san diego community college district propositions s & n construction bond program

75
San Diego Community College District Propositions S and N Construction Bond Program P t ti t Presentation to January 12 2010 January 12, 2010 Ursula Kroemer, Communications Director Charlotte Zolezzi, Construction Manager

Upload: san-diego-community-college-district

Post on 14-Mar-2016

218 views

Category:

Documents


1 download

DESCRIPTION

​The San Diego Community College District’s (SDCCD) construction bond program, funded by voter-approved Proposition S, a $685 million bond passed in 2002, and Proposition N, an $870 million bond passed in 2006, is providing for new, state-of-the-art instructional and career training facilities, major renovations, public safety and accessibility enhancements, parking, and campuswide infrastructure projects at City, Mesa and Miramar Colleges, and six Continuing Education campuses.

TRANSCRIPT

Page 1: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond Program

P t ti tPresentation to

January 12 2010January 12, 2010

Ursula Kroemer, Communications DirectorCharlotte Zolezzi, Construction Manager

Page 2: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

$1.555 billion construction bond program provides forj i i80+ projects at City, Mesa and Miramar Colleges, and

six Continuing Education campuses:St t f th t t hi d l i f iliti State of the art teaching and learning facilities

Major renovations and modernizations Campus-wide infrastructure projects Green Building Policy

2

Page 3: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond Program

G l f Alt ti P j t D li

Propositions S and N Construction Bond Program

Goals for Alternative Project Delivery

Project-centric delivery

Reduce waste

Maximize value

Match contractor skills and experience with project

Select the best personnel available

Page 4: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond Program

How is SDCCD achieving this?

Propositions S and N Construction Bond Program

Standards developed for critical systems

Requiring use of BIM for all new construction Requiring use of BIM for all new construction

Using CM Multiple Prime delivery

Using Design/Build for projects as well as systems

Utilizing elements of Integrated Project Delivery

Pursuing LEED certification at Silver level or better

Page 5: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N – City CollegePropositions S and N City College

Seven new teaching and learning facilities

Seven major renovations

C i ill Campus expansion will provide facilities/programs to accommodate eventual enrollment of 25,000 students

Page 6: San Diego Community College District Propositions S & N Construction Bond Program

City College - Completed ProjectsLearning Resource Center

Project Budget: $3.4 million

C l ti D t A t 2007

g

Completion Date: August 2007

Renovation to convert approximately 15,000 SF of parking garage space into5,000 S o pa g ga age space ofaculty offices, student classrooms and support space. First Propositions S and N project to obtain LEED certification..project to obtain LEED certification..

Page 7: San Diego Community College District Propositions S & N Construction Bond Program

City College - Completed ProjectsAcademic Success Center (L Bldg. Renovation)

P j t B d t $10 8 illi

( g )

Project Budget: $10.8 million

Completion Date: April 2009

C l t j ti f t t Complete, major renovation of two-story building totaling 28,700 sq. ft. Serves as one-stop shopping for all student services, i l di t t i t d i i including tutoring, assessment, advising, and other student support programs.

Page 8: San Diego Community College District Propositions S & N Construction Bond Program

City College - Completed ProjectsP Building Renovation

Project Budget: $11.3 million

g

Completion Date: January 2010

Major interior and exterior renovation of two-i i istory concrete gymnasium building. Renovated

facility includes work-out rooms, locker rooms, training areas, classrooms, faculty/staff areas,and enhanced parking and ADA accessibility.

Page 9: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsCareer Technology Center

Project Budget: $72.5 million

gy

ojec udge : $7 .5 o

Construction Start: May 2008

Targeted Completion: May 2010

New five-story 88,000 sq. ft. facility tohouse the Nursing, Cosmetology and Photography & Digital Arts programs.Includes classrooms, computer labs, medical simulation labs, and a galleryfor student work. Also includes a 694-space parking structure and new headquarters for City College Police.

Page 10: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsArts & Humanities/Business Technology Buildings

Project Budget: $85 million

/ gy g

Expected Construction Start: May 2010

Targeted Completion: January 2012

Arts & Humanities will consist of approx.70,000 sq. ft. to include new classrooms, alecture hall, computer labs, studio space

d 100 t “bl k b th t ”and a 100-seat “black box theatre.”

Business Technology will consist of approx.40 000 sq ft to include “smart” classrooms40,000 sq. ft. to include smart classrooms,computer labs and areas for student start-up businesses. The project also includessublevel parking.

Page 11: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsArts & Humanities/Business Technology Buildings/ gy g

Estimated Construction Start:

Summer 2010

Delivery Method: CMMP

CM: Turner Construction

Architect: Roesling Nakamura Terada Architectsg

Sub Opportunities: Multiple trade bid packages solicited in late summer 2010.

Page 12: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsGeneral Purpose Classroom Building

Project Budget: $83.5 million (incl. land acquisition)

p g

j g $ ( q )

Expected Construction Start: Oct. 2010

Targeted Completion: May 2012

Project involves land acquisition and construction of new 72,000 sq. ft. classroom and laboratory building. It will include the District’s Corporate Education Center, Military p yEducation, a Family Health Center and a six-story parking structure with 400+ stalls.

Delivery Method: Design/Build (RNT Sundt)Delivery Method: Design/Build (RNT, Sundt)

Sub Opportunities: Major trade subcontractors have been selected for MEP, Structure, and Concrete. Multiple trade contracts will be solicited in late summer 2010contracts will be solicited in late summer 2010.

Page 13: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsScience Building

Project Budget: $54.8 million

E t d C t ti St t M h 2011

g

Expected Construction Start: March 2011

Targeted Completion: November 2012

F t L h d b ildi idi 73 000 Four-story, L-shaped building providing 73,000 square feet of new construction for classrooms, labs and a planetarium.

Delivery Method: CMMP

CM: Rudolph & Sletten

Architect: Harley Ellis Devereaux

Sub Opportunities: Multiple trade bid packages solicited in winter 2010solicited in winter 2010.

Page 14: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future Projects16th Street Sewer/Storm Drain Upgrade Project

Estimated Construction Start:

/ pg j

Estimated Construction Start:Spring 2010

Estimated Construction Cost: $3 million

Delivery Method: Design-Bid-Build

Engineer: AB Engineering

Sub Opportunities: This project will lik l bid t h i il t tiliti likely bid to heavy civil or wet utilities general contractors.

Page 15: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsCentral Plant Upgrade

Estimated Construction Start: Summer 2010

pg

Estimated Construction Cost: $8 million

D li M th d D i /B ildDelivery Method: Design/Build

D/B Contractor: University Mechanical (UMEC)( )

Sub Opportunities: TBD

Page 16: San Diego Community College District Propositions S & N Construction Bond Program

City College - Future ProjectsTelecommunications Infrastructure Upgrade

Estimated Construction Start:S 2010

pg

Summer 2010

Estimated Construction Cost: $1.2 million

Engineer: Randall Lamb

Delivery Method: Design/Bid/Build

Sub Opportunities: Civil & Electrical

Page 17: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N – Mesa College

Nine projects completed

Propositions S and N Mesa College

p j punder Propositions S and N

Two projects currently Two projects currently under construction; three more in design

Seven more remaining as part of campus expansionp p p

Page 18: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Completed ProjectsAllied Health Building

Project Budget: $28.9 millionCompletion Date: August 2009

g

Completion Date: August 2009

New three-story, 50,000 square-foot provides training facilities and classroom p gspace for degree and certificate programs for five healthcare fields.

The project is currently tracking LEED Gold.

Page 19: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Completed ProjectsCollege Police Station

Project Budget: $3.4 million (Part of $34.4 million East Campus Improvement Project)

g

Completion Date: July 2009

The 7,000 square-foot station include a waiting area offices conference room a waiting area, offices, conference room, a secure suspect processing area, and a locker room area outfitted with daylight-harvesting fixtures and waterless and low-gflow plumbing fixtures. Tracking LEED Gold.

Page 20: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Completed ProjectsParking Structure

Completion Date: March 2009

g

The new 1 100-space four-level parking The new 1,100-space, four-level parking structure is part of East Campus improvement Project that includes a complete road realignment. Photovoltaic panels will be realignment. Photovoltaic panels will be installed on the top level to harvest solar energy, offsetting the energy needs for the new police station and the new Allied pHealth Building.

Page 21: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Completed ProjectsAthletic Facilityy

Project Budget: $4.9 million

Renovation includes new artificial turf, an all weather synthetic track an upper field

Completion Date: January 2010

all-weather synthetic track, an upper field event area, and ADA-compliant pedestrian ramp and restroom facilities. The renovation will also include retaining walls concrete will also include retaining walls, concrete, fencing and utilities for athletic field events.

Page 22: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Future ProjectsStudent Services Building

Project Budget: $55.7 million

t d C t ti St t S i 20 0

g

Expected Construction Start: Spring 2010

Targeted Completion: Spring 2012

New four-story, 85,000 GSF building will provide facilities for student services such as Admissions, Financial Aid and Counseling. It will include classrooms, conference areas, It will include classrooms, conference areas, a café, and an exterior elevator that stops at every level.

Delivery Method: CMMPDelivery Method: CMMP

CM: PCL Construction

Architect: Hanna Gabriel Wells

Sub Opportunities: All Trades

Page 23: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Future ProjectsMath and Science Buildingg

Project Budget: $117 million

E t d C t ti St t F b 2011Expected Construction Start: Feb. 2011

Targeted Completion: January 2013

New 200,000 GSF, four-story building will have classrooms, lecture rooms, labs for scientific experiments, computer labs, and facility, staff and administrative support areas and administrative support areas.

Delivery Method: CMMP

CM: McCarthyCM: McCarthy

Architect: Delawie Wilkes Rodrigues Barker

Sub Opportunities: Trades MEP and skin Sub Opportunities: Trades, MEP and skin as Design/Build; balance of trades

Page 24: San Diego Community College District Propositions S & N Construction Bond Program

Mesa College - Future ProjectsMuir Renovation

Renovation of 28,000 FT facility; project has been submitted to DSA

Estimated Construction Start:February 2010

Estimated Construction Cost:$1.3 million

Delivery Method: Design-Bid-Build

Contractor: Nielsen

Architect: Delawie Wilkes Rodrigues Barker

Sub Opportunities: All Trades

Page 25: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N – Miramar College

13 completed projects

Propositions S and N Miramar College

13 completed projects

Infrastructure project, t l b ildi two classroom buildings and Library Learning Resource Center currently in construction

Campus expansion will Campus expansion will accommodate eventual enrollment of 25 00025,000

Page 26: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Completed ProjectsHourglass Park Field House

Project Budget: $27.7 million

g

Completion Date: March 2009

Joint use project with the City of San Diego. I l d i fit t Includes a gymnasium, fitness center, classrooms, dance rooms, lecture rooms, multi-purpose areas and a concession stand Third and final phase of a 32 acre stand. Third and final phase of a 32-acre complex that includes an aquatics center and multi-sport ball fields. LEED-certified.

Page 27: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsLibrary Learning Resource Centery g

Project Budget: $48.3 million

Construction Start: December 2009

Targeted Completion: Fall 2011

New three-story, 100,000 square feet facility will include a new library, classrooms computer labs tutoring classrooms, computer labs, tutoring services, media production facility, and faculty and staff workspace.

Page 28: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsStudent Campus Center & Cafeteria/Bookstorep /

Project Budget: $33.2 million

E ti t d C t ti St t S i 2011Estimated Construction Start: Spring 2011

Targeted Completion: Spring 2013

New multi-story will consist of approx. 45,000 SF of new construction to house a new cafeteria, bookstore and student services center services center.

Delivery Method: CMMP

CM CW D iCM: CW Driver

Architect: NTD Architecture

Sub Opportunities: Multiple trade pkgs Sub Opportunities: Multiple trade pkgs., MEP trades to be solicited TBD

Page 29: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsAutomotive Career Instructional Building Expansion

Project Budget: $5.3 million

g p

Estimated Construction Start: Feb 2010

Targeted Completion: Spring 2011

Addition of approx. 6,500 SF of new construction to add additional laboratory and classroom space and storage. Additi ll ADA d d i Additionally, ADA upgrades and minor renovations will be performed on the existing building.

Delivery Method: Design-Bid-Build

Architect: Zagrodnik & Thomas

S b O t iti U d d Utiliti Sub Opportunities: Underground Utilities, Block, Mechanical and Electrical

Page 30: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsHeavy Duty Advanced Transportation Technology y y p gyCenter Expansion

P j t B d t $11 6 illiProject Budget: $11.6 million

Estimated Construction Start: Fall 2010

Targeted Completion: Fall 2011

Project will consist of approximately 14,000 SF of new building construction to support program

i t di l t l h b id b d

Targeted Completion: Fall 2011

expansion to diesel, natural gas, hybrid bus and transit technology and new developments in construction equipment technology

Delivery Method: CMMP

Architect: Marlene Imirzian

Sub Opportunities: Multiple Trade packages will be solicited in March 2010

Page 31: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsAviation Maintenance Technology Centergy

Project Budget: $8.9 million

Estimated Construction Start: Spring 2011

Targeted Completion: Summer 2012

Addition of approx. 6,500 SF of new construction to add additional laboratory and classroom space and storage. Additionally, ADA d d i ti ill b ADA upgrades and minor renovations will be performed on the existing building.

Delivery Method: CMMPy C

Architect: Joseph Wong Design Associates

Sub Opportunities: Multiple Trade pkgs.

Page 32: San Diego Community College District Propositions S & N Construction Bond Program

Miramar College - Future ProjectsParking Structure and Police Substationg

Project Budget: $13.8 million

Estimated Construction Start:

Summer 2010

Targeted Completion: Spring 2012

Project improve public safety and li t ffi ti b relieve traffic congestion by

constructing a parking structure on the campus. Project is designed to obtain LEED Platinum – the first for SDCCD.

Delivery Method: Design-Build

Design/Builder: McCarthy ConstructionDesign/Builder: McCarthy Construction

Sub Opportunities: N/A

Page 33: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N – Continuing EducationPropositions S and N Continuing Education

Four projects completed

Four projects in designFour projects in design

Total of eight projects to expand and modernize six expand and modernize six Continuing Education sites

Page 34: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Completed ProjectsWest City CampusProject Budget: $18,000,000Completion Date: May 2009

y p

New, two-story, 38,930 SF facility is the Campus of Excellence for Hospitality and C S i It i l d “ t” Consumer Science. It includes “smart” classrooms, a state-of-the-art teaching and demonstration kitchen, computer l b d th P i labs and other space. Pursuing LEED Silver.

Page 35: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Completed ProjectsSkills Center at Educational Cultural Complex

Project Budget: $35,000,000Completion Date: September 2009

p

Completion Date: September 2009

New 52,600 SF facility is the Campus of Excellence for Career & Technical Education.It includes classrooms for Automotive Repair, Upholstery, Reprographics Services, and Business Information Technology. Includes SDG&E-funded solar panel array. Pursuing LEED Silver.

Page 36: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Future ProjectsNorth City Classroom Building & Parking Structure

Project Budget: $50.7 millionE t d C t ti St t M 2011

y g g

Expected Construction Start: May 2011Targeted Completion: December 2012

Land acquisition; construction of a new Land acquisition; construction of a new, two-story, 40,500 GSF classroom building; and construction of a 300-space parkingstructure It will be the Campus of structure. It will be the Campus of Excellence for Multimedia and Innovation.

Delivery Method: CMMP

CM: Barnhart

Architect: Joseph Wong Design Associates

Sub Opportunities: All trades

Parking structure: TBD

Page 37: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Future ProjectsCesar Chavez Campus

Project Budget: $48.7 millionExpected Construction Start: Feb 2011

p

Expected Construction Start: Feb 2011Targeted Completion: July 2012

This project consists of land acquisition and t ti f 70 000 GSF b ildi t construction of a new 70,000 GSF building to

consolidate the current programs at the Cesar Chavez and Centre City campuses. Includes

l ll b i i b t t classrooms, a small business incubator center, and underground parking with 154 spaces.

Delivery Method: CMMP Delivery Method: CMMP

Architect: Martinez + Cutri

CM: Rudolph & Sletten

Sub Opportunities: TBD

Page 38: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Future ProjectsLinda Vista Campus at Mesa College

Project Budget: $19.2 millionE t d C t ti St t M 2011

p g

Expected Construction Start: May 2011Targeted Completion: December 2012

The new facility will help consolidate programsThe new facility will help consolidate programscurrently housed in temporary spaces. The new 38,000 GSF facility will include classrooms, an art lab, a parent-child area, multipurpose p p proom and a nutritional demonstration kitchenette.

Delivery Method: CMMP y

CM: PCL

Architect: SGPA Architecture and Planning

Sub Opportunities: All trades

Page 39: San Diego Community College District Propositions S & N Construction Bond Program

Continuing Education - Future ProjectsWing expansion at Educational Cultural Complex

Project Budget: $16.3 million

E t d C t ti St t M 2011

g p p

Expected Construction Start: May 2011

Targeted Completion: November 2012

New15,000 SF expansion to main building will replace bungalows, modular classrooms, labs and support rooms not connected to building.Allows for relocation of College Police and will create more efficient space for admin team.

Delivery Method: CMMPDelivery Method: CMMP

CM: CW Driver

Architect: RJC Architects

Sub Opportunities: All trades

Page 40: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond Program

www.sdccdprops-n.com

Propositions S and N Construction Bond Program

Page 41: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond Program

SharePoint - Communications & Reporting

Propositions S and N Construction Bond Program

p g

Page 42: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 43: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

We can, d and we are…

Page 44: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 45: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 46: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 47: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 48: San Diego Community College District Propositions S & N Construction Bond Program

San Diego Community College DistrictPropositions S and N Construction Bond ProgramPropositions S and N Construction Bond Program

Page 49: San Diego Community College District Propositions S & N Construction Bond Program

Welcome to the

Construction Manager: Charlotte Zolezzi

Miramar Infrastructure & Site Development

Page 50: San Diego Community College District Propositions S & N Construction Bond Program
Page 51: San Diego Community College District Propositions S & N Construction Bond Program

Key Roles & Responsibilities

Also known as the CM Authorized construction contract relative

Construction Manager

Also known as the CM. Authorized construction contract relative

to the District project. The CM is the authorized administrative

representative for the District during the construction phase representative for the District during the construction phase

regarding construction supervision and coordination. The CM

specifically is tasked with schedule monitoring, cost containment, g

conflict resolution, issue tracking, meeting documentation,

correspondence and communication between project

stakeholders.

Charlotte Zolezzi, Gafcon

Page 52: San Diego Community College District Propositions S & N Construction Bond Program

Key Roles

Inspectors Labor Compliance Officer Architects and Engineers Campus Staff

ManagementF iliti Facilities

Police Public Information Manager

Page 53: San Diego Community College District Propositions S & N Construction Bond Program

Key Roles

General ContractorResponsible for overall construction scope

Sub-Contractor:

Responsible for overall construction scope

Responsible for a single trade scope and report to the General Contractor (GC). Grading Grading Mechanical Electrical Concrete Landscaping

Page 54: San Diego Community College District Propositions S & N Construction Bond Program

District Priorities

SAFETY BUDGET BUDGET SCHEDULECAMPUS COORDINATIONCAMPUS COORDINATIONDOCUMENTATION

Page 55: San Diego Community College District Propositions S & N Construction Bond Program

Issues and Concerns Specific to Infrastructure ProjectInfrastructure Project

Parking Parking Access & Egress

1 million square feet qcoordination

Delivery and lay down of 12 miles of pipe and conduit

Page 56: San Diego Community College District Propositions S & N Construction Bond Program
Page 57: San Diego Community College District Propositions S & N Construction Bond Program

Job Site Safety

CM R ibiliti

Safety Violations

CM Responsibilities Recommend corrective action Authorized to stop work in event of life safety issue Authorized to stop work in event of life safety issue Notification of decision to stop work Notice of Non-Compliancep Verbal Notification Document Condition Ensure Appropriate Corrective Action Document

Page 58: San Diego Community College District Propositions S & N Construction Bond Program

Construction Schedule

Overview CM maintains documentation in Contract Manager CM maintains documentation in Contract Manager

and SharePoint

Page 59: San Diego Community College District Propositions S & N Construction Bond Program

SubmittalsAll final documentation stored in SharePointAll final documentation stored in SharePoint

Procedural Requirements Procedural Requirements Shop Drawings Product Data Product Data Samples Mock ups Mock-ups Material Lists Quality Control Items Quality Control Items

Page 60: San Diego Community College District Propositions S & N Construction Bond Program
Page 61: San Diego Community College District Propositions S & N Construction Bond Program

Request for Information (RFI)

Manage conflicts Errors and Omissions

Q ti i i t t ti Questions concerning interpretation

CM is liaison for relay of information CM is liaison for relay of information Record-keeping in Contract Manager and

SharePoint

Page 62: San Diego Community College District Propositions S & N Construction Bond Program
Page 63: San Diego Community College District Propositions S & N Construction Bond Program

Photographic DocumentationPhotos stored in SharePointPhotos stored in SharePoint

Provides a system for photographic documentation of i l i i id d construction progress, claim issues, accident reports and

insurance claims, coordination issues and photographs for public relations and marketing.

Page 64: San Diego Community College District Propositions S & N Construction Bond Program

64

Page 65: San Diego Community College District Propositions S & N Construction Bond Program

Change Orders (CO)D t ti t d i Sh P i tDocumentation stored in SharePoint

Baseline Documents Construction contract documentsConstruction contract documents Addenda General Conditions Special Conditions Technical Specifications

Origination based on need of contractual change PI, CM and A/E will discuss and determine if warranted

Page 66: San Diego Community College District Propositions S & N Construction Bond Program
Page 67: San Diego Community College District Propositions S & N Construction Bond Program

Contractor Payments

District policy is one payment per vendor per month Based on monitoring % of work done vs. Schedule of g %

Values CM, PI and GC Superintendent meet to discuss % of

work completework complete GC presents proposed completion % CM is responsible to ensure payment does not CM is responsible to ensure payment does not

exceed value of work CM maintains up-to-date information in SharePoint

Page 68: San Diego Community College District Propositions S & N Construction Bond Program
Page 69: San Diego Community College District Propositions S & N Construction Bond Program

YOUYOU

Page 70: San Diego Community College District Propositions S & N Construction Bond Program
Page 71: San Diego Community College District Propositions S & N Construction Bond Program
Page 72: San Diego Community College District Propositions S & N Construction Bond Program
Page 73: San Diego Community College District Propositions S & N Construction Bond Program
Page 74: San Diego Community College District Propositions S & N Construction Bond Program
Page 75: San Diego Community College District Propositions S & N Construction Bond Program

THANK YOU!!

URSULA KROEMER [email protected]

CHARLOTTE ZOLEZZI [email protected]

www.gafcon.comg

SAN DIEGO IRVINE LOS ANGELES

701 B Street, Suite 1600 San Diego, CA 92101g

75