said monitoring network · 9 co-funded by the seventh framework programme (fp7), under grant...

13
Antonio Hayas López Abengoa Water 1 SAID Monitoring network Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 ABENGOA Lourdes, 19 th October 2016

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

Antonio Hayas López

Abengoa Water

1

SAID Monitoring network

Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1

ABENGOA

Lourdes, 19th October 2016

Page 2: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

SAID demonstrator area

2Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Page 3: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

3Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Previous monitoring networksWater quality data from Consejería

Page 4: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

4Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Rainfall and water flow data from HidrosurPrevious monitoring networks

Page 5: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

SAID sensors: Control in reservoirs

5Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Guadalhorce reservoir (Water quantity and quality)

depth, conduct., temp., pH, Dis.Ox., redox

Page 6: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

6Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Guadalteba reservoir (Water quantity and quality)

SAID sensors: Control in reservoirs

depth, conduct., temp., pH, Dis.Ox., redox

Page 7: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

7Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Channel for irrigation supply

(Water quality)

Channel for irrigation + urban supply

(Water quantity and quality)

Channel downstream La Encantada dam(Water quantity and quality)

SAID sensors: Control in channels

Page 8: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

8Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Grande River(Flood)

Campanillas River(Flood)

Guadalhorce River (Environmental flow)

SAID sensors: Control in rivers

Page 9: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

9Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

SAID Communication network An IHP node collects data from

environmental sensors and sends readings to a sink (another IHP node)

The sink node forwards data to a GSM/LTE Gateway connected to Internet

The gateways send their data to the IHP server (via Internet)

IHP server passes data to the DSS server which supplies inputs to DSS in the expected formats and time rates

* IHP nodes draw only a few mA, leading to long lifetime (months, years)

Example of IHP Node

Page 10: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

Final SAID network

10Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Sensor data gathered from sevenlocations.

Sensor nodes collect data and forward to the GSM gateway, and to the internet.

Selected 868 MHz frecuency band for wireless communication in each location:

License-free band

Huge TX power available (up to +27 dBm)

868 MHz transceiver available onIHP nodes

Page 11: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

Conclusions

Autonomous sensing communication available

No infraestructure needed: wireless communication and battery-powered operation

Easy to add new sensors

Based on SDI-12 interface

No configuration needed

Long lifetime

Low-power operation

11

Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the water inno& demo-1

Page 12: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

Thank you for your attention

www.said-project.eu

12Co-funded by the seventh framework programme (FP7), under grant

agreement no. 619132, within the Water Inno & Demo-1

Page 13: SAID Monitoring network · 9 Co-funded by the seventh framework programme (FP7), under grant agreement no. 619132, within the Water Inno & Demo-1 SAID Communication network An IHP

2

SAID project