sail through every storm proposal for waveriders
TRANSCRIPT
![Page 1: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/1.jpg)
Sail through every storm
Proposal for Waveriders
![Page 2: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/2.jpg)
Agenda for the MeetingAnalysis of Waveriders Current Situation
Prioritizing the Problems
Timeline
Problem Management
Conclusion
![Page 3: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/3.jpg)
Strengths
![Page 4: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/4.jpg)
Areas for Improvement
![Page 5: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/5.jpg)
Goals and ObjectivesLong Term Goals
Profit making organization
No. 1 Player in EU
Sustainability
Knowledge Management
Short Term Goals
Stock Management and Clearance
Employee Welfare
Ergonomic Considerations
Technology
Environment
Knowledge Management
![Page 6: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/6.jpg)
Prioritized ProblemsStock
Health and Safety
Facility Management
Lifecycle cost management
Environment
---------------------------------------------------------------------------
Knowledge Management
![Page 7: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/7.jpg)
1 2 3 4
Stock
Health & Safety
KM system
5
Space
Technology
Timeline
Environment
![Page 8: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/8.jpg)
1) Stock1,764,128 pounds
Reasons – Sales Forecasting or Sales targets not being met.
Outcome – Cash Deficiency
![Page 9: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/9.jpg)
Solution to StockMRP – Materials
Requirement Planning
The Master Production Schedule
Bill of Materials
Production cycle times and Material needs at each stage of the production cycle time
Supplier Lead Times.
![Page 10: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/10.jpg)
Stock
Procedure Buy Software
Evaluate Processes
Develop Team
Create Plan
Begin System
Monitor Progress
Why MRP? Cheaper
Quicker
Focuses on Key Problematic Areas
![Page 11: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/11.jpg)
2)Health and Safety Waveriders has no policy that covers employees’
welfare and employees’ safety.
![Page 12: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/12.jpg)
Action Plan Appoint Facility manager
Achieve ‘six packs’ through “An introduction to health and safety for small firm”.
Follow health and safety issue related to Waveriders in “An introduction to health and safety for small firm” by Health and safety executive (HSE)
Consult HSE
Conduct 5 steps risk assessment and involve employees in the process.
Encourage safety culture
Develop health and safety policy
Develop manual and emergency plan
Educate and train manager and employees
Quarterly review
![Page 13: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/13.jpg)
Health & Safety Follow guideline in “An Introduction in Health &
Safety in Small business” by Health and Safety Executive (HSE)
Managing health and safety Slips, trips and falls Hazardous substances Musculoskeletal disorders Display screen equipment Work equipment and machinery Maintenance and building work First aid and accident reporting
![Page 14: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/14.jpg)
Risk Assessment5 steps in risk assessment
Step 1 Identify the hazards
Step 2 Decide who might be harmed and how
Step 3 Evaluate the risks and decide on precautions
Step 4 Record your findings and implement them
Step 5 Review your assessment and update if necessary
![Page 15: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/15.jpg)
Problems :
- Lack of proper consideration in ergonomics.
- Inefficient management of space in terms of stock assembly and waste.
3)Space Management
![Page 16: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/16.jpg)
Solution:- Purchase QFM software.- Outsource - Hiring of a facility manager.- Reduce fixed fit-out equipments and provide a small
range of versatile, user-friendly, standardized, re-locatable and adjustable components.
- Divide space into locally manageable unit sizes- Deliver fit for purpose building.
Space Management
![Page 17: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/17.jpg)
Space ManagementOutsourcing.
Outsource experts in the market and technology boat market in Europe.
Keeping core business processes in-house within waveriders and outsource non-core services.
![Page 18: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/18.jpg)
4)Lifecycle Cost Management
Invaluable Assets
Installing a new Technology
![Page 19: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/19.jpg)
Lifecycle Cost Management
Life Cycle Asset Management Model
![Page 20: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/20.jpg)
Solutions to life cycle cost asset managementHiring Lifecycle Engineering
![Page 21: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/21.jpg)
Environment Management
An environmental management system is about running an enterprise better, more efficiently, more competitively, and more sustainably, and about making and saving money.
Environmental management is the part of EFQM and can link to European Excellence Model e.g. Processes and Society Results
![Page 22: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/22.jpg)
Challenges for organization.
Atmosphere
Toxic Chemicals
Land
Oceans
Biotechnology and biodiversity
![Page 23: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/23.jpg)
Atmospheric ConcernGlobal warming - rise in emissions of
greenhouse gases such as carbon dioxide and methane resulting in an increase in earth's temperature, climate change and a rise in sea level.
Ozone depletion - reduction in the ozone layer surrounding the earth, caused by the use of CFCs, letting the sun's ultraviolet rays penetrate.
![Page 24: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/24.jpg)
Eco Friendly ProductSome Benefits of Eco Friendly Product which
can be describe as Exposure to any toxic chemicals can be harmful to the human body and using eco-friendly products can kill the danger of it. Many products these days contain substances which promotes cancer or other deadly diseases
![Page 25: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/25.jpg)
Implementation ISO 14000ISO 14000 is a management tool enabling an organization of any size or type to:
Identify and control the environmental impact of its activities, products or services, and to
Improve its environmental performance continually, and to
Implement a systematic approach to setting environmental objectives and targets, to achieving these and to demonstrating that they have been achieved.
![Page 26: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/26.jpg)
Implementation of Knowledge Management
Drag picture to placeholder or click icon to add
![Page 27: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/27.jpg)
Knowledge Management in excellent organizations 4e. Information and knowledge are managed to support effective
decision making and to build the organisation’s capability
In practice Ensure accurate and sufficient information to support timely
decision making Transform data into information and into knowledge that can
be shared. Provide access to information and knowledge to people. Establish and manage networks to identify opportunity for
innovation. Use data and information on current performance to d
identifies opportunity to generate innovation
EFQM Excellence model 2010 (4e)
![Page 28: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/28.jpg)
Implementation framework
Adapted from: Tiwana, A. (2000).
Analyze existing infrastructure
Design KM infrastructure
Align KM and business strategy
Audit existing knowledge asset and system
Deploy using result driven incremental technology
Design KM team
Create KM blueprint
Develop KM system
Manage change culture and reward structure
Evaluate performance and incrementally refine the KMS
Infrastructure evaluation
KM system analyse design and development
Deployment
Evaluation
![Page 29: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/29.jpg)
People
• No KM team• No training• No knowledge retention• No learning culture
Resources• No database• No Intranet
Process• No documentation• No knowledge transfer/sharing
Existing KM at Waveriders
![Page 30: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/30.jpg)
People
• Involvement and commitment from top level managers• Investing on people, support them with trainings• Create knowledge culture through effective communication • Improve the existing environment through employee feedback
Resources• outsourcing • Intranet, forum for employees• Working Manual library (online)• Website-newsletters, blogs for external users and customers• Database management
Process• Retain talents and strengthen recruitment• Weekly/ project review• Networking (socialising)
KM at Waveriders
![Page 31: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/31.jpg)
SUMMARY
Drag picture to placeholder or click icon to add
![Page 32: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/32.jpg)
Organizational Structure
Stock Clearance – Maroon Circle representing the Department
Health and Safety - Hire a Facility Manager
Space Management – Hire a Facility Manager
Life Cycle Cost Asset Management – Red Circle represents the department as well as Life Cycle Engineering Agency
Environment Management – Hire a Facility Management
HR Department is required for all the activities.
![Page 33: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/33.jpg)
1 2 3 4
MRP completed
Health & Safety
KM system
5
Space
Technology
Timeline
ISO 14000
![Page 34: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/34.jpg)
Conclusion In order for Waveriders to reach higher levels
of ROI for the company it is important for them to make efficient use of their Assets and Knowledge.
This can be achieved through strong dedication and motivation from the leaders as well as all employees in the organization.
TRUMP believes that upon undergoing the given change plans Waveriders will emerge from their present state to lead a sustainable future.
![Page 35: Sail through every storm Proposal for Waveriders](https://reader030.vdocuments.net/reader030/viewer/2022032600/56649db35503460f94aa35c6/html5/thumbnails/35.jpg)
Thank You
Drag picture to placeholder or click icon to add