saic-k-4006.xls

4
Page 1 of 4 SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08 SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER SAIC-K-4006 15-Dec-09 HVAC PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRA SAUDI ARAMCO USE ONLY SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-I A1 HVAC system for EOF shall be provided with standby system. A2 A3 A4 A5 A6 A7 A8 A9 A10 Essential Operating Facilities (EOF) HVAC Requirements ITEM No. SAES-K-002 Para 4.3.1 Buildings located in Class I, Zone 2 or Class I, Division 2 electrical areas shall be maintained at the positive pressure of 0.1 inch water gauge - (NFPA 496 Para 7.4.1) Note: See Item No. A3 in this SAIC for Control Building SAES-K-002 Para 5.1.1 Control building shall be maintained at a positive pressure of 0.25 inch water gauge with all the openings closed. SAES-K-002 Para 5.2 Auto changeover switches shall be provided between the operating and standby units. These switches shall be capable of providing changeover and equal wear and tear between the operating and standby units. SAES-K-002 Para 4.3.2 If the maximum design capacity of the HVAC system is supplied by two or more normally operating units, at least one standby unit shall be provided with a capacity equal to or greater than the capacity of the largest operating unit. SAES-K-002 Para 4.3.3.1 In case the maximum HVAC system demand is satisfied by one operating unit only, the capacity of the standby unit shall be at least equal to the capacity of the operating unit. SAES-K-002 Para 4.3.3.2 Alarms shall be provided for all HVAC systems to provide warning of power loss (from the normal supply) and failure of any portion of the HVAC system. SAES-K-002 Para 4.3.4.1 All alarm devices shall be independent of the normal power supply of the HVAC system SAES-K-002 Para 4.3.4.2 Individual alarm devices shall be connected to a master alarm in a location where they can be conveniently observed by an attendant or other responsible person designated by the management of this essential operating facility. SAES-K-002 Para 4.3.4.3 In cases where the facility is not attended full time, the system shall be connected to an alarm at the security office, utilities office, fire station or other full-time service unit with which arrangements can be made to alert the person in charge of this facility SAES-K-002 Para 4.3.4.3

Upload: mohamad

Post on 05-Jan-2016

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SAIC-K-4006.xls

Page 1 of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Essential Operating Facilities (EOF) HVAC Requirements SAIC-K-4006 15-Dec-09 HVAC

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIMESAUDI ARAMCO USE ONLY

SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE

A1 HVAC system for EOF shall be provided with standby system.

A2

A3

A4

A5

A6

A7

A8

A9

A10

ITEM No.

SAES-K-002Para 4.3.1

Buildings located in Class I, Zone 2 or Class I, Division 2 electrical areas shall be maintained at the positive pressure of 0.1 inch water gauge - (NFPA 496 Para 7.4.1)Note: See Item No. A3 in this SAIC for Control Building

SAES-K-002Para 5.1.1

Control building shall be maintained at a positive pressure of 0.25 inch water gauge with all the openings closed.

SAES-K-002Para 5.2

Auto changeover switches shall be provided between the operating and standby units. These switches shall be capable of providing changeover and equal wear and tear between the operating and standby units.

SAES-K-002Para 4.3.2

If the maximum design capacity of the HVAC system is supplied by two or more normally operating units, at least one standby unit shall be provided with a capacity equal to or greater than the capacity of the largest operating unit.

SAES-K-002Para 4.3.3.1

In case the maximum HVAC system demand is satisfied by one operating unit only, the capacity of the standby unit shall be at least equal to the capacity of the operating unit.

SAES-K-002Para 4.3.3.2

Alarms shall be provided for all HVAC systems to provide warning of power loss (from the normal supply) and failure of any portion of the HVAC system.

SAES-K-002Para 4.3.4.1

All alarm devices shall be independent of the normal power supply of the HVAC system

SAES-K-002Para 4.3.4.2

Individual alarm devices shall be connected to a master alarm in a location where they can be conveniently observed by an attendant or other responsible person designated by the management of this essential operating facility.

SAES-K-002Para 4.3.4.3

In cases where the facility is not attended full time, the system shall be connected to an alarm at the security office, utilities office, fire station or other full-time service unit with which arrangements can be made to alert the person in charge of this facility

SAES-K-002Para 4.3.4.3

Page 2: SAIC-K-4006.xls

Page 2 of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2008) Rev 3 30-Jun-08

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Essential Operating Facilities (EOF) HVAC Requirements SAIC-K-4006 HVAC

PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REFERENCE DOCUMENTS:

1-SAES-K-002 -- Air Conditioning Systems for Essential Operating Facilities 31 May, 2004

2-NFPA 496 -- Standard for Purged and Pressurized Enclosures for Electrical Equipment, 2008

Contractor / Third-Party Saudi Aramco

Name, Initials and Date:Work is Complete and Ready for Inspection:

Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

QC Inspector PID Representative

Name, Initials and Date:Performed Inspection Work / Rework May Proceed

Name, Initials and Date:T&I Witnessed QC Record Reviewed Work Verified

QC Supervisor Proponent and Others

Name, Sign and Date: Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

REMARKS:

Construction Representative* PMT Representative

Name, Organization,Initials and Date: