmTogo

800 km

OPTICAL SITES INFRASTRUCTURESMore than 23 000 Km of Optical Fibre deployed in Africa

for national backbones construction, including civil works and

site construction( shelters, power, fencing,...)

Page 12: Sagemcom System Integration

TELECOM SITE CONSTRUCTION

Page 13: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 13

• Greenfield Towers

• Complete range of Towers with two main

Partners

• Lattice Towers

• Guyed Towers

• Towers without foundations (Fast Deployment)

• Rooftops

• Masts

• Guyed Towers

• 2G/3G/MW Antennas

• Feeders

SCOPE OF SUPPLY (1/2)Large range of material to build a site

Page 14: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 14

• Shelters

• DC Power Supply

• Genset

• Indoor or Outdoor Cabinet

• Electrical Circuit

• Air Conditioning

• Remote Supervision System

SCOPE OF SUPPLY (2/2)Large range of material to build a site

Page 15: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

External document | AET/GE | 2009, November 19th 15

SCOPE OF WORKThe turn-key solution

Green Field Sites

•Soil Analysis

•Tower Erection

•Foundation Excavation

•Concrete Slab

Logistic

•Air & Sea Transport

•Custom Clearance

•Warehouse

•Transport to Site

Rooftop Sites

•Structure Analysis

•Structure Reinforcement

•Concrete Plinth

I&C

•BTS

•MW

•VSAT

Engineering

•Site Survey

•Layout

•As-built

•Certification

Sites Options

•Electrical Installation

•Access Road

•Fence

•Guard House

Maintenance

•Preventive

•Curative

•Site Clearance

Page 16: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

HDRHandheld Document Reader

Page 17: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

HDR (Handheld Document Reader)

The HDR as multireader accessory connects to communication device

which is managing communication autentication and integrated data storage. The

goal has been to create pocket size device which can be handheld for the

following tasks:

• Identification check on and inside of the borders

• Support of foreign issues (overstaying)

• Document validity check and ownership of the document

• Support of vehicle checking

Page 18: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

HDR (Handheld Document Reader) main objective

• On scene identification:

• from biometric data

• by document (Passport, ID

card, stb.)

• Doc validity check

• Search on the black lists

•Vehicle control

• Plate number recognition

• Search on the black lists

• Digital tahograf card reading

Page 19: Sagemcom System Integration

This document and the information contained are Sagemcom property and shall not be copied or disclosed to any third party without Sagemcom prior written authorization

HDR (Handheld Document Reader)

• Integratio with T series TETRAtab device

• Secured Bluetooth connection between HDR

and communication device

• Search in AFIS data bases

• SAP level FBI10 biometric scanner:

• User autentication and logging

• Customer biometric data input

• 2D barcode reader and OCR

• RFID contactless cardreader

• Smart card reader

• IP54 resistance

• 8 hour operation time from the battery

• 4-8 GB embedded memory for the black lists