Sample of Public bid BIM EX Plan

• Specification format

• More quantifiable

• Can be applied to any project

• Not project specific based

Page 2: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is
Page 3: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is
Page 4: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is
Page 5: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is

Sample of Privately bid BIM Ex Plan• Team based

• Explains project goals / objectives

• Distribute information based on Design Model LOD

• Project specific priorities associated with schedule

Page 6: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is
Page 7: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is
Page 8: Sample of Public bid BIM EX Plan - Engineering Center · active Construction BIM to ensure that there are no conflicts between Other elements and their system(s). 6. Each Trade is

Project specific questions to ask:• How is BIM being used• Who will be using it• Is there a chance that the BIM investment will not be carried over to owner• Produce menu of options for use and needs for O&M

Coordination OverlayBased on BIM turnover

Master equipment ListBased on Menu of Options