san bernardino international airport - sbiaa.org€¦ · active dirt pile. active piles. open...

19
AECOM T: 714.567.2400 999 TOWN & COUNTRY ROAD F: 714.567.2729 ORANGE, CALIFORNIA 92868 www.aecom.com SAN BERNARDINO INTERNATIONAL AIRPORT RAMP JOINT SEAL REPLACEMENT & EDA GRANT NO. 07-49-06454 ISSUED FOR BID PAVEMENT REPAIR PROJECT

Upload: lethuan

Post on 22-May-2018

230 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

SAN BERNARDINO

INTERNATIONAL AIRPORT

RAMP JOINT SEAL REPLACEMENT &

EDA GRANT NO. 07-49-06454

ISSUED FOR BID

PAVEMENT REPAIR PROJECT

AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
AREA U/C
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
SP
AutoCAD SHX Text
FP
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ACTIVE DIRT PILE
AutoCAD SHX Text
ACTIVE PILES
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
WINDSOCK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
POLE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
FP
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
AIRCRAFT DEBRIS
AutoCAD SHX Text
BRUSH
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
GEORGE WEBSTER DR.
AutoCAD SHX Text
S LELAND NORTON WAY
AutoCAD SHX Text
HARRY SHEPARD BLVD.
AutoCAD SHX Text
N LELAND NORTON WAY
AutoCAD SHX Text
S DEL ROSA DR.
AutoCAD SHX Text
PERIMETER RD.
AutoCAD SHX Text
99TH ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
E 3RD ST.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
9
AutoCAD SHX Text
1857426.06
AutoCAD SHX Text
6788654.13
AutoCAD SHX Text
1077.86
AutoCAD SHX Text
11
AutoCAD SHX Text
1857603.75
AutoCAD SHX Text
6790993.62
AutoCAD SHX Text
1095.86
AutoCAD SHX Text
13
AutoCAD SHX Text
1862114.18
AutoCAD SHX Text
6793262.07
AutoCAD SHX Text
1124.58
AutoCAD SHX Text
14
AutoCAD SHX Text
1857545.70
AutoCAD SHX Text
6795478.13
AutoCAD SHX Text
1134.04
AutoCAD SHX Text
15
AutoCAD SHX Text
1861947.60
AutoCAD SHX Text
6797748.50
AutoCAD SHX Text
1159.09
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
N DEL ROSA DR.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
HARRY SHEPPARD BLVD.
AutoCAD SHX Text
RIALTO AVE.
AutoCAD SHX Text
G-01
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SITE MAP
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY 1601 E. THIRD STREET SAN BERNARDINO, CA 92408
AutoCAD SHX Text
TWO DAYS BEFORE YOU DIG
AutoCAD SHX Text
CALL TOLL FREE
AutoCAD SHX Text
S
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
1-800-227-2600
AutoCAD SHX Text
1
AutoCAD SHX Text
COVER SHEET
Page 2: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
G-02
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
EG
AutoCAD SHX Text
%%UABBREVIATIONS:
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
FINISHED SURFACE
AutoCAD SHX Text
FLOWLINE
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXCAVATION
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
END OF CURVE
AutoCAD SHX Text
EACH
AutoCAD SHX Text
CLEAR, CLEARANCE
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CRUSHED AGGREGATE BASE COURSE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BEGINNING OF CURVE
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
APPROXIMATE
AutoCAD SHX Text
ALTERNATE
AutoCAD SHX Text
ABOVE FINISHED GRADE
AutoCAD SHX Text
ASPHALTIC CONCRETE
AutoCAD SHX Text
FS
AutoCAD SHX Text
F , FL
AutoCAD SHX Text
FG
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXC
AutoCAD SHX Text
EP
AutoCAD SHX Text
EL, ELEV
AutoCAD SHX Text
EC
AutoCAD SHX Text
EA
AutoCAD SHX Text
CLR
AutoCAD SHX Text
C , C/L
AutoCAD SHX Text
CABC
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BC
AutoCAD SHX Text
BARR
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
APPROX
AutoCAD SHX Text
ALT
AutoCAD SHX Text
AFG
AutoCAD SHX Text
AC
AutoCAD SHX Text
(720.73)
AutoCAD SHX Text
720.73
AutoCAD SHX Text
AB
AutoCAD SHX Text
EXISTING SPOT ELEVATION
AutoCAD SHX Text
NEW SPOT ELEVATION
AutoCAD SHX Text
ANCHOR BOLT
AutoCAD SHX Text
BEGIN VERTICAL CURVE STATION CONDUIT
AutoCAD SHX Text
BVCS
AutoCAD SHX Text
BVCE
AutoCAD SHX Text
BEGIN VERTICAL CURVE ELEVATION
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONT.
AutoCAD SHX Text
CORR.
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
CORRUGATED
AutoCAD SHX Text
DOUBLE
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
DBL
AutoCAD SHX Text
DIA
AutoCAD SHX Text
END VERTICAL CURVE ELEVATION
AutoCAD SHX Text
EVCE
AutoCAD SHX Text
EVCS
AutoCAD SHX Text
END VERTICAL CURVE STATION
AutoCAD SHX Text
GALV
AutoCAD SHX Text
GALVANIZED
AutoCAD SHX Text
c/c
AutoCAD SHX Text
CENTER TO CENTER
AutoCAD SHX Text
GB
AutoCAD SHX Text
GRADE BREAK
AutoCAD SHX Text
ENGINEERED MATERIALS ARRESTING SYSTEMS
AutoCAD SHX Text
EMAS
AutoCAD SHX Text
BITUMINOUS
AutoCAD SHX Text
BIT
AutoCAD SHX Text
AIRFIELD LIGHTING VAULT
AutoCAD SHX Text
ALV
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
FH
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CLF
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
CB
AutoCAD SHX Text
EACH WAY
AutoCAD SHX Text
EW
AutoCAD SHX Text
EDGE OF SHOULDER
AutoCAD SHX Text
ES
AutoCAD SHX Text
BLAST FENCE
AutoCAD SHX Text
BF
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AVE
AutoCAD SHX Text
ASTM
AutoCAD SHX Text
AIR TRAFFIC CONTROL TOWER
AutoCAD SHX Text
ATCT
AutoCAD SHX Text
AIRPORT RESCUE AND FIRE FIGHTING
AutoCAD SHX Text
ARFF
AutoCAD SHX Text
CONCRETE MASONRY UNITS
AutoCAD SHX Text
CMU
AutoCAD SHX Text
FEDERAL AVIATION ADMINISTRATION
AutoCAD SHX Text
FAA
AutoCAD SHX Text
BASE
AutoCAD SHX Text
B
AutoCAD SHX Text
CY
AutoCAD SHX Text
CUBIC YARD
AutoCAD SHX Text
ARC LENGTH
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
EQ
AutoCAD SHX Text
GSA
AutoCAD SHX Text
GLIDE SLOPE ANTENNA
AutoCAD SHX Text
DUCTILE IRON
AutoCAD SHX Text
DI
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DWG
AutoCAD SHX Text
CEMENT COATED STEEL PIPE
AutoCAD SHX Text
CCSP
AutoCAD SHX Text
LIGHTING SYSTEM AND RUNWAY
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
HIGH DENSITY POLYETHYLENE
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TAXIWAY
AutoCAD SHX Text
TOP OF GRATE
AutoCAD SHX Text
TERMINATE
AutoCAD SHX Text
STATION
AutoCAD SHX Text
SQUARE FEET
AutoCAD SHX Text
RUNWAY
AutoCAD SHX Text
POINT OF VERTICAL TANGENCY
AutoCAD SHX Text
POINT OF VERTICAL INTERSECTION
AutoCAD SHX Text
POINT OF VERTICAL CURVATURE
AutoCAD SHX Text
POINT OF TANGENCY
AutoCAD SHX Text
POINT OF INTERSECTION
AutoCAD SHX Text
POINT OF COMPOUND CURVATURE
AutoCAD SHX Text
PORTLAND CEMENT CONCRETE/
AutoCAD SHX Text
ORIGINAL GROUND
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text
LUMP SUM
AutoCAD SHX Text
LINEAL FEET
AutoCAD SHX Text
POUND
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TWY
AutoCAD SHX Text
TG
AutoCAD SHX Text
TERM
AutoCAD SHX Text
STA
AutoCAD SHX Text
SF
AutoCAD SHX Text
RWY
AutoCAD SHX Text
PVT
AutoCAD SHX Text
PVI
AutoCAD SHX Text
PVC
AutoCAD SHX Text
PT
AutoCAD SHX Text
PI
AutoCAD SHX Text
OG
AutoCAD SHX Text
NO
AutoCAD SHX Text
MISC
AutoCAD SHX Text
LS
AutoCAD SHX Text
LF
AutoCAD SHX Text
LB
AutoCAD SHX Text
TC
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
INVERT
AutoCAD SHX Text
INV
AutoCAD SHX Text
LONG
AutoCAD SHX Text
LG
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MPH
AutoCAD SHX Text
MILES PER HOUR
AutoCAD SHX Text
NOM
AutoCAD SHX Text
NOMINAL
AutoCAD SHX Text
OC
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
P.C.
AutoCAD SHX Text
PORTLAND CEMENT
AutoCAD SHX Text
PSF
AutoCAD SHX Text
PSI
AutoCAD SHX Text
POUNDS PER SQUARE FOOT
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
RGS
AutoCAD SHX Text
RIGID STEEL
AutoCAD SHX Text
SQ
AutoCAD SHX Text
SQUARE
AutoCAD SHX Text
USS
AutoCAD SHX Text
UNITED STATES STANDARD
AutoCAD SHX Text
HORIZ
AutoCAD SHX Text
HORIZONTAL
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text
VERT
AutoCAD SHX Text
VC
AutoCAD SHX Text
VERTICAL CURVE
AutoCAD SHX Text
PRVC
AutoCAD SHX Text
POINT OF REVERSE VERTICAL CURVATURE
AutoCAD SHX Text
VAR
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
HIGH TENSION
AutoCAD SHX Text
H.T.
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SR
AutoCAD SHX Text
SERVICE ROAD
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
W/
AutoCAD SHX Text
WITH
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PVMT
AutoCAD SHX Text
POB
AutoCAD SHX Text
POE
AutoCAD SHX Text
POINT OF BEGINNING
AutoCAD SHX Text
POINT OF END
AutoCAD SHX Text
POINT OF CURVATURE
AutoCAD SHX Text
PC
AutoCAD SHX Text
PB
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text
REINFORCED CONCRETE PIPE
AutoCAD SHX Text
RCP
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
REINFORCED
AutoCAD SHX Text
REINF
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
L
AutoCAD SHX Text
ST
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LEFT
AutoCAD SHX Text
LT
AutoCAD SHX Text
RT
AutoCAD SHX Text
RIGHT
AutoCAD SHX Text
SPPWC
AutoCAD SHX Text
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
AutoCAD SHX Text
HP
AutoCAD SHX Text
HIGH POINT
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
TOT
AutoCAD SHX Text
WWF
AutoCAD SHX Text
WELDED WIRE FABRIC
AutoCAD SHX Text
SECURITY IDENTIFICATION DISPLAY AREA
AutoCAD SHX Text
SIDA
AutoCAD SHX Text
OD
AutoCAD SHX Text
OUTSIDE DIAMETER
AutoCAD SHX Text
STORMWATER POLLUTION PREVENTION PROGRAM
AutoCAD SHX Text
SWPPP
AutoCAD SHX Text
THICKNESS
AutoCAD SHX Text
T
AutoCAD SHX Text
ID
AutoCAD SHX Text
INSIDE DIAMETER
AutoCAD SHX Text
PROP
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
TRANSPORTATION SECURITY ADMINISTRATION
AutoCAD SHX Text
TSA
AutoCAD SHX Text
SSPWC
AutoCAD SHX Text
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
AutoCAD SHX Text
PROCESSED MISCELLANEOUS BASE
AutoCAD SHX Text
PMB
AutoCAD SHX Text
PCC
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
SANITARY SEWER
AutoCAD SHX Text
SS
AutoCAD SHX Text
STORM DRAIN
AutoCAD SHX Text
SD
AutoCAD SHX Text
MH
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
MALSR
AutoCAD SHX Text
MEDIUM INTENSITY APPROACH
AutoCAD SHX Text
ALIGNMENT INDICATOR LIGHTS
AutoCAD SHX Text
PRECISION APPROACH PATH INDICATOR
AutoCAD SHX Text
PAPI
AutoCAD SHX Text
W
AutoCAD SHX Text
WATER
AutoCAD SHX Text
UNO
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
3
AutoCAD SHX Text
TP-04
AutoCAD SHX Text
DWG NO.
AutoCAD SHX Text
DETAIL NO.
AutoCAD SHX Text
%%UREFERENCE SYSTEM:
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SBIAA
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
AMERICAN SOCIETY FOR TESTING AND MATERIALS
AutoCAD SHX Text
ALGEBRAIC DIFFERENCE
AutoCAD SHX Text
A.D.
AutoCAD SHX Text
CURVE COEFFICIENT
AutoCAD SHX Text
"K"
AutoCAD SHX Text
%%UABBREVIATIONS CONT:
AutoCAD SHX Text
VSR
AutoCAD SHX Text
VEHICLE SERVICE ROAD
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
CONTRACTOR'S OPERATIONS AND STORAGE AREA
AutoCAD SHX Text
PROJECT SITE AREA
AutoCAD SHX Text
CONTRACTOR'S HAUL ROUTES
AutoCAD SHX Text
INDEX OF DRAWINGS, GENERAL &
AutoCAD SHX Text
CONSTRUCTION NOTES, ABBREVIATIONS & LEGENDS
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DWG NO.
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
1
AutoCAD SHX Text
G-01
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
2
AutoCAD SHX Text
G-02
AutoCAD SHX Text
INDEX OF DRAWINGS, GENERAL & CONS NOTES, ABBREVIATIONS & LEGENDS
AutoCAD SHX Text
3
AutoCAD SHX Text
G-03
AutoCAD SHX Text
INDEX MAP & DESCRIPTION OF WORK
AutoCAD SHX Text
4
AutoCAD SHX Text
G-04
AutoCAD SHX Text
CONTRACTOR'S ACCESS & LAYDOWN AREA
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
5
AutoCAD SHX Text
PH-01
AutoCAD SHX Text
OVERALL NORTH & WEST RAMPS CONSTRUCTION PHASING PLAN
AutoCAD SHX Text
6
AutoCAD SHX Text
PH-02
AutoCAD SHX Text
CONSTRUCTION PHASING SCHEDULE - NORTH & WEST RAMPS
AutoCAD SHX Text
7
AutoCAD SHX Text
PH-04
AutoCAD SHX Text
CONSTRUCTION PHASING DETAILS
AutoCAD SHX Text
8
AutoCAD SHX Text
C-01
AutoCAD SHX Text
NORTH RAMP - SHEET 1 OF 6
AutoCAD SHX Text
9
AutoCAD SHX Text
C-02
AutoCAD SHX Text
NORTH RAMP - SHEET 2 OF 6
AutoCAD SHX Text
10
AutoCAD SHX Text
C-03
AutoCAD SHX Text
NORTH RAMP - SHEET 3 OF 6
AutoCAD SHX Text
11
AutoCAD SHX Text
C-04
AutoCAD SHX Text
NORTH RAMP - SHEET 4 OF 6
AutoCAD SHX Text
12
AutoCAD SHX Text
C-05
AutoCAD SHX Text
NORTH RAMP - SHEET 5 OF 6
AutoCAD SHX Text
13
AutoCAD SHX Text
C-06
AutoCAD SHX Text
NORTH RAMP - SHEET 6 OF 6
AutoCAD SHX Text
14
AutoCAD SHX Text
C-07
AutoCAD SHX Text
WEST RAMP - SHEET 1 OF 4
AutoCAD SHX Text
15
AutoCAD SHX Text
C-08
AutoCAD SHX Text
WEST RAMP - SHEET 2 OF 4
AutoCAD SHX Text
16
AutoCAD SHX Text
C-09
AutoCAD SHX Text
WEST RAMP - SHEET 3 OF 4
AutoCAD SHX Text
17
AutoCAD SHX Text
C-10
AutoCAD SHX Text
WEST RAMP - SHEET 3 OF 4
AutoCAD SHX Text
18
AutoCAD SHX Text
C-30
AutoCAD SHX Text
PAVEMENT REPAIR DETAILS 1 OF 2
AutoCAD SHX Text
19
AutoCAD SHX Text
C-31
AutoCAD SHX Text
PAVEMENT REPAIR DETAILS 2 OF 2
AutoCAD SHX Text
1.WHEN SHOWN, THE LOCATION OF THE SUBSTRUCTURES/UTILITIES SHOWN ON THESE PLANS WHEN SHOWN, THE LOCATION OF THE SUBSTRUCTURES/UTILITIES SHOWN ON THESE PLANS WAS OBTAINED BY SEARCH OF AVAILABLE RECORDS. THERE IS NO ASSURANCE THAT THE RECORD INFORMATION IS ACCURATE, OR THAT ALL EXISTING SUBSTRUCTURES ARE SHOWN ON THESE PLANS. THE CONTRACTOR IS RESPONSIBLE FOR TAKING THE NECESSARY PRECAUTIONARY MEASURES TO PROTECT THE SUBSTRUCTURES SHOWN AND ANY OTHER SUBSTRUCTURES ENCOUNTERED NOT OF RECORD OR NOT SHOWN ON THESE PLANS. 2.ATTENTION IS DIRECTED TO THE SPECIFICATIONS WHERE BIDDERS ARE REQUIRED TO EXAMINE ATTENTION IS DIRECTED TO THE SPECIFICATIONS WHERE BIDDERS ARE REQUIRED TO EXAMINE AND JUDGE, AS THEIR OWN RESPONSIBILITY, THE LOCATION, PHYSICAL CONDITIONS, AND SURROUNDINGS OF THE PROPOSED WORK. 3.WHERE NEW SUBSURFACE IMPROVEMENTS CROSS EXISTING SUBSTRUCTURES, THE CONTRACTOR WHERE NEW SUBSURFACE IMPROVEMENTS CROSS EXISTING SUBSTRUCTURES, THE CONTRACTOR SHALL TRENCH WITH EXTREME CAUTION TO LOCATE ALL ACTIVE AND IDLE SUBSTRUCTURES AT THESE CROSSINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ALL SUBSTRUCTURES DAMAGED DURING CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 4.SAFE CONSTRUCTION PRACTICES DURING EXCAVATION INCLUDING PROPER SLOPES AND SAFE CONSTRUCTION PRACTICES DURING EXCAVATION INCLUDING PROPER SLOPES AND SHORING ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL COMPLY WITH ALL OSHA AND OTHER APPLICABLE SAFETY REGULATIONS. INFORMATION REGARDING SOIL CONDITIONS ARE CONTAINED IN THE SOIL REPORT FOR THE SITE WHICH IS AVAILABLE FOR REVIEW AT THE ENGINEER'S OFFICE. 5.THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH THE VARIOUS COMPANIES AND THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WITH THE VARIOUS COMPANIES AND AGENCIES WHO MAY BE AFFECTED BY THIS PROJECT. THE CONTRACTOR SHALL OBTAIN ANY REQUIRED PERMITS. 6.THE CONTRACTOR SHALL ADHERE TO ALL SAFETY CODES, REGULATIONS AND SPECIFICATIONS THE CONTRACTOR SHALL ADHERE TO ALL SAFETY CODES, REGULATIONS AND SPECIFICATIONS FOR THE DURATION OF THIS CONTRACT. 7.THE CONTRACTOR SHALL VERIFY THE DIMENSIONS OF EXISTING FACILITIES PRIOR TO THE THE CONTRACTOR SHALL VERIFY THE DIMENSIONS OF EXISTING FACILITIES PRIOR TO THE PROCUREMENT, FABRICATION AND INSTALLATION OF ANY NEW WORK. 8.ALL ASPHALTIC CONCRETE AND CONCRETE PAVEMENT AND OTHER EXISTING SURFACES ALL ASPHALTIC CONCRETE AND CONCRETE PAVEMENT AND OTHER EXISTING SURFACES DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED AT THE CONTRACTOR'S EXPENSE. 9.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. 10.CONTRACTOR SHALL RECEIVE ACCESS TO THE PROJECT SITE TO BEGIN WORK AFTER CONTRACTOR SHALL RECEIVE ACCESS TO THE PROJECT SITE TO BEGIN WORK AFTER COMPLETION OF THE PRINCIPAL ITEMS OF MOBILIZATION. 11.THE CONTRACTOR MUST SCHEDULE OPERATIONS IN ORDER TO COMPLETE CONSTRUCTION IN THE CONTRACTOR MUST SCHEDULE OPERATIONS IN ORDER TO COMPLETE CONSTRUCTION IN THE CONTRACT TIME SPECIFIED. CONTRACTOR SHALL PREPARE A SCHEDULE OF CONSTRUCTION AND PRESENT AT THE PRECONSTRUCTION MEETING. THIS SCHEDULE WILL BE DISCUSSED AND ADOPTED AT THE PRECONSTRUCTION MEETING. 12.THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE AIRPORT MANAGER OR THE THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE AIRPORT MANAGER OR THE ENGINEER. THE CONTRACTOR SHALL PROVIDE NO LESS THAN TWO (2) DAYS ADVANCED NOTICE OF CONSTRUCTION OPERATIONS SO THAT INFORMATION ON CLOSED OR HAZARDOUS CONDITIONS SUCH THAT A NOTAM CAN BE ISSUED. 13.ALL HAUL ROUTES, STOCKPILE AREAS AND ACTIVE AIRPORT OPERATIONAL SAFETY AREAS SHALL ALL HAUL ROUTES, STOCKPILE AREAS AND ACTIVE AIRPORT OPERATIONAL SAFETY AREAS SHALL BE DISCUSSED AND COORDINATED WITH THE RESIDENT PROJECT REPRESENTATIVE AND THE AIRPORT MANAGER PRIOR TO PERFORMING ANY WORK IN ANY OF THE WORK AREAS. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REPAIRING ANY EXISTING THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REPAIRING ANY EXISTING PAVEMENTS AND/OR HAUL ROUTES DAMAGED BY CONSTRUCTION TRAFFIC THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY NECESSARY ADDITIONAL STABILIZATION OF ALL ACCESS AND HAUL ROUTES. ALL ACCESS AND HAUL ROUTES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. 15.ALL CONSTRUCTION TRAFFIC MUST ENTER AND EXIT THE PROJECT WORK AREA AS SHOWN ON ALL CONSTRUCTION TRAFFIC MUST ENTER AND EXIT THE PROJECT WORK AREA AS SHOWN ON DRAWINGS OR AS APPROVED BY THE ENGINEER. 16.THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS NOT TO DISTURB EXISTING THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS NOT TO DISTURB EXISTING CONCRETE SURVEY MONUMENTS. 17.CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND OBTAIN ALL PERMITS. CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES AND OBTAIN ALL PERMITS. 18.IN THE EVENT OF ANY DISCREPANCIES AND/OR ERRORS FOUND IN THE DRAWINGS, OR IF IN THE EVENT OF ANY DISCREPANCIES AND/OR ERRORS FOUND IN THE DRAWINGS, OR IF PROBLEMS ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL BE REQUIRED TO NOTIFY THE ENGINEER BEFORE PROCEEDING WITH THE WORK. IF THE ENGINEER IS NOT NOTIFIED, THE CONTRACTOR SHALL TAKE RESPONSIBILITY FOR THE COST OF ANY REVISIONS. 19.GENERAL CONTRACTOR SHALL HAVE AN AUTHORIZED JOB SUPERINTENDENT ON THE JOB AT GENERAL CONTRACTOR SHALL HAVE AN AUTHORIZED JOB SUPERINTENDENT ON THE JOB AT ALL TIMES WHEN ANY WORK IS IN PROGRESS BY ANY TRADE. 20.THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT AIRCRAFT WILL BE OPERATING AT THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT AIRCRAFT WILL BE OPERATING AT THIS AIRPORT. THE CONTRACTOR SHALL PERFORM THE WORK IN SUCH A MANNER AS TO NOT UNDULY INTERFERE WITH NOR ENDANGER THE AIRCRAFT OR AIRPORT OPERATIONS. THE CONTRACTOR SHOULD MAKE AN ESTIMATE OF THE DIFFICULTIES TO BE ENCOUNTERED (SEE CONSTRUCTION SAFETY AND PHASING PLAN). 21.MUD AND/OR DEBRIS WILL NOT BE ALLOWED ON PAVED SURFACES. ANY CORRECTIVE ACTION MUD AND/OR DEBRIS WILL NOT BE ALLOWED ON PAVED SURFACES. ANY CORRECTIVE ACTION NEEDED TO ASSURE THIS WILL BE CONSIDERED INCIDENTAL TO THE PROJECT. 22.PROJECT CONSTRUCTION SAFETY AND PHASING PLAN MUST BE STRICTLY FOLLOWED. PROJECT CONSTRUCTION SAFETY AND PHASING PLAN MUST BE STRICTLY FOLLOWED.
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text
X
AutoCAD SHX Text
EXISTING AOA PERIMETER FENCE
AutoCAD SHX Text
EXISTING /EDGE TWY PVMT MARKINGS
AutoCAD SHX Text
CONSTRUCTION PHASING LIMIT
Page 3: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

····

AutoCAD SHX Text
TANKS
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
SP
AutoCAD SHX Text
FP
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
POLE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
FP
AutoCAD SHX Text
BRUSH
AutoCAD SHX Text
GEORGE WEBSTER DR.
AutoCAD SHX Text
S LELAND NORTON WAY
AutoCAD SHX Text
HARRY SHEPARD BLVD.
AutoCAD SHX Text
N LELAND NORTON WAY
AutoCAD SHX Text
S DEL ROSA DR.
AutoCAD SHX Text
E 3RD ST.
AutoCAD SHX Text
PERIMETER RD.
AutoCAD SHX Text
99TH ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
E 3RD ST.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
TANK
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
N DEL ROSA DR.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
HARRY SHEPPARD BLVD.
AutoCAD SHX Text
RIALTO AVE.
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
E. 3RD ST.
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TWY D
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RWY 24 RUN UP PAD
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
G-03
AutoCAD SHX Text
3
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
200'
AutoCAD SHX Text
400'
AutoCAD SHX Text
800'
AutoCAD SHX Text
400'
AutoCAD SHX Text
INDEX MAP & DESCRIPTION OF WORK
AutoCAD SHX Text
HANGAR HEAVY AIRCRAFT MAINTENANCE
AutoCAD SHX Text
%%UINDEX MAP
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
LUXIVAIR
AutoCAD SHX Text
BASE BID - GENERAL DESCRIPTION OF WORK:
AutoCAD SHX Text
REMOVAL AND REPLACEMENT OF PCC JOINT SEALANTS. SEAL CRACKS IN PCC SLABS. PARTIAL DEPTH PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLABS. RESTORE PAVEMENT MARKINGS AND STRIPING OF REPAIRED AREAS AS REQUIRED.
Page 4: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
AREA U/C
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
SP
AutoCAD SHX Text
FP
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
POLE
AutoCAD SHX Text
TARGET
AutoCAD SHX Text
1192.1
AutoCAD SHX Text
ACTIVE DIRT PILE
AutoCAD SHX Text
ACTIVE PILES
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
WINDSOCK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
POLE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
TARGET
AutoCAD SHX Text
1187.6
AutoCAD SHX Text
GATE
AutoCAD SHX Text
FP
AutoCAD SHX Text
OPEN STORAGE
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
AIRCRAFT DEBRIS
AutoCAD SHX Text
BRUSH
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
BUNKER
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
GEORGE WEBSTER DR.
AutoCAD SHX Text
S LELAND NORTON WAY
AutoCAD SHX Text
HARRY SHEPARD BLVD.
AutoCAD SHX Text
N LELAND NORTON WAY
AutoCAD SHX Text
S DEL ROSA DR.
AutoCAD SHX Text
E 3RD ST.
AutoCAD SHX Text
PERIMETER RD.
AutoCAD SHX Text
99TH ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
W ST.
AutoCAD SHX Text
E 3RD ST.
AutoCAD SHX Text
ALABAMA ST.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
TANK
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
N DEL ROSA DR.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
TANK
AutoCAD SHX Text
S TIPPECANOE AVE.
AutoCAD SHX Text
E PALM MEADOWS DR.
AutoCAD SHX Text
HARRY SHEPPARD BLVD.
AutoCAD SHX Text
RIALTO AVE.
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TWY D
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
N. DEL ROSA DR.
AutoCAD SHX Text
HARRY SHEPPARD BLVD.
AutoCAD SHX Text
E. 3RD ST.
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
250'
AutoCAD SHX Text
500'
AutoCAD SHX Text
1000'
AutoCAD SHX Text
500'
AutoCAD SHX Text
HAUL ROUTE
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text
CONTRACTOR'S OPERATIONS AND STORAGE AREA
AutoCAD SHX Text
LIMIT OF CONSTRUCTION
AutoCAD SHX Text
GATE 8
AutoCAD SHX Text
G-04
AutoCAD SHX Text
4
AutoCAD SHX Text
CONTRACTOR'S ACCESS & LAYDOWN AREA
AutoCAD SHX Text
HANGAR HEAVY AIRCRAFT MAINTENANCE
AutoCAD SHX Text
LUXIVAIR
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text
99TH ST.
AutoCAD SHX Text
Y STREET
AutoCAD SHX Text
PERIMETER RD.
AutoCAD SHX Text
150TH ST.
AutoCAD SHX Text
U ST.
AutoCAD SHX Text
AOA PERIMETER FENCE
AutoCAD SHX Text
X
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
AIRPORT VEHICLE SERVICE ROAD
AutoCAD SHX Text
GATE 3N
AutoCAD SHX Text
GATE 6 CONTRACTOR'S VEHICLE ACCESS
AutoCAD SHX Text
AC PAVEMENT STOCKPILE AREA
AutoCAD SHX Text
FLAG PERSON
AutoCAD SHX Text
GATE 3S
AutoCAD SHX Text
VICTORIA AVE.
AutoCAD SHX Text
CONTRACTOR'S STAGING OPERATION & STORAGE AREA (100'x100')
AutoCAD SHX Text
1.CONTRACTOR SHALL COORDINATE WITH SBIAA FOR STAGING AREA SITE REQUIREMENTS. CONTRACTOR SHALL COORDINATE WITH SBIAA FOR STAGING AREA SITE REQUIREMENTS. IF REQUIRED, CLEARING, GRADING, PLACEMENT OF GRAVEL, DUST CONTROL, POWER AND UTILITY LINES, FOR THE STAGING AREA ARE THE RESPONSIBILITY OF THE CONTRACTOR. 2.ALL PAVEMENTS IN THE WORK AREA AND HAUL ROADS SHALL BE KEPT FREE OF ALL PAVEMENTS IN THE WORK AREA AND HAUL ROADS SHALL BE KEPT FREE OF DEBRIS AT ALL TIMES, BY THE CONTRACTOR, USING APPROVED VACUUM SWEEPER TRUCKS. 3.CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING PAVEMENTS AND STRIPING CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING PAVEMENTS AND STRIPING CAUSED BY THEIR OPERATIONS AT THEIR OWN EXPENSE. 4.CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND COMPLY WITH CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND COMPLY WITH OPERATIONAL SAFETY REQUIREMENTS AND PROVIDE TRAFFIC CONTROLS AS REQUIRED BY CONSTRUCTION SAFETY PLAN. 5.CONTRACTOR SHALL COORDINATE ALL MISCELLANEOUS WORK AS REQUIRED BY THE CONTRACTOR SHALL COORDINATE ALL MISCELLANEOUS WORK AS REQUIRED BY THE SPECIFICATIONS AND NOT SHOWN ON THE PLANS WITH THE AIRPORT AUTHORITY. 6.CONTRACTOR SHALL COORDINATE WITH THE AIRPORT OPERATIONS FOR CLOSING OF CONTRACTOR SHALL COORDINATE WITH THE AIRPORT OPERATIONS FOR CLOSING OF ANY TAXIWAYS AS REQUIRED FOR HAUL ROUTE TO THE CONSTRUCTION AREA. HAUL ROUTE ALONG TAXIWAYS ARE SUBJECT TO INTERRUPTION SHOULD THERE BE AN INCREASE IN AIRCRAFT TRAFFIC SUCH AS FOREST SERVICE TANKERS. 7.FLAG PERSONS SHALL BE PROVIDED BY THE CONTRACTOR AT TAXIWAY CROSSINGS FLAG PERSONS SHALL BE PROVIDED BY THE CONTRACTOR AT TAXIWAY CROSSINGS DURING HAULING OPERATION. CONTRACTOR SHALL ALSO PROVIDE AND INSTALL LOW-PROFILE BARRICADES AND TAXIWAY CLOSURE MARKERS PER SHEET PH-04. 8.CONTRACTOR'S VEHICLE ACCESS TO THE GATE(S) SHALL BE COORDINATED WITH THE CONTRACTOR'S VEHICLE ACCESS TO THE GATE(S) SHALL BE COORDINATED WITH THE AIRPORT OPERATIONS.
AutoCAD SHX Text
GENERAL PHASING NOTES:
AutoCAD SHX Text
NORTH RAMP CONSTRUCTION AREA
AutoCAD SHX Text
WEST RAMP CONSTRUCTION AREA
AutoCAD SHX Text
HAUL ROUTE TO NORTH & WEST RAMP
Page 5: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
N1
AutoCAD SHX Text
N5
AutoCAD SHX Text
N3
AutoCAD SHX Text
N2
AutoCAD SHX Text
N6
AutoCAD SHX Text
N7
AutoCAD SHX Text
N8A
AutoCAD SHX Text
N3
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
PH-01
AutoCAD SHX Text
5
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
100'
AutoCAD SHX Text
200'
AutoCAD SHX Text
400'
AutoCAD SHX Text
200'
AutoCAD SHX Text
OVERALL NORTH & WEST RAMPS CONSTRUCTION PHASING PLAN
AutoCAD SHX Text
TAXIWAY A
AutoCAD SHX Text
TAXIWAY D
AutoCAD SHX Text
TAXIWAY B
AutoCAD SHX Text
TAXIWAY C
AutoCAD SHX Text
TAXIWAY E
AutoCAD SHX Text
%%UGENERAL PHASING NOTES:
AutoCAD SHX Text
1.CONTRACTOR SHALL COORDINATE WITH SBIAA FOR THE CONSTRUCTION OF CONTRACTOR SHALL COORDINATE WITH SBIAA FOR THE CONSTRUCTION OF PHASES THAT CAN BE PERFORMED SIMULTANEOUSLY, AND COMPLETE WITHIN THE TOTAL PERIOD OF TIME ALLOTTED IN THE CONTRACT. 2.CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL FACILITIES AT ALL CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL FACILITIES AT ALL TIMES. PROVIDE TEMPORARY 24-FOOT WIDE VEHICLE SERVICE ROAD AS NEEDED BY USING LOW PROFILE BARRICADES OR OTHER METHODS AS APPROVED BY SBIAA. 3.THE PHASING LIMITS SHOWN ARE APPROXIMATE, AND MAY BE ADJUSTED IN THE PHASING LIMITS SHOWN ARE APPROXIMATE, AND MAY BE ADJUSTED IN THE FIELD. CONTRACTOR SHALL COORDINATE LOCATION OF ALL LOW-PROFILE BARRICADES AND OTHER TRAFFIC CONTROL DEVICES WITH AIRPORT OPERATIONS PRIOR TO THE START OF EACH PHASE. LOW PROFILE BARRICADES SHALL REMAIN IN PLACE UNTIL THE PCC CURING TIME IS COMPLETED. 4.CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND WORK ON CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND WORK ON PULL-BACK OPERATIONS TO ALLOW AIRCRAFT MOVEMENT AS NEEDED DURING THE WORK WITHIN THE RAMPS AND TAXIWAY/TAXILANE OBJECT FREE AREAS (TOFA), AND MAY BE REQUIRED TO RELOCATE BARRICADES ACCORDINGLY AFTER WORK IS COMPLETED WITHIN THE TOFA. SEE NOTE 10. 5.UNLESS OTHERWISE APPROVED BY SBIAA, INDIVIDUAL PHASES SHALL BE UNLESS OTHERWISE APPROVED BY SBIAA, INDIVIDUAL PHASES SHALL BE COMPLETED WITHIN THE DURATION SHOWN IN THE CONSTRUCTION PHASING SCHEDULE. 6.ADDITIONAL COORDINATION FOR PHASING OF THE WORK WILL BE REQUIRED ADDITIONAL COORDINATION FOR PHASING OF THE WORK WILL BE REQUIRED DURING FIRE SEASON. 7.WORK AROUND ACTIVE HANGARS & BUILDINGS MAY REQUIRE ADDITIONAL WORK AROUND ACTIVE HANGARS & BUILDINGS MAY REQUIRE ADDITIONAL COORDINATION FOR SUB-PHASES AND NIGHT WORK TO MAINTAIN ACCESS. THIS IS CONSIDERED PART OF THE SCOPE OF THIS PROJECT. 8.CONTRACTOR SHALL COORDINATE WITH SBIAA WHEN WORK REQUIRES CONTRACTOR SHALL COORDINATE WITH SBIAA WHEN WORK REQUIRES RELOCATION OF PARKED AIRCRAFT. 9.DURING CONSTRUCTION OF PAVEMENT REPAIR WORK WITHIN THE DURING CONSTRUCTION OF PAVEMENT REPAIR WORK WITHIN THE TAXIWAY/TAXILANE OBJECT FREE AREA (TOFA), WHEN AIRPORT DETERMINES PULL-BACK OPERATIONS IS NOT FEASIBLE, THE CONTRACTOR SHALL PROVIDE AND INSTALL TAXIWAY CLOSURE MARKERS PER DETAILS 6 AND 7 ON SHEET PH-04.
AutoCAD SHX Text
%%UPHASING CONSTRUCTION NOTES:
AutoCAD SHX Text
INSTALL LOW-PROFILE BARRICADE PER DETAIL 1 ON DWG PH-04 DURING PHASE SHOWN ON PLAN.
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
N5
AutoCAD SHX Text
N4
AutoCAD SHX Text
1
AutoCAD SHX Text
N4
AutoCAD SHX Text
1
AutoCAD SHX Text
N3
AutoCAD SHX Text
1
AutoCAD SHX Text
N1
AutoCAD SHX Text
1
AutoCAD SHX Text
N1
AutoCAD SHX Text
1
AutoCAD SHX Text
N2
AutoCAD SHX Text
1
AutoCAD SHX Text
N1
AutoCAD SHX Text
N2
AutoCAD SHX Text
1
AutoCAD SHX Text
N1
AutoCAD SHX Text
N3
AutoCAD SHX Text
1
AutoCAD SHX Text
N2
AutoCAD SHX Text
N3
AutoCAD SHX Text
1
AutoCAD SHX Text
N3
AutoCAD SHX Text
N4
AutoCAD SHX Text
1
AutoCAD SHX Text
N6
AutoCAD SHX Text
N3
AutoCAD SHX Text
N4
AutoCAD SHX Text
HARRY SHEPPARD BLVD.
AutoCAD SHX Text
HANGARS HEAVY AIRCRAFT MAINTENANCE
AutoCAD SHX Text
DEL ROSA AVENUE
AutoCAD SHX Text
LUXIVAIR
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text
TERMINAL
AutoCAD SHX Text
FIRE STATION
AutoCAD SHX Text
US FOREST SERVICE
AutoCAD SHX Text
1
AutoCAD SHX Text
N3
AutoCAD SHX Text
1
AutoCAD SHX Text
N2
AutoCAD SHX Text
N6
AutoCAD SHX Text
1
AutoCAD SHX Text
N5
AutoCAD SHX Text
N6
AutoCAD SHX Text
PHASE N8A
AutoCAD SHX Text
BLAST FENCE
AutoCAD SHX Text
1
AutoCAD SHX Text
N5
AutoCAD SHX Text
N7
AutoCAD SHX Text
1
AutoCAD SHX Text
N8A
AutoCAD SHX Text
1
AutoCAD SHX Text
N8A
AutoCAD SHX Text
1
AutoCAD SHX Text
N7
AutoCAD SHX Text
1
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N4
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PHASE N7
Page 6: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

CONSTRUCTION PHASING SCHEDULE - NORTH & WEST RAMPS

PHASE LOCATION DESCRIPTION OF WORK

BASE BID

NO. OF

CALENDAR DAYS

WORK

HOURS

NOTES

N1 NORTH RAMP NORTH OF TAXIWAY C

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING;

RESTORE PAVEMENT MARKINGS AS REQUIRED.

7

NORTH RAMP (NORTH CENTER SIDE)5

6

4

5

N2

NORTH RAMP (NORTH SIDE OF RAMP TAXILANE)N3

NORTH RAMP (NORTHWEST SIDE)

N4

NORTH RAMP (NORTHWEST SIDE)N5

NORTH RAMP (NORTH SIDE AT HANGAR)N6

NORTH RAMP (EAST SIDE BETWEEN TAXIWAYS D AND E)

N7

DAY-TIME

WORK

N / A

NIGHT-TIME

WORK

NIGHT-TIME

WORK

NIGHT-TIME

WORK

NIGHT-TIME

WORK

NIGHT-TIME

WORK

10WEST RAMP (CENTER)

N8AMAINTAIN ACCESS TO HANGAR #695

DAY-TIME / NIGHT-TIME

WORK

AIRCRAFT DESIGN

GROUP

- CESSNA 172

- GULFSTREAM IV

- B737

- B757 / 767

- B747 / 777

DISTANCE FROM

CENTERLINE TAXIWAY

44.5'

65.5'

93'

129.5'

160'

PULL-BACK DISTANCES

TABLE 1

DISTANCE FROM

CENTERLINE TAXILANE

39.5'

57.5'

81'

112.5'

138'

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING; RESTORE PAVEMENT

MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING;

RESTORE PAVEMENT MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING;

RESTORE PAVEMENT MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING; RESTORE PAVEMENT

MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING; RESTORE PAVEMENT

MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING; RESTORE PAVEMENT

MARKINGS AS REQUIRED.

CONCRETE SPALL REPAIR, CRACK AND JOINT RESEALING; RESTORE PAVEMENT

MARKINGS AS REQUIRED.

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

MAINTAIN ACCESS TO NORTH RAMP FBO's,

SEE NOTE 8

0 N/AMOBILIZATION

30

DAY-TIME

WORK

N/A

4

4

I

II

III

I V

V

NIGHT-TIME

WORK

AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
PH-02
AutoCAD SHX Text
6
AutoCAD SHX Text
CONSTRUCTION PHASING SCHEDULE - NORTH & WEST RAMPS
AutoCAD SHX Text
%%UGENERAL PHASING NOTES:
AutoCAD SHX Text
1.CONTRACTOR SHALL COORDINATE WITH SBIAA FOR THE CONSTRUCTION OF CONTRACTOR SHALL COORDINATE WITH SBIAA FOR THE CONSTRUCTION OF PHASES THAT CAN BE PERFORMED SIMULTANEOUSLY, AND COMPLETE WITHIN THE TOTAL PERIOD OF TIME ALLOTTED IN THE CONTRACT. 2.CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL FACILITIES AT ALL CONTRACTOR SHALL MAINTAIN VEHICULAR ACCESS TO ALL FACILITIES AT ALL TIMES. PROVIDE TEMPORARY 24-FOOT WIDE VEHICLE SERVICE ROAD AS NEEDED BY USING LOW PROFILE BARRICADES OR OTHER METHODS AS APPROVED BY SBIAA. 3.THE PHASING LIMITS SHOWN ARE APPROXIMATE, AND MAY BE ADJUSTED IN THE PHASING LIMITS SHOWN ARE APPROXIMATE, AND MAY BE ADJUSTED IN THE FIELD. CONTRACTOR SHALL COORDINATE LOCATION OF ALL LOW-PROFILE BARRICADES AND OTHER TRAFFIC CONTROL DEVICES WITH AIRPORT OPERATIONS PRIOR TO THE START OF EACH PHASE. LOW PROFILE BARRICADES SHALL REMAIN IN PLACE UNTIL THE PCC CURING TIME IS COMPLETED. 4.CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND WORK ON CONTRACTOR SHALL COORDINATE WITH AIRPORT OPERATIONS AND WORK ON PULL-BACK OPERATIONS TO ALLOW AIRCRAFT MOVEMENT AS NEEDED DURING THE WORK WITHIN THE RAMPS AND TAXIWAY/TAXILANE OBJECT FREE AREAS (TOFA), AND MAY BE REQUIRED TO RELOCATE BARRICADES ACCORDINGLY AFTER WORK IS COMPLETED WITHIN THE TOFA. SEE NOTE 10. 5.UNLESS OTHERWISE APPROVED BY SBIAA, INDIVIDUAL PHASES SHALL BE UNLESS OTHERWISE APPROVED BY SBIAA, INDIVIDUAL PHASES SHALL BE COMPLETED WITHIN THE DURATION SHOWN IN THE CONSTRUCTION PHASING SCHEDULE. 6.ADDITIONAL COORDINATION FOR PHASING OF THE WORK WILL BE REQUIRED ADDITIONAL COORDINATION FOR PHASING OF THE WORK WILL BE REQUIRED DURING FIRE SEASON. 7.WORK AROUND ACTIVE HANGARS & BUILDINGS MAY REQUIRE ADDITIONAL WORK AROUND ACTIVE HANGARS & BUILDINGS MAY REQUIRE ADDITIONAL COORDINATION FOR SUB-PHASES AND NIGHT WORK TO MAINTAIN ACCESS. THIS IS CONSIDERED PART OF THE SCOPE OF THIS PROJECT. 8.CONTRACTOR SHALL COORDINATE WITH SBIAA WHEN WORK REQUIRES CONTRACTOR SHALL COORDINATE WITH SBIAA WHEN WORK REQUIRES RELOCATION OF PARKED AIRCRAFT. 9.DURING CONSTRUCTION OF PAVEMENT REPAIR WORK WITHIN THE DURING CONSTRUCTION OF PAVEMENT REPAIR WORK WITHIN THE TAXIWAY/TAXILANE OBJECT FREE AREA (TOFA), WHEN AIRPORT DETERMINES PULL-BACK OPERATIONS IS NOT FEASIBLE, THE CONTRACTOR SHALL PROVIDE AND INSTALL TAXIWAY CLOSURE MARKERS PER DETAILS 6 AND 7 ON SHEET PH-04.
Page 7: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

AutoCAD SHX Text
%%USIDE ELEVATION
AutoCAD SHX Text
%%UFRONT ELEVATION
AutoCAD SHX Text
FLASHING RED SOLAR POWERED LIGHT, TYP 2
AutoCAD SHX Text
SAFETY ORANGE HDPE PLASTIC BODY
AutoCAD SHX Text
NOTES: 1.BARRICADES SHALL BE PLACED 10' OFF WORK AREA LIMITS, UNLESS NOTED OTHERWISE. BARRICADES SHALL BE PLACED 10' OFF WORK AREA LIMITS, UNLESS NOTED OTHERWISE. 2.FOR RAMP AREAS, SPACE BARRICADES 10' MAXIMUM BETWEEN ENDS. FOR RAMP AREAS, SPACE BARRICADES 10' MAXIMUM BETWEEN ENDS. 3.FOR TAXIWAYS, SPACE BARRICADES WITH NO GAPS. FOR TAXIWAYS, SPACE BARRICADES WITH NO GAPS. 4.BARRICADES SHALL BE CONSTRUCTED OF HIGH DENSITY POLYETHYLENE PLASTIC COLLAPSIBLE AS MANUFACTURED BY BARRICADES SHALL BE CONSTRUCTED OF HIGH DENSITY POLYETHYLENE PLASTIC COLLAPSIBLE AS MANUFACTURED BY SHERWIN INDUSTRIES. (TYPE AR10X96 ORANGE BACKGROUND HDPE BARRICADE) OR SIMILAR APPROVED EQUAL. 5.BARRICADES SHALL BE SECURED IN A MANNER TO PREVENT POSSIBLE DAMAGE OR INJURY DUE TO JET BLAST.BARRICADES SHALL BE SECURED IN A MANNER TO PREVENT POSSIBLE DAMAGE OR INJURY DUE TO JET BLAST.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPE II BARRICADE
AutoCAD SHX Text
-
AutoCAD SHX Text
2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LOW-PROFILE BARRICADE
AutoCAD SHX Text
-
AutoCAD SHX Text
1
AutoCAD SHX Text
NOTES: 1.CONSTRUCTION SAFETY FLAG SHALL BE CONSTRUCTION SAFETY FLAG SHALL BE PROMINENTLY DISPLAYED ON ALL CONSTRUCTION EQUIPMENT.
AutoCAD SHX Text
AVIATION WHITE (12"x12")
AutoCAD SHX Text
AVIATION ORANGE (12"x12")
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CONSTRUCTION SAFETY FLAG
AutoCAD SHX Text
-
AutoCAD SHX Text
4
AutoCAD SHX Text
6" BAND OF RED COLOR RETROREFLECTIVE MATERIAL, TYP 2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TRAFFIC DELINEATOR TUBES
AutoCAD SHX Text
-
AutoCAD SHX Text
3
AutoCAD SHX Text
PAVEMENT SURFACE
AutoCAD SHX Text
FLUORESCENT ORANGE
AutoCAD SHX Text
WEIGHTED BASE
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
ORANGE STRIPE
AutoCAD SHX Text
WHITE STRIPE
AutoCAD SHX Text
NOTES: 1.BARRICADES SHALL BE PLACED 10' OFF THE WORK BARRICADES SHALL BE PLACED 10' OFF THE WORK AREA LIMITS, UNLESS NOTED OTHERWISE. 2.BARRICADES SHALL BE TYPE II MEETING THE BARRICADES SHALL BE TYPE II MEETING THE REQUIREMENTS OF CALIFORNIA MUTCD. 3.BARRICADES SHALL BE SECURED BY APPROVED BARRICADES SHALL BE SECURED BY APPROVED WEIGHTED MATERIAL.
AutoCAD SHX Text
NOTES: 1.TRAFFIC DELINEATOR TUBES SHALL MEET REQUIREMENTS TRAFFIC DELINEATOR TUBES SHALL MEET REQUIREMENTS OF CALIFORNIA MUTCD 2014. 2.UNLESS OTHERWISE NOTED, USE DELINEATOR TUBES FOR UNLESS OTHERWISE NOTED, USE DELINEATOR TUBES FOR ACCESS ROUTES CROSSING TAXIWAYS, TAXILANES, APRON AREAS OR INFIELD RUNWAY SAFETY AREAS. 3.BARRICADES SHALL BE SECURED BY APPROVED WEIGHTED BARRICADES SHALL BE SECURED BY APPROVED WEIGHTED MATERIAL.
AutoCAD SHX Text
7" WIDE WHITE STRIPE ON BOTH SIDES, TYP
AutoCAD SHX Text
INTERCONNECTING PEG
AutoCAD SHX Text
FLASHING RED SOLAR POWERED LIGHT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TRAFFIC CONE
AutoCAD SHX Text
-
AutoCAD SHX Text
5
AutoCAD SHX Text
FLUORESCENT ORANGE
AutoCAD SHX Text
WEIGHTED BASE
AutoCAD SHX Text
NOTES: 1.TRAFFIC CONE SHALL MEET REQUIREMENTS OF TRAFFIC CONE SHALL MEET REQUIREMENTS OF CALIFORNIA MUTCD 2014. 2.UNLESS OTHERWISE NOTED, USE TRAFFIC CONES FOR UNLESS OTHERWISE NOTED, USE TRAFFIC CONES FOR TRAFFIC CONTROL AND AS REQUIRED BY AIRPORT OPERATIONS.
AutoCAD SHX Text
6" BAND OF RETROREFLECTIVE MATERIAL, TYP 2
AutoCAD SHX Text
PH-04
AutoCAD SHX Text
7
AutoCAD SHX Text
CONSTRUCTION PHASING DETAILS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL TAXIWAY/TAXILANE CLOSURE DETAIL
AutoCAD SHX Text
-
AutoCAD SHX Text
7
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TAXIWAY CLOSURE MARKER
AutoCAD SHX Text
-
AutoCAD SHX Text
6
AutoCAD SHX Text
TWY
AutoCAD SHX Text
NOTES: 1.FABRIC MESH SHALL BE OF APPROVED MATERIAL FABRIC MESH SHALL BE OF APPROVED MATERIAL AND SECURED BY APPROVED WEIGHTED MATERIAL TO WITHSTAND JET BLAST.
AutoCAD SHX Text
YELLOW FABRIC MESH
AutoCAD SHX Text
TAXIWAY/TAXILANE
AutoCAD SHX Text
TWY
AutoCAD SHX Text
%%UPHASING CONSTRUCTION NOTES:
AutoCAD SHX Text
INSTALL LOW-PROFILE BARRICADE PER DETAIL 1 ON DWG PH-04 DURING PHASE SHOWN ON PLAN.
AutoCAD SHX Text
PLACE COLOR X MESH ROLLED OUT FABRIC CLOSURE MARKER PER DETAIL 6 ON DWG PH-04 DURING PHASE SHOWN ON PLAN.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
160'
AutoCAD SHX Text
160'
AutoCAD SHX Text
TWY
Page 8: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
Q
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
AREA U/C
AutoCAD SHX Text
TANK
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-02
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-04
AutoCAD SHX Text
C-01
AutoCAD SHX Text
8
AutoCAD SHX Text
NORTH RAMP - SHEET 1 OF 6
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
LUXIVAIR
AutoCAD SHX Text
3' WIDE TRENCH
AutoCAD SHX Text
FOUNTAIN
AutoCAD SHX Text
HANGAR
AutoCAD SHX Text
ABANDONED VAULT (TYP.)
AutoCAD SHX Text
7.5' WIDE TRENCH
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
C.B. (TYP)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
VAULT ALL AROUND (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
EXIST PCC NO WORK
AutoCAD SHX Text
5' WIDE TRENCH
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 9: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
V
AutoCAD SHX Text
W
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
DA
AutoCAD SHX Text
DB
AutoCAD SHX Text
DC
AutoCAD SHX Text
DD
AutoCAD SHX Text
DE
AutoCAD SHX Text
DF
AutoCAD SHX Text
DG
AutoCAD SHX Text
DU
AutoCAD SHX Text
DV
AutoCAD SHX Text
DW
AutoCAD SHX Text
DX
AutoCAD SHX Text
DY
AutoCAD SHX Text
DZ
AutoCAD SHX Text
D1
AutoCAD SHX Text
D2
AutoCAD SHX Text
D3
AutoCAD SHX Text
D4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
7
AutoCAD SHX Text
E2
AutoCAD SHX Text
E3
AutoCAD SHX Text
E4
AutoCAD SHX Text
E5
AutoCAD SHX Text
E1
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
DO
AutoCAD SHX Text
DP
AutoCAD SHX Text
DQ
AutoCAD SHX Text
DR
AutoCAD SHX Text
DS
AutoCAD SHX Text
DT
AutoCAD SHX Text
DH
AutoCAD SHX Text
DI
AutoCAD SHX Text
DJ
AutoCAD SHX Text
DK
AutoCAD SHX Text
DL
AutoCAD SHX Text
DM
AutoCAD SHX Text
DN
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
7.00 sf
AutoCAD SHX Text
18.00 sf
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-03
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-05
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-01
AutoCAD SHX Text
C-02
AutoCAD SHX Text
9
AutoCAD SHX Text
NORTH RAMP - SHEET 2 OF 6
AutoCAD SHX Text
U.S. FOREST SERVICE
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
C.B. (TYP) NO SEAL REQ'D.
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 10: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
18
AutoCAD SHX Text
D4
AutoCAD SHX Text
D5
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
23
AutoCAD SHX Text
E6
AutoCAD SHX Text
E7
AutoCAD SHX Text
E8
AutoCAD SHX Text
E9
AutoCAD SHX Text
E10
AutoCAD SHX Text
E11
AutoCAD SHX Text
E12
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F2
AutoCAD SHX Text
F1
AutoCAD SHX Text
F3
AutoCAD SHX Text
F4
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
G3
AutoCAD SHX Text
G2
AutoCAD SHX Text
G1
AutoCAD SHX Text
G4
AutoCAD SHX Text
G5
AutoCAD SHX Text
G6
AutoCAD SHX Text
G7
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
D1
AutoCAD SHX Text
D2
AutoCAD SHX Text
D3
AutoCAD SHX Text
D4
AutoCAD SHX Text
D5
AutoCAD SHX Text
DZ
AutoCAD SHX Text
DY
AutoCAD SHX Text
DX
AutoCAD SHX Text
DW
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
ASPH.
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-06
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-02
AutoCAD SHX Text
C-03
AutoCAD SHX Text
10
AutoCAD SHX Text
NORTH RAMP - SHEET 3 OF 6
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
5
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 11: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
35
AutoCAD SHX Text
36
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
Q
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
F1
AutoCAD SHX Text
G
AutoCAD SHX Text
G1
AutoCAD SHX Text
H
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
Q
AutoCAD SHX Text
A
AutoCAD SHX Text
N LELAND NORTON WAY
AutoCAD SHX Text
347.74 sf
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N4
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PHASE N4
AutoCAD SHX Text
PHASE N4
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N5
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-05
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-07
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-01
AutoCAD SHX Text
C-04
AutoCAD SHX Text
11
AutoCAD SHX Text
NORTH RAMP - SHEET 4 OF 6
AutoCAD SHX Text
U.S. CUSTOMS
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
3' WIDE TRENCH
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
SLIDING METAL GATE
AutoCAD SHX Text
C.B. (TYP)
AutoCAD SHX Text
ABANDONED VAULT (TYP.)
AutoCAD SHX Text
STEEL FENCE
AutoCAD SHX Text
7.5' WIDE TRENCH
AutoCAD SHX Text
5.5' WIDE TRENCH
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
C.B. (TYP)
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
2
AutoCAD SHX Text
VAULT ALL AROUND (TYP.)
AutoCAD SHX Text
C.B. (TYP)
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
1
Page 12: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
PHASE N6
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N2
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
V
AutoCAD SHX Text
W
AutoCAD SHX Text
X
AutoCAD SHX Text
Y
AutoCAD SHX Text
Z
AutoCAD SHX Text
AA
AutoCAD SHX Text
AB
AutoCAD SHX Text
AC
AutoCAD SHX Text
AD
AutoCAD SHX Text
AE
AutoCAD SHX Text
AF
AutoCAD SHX Text
AG
AutoCAD SHX Text
AH
AutoCAD SHX Text
AI
AutoCAD SHX Text
AJ
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
35
AutoCAD SHX Text
36
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
DH
AutoCAD SHX Text
DI
AutoCAD SHX Text
DJ
AutoCAD SHX Text
DK
AutoCAD SHX Text
DL
AutoCAD SHX Text
DM
AutoCAD SHX Text
DN
AutoCAD SHX Text
DO
AutoCAD SHX Text
DP
AutoCAD SHX Text
DQ
AutoCAD SHX Text
DR
AutoCAD SHX Text
DS
AutoCAD SHX Text
DT
AutoCAD SHX Text
R
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
23
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
35
AutoCAD SHX Text
DU
AutoCAD SHX Text
DA
AutoCAD SHX Text
DB
AutoCAD SHX Text
DC
AutoCAD SHX Text
DD
AutoCAD SHX Text
DE
AutoCAD SHX Text
DF
AutoCAD SHX Text
DG
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
V
AutoCAD SHX Text
W
AutoCAD SHX Text
626.82 sf
AutoCAD SHX Text
625.00 sf
AutoCAD SHX Text
6.25 sf
AutoCAD SHX Text
43.25 sf
AutoCAD SHX Text
8.01 sf
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-06
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-08
AutoCAD SHX Text
MATCHLINE - DWG No C-02
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-04
AutoCAD SHX Text
C-05
AutoCAD SHX Text
12
AutoCAD SHX Text
NORTH RAMP - SHEET 5 OF 6
AutoCAD SHX Text
ABANDONED VAULT (TYP.)
AutoCAD SHX Text
5.5' WIDE TRENCH
AutoCAD SHX Text
C.B. (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
C.B. (TYP) NO SEAL REQ'D.
AutoCAD SHX Text
3
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
1
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 13: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
27
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
12
AutoCAD SHX Text
14
AutoCAD SHX Text
13
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
16
AutoCAD SHX Text
19
AutoCAD SHX Text
18
AutoCAD SHX Text
20
AutoCAD SHX Text
22
AutoCAD SHX Text
21
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
26
AutoCAD SHX Text
25
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
1A
AutoCAD SHX Text
2A
AutoCAD SHX Text
3A
AutoCAD SHX Text
4A
AutoCAD SHX Text
5A
AutoCAD SHX Text
6A
AutoCAD SHX Text
7A
AutoCAD SHX Text
8A
AutoCAD SHX Text
9A
AutoCAD SHX Text
10A
AutoCAD SHX Text
11A
AutoCAD SHX Text
12A
AutoCAD SHX Text
13A
AutoCAD SHX Text
14A
AutoCAD SHX Text
15A
AutoCAD SHX Text
16A
AutoCAD SHX Text
17A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
F22
AutoCAD SHX Text
18B
AutoCAD SHX Text
F5
AutoCAD SHX Text
F6
AutoCAD SHX Text
F7
AutoCAD SHX Text
F8
AutoCAD SHX Text
F9
AutoCAD SHX Text
F10
AutoCAD SHX Text
F11
AutoCAD SHX Text
F12
AutoCAD SHX Text
F13
AutoCAD SHX Text
F14
AutoCAD SHX Text
F15
AutoCAD SHX Text
F16
AutoCAD SHX Text
F17
AutoCAD SHX Text
F18
AutoCAD SHX Text
F19
AutoCAD SHX Text
F20
AutoCAD SHX Text
F21
AutoCAD SHX Text
F23
AutoCAD SHX Text
F24
AutoCAD SHX Text
F25
AutoCAD SHX Text
F26
AutoCAD SHX Text
F27
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
D4
AutoCAD SHX Text
D6
AutoCAD SHX Text
D5
AutoCAD SHX Text
D7
AutoCAD SHX Text
D8
AutoCAD SHX Text
D9
AutoCAD SHX Text
D10
AutoCAD SHX Text
D11
AutoCAD SHX Text
D12
AutoCAD SHX Text
D13
AutoCAD SHX Text
D14
AutoCAD SHX Text
D15
AutoCAD SHX Text
G8
AutoCAD SHX Text
G9
AutoCAD SHX Text
G10
AutoCAD SHX Text
G11
AutoCAD SHX Text
G12
AutoCAD SHX Text
G13
AutoCAD SHX Text
G14
AutoCAD SHX Text
G15
AutoCAD SHX Text
G16
AutoCAD SHX Text
G17
AutoCAD SHX Text
G18
AutoCAD SHX Text
G19
AutoCAD SHX Text
G20
AutoCAD SHX Text
G21
AutoCAD SHX Text
G22
AutoCAD SHX Text
G23
AutoCAD SHX Text
G24
AutoCAD SHX Text
G25
AutoCAD SHX Text
G26
AutoCAD SHX Text
G27
AutoCAD SHX Text
G28
AutoCAD SHX Text
G29
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
DQ
AutoCAD SHX Text
DR
AutoCAD SHX Text
DS
AutoCAD SHX Text
DT
AutoCAD SHX Text
DU
AutoCAD SHX Text
DV
AutoCAD SHX Text
DW
AutoCAD SHX Text
DX
AutoCAD SHX Text
DY
AutoCAD SHX Text
DZ
AutoCAD SHX Text
D1
AutoCAD SHX Text
D2
AutoCAD SHX Text
D3
AutoCAD SHX Text
DP
AutoCAD SHX Text
DM
AutoCAD SHX Text
DL
AutoCAD SHX Text
DK
AutoCAD SHX Text
DN
AutoCAD SHX Text
DO
AutoCAD SHX Text
D2
AutoCAD SHX Text
D3
AutoCAD SHX Text
D4
AutoCAD SHX Text
D5
AutoCAD SHX Text
D1
AutoCAD SHX Text
DX
AutoCAD SHX Text
DW
AutoCAD SHX Text
DV
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PHASE N1
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-09
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-05
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-03
AutoCAD SHX Text
C-06
AutoCAD SHX Text
13
AutoCAD SHX Text
NORTH RAMP - SHEET 6 OF 6
AutoCAD SHX Text
NON-MOVEMENT AREA MARKING
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
5
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
TAXIWAY E
AutoCAD SHX Text
TAXIWAY C
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
NON MOVEMENT AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
4
AutoCAD SHX Text
10'X5' SPALL 6 PLACES
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
EXIST BLUE PVMT MARKING
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 14: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
38
AutoCAD SHX Text
39
AutoCAD SHX Text
40
AutoCAD SHX Text
41
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
46
AutoCAD SHX Text
47
AutoCAD SHX Text
48
AutoCAD SHX Text
49
AutoCAD SHX Text
50
AutoCAD SHX Text
51
AutoCAD SHX Text
52
AutoCAD SHX Text
53
AutoCAD SHX Text
54
AutoCAD SHX Text
55
AutoCAD SHX Text
56
AutoCAD SHX Text
57
AutoCAD SHX Text
58
AutoCAD SHX Text
59
AutoCAD SHX Text
60
AutoCAD SHX Text
61
AutoCAD SHX Text
CB
AutoCAD SHX Text
CA
AutoCAD SHX Text
CB
AutoCAD SHX Text
CC
AutoCAD SHX Text
CD
AutoCAD SHX Text
CE
AutoCAD SHX Text
CF
AutoCAD SHX Text
CG
AutoCAD SHX Text
CH
AutoCAD SHX Text
CI
AutoCAD SHX Text
C1
AutoCAD SHX Text
C4
AutoCAD SHX Text
C2
AutoCAD SHX Text
C3
AutoCAD SHX Text
C5
AutoCAD SHX Text
C7
AutoCAD SHX Text
C6
AutoCAD SHX Text
C8
AutoCAD SHX Text
C11
AutoCAD SHX Text
C9
AutoCAD SHX Text
C10
AutoCAD SHX Text
C12
AutoCAD SHX Text
C13
AutoCAD SHX Text
C14
AutoCAD SHX Text
C15
AutoCAD SHX Text
C16
AutoCAD SHX Text
C17
AutoCAD SHX Text
C18
AutoCAD SHX Text
C19
AutoCAD SHX Text
C20
AutoCAD SHX Text
C21
AutoCAD SHX Text
C22
AutoCAD SHX Text
C23
AutoCAD SHX Text
C24
AutoCAD SHX Text
C25
AutoCAD SHX Text
C26
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
G1
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
NA
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
Q
AutoCAD SHX Text
R
AutoCAD SHX Text
H
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
I
AutoCAD SHX Text
J
AutoCAD SHX Text
I
AutoCAD SHX Text
NB
AutoCAD SHX Text
1183470.31 sf
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-08
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-04
AutoCAD SHX Text
C-07
AutoCAD SHX Text
14
AutoCAD SHX Text
WEST RAMP - SHEET 1 OF 4
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
STEEL FENCE
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
GATE 2
AutoCAD SHX Text
C.B. (TYP)
AutoCAD SHX Text
VSR
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
VSR
AutoCAD SHX Text
GATE 5
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
1
AutoCAD SHX Text
C.B. (TYP) NO SEAL REQ'D
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
2
AutoCAD SHX Text
VAULT ALL AROUND (TYP.)
AutoCAD SHX Text
STEEL FENCE
AutoCAD SHX Text
AC PVMT
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
Page 15: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
AK
AutoCAD SHX Text
AL
AutoCAD SHX Text
AM
AutoCAD SHX Text
AN
AutoCAD SHX Text
AO
AutoCAD SHX Text
AP
AutoCAD SHX Text
AQ
AutoCAD SHX Text
AR
AutoCAD SHX Text
AS
AutoCAD SHX Text
AT
AutoCAD SHX Text
AU
AutoCAD SHX Text
AV
AutoCAD SHX Text
38
AutoCAD SHX Text
39
AutoCAD SHX Text
40
AutoCAD SHX Text
41
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
45
AutoCAD SHX Text
46
AutoCAD SHX Text
47
AutoCAD SHX Text
48
AutoCAD SHX Text
49
AutoCAD SHX Text
50
AutoCAD SHX Text
51
AutoCAD SHX Text
52
AutoCAD SHX Text
53
AutoCAD SHX Text
54
AutoCAD SHX Text
55
AutoCAD SHX Text
56
AutoCAD SHX Text
57
AutoCAD SHX Text
58
AutoCAD SHX Text
59
AutoCAD SHX Text
60
AutoCAD SHX Text
61
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
V
AutoCAD SHX Text
W
AutoCAD SHX Text
X
AutoCAD SHX Text
Y
AutoCAD SHX Text
Z
AutoCAD SHX Text
AA
AutoCAD SHX Text
AB
AutoCAD SHX Text
AC
AutoCAD SHX Text
AD
AutoCAD SHX Text
AE
AutoCAD SHX Text
AF
AutoCAD SHX Text
R
AutoCAD SHX Text
36
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
39
AutoCAD SHX Text
40
AutoCAD SHX Text
41
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
DH
AutoCAD SHX Text
DI
AutoCAD SHX Text
DJ
AutoCAD SHX Text
DA
AutoCAD SHX Text
DB
AutoCAD SHX Text
DC
AutoCAD SHX Text
DD
AutoCAD SHX Text
DE
AutoCAD SHX Text
DF
AutoCAD SHX Text
DG
AutoCAD SHX Text
DG
AutoCAD SHX Text
DF
AutoCAD SHX Text
DE
AutoCAD SHX Text
DA
AutoCAD SHX Text
DB
AutoCAD SHX Text
DC
AutoCAD SHX Text
DD
AutoCAD SHX Text
49
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
BI
AutoCAD SHX Text
BJ
AutoCAD SHX Text
BK
AutoCAD SHX Text
BL
AutoCAD SHX Text
BC
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BD
AutoCAD SHX Text
BM
AutoCAD SHX Text
BN
AutoCAD SHX Text
BO
AutoCAD SHX Text
BP
AutoCAD SHX Text
BQ
AutoCAD SHX Text
BR
AutoCAD SHX Text
BS
AutoCAD SHX Text
BT
AutoCAD SHX Text
BU
AutoCAD SHX Text
BV
AutoCAD SHX Text
BW
AutoCAD SHX Text
BX
AutoCAD SHX Text
BY
AutoCAD SHX Text
BZ
AutoCAD SHX Text
B1
AutoCAD SHX Text
B2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BC
AutoCAD SHX Text
BD
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
B2
AutoCAD SHX Text
BZ
AutoCAD SHX Text
B1
AutoCAD SHX Text
BX
AutoCAD SHX Text
BY
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
347.75 sf
AutoCAD SHX Text
A
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-09
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-05
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-07
AutoCAD SHX Text
C-08
AutoCAD SHX Text
15
AutoCAD SHX Text
WEST RAMP - SHEET 2 OF 4
AutoCAD SHX Text
ABANDONED VAULT (TYP.)
AutoCAD SHX Text
CURB
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
HANGAR #695 SHERIFF - FIRE
AutoCAD SHX Text
30" WIDE TRENCH
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
5.5' WIDE TRENCH
AutoCAD SHX Text
9.5' WIDE TRENCH
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
STEEL BOX LID (TYP) NO SEALING REQ'D
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
2
AutoCAD SHX Text
VAULT ALL AROUND (TYP.)
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
1
Page 16: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
AV
AutoCAD SHX Text
AW
AutoCAD SHX Text
AX
AutoCAD SHX Text
AY
AutoCAD SHX Text
AZ
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BC
AutoCAD SHX Text
BD
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
BI
AutoCAD SHX Text
AX
AutoCAD SHX Text
AY
AutoCAD SHX Text
AZ
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BC
AutoCAD SHX Text
BD
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
29
AutoCAD SHX Text
30
AutoCAD SHX Text
31
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
L
AutoCAD SHX Text
K
AutoCAD SHX Text
J
AutoCAD SHX Text
I
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
K
AutoCAD SHX Text
J
AutoCAD SHX Text
I
AutoCAD SHX Text
H
AutoCAD SHX Text
G
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
F28
AutoCAD SHX Text
F29
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
DL
AutoCAD SHX Text
DM
AutoCAD SHX Text
DN
AutoCAD SHX Text
DO
AutoCAD SHX Text
DP
AutoCAD SHX Text
DQ
AutoCAD SHX Text
DR
AutoCAD SHX Text
DS
AutoCAD SHX Text
DT
AutoCAD SHX Text
DU
AutoCAD SHX Text
DV
AutoCAD SHX Text
DW
AutoCAD SHX Text
DX
AutoCAD SHX Text
DY
AutoCAD SHX Text
DZ
AutoCAD SHX Text
D2
AutoCAD SHX Text
D1
AutoCAD SHX Text
D3
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DJ
AutoCAD SHX Text
DI
AutoCAD SHX Text
DH
AutoCAD SHX Text
DG
AutoCAD SHX Text
60
AutoCAD SHX Text
59
AutoCAD SHX Text
58
AutoCAD SHX Text
57
AutoCAD SHX Text
56
AutoCAD SHX Text
55
AutoCAD SHX Text
54
AutoCAD SHX Text
53
AutoCAD SHX Text
52
AutoCAD SHX Text
51
AutoCAD SHX Text
50
AutoCAD SHX Text
48
AutoCAD SHX Text
47
AutoCAD SHX Text
46
AutoCAD SHX Text
45
AutoCAD SHX Text
B3
AutoCAD SHX Text
B4
AutoCAD SHX Text
B5
AutoCAD SHX Text
B4
AutoCAD SHX Text
B5
AutoCAD SHX Text
B3
AutoCAD SHX Text
A
AutoCAD SHX Text
98965.70 sf
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PHASE N3
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-10
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-08
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-06
AutoCAD SHX Text
C-09
AutoCAD SHX Text
16
AutoCAD SHX Text
WEST RAMP - SHEET 3 OF 4
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
NON-MOVEMENT AREA LINE
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
2
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
5
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
TAXIWAY "C"
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
3
Page 17: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

KEY MAP

AutoCAD SHX Text
BD
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
BI
AutoCAD SHX Text
BJ
AutoCAD SHX Text
BK
AutoCAD SHX Text
BL
AutoCAD SHX Text
BM
AutoCAD SHX Text
BN
AutoCAD SHX Text
AY
AutoCAD SHX Text
70
AutoCAD SHX Text
71
AutoCAD SHX Text
72
AutoCAD SHX Text
76
AutoCAD SHX Text
77
AutoCAD SHX Text
78
AutoCAD SHX Text
79
AutoCAD SHX Text
80
AutoCAD SHX Text
81
AutoCAD SHX Text
82
AutoCAD SHX Text
83
AutoCAD SHX Text
84
AutoCAD SHX Text
69
AutoCAD SHX Text
68
AutoCAD SHX Text
67
AutoCAD SHX Text
66
AutoCAD SHX Text
65
AutoCAD SHX Text
64
AutoCAD SHX Text
63
AutoCAD SHX Text
62
AutoCAD SHX Text
61
AutoCAD SHX Text
73
AutoCAD SHX Text
75
AutoCAD SHX Text
74
AutoCAD SHX Text
BI
AutoCAD SHX Text
AX
AutoCAD SHX Text
AY
AutoCAD SHX Text
AZ
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BC
AutoCAD SHX Text
BD
AutoCAD SHX Text
BE
AutoCAD SHX Text
BF
AutoCAD SHX Text
BG
AutoCAD SHX Text
BH
AutoCAD SHX Text
AV
AutoCAD SHX Text
AW
AutoCAD SHX Text
AX
AutoCAD SHX Text
AZ
AutoCAD SHX Text
BA
AutoCAD SHX Text
BB
AutoCAD SHX Text
BC
AutoCAD SHX Text
B7
AutoCAD SHX Text
B8
AutoCAD SHX Text
B9
AutoCAD SHX Text
B4
AutoCAD SHX Text
B5
AutoCAD SHX Text
B3
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
3464.50 sf
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PHASE N7
AutoCAD SHX Text
PHASE N8
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE: 1"=
AutoCAD SHX Text
15'
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
30'
AutoCAD SHX Text
MATCHLINE - SEE DWG No C-09
AutoCAD SHX Text
C-10
AutoCAD SHX Text
17
AutoCAD SHX Text
WEST RAMP - SHEET 3 OF 4
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
SPALL (TYP.)
AutoCAD SHX Text
5
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
1.CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR CONCRETE JOINT LAYOUT SHOWN ON THIS PLAN IS APPROXIMATE. CONTRACTOR SHALL RESEAL ALL JOINTS WITHIN THE RAMP AREA UNLESS OTHERWISE INDICATED ON THE PLANS OR AS DIRECTED BY THE ENGINEER. 2.JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD JOINTS AROUND STRUCTURES (i.e. MANHOLES, CATCH BASINS, VAULTS, AIRFIELD LIGHTS) MAY NOT BE SHOWN AND SHALL BE RESEALED UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3.AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL AFTER REMOVAL OF OLD SEALANT, WHICH MAY INCLUDE PRE-FORMED/STEEL SEALANT COVERED BY LIQUID SEALANT, CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON THE RESEALING METHOD BEFORE PROCEEDING WITH WORK. 4.LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND LOCATIONS OF PCC SPALL REPAIRS ALONG CRACKS, JOINTS, CORNER AND MID-SLAB ARE APPROXIMATE AND MAY NOT ALL BE SHOWN ON THE PLANS. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO AGREE UPON WHICH LOCATIONS TO BE REPAIRED. 5.PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR PAVEMENT MARKINGS AND STRIPING WHICH ARE SIGNIFICANTLY OBSCURED OR REMOVED FROM JOINT/CRACK SEALING, SPALL REPAIRS OR BY PCC SLAB REPLACEMENT SHALL BE REPAINTED TO ITS ORIGINAL CLARITY. 6.CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST CONTRACTOR SHALL REMOVE AND REPLACE THE PCC SLAB TO THE NEAREST JOINT AT FULL DEPTH UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 7.PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL PCC SLABS WITH LENGTH-TO-WIDTH RATIO EXCEEDING 1.25 SHALL BE REINFORCED WITH STEEL. 8.THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN THE EXISTING PAVEMENT THICKNESS IS ESTIMATED TO RANGE BETWEEN 16" TO 20" THICK. 9.CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE CONTRACTOR SHALL PROVIDE FOR THE COLLECTION & DRAINAGE OF SURFACE & SUBSURFACE WATER DURING CONSTRUCTION AND KEEP THE SOIL/SUBGRADE MATERIAL SUFFICIENTLY DRY WHILE THE EXCAVATION IS OPEN. 10.PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE PRIOR TO BEGINNING WORK, IT SHALL BE THE CONTRACTORS SOLE RESPONSIBILITY TO INVESTIGATE & PROTECT IN PLACE ALL KNOWN & UNKNOWN UTILITIES.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES:
AutoCAD SHX Text
01
AutoCAD SHX Text
02
AutoCAD SHX Text
03
AutoCAD SHX Text
04
AutoCAD SHX Text
05
AutoCAD SHX Text
06
AutoCAD SHX Text
07
AutoCAD SHX Text
08
AutoCAD SHX Text
09
AutoCAD SHX Text
10
AutoCAD SHX Text
RWY 6-24
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY E
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TW A1
AutoCAD SHX Text
TWY C
AutoCAD SHX Text
TW A2
AutoCAD SHX Text
TWY B
AutoCAD SHX Text
TWY A
AutoCAD SHX Text
TWY F
AutoCAD SHX Text
TW D
AutoCAD SHX Text
EAST RAMP
AutoCAD SHX Text
RW24 RUN UP PAD
AutoCAD SHX Text
WEST RAMP
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text
PERFORM SPALL REPAIR
AutoCAD SHX Text
PERFORM RESEAL OF JOINT
AutoCAD SHX Text
10
AutoCAD SHX Text
B
AutoCAD SHX Text
SLAB DESIGNATION
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
PERFORM CRACK SEALING
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH UP TO 1")
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH GREATER THAN 2")
AutoCAD SHX Text
EXISTING JOINT (NO WORK)
AutoCAD SHX Text
(COLUMN)
AutoCAD SHX Text
(ROW)
AutoCAD SHX Text
EXISTING CRACK (NO WORK)
AutoCAD SHX Text
PERFORM RESEAL JOINT (WIDTH BETWEEN 1" TO 2")
AutoCAD SHX Text
PERFORM JOINT SPALL REPAIR
AutoCAD SHX Text
EXISTING JOINT SPALL (NO WORK)
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
PERFORM SEAL CRACK
AutoCAD SHX Text
1
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEALANT PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (1" TO 2" WIDTH) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
3
AutoCAD SHX Text
REMOVE & INSTALL JOINT SEAL (2" WIDTH & GREATER) PER DETAIL 1 ON DWG C-31.
AutoCAD SHX Text
4
AutoCAD SHX Text
JOINT EDGE SPALL REPAIR PER DETAILS 1 & 2 ON DWG C-30.
AutoCAD SHX Text
5
AutoCAD SHX Text
MID-PANEL CRACK REPAIR PER DETAIL 3 ON DWG C-30.
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
AutoCAD SHX Text
EXIST PVMT MARKINGS (TYP)
AutoCAD SHX Text
NEW PCC PVMT (BY OTHERS)
AutoCAD SHX Text
BLAST FENCE
AutoCAD SHX Text
NO WORK WITHIN THIS AREA
Page 18: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
C-30
AutoCAD SHX Text
18
AutoCAD SHX Text
R
AutoCAD SHX Text
REMOVE EXIST. JOINT SEALER AND INSTALL NEW SEALANT AND BACKER ROD PER DETAILS 1 OR 2 ON SHEET C-31
AutoCAD SHX Text
SAW-CUT 2" FROM THE FARTHEST EDGE OF SPALL (TYP)
AutoCAD SHX Text
NEW BACKER ROD (B)
AutoCAD SHX Text
REMOVE DETERIORATED CONCRETE TO SOUND CONCRETE SURFACE & PRIME WITH SAND CEMENT GROUT
AutoCAD SHX Text
SAW CUT DEPTH 2" MIN
AutoCAD SHX Text
DETERIORATED CONCRETE
AutoCAD SHX Text
NEW CONCRETE
AutoCAD SHX Text
EXIST. JOINT OR CRACK
AutoCAD SHX Text
SAW-CUT 2" FROM THE FARTHEST EDGE OF SPALL (TYP)
AutoCAD SHX Text
NEW PCC (TYP)
AutoCAD SHX Text
SAW-CUT (TYP)
AutoCAD SHX Text
DETERIORATED CONCRETE
AutoCAD SHX Text
SAW-CUT (TYP)
AutoCAD SHX Text
NEW PCC (TYP)
AutoCAD SHX Text
SAW-CUT 2" FROM THE FARTHEST EDGE OF SPALL (TYP)
AutoCAD SHX Text
2"
AutoCAD SHX Text
SAW-CUT 2" FROM THE FARTHEST EDGE OF SPALL (TYP)
AutoCAD SHX Text
DETERIORATED CONCRETE
AutoCAD SHX Text
DETERIORATED CONCRETE
AutoCAD SHX Text
SAW-CUT (TYP)
AutoCAD SHX Text
NEW PCC (TYP)
AutoCAD SHX Text
90°(TYP)
AutoCAD SHX Text
SPALL REPAIR ALONG RANDOM WORKING CRACK
AutoCAD SHX Text
SPALL REPAIR ALONG JOINTS
AutoCAD SHX Text
CORNER AND MID SLAB SPALL REPAIR
AutoCAD SHX Text
SEE NOTE 8
AutoCAD SHX Text
PAVEMENT REPAIR DETAILS 1 OF 2
AutoCAD SHX Text
1.APPROX. LOCATION OF PARTIAL DEPTH SPALL REPAIR ARE SHOWN ON THE DRAWINGS. EXACT REPAIR LOCATION APPROX. LOCATION OF PARTIAL DEPTH SPALL REPAIR ARE SHOWN ON THE DRAWINGS. EXACT REPAIR LOCATION AND DIMENSIONS OF SPALL REPAIR MUST BE DETERMINED AND MARKED IN THE FIELD BY CONTRACTOR AND APPROVED BY THE ENGINEER. THE INTENTION IS TO REMOVE AND REPLACE ALL DETERIORATED CONCRETE, AND TO MAINTAIN THE SIZE OF THE SPALL REPAIR TO THE MINIMUM PRACTICAL TO AVOID UNNECESSARY REMOVAL OF SOUND CONCRETE. 2.REMOVE ANY SEALANT PRESENT IN THE JOINT OR CRACK ADJACENT TO THE SPALL. REMOVE ANY SEALANT PRESENT IN THE JOINT OR CRACK ADJACENT TO THE SPALL. 3.JOINT SPALLS WITH ACTUAL CAVITY WIDTHS LESS THAN 2" SHALL BE REPAIRED BY CLEANING (SAWING) AND JOINT SPALLS WITH ACTUAL CAVITY WIDTHS LESS THAN 2" SHALL BE REPAIRED BY CLEANING (SAWING) AND FILLING WITH JOINT SEALANT IN LIEU OF SPALL REPAIR. 4.SAWCUT A BOUNDARY (RECTANGULAR) AROUND THE SPALLED AREA TO A MINIMUM DEPTH OF 2". BREAKOUT SAWCUT A BOUNDARY (RECTANGULAR) AROUND THE SPALLED AREA TO A MINIMUM DEPTH OF 2". BREAKOUT AND REMOVE PAVEMENT AND UNSOUND CONCRETE WITHIN SAWCUTS TO A MINIMUM DEPTH OF 2". CLEAN EXPOSED CAVITY SURFACES. 5.VACUUM SWEEP THE AREA TO PREVENT DEBRIS FROM REENTERING THE SPALL REPAIR AREA. VACUUM SWEEP THE AREA TO PREVENT DEBRIS FROM REENTERING THE SPALL REPAIR AREA. 6.INSTALL JOINT FILLER TO PROVIDE RIGID BOUNDARY NEXT TO THE JOINT OR CRACK AND TO RETAIN THE SHAPE INSTALL JOINT FILLER TO PROVIDE RIGID BOUNDARY NEXT TO THE JOINT OR CRACK AND TO RETAIN THE SHAPE OF THE JOINT. THIS FILLER MUST EXTEND THE FULL LENGTH OF THE JOINT OR CRACK AND FOR THE FULL DEPTH OF THE SPALL REPAIR AREA. WHERE PRACTICAL AND AT OPTION OF CONTRACTOR, EXTEND JOINT FILLER TO A MINIMUM OF 1/2" BELOW THE CAVITY SURFACE TO HOLD NEW FILLER DURING CONCRETE PLACEMENT AND PREVENT CEMENT GROUT OR CONCRETE FROM BY-PASSING FILLER AND ENTERING JOINT SPACE. 7.WHERE SPALL REPAIRS ARE REQUIRED ON EACH SIDE OF A JOINT OR CRACK, A JOINT FILLER SHALL BE WHERE SPALL REPAIRS ARE REQUIRED ON EACH SIDE OF A JOINT OR CRACK, A JOINT FILLER SHALL BE SECURED IN ALIGNMENT WITH THE JOINT OR CRACK. AFTER BREAKING OUT THE SPALLED CONCRETE, THE SPALL REPAIRS SHALL BE COMPLETED ON ONE SIDE AT A TIME AS SPECIFIED. 8.AT SPALLS WHERE THE LENGTH OR WIDTH OF THE REPAIR IS CLOSER THAN 3" TO THE JOINT, THE REPAIR AT SPALLS WHERE THE LENGTH OR WIDTH OF THE REPAIR IS CLOSER THAN 3" TO THE JOINT, THE REPAIR SHALL EXTEND TO THE NEAREST JOINT. SAWCUT MUST BE MADE AT INTERSECTION JOINT LINES. 9.AT OPTION OF CONTRACTOR, A NEAT BEAD OF CAULK MAY BE APPLIED TO PREVENT GROUT OR CONCRETE AT OPTION OF CONTRACTOR, A NEAT BEAD OF CAULK MAY BE APPLIED TO PREVENT GROUT OR CONCRETE FROM BY-PASSING FILLER AND ENTERING THE JOINT SPACE. 10.APPLY AND SCRUB SAND-CEMENT GROUT BONDING COURSE ON ALL EXPOSED CAVITY SURFACES EXCEPT FACES APPLY AND SCRUB SAND-CEMENT GROUT BONDING COURSE ON ALL EXPOSED CAVITY SURFACES EXCEPT FACES OF JOINTS AND WORKING CRACKS. FILL CAVITY FLUSH WITH PAVEMENT SURFACE WITH CONCRETE AS SPECIFIED. FINISHING MUST BE TO SCREED FROM THE CENTER OF THE PATCH OUT TO THE PATCH BOUNDARIES. 11.ALL JOINT CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH ITEM P-605 OR AS NOTED. ALL JOINT CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH ITEM P-605 OR AS NOTED. 12.AFTER CURING IS COMPLETE, SAW THE JOINT OR CRACK TO MATCH THE EXISTING WIDTH AND TO PROVIDE AFTER CURING IS COMPLETE, SAW THE JOINT OR CRACK TO MATCH THE EXISTING WIDTH AND TO PROVIDE FRESH SURFACES FOR SEALANT, SANDBLAST AND WATERBLAST EACH FACE OF THE FRESH SAWCUT, KEEP CLEAN WITH HIGH COMPRESSED AIR AND VACUUM SWEEP THE AREA. 13.PLACE THE PROPER WIDTH BACKER ROD AT THE REQUIRED DEPTH AND PLACE THE SEALANT. PLACE THE PROPER WIDTH BACKER ROD AT THE REQUIRED DEPTH AND PLACE THE SEALANT. 14.AFTER REPAIR OPERATION IS COMPLETE, CLEAN AND VACCUM SWEEP THE SURROUNDING PAVEMENT OF ALL AFTER REPAIR OPERATION IS COMPLETE, CLEAN AND VACCUM SWEEP THE SURROUNDING PAVEMENT OF ALL POTENTIAL MATERIALS THAT MAY CAUSE FOD. 15.SAW CRACK/JOINT TO THE PROPER WIDTH AND DEPTH PER SPECIFICATIONS AND SEALANT MANUFACTURER SAW CRACK/JOINT TO THE PROPER WIDTH AND DEPTH PER SPECIFICATIONS AND SEALANT MANUFACTURER RECOMMENDATION. 16.A 2" SAWCUT DEPTH IS USED TO BEGIN THE CHIPPING AND REMOVAL PROCESS, TO REMOVE ALL UNSOUND A 2" SAWCUT DEPTH IS USED TO BEGIN THE CHIPPING AND REMOVAL PROCESS, TO REMOVE ALL UNSOUND CONCRETE FOR PARTIAL DEPTH REPAIR. IF UNSOUND CONCRETE CONTINUES TO BELOW 1/3 PANEL THICKNESS OR MORE THAN 6" WIDE SPALL REPAIR, NOTIFY THE ENGINEER. REPAIR MAY BECOME A FULL DEPTH REPAIR.
AutoCAD SHX Text
CONCRETE CRACK & SPALL REPAIR PROCEDURE (SAW & PATCH)
AutoCAD SHX Text
ROUT CRACK TO A DEPTH OF 3/4" CLEAN CRACK WITH COMPRESS AIR. INSTALL BACKER ROD. FILL CRACK WITH SEALANT PER P-605 PER DETAILS
AutoCAD SHX Text
PANEL SURFACE CRACK 1/4" TO 2"
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
1.IF CRACK IS LESS THAN 1/4" WIDE AND NO SPALLING HAS OCCURRED, DO NOT IF CRACK IS LESS THAN 1/4" WIDE AND NO SPALLING HAS OCCURRED, DO NOT WIDEN, DO NOT SEAL. 2.IF CRACK IS GREATER THAN 1/4" WIDE AND LESS THAN 2" WIDE REMOVE DEBRIS, IF CRACK IS GREATER THAN 1/4" WIDE AND LESS THAN 2" WIDE REMOVE DEBRIS, ROUTE CRACK AS NECESSARY TO PROVIDE A RESERVOIR WITH A WIDTH/DEPTH RATIO ACCEPTABLE TO THE SILICONE SEALANT MANUFACTURER. CLEAN CRACK AND INSTALL BACKER ROD AND SEAL. 3.IF CRACK IS GREATER THAN 2" WIDE COORDINATE WITH THE ENGINEER FOR THE IF CRACK IS GREATER THAN 2" WIDE COORDINATE WITH THE ENGINEER FOR THE METHOD OF CRACK REPAIR.
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
2" MIN. (SEE NOTE 16)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL PARTIAL DEPTH SPALL REPAIR DETAILS
AutoCAD SHX Text
C-30
AutoCAD SHX Text
1
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SPALL REPAIR AT CONCRETE JOINTS AND WORKING CRACKS
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL MID-PANEL CRACK REPAIR (1/4" TO 2" WIDE)
AutoCAD SHX Text
C-30
AutoCAD SHX Text
3
AutoCAD SHX Text
(SEE NOTE 16)
AutoCAD SHX Text
BACKER ROD
AutoCAD SHX Text
SEE DETAIL 1 ON DWG C-31 FOR JOINT RESEALING METHOD
AutoCAD SHX Text
PCC JOINT
AutoCAD SHX Text
PCC JOINT
AutoCAD SHX Text
2
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
C-30
AutoCAD SHX Text
2
AutoCAD SHX Text
C-31
AutoCAD SHX Text
1.ALL OLD AND DAMAGED SEALANTS SHALL BE REMOVED. EXISTING JOINT SEALANT MAY INCLUDE BOTH PREFORMED ALL OLD AND DAMAGED SEALANTS SHALL BE REMOVED. EXISTING JOINT SEALANT MAY INCLUDE BOTH PREFORMED & LIQUID SEALANT, OR METAL JOINT FILLER COVERED BY LIQUID SEALANT. 2.PREPARATION OF JOINTS/CRACKS SHALL BE IN ACCORDANCE WITH SPECIFICATION ITEM P-605. RESERVOIRS PREPARATION OF JOINTS/CRACKS SHALL BE IN ACCORDANCE WITH SPECIFICATION ITEM P-605. RESERVOIRS SHALL BE CLEANED, DRIED & WITH BACKER ROD BEFORE PLACING SEALANTS. 3.SAWCUT NEW RESERVOIR AS REQUIRED TO PROVIDE SUFFICIENT RESERVOIR DEPTH FOR BACKER ROD AND SAWCUT NEW RESERVOIR AS REQUIRED TO PROVIDE SUFFICIENT RESERVOIR DEPTH FOR BACKER ROD AND SEALANT.
AutoCAD SHX Text
GENERAL NOTES:
Page 19: SAN BERNARDINO INTERNATIONAL AIRPORT - sbiaa.org€¦ · active dirt pile. active piles. open storage. windsock. asph. asph. tank. ... cover sheet. aecom t: 714.567.2400 ... ccsp

AECOM T: 714.567.2400

999 TOWN & COUNTRY ROAD F: 714.567.2729

ORANGE, CALIFORNIA 92868 www.aecom.com

RECOMMENDED SHAPE FACTOR FOR SILICONE SEALANT

*

*

EXIST W = 0.25" TO 0.50"

*

EXIST W = 0.50" OR LARGER

*

*

*

EXIST W = 0.25" TO 1"

JOINT WITH METAL FILLER

*

FILL SPALL CAVITIES WITH JOINT

SEALANT, UNLESS OTHERWISE

DIRECTED BY THE ENGINEER

*

**

**

*

EXIST W = 1" OR MORE

AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
SAN BERNARDINO INTERNATIONAL AIRPORT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
OF
AutoCAD SHX Text
1
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
Y
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
U
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
D
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RAMP JOINT SEAL REPLACEMENT
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR.
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
19
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
MARCH 2018
AutoCAD SHX Text
Exp. 6/30/18
AutoCAD SHX Text
No. C69209
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
O
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
O
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
L
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
I
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
D
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
& PAVEMENT REPAIR PROJECT
AutoCAD SHX Text
C-31
AutoCAD SHX Text
19
AutoCAD SHX Text
PAVEMENT REPAIR DETAILS 2 OF 2
AutoCAD SHX Text
1.SEE CONCRETE & SPALL REPAIR PROCEDURE (SAW & PATCH) NOTES ON SHEET C-30. SEE CONCRETE & SPALL REPAIR PROCEDURE (SAW & PATCH) NOTES ON SHEET C-30. 2.ALL OLD AND DAMAGED SEALANTS SHALL BE REMOVED. EXISTING JOINT SEALANT MAY ALL OLD AND DAMAGED SEALANTS SHALL BE REMOVED. EXISTING JOINT SEALANT MAY INCLUDE BOTH PREFORMED & LIQUID SEALANT, OR METAL JOINT FILLER COVERED BY LIQUID SEALANT. 3.PREPARATION OF JOINTS/CRACKS SHALL BE IN ACCORDANCE WITH SPECIFICATION ITEM PREPARATION OF JOINTS/CRACKS SHALL BE IN ACCORDANCE WITH SPECIFICATION ITEM P-605. RESERVOIRS SHALL BE CLEANED, DRIED & WITH BACKER ROD BEFORE PLACING SEALANTS. 4.SAWCUT NEW RESERVOIR AS REQUIRED TO PROVIDE SUFFICIENT RESERVOIR DEPTH FOR SAWCUT NEW RESERVOIR AS REQUIRED TO PROVIDE SUFFICIENT RESERVOIR DEPTH FOR BACKER ROD AND SEALANT.
AutoCAD SHX Text
GENERAL NOTES:
AutoCAD SHX Text
JOINT/CRACK WIDTH (W)
AutoCAD SHX Text
RECESS BELOW SURFACE (R)
AutoCAD SHX Text
SEALANT THICKNESS (D)
AutoCAD SHX Text
BACKER ROD DIAMETER (B)
AutoCAD SHX Text
TOTAL JOINT DEPTH (T)
AutoCAD SHX Text
3/8"
AutoCAD SHX Text
1/4"
AutoCAD SHX Text
1/4"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
1"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
1/4"
AutoCAD SHX Text
1/4"
AutoCAD SHX Text
5/8"
AutoCAD SHX Text
1 1/8"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
1/4"
AutoCAD SHX Text
3/8"
AutoCAD SHX Text
7/8"
AutoCAD SHX Text
1 1/2"
AutoCAD SHX Text
1"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
1 1/4"
AutoCAD SHX Text
2 1/4"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
2"
AutoCAD SHX Text
1/2"
AutoCAD SHX Text
2 1/2"
AutoCAD SHX Text
2 1/2"
AutoCAD SHX Text
3/4"
AutoCAD SHX Text
TABLE 1
AutoCAD SHX Text
VERIFY SEALANT THICKNESS (D) WITH SEALANT MANUFACTURER. "D" AS INDICATED IS A MINIMAL.
AutoCAD SHX Text
R
AutoCAD SHX Text
EXIST CRACK
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
CRACK SEALING (TYP)
AutoCAD SHX Text
CRACK SEALING (TYP)
AutoCAD SHX Text
SAWCUT CRACK
AutoCAD SHX Text
R
AutoCAD SHX Text
EXIST CRACK
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
ROUTE CRACK
AutoCAD SHX Text
NOTE: SEE TABLE 1 THIS SHEET.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CRACK RESEALING DETAILS
AutoCAD SHX Text
C-31
AutoCAD SHX Text
2
AutoCAD SHX Text
R
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
R
AutoCAD SHX Text
SAWCUT JOINT (BOTH SIDES) & REMOVE EXIST JOINT SEALANT AND BACKER ROD
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
CONTRACTION AND CONSTRUCTION JOINT (TYP)
AutoCAD SHX Text
CONTRACTION AND CONSTRUCTION JOINT (TYP)
AutoCAD SHX Text
NOTE: SEE TABLE 1 THIS SHEET.
AutoCAD SHX Text
R
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
ISOLATION / EXPANSION JOINT (TYP)
AutoCAD SHX Text
REMOVE EXIST SEALANT AND BACKER ROD
AutoCAD SHX Text
SAWCUT NEW RESERVOIR
AutoCAD SHX Text
EXIST SEALANT RESERVOIR
AutoCAD SHX Text
BACKER ROD (B)
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
JOINT SEAL WITH MINOR SPALL
AutoCAD SHX Text
SAWCUT JOINT
AutoCAD SHX Text
SAWCUT JOINT (BOTH SIDES) & REMOVE EXIST METAL JOINT FILLER AND SEALANT
AutoCAD SHX Text
SAWCUT NEW RESERVOIR
AutoCAD SHX Text
EXIST SEALANT RESERVOIR
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
BEVEL
AutoCAD SHX Text
1/4" RECESSED
AutoCAD SHX Text
1/4" BEVEL
AutoCAD SHX Text
NEW JOINT SEALANT
AutoCAD SHX Text
NOTE: SEE TABLE 1 THIS SHEET.
AutoCAD SHX Text
EXISTING JOINT FILLER TO REMAIN
AutoCAD SHX Text
(SEE NOTE 4)
AutoCAD SHX Text
(SEE NOTE 4)
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
BEVEL
AutoCAD SHX Text
SAWCUT AS REQUIRED TO PROVIDE SUFFICIENT RESERVOIR DEPTH FOR BACKER ROD & SEALANT.
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
3
AutoCAD SHX Text
-
AutoCAD SHX Text
BEVEL DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1
AutoCAD SHX Text
-
AutoCAD SHX Text
JOINT RESEALING DETAILS