Page 1: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa City Schools

2014 General Obligation Authorization – Measure I

City of Santa Rosa High School District Citizens’ Oversight Committee for Measure I

August 22, 2019

Page 2: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictProject Expenditure Report – Measure I

Project Expenditure Detail Report

Measure I

From 3-31-2019 to 6-28-2019

2

Page 3: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 230-9532-5189 - Cook Middle - SecurityB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/16/2019 Integ Security Controls Inc 317198 21-0142 5800 2,850.26 Other Services & Operating Expenditures

05/16/2019 Integ Security Controls Inc 317198 21-0142 5800 84,444.90 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 87,295.16 0.00 0.00 0.00 $87,295.16

Project Subtotal $87,295.16

PROJECT: 231-9532-5189 - Slater Middle - SecurityB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/02/2019 Integ Security Controls Inc 316718 21-0142 5800 73,912.36 Other Services & Operating Expenditures

05/16/2019 Integ Security Controls Inc 317198 21-0142 5800 2,550.37 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 76,462.73 0.00 0.00 0.00 $76,462.73

Project Subtotal $76,462.73

PROJECT: 231-9540-5192 - Slater Middle - Asbestos/Hazardous MaterialsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 NorBay Consulting 315680 21-0142 5800 2,636.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 2,636.00 0.00 0.00 0.00 $2,636.00

Project Subtotal $2,636.00

PROJECT: 232-9821-5192 - Comstock Middle - Roofing ReplacementC - Construction

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

04/09/2019 Matrix HG Inc. 316043 21-0142 6210 64,823.58 Buildings & Improvement

04/09/2019 Matrix HG Inc. 316043 21-0142 6210 254,632.46 Buildings & Improvement

C - Construction Subtotal 319,456.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $319,456.04

Project Subtotal $319,456.04

PROJECT: 249-9500-5192 - Secondary District Wide - Athletic FieldsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/04/2019 S.R.C.S. IFC19-00051 21-0142 1000-3999 167.04 Jrnl custodian5/10/1

CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20193

Page 4: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/04/2019 S.R.C.S. IFC19-00051 21-0142 1000-3999 10.36 Jrnl custodian5/10/1

06/04/2019 S.R.C.S. IFC19-00051 21-0142 1000-3999 2.42 Jrnl custodian5/10/1

06/04/2019 S.R.C.S. IFC19-00051 21-0142 1000-3999 0.08 Jrnl custodian5/10/1

06/04/2019 S.R.C.S. IFC19-00051 21-0142 1000-3999 3.21 Jrnl custodian5/10/1

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 183.11 0.00 0.00 0.00 $183.11

Project Subtotal $183.11

PROJECT: 249-9540-5192 - Secondary District Wide - Asbestos/HazardousB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/23/2019 RegasGroup Environ Conslt 317429 21-0142 5800 560.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 560.00 0.00 0.00 0.00 $560.00

Project Subtotal $560.00

PROJECT: 249-9650-5192 - Secondary District Wide - Other FeesB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/19/2019 PBK 315534 21-0142 5800 28,319.64 Other Services & Operating Expenditures

03/19/2019 PBK 315534 21-0142 5800 769.97 Other Services & Operating Expenditures

03/19/2019 PBK 315534 21-0142 5800 194.00 Other Services & Operating Expenditures

03/19/2019 PBK 315534 21-0142 5800 27,387.79 Other Services & Operating Expenditures

03/19/2019 PBK 315534 21-0142 5800 574.26 Other Services & Operating Expenditures

03/21/2019 KTR Facilities Consulting Inc 315560 21-0142 5800 5,512.50 Other Services & Operating Expenditures

04/02/2019 KTR Facilities Consulting Inc 315834 21-0142 5800 5,512.50 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 14,165.78 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 10,744.01 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 3,669.37 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 7,079.91 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 10,694.45 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 4,125.00 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 18,680.88 Other Services & Operating Expenditures

04/09/2019 PBK 316055 21-0142 5800 41,081.69 Other Services & Operating Expenditures

04/23/2019 KTR Facilities Consulting Inc 316395 21-0142 5800 5,512.50 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 136,938.95 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 120,239.84 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 117.72 Other Services & Operating Expenditures

CALIFORNIA FINANCIAL SERVICES PAGE 2 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20194

Page 5: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/02/2019 PBK 316633 21-0142 5800 350,546.83 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 68,469.48 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 31.92 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 31,500.00 Other Services & Operating Expenditures

05/02/2019 PBK 316633 21-0142 5800 63.77 Other Services & Operating Expenditures

05/02/2019 KTR Facilities Consulting Inc 316708 21-0142 5800 4,788.00 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 2,404.60 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 2,935.49 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 4,403.25 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 525.48 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 115,500.00 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 41,930.69 Other Services & Operating Expenditures

05/07/2019 PBK 316824 21-0142 5800 17,111.12 Other Services & Operating Expenditures

05/23/2019 KTR Facilities Consulting Inc 317348 21-0142 5800 5,512.50 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 557.88 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 6,416.67 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 1,416.58 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 1,074.40 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 7,079.91 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 12,375.00 Other Services & Operating Expenditures

05/30/2019 PBK 317573 21-0142 5800 5,725.71 Other Services & Operating Expenditures

06/04/2019 KTR Facilities Consulting Inc 317657 21-0142 5800 5,040.00 Other Services & Operating Expenditures

06/20/2019 KTR Facilities Consulting Inc 318187 21-0142 5800 5,040.00 Other Services & Operating Expenditures

06/20/2019 KTR Facilities Consulting Inc 318187 21-0142 5800 5,292.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,137,062.04 0.00 0.00 0.00 $1,137,062.04

Project Subtotal $1,137,062.04

PROJECT: 249-9861-5192 - Secondary District Wide - ManagementB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/11/2019 California Financial Services 316099 21-0142 5800 8,400.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 8,400.00 0.00 0.00 0.00 $8,400.00

C - ConstructionACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

04/15/2019 S.R.C.S. ST19-00240 21-0142 4300 47.98 Materials & Supplies

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 47.98 0.00 $47.98

CALIFORNIA FINANCIAL SERVICES PAGE 3 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20195

Page 6: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

Project Subtotal $8,447.98

PROJECT: 249-9900-5189 - Secondary District Wide - Tech. InfrastructureB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/05/2019 TEKsystems 315028 21-0142 5800 2,038.40 Other Services & Operating Expenditures

03/07/2019 TEKsystems 315220 21-0142 5800 2,038.40 Other Services & Operating Expenditures

03/14/2019 TEKsystems 315407 21-0142 5800 2,038.40 Other Services & Operating Expenditures

03/26/2019 TEKsystems 315595 21-0142 5800 2,038.40 Other Services & Operating Expenditures

04/04/2019 Development Group, Inc. 315918 21-0142 5800 45.69 Other Services & Operating Expenditures

04/11/2019 Development Group, Inc. 316106 21-0142 5800 172.54 Other Services & Operating Expenditures

05/02/2019 Ivan J Arano 316613 21-0142 5800 6,532.96 Other Services & Operating Expenditures

05/23/2019 TEKsystems 317267 21-0142 5800 2,038.40 Other Services & Operating Expenditures

05/30/2019 Ivan J Arano 317548 21-0142 5800 6,532.96 Other Services & Operating Expenditures

06/06/2019 Development Group, Inc. 317765 21-0142 5800 54.58 Other Services & Operating Expenditures

06/06/2019 Development Group, Inc. 317765 21-0142 5800 217.60 Other Services & Operating Expenditures

06/11/2019 Development Group, Inc. 317871 21-0142 5800 17.42 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 23,765.75 0.00 0.00 0.00 $23,765.75

C - ConstructionACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

03/05/2019 Development Group, Inc. 315067 21-0142 4412 16,248.27 Technology - Hardware < $5000

03/05/2019 Development Group, Inc. 315067 21-0142 4412 20,060.48 Technology - Hardware < $5000

04/04/2019 Development Group, Inc. 315918 21-0142 6412 1,968.09 Equipment - Technology

04/11/2019 Development Group, Inc. 316106 21-0142 6412 7,431.99 Equipment - Technology

06/06/2019 Development Group, Inc. 317765 21-0142 6412 2,350.79 Equipment - Technology

06/06/2019 Development Group, Inc. 317765 21-0142 6412 9,372.77 Equipment - Technology

06/11/2019 Development Group, Inc. 317871 21-0142 6412 750.42 Equipment - Technology

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 58,182.81 0.00 $58,182.81

Project Subtotal $81,948.56

PROJECT: 249-9902-5189 - Secondary District Wide - Phone Intercom SystemB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/04/2019 Development Group, Inc. 315918 21-0142 5800 29.00 Other Services & Operating Expenditures

04/11/2019 Development Group, Inc. 316106 21-0142 5800 109.52 Other Services & Operating Expenditures

06/06/2019 Development Group, Inc. 317765 21-0142 5800 34.64 Other Services & Operating Expenditures

06/06/2019 Development Group, Inc. 317765 21-0142 5800 138.12 Other Services & Operating Expenditures

06/11/2019 Development Group, Inc. 317871 21-0142 5800 11.06 Other Services & Operating Expenditures

CALIFORNIA FINANCIAL SERVICES PAGE 4 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20196

Page 7: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/11/2019 Development Group, Inc. 317871 21-0142 5800 13,995.30 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 14,317.64 0.00 0.00 0.00 $14,317.64

Project Subtotal $14,317.64

PROJECT: 249-9907-5189 - Secondary District Wide - Technology OtherB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 T&R Communications Inc 315713 21-0142 5800 17,740.50 Other Services & Operating Expenditures

04/04/2019 T&R Communications Inc 315967 21-0142 5800 28,324.71 Other Services & Operating Expenditures

04/23/2019 T&R Communications Inc 316445 21-0142 5800 41,075.75 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 87,140.96 0.00 0.00 0.00 $87,140.96

C - ConstructionACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

04/04/2019 Development Group, Inc. 315918 21-0142 4412 1,625.82 Technology - Hardware < $5000

04/11/2019 Development Group, Inc. 316106 21-0142 4412 4,889.29 Technology - Hardware < $5000

05/02/2019 Development Group, Inc. 316699 21-0142 4412 17,179.09 Technology - Hardware < $5000

06/04/2019 Development Group, Inc. 317646 21-0142 4412 5,207.13 Technology - Hardware < $5000

06/06/2019 Development Group, Inc. 317765 21-0142 4412 4,223.24 Technology - Hardware < $5000

06/11/2019 Development Group, Inc. 317871 21-0142 4412 3,122.28 Technology - Hardware < $5000

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36,246.85 0.00 $36,246.85

Project Subtotal $123,387.81

PROJECT: 250-9500-5192 - Montgomery High - Athletic FieldsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 Miller Pacific Engineering 315672 21-0142 5800 1,280.60 Other Services & Operating Expenditures

04/23/2019 Carlile - Macy 316384 21-0142 5800 1,947.50 Other Services & Operating Expenditures

05/30/2019 Carlile - Macy 317505 21-0142 5800 600.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,828.10 0.00 0.00 0.00 $3,828.10

Project Subtotal $3,828.10

PROJECT: 250-9502-5192 - Montgomery High - Track Repairs

CALIFORNIA FINANCIAL SERVICES PAGE 5 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20197

Page 8: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/28/2019 KYA Services 315768 21-0142 5800 392,716.01 Other Services & Operating Expenditures

04/23/2019 KYA Services 316411 21-0142 5800 68,400.00 Other Services & Operating Expenditures

05/30/2019 KYA Services 317551 21-0142 5800 7,600.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 468,716.01 0.00 0.00 0.00 $468,716.01

Project Subtotal $468,716.01

PROJECT: 250-9532-5189 - Montgomery High - SecurityB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/02/2019 Integ Security Controls Inc 316718 21-0142 5800 106,443.81 Other Services & Operating Expenditures

05/16/2019 Integ Security Controls Inc 317198 21-0142 5800 16,324.45 Other Services & Operating Expenditures

06/18/2019 Integ Security Controls Inc 318113 21-0142 5800 24,802.50 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 147,570.76 0.00 0.00 0.00 $147,570.76

Project Subtotal $147,570.76

PROJECT: 250-9650-5192 - Montgomery High - Other FeesB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/25/2019 S.R.C.S. 316549 21-0142 5800 1,000.00 Other Services & Operating Expenditures

05/30/2019 S.R.C.S. 317583 21-0142 5800 (500.00) Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 0.00 $500.00

Project Subtotal $500.00

PROJECT: 250-9800-5192 - Montgomery High - Permanent Bldgs NewB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/14/2019 RGH Geotechnical & Environment315477 21-0142 5800 600.00 Other Services & Operating Expenditures

03/26/2019 RGH Geotechnical & Environment315696 21-0142 5800 900.00 Other Services & Operating Expenditures

04/23/2019 TLCD Architecture Inc 316449 21-0142 6221 302.81 Architect Fee - Plans

04/23/2019 TLCD Architecture Inc 316449 21-0142 6221 101,055.00 Architect Fee - Plans

04/23/2019 TLCD Architecture Inc 316449 21-0142 6221 508.68 Architect Fee - Plans

04/23/2019 TLCD Architecture Inc 316449 21-0142 6221 25,263.75 Architect Fee - Plans

05/23/2019 TLCD Architecture Inc 317470 21-0142 6221 15,158.25 Architect Fee - Plans

06/06/2019 TLCD Architecture Inc 317819 21-0142 6221 94.62 Architect Fee - Plans

06/06/2019 TLCD Architecture Inc 317819 21-0142 6221 30,125.75 Architect Fee - Plans

CALIFORNIA FINANCIAL SERVICES PAGE 6 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20198

Page 9: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 172,508.86 0.00 0.00 0.00 0.00 1,500.00 0.00 0.00 0.00 $174,008.86

Project Subtotal $174,008.86

PROJECT: 250-9851-5192 - Montgomery High - Site ImprovementsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/23/2019 Matrix HG Inc. 316416 21-0142 5800 278.25 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 278.25 0.00 0.00 0.00 $278.25

Project Subtotal $278.25

PROJECT: 251-9500-5192 - Piner High - Athletic FieldsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 Carlile - Macy 315614 21-0142 5800 1,350.00 Other Services & Operating Expenditures

04/23/2019 Carlile - Macy 316384 21-0142 5800 200.00 Other Services & Operating Expenditures

04/23/2019 Carlile - Macy 316384 21-0142 5800 1,400.00 Other Services & Operating Expenditures

05/30/2019 Carlile - Macy 317505 21-0142 5800 1,380.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 4,330.00 0.00 0.00 0.00 $4,330.00

Project Subtotal $4,330.00

PROJECT: 251-9502-5192 - Piner High - Track RepairsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 KYA Services 315658 21-0142 5800 703,342.99 Other Services & Operating Expenditures

04/23/2019 KYA Services 316411 21-0142 5800 265,975.93 Other Services & Operating Expenditures

05/30/2019 KYA Services 317551 21-0142 5800 512,559.04 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,481,877.96 0.00 0.00 0.00 $1,481,877.96

Project Subtotal $1,481,877.96

PROJECT: 251-9506-5192 - Piner High - Athletic Field LightingB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 Axia Architects 315602 21-0142 6220 3,436.58 Architect Fees

CALIFORNIA FINANCIAL SERVICES PAGE 7 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/20199

Page 10: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/23/2019 Axia Architects 316379 21-0142 6220 38.22 Architect Fees

04/23/2019 Axia Architects 316379 21-0142 6220 680.52 Architect Fees

04/23/2019 Axia Architects 316379 21-0142 6220 490.94 Architect Fees

05/30/2019 Axia Architects 317501 21-0142 6220 245.47 Architect Fees

B - Planning Subtotal 4,891.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $4,891.73

Project Subtotal $4,891.73

PROJECT: 251-9532-5189 - Piner High - SecurityB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/23/2019 Integ Security Controls Inc 317369 21-0142 5800 4,558.96 Other Services & Operating Expenditures

05/23/2019 Integ Security Controls Inc 317369 21-0142 5800 132,111.55 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 136,670.51 0.00 0.00 0.00 $136,670.51

Project Subtotal $136,670.51

PROJECT: 251-9566-5192 - Piner High - School SignageB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/20/2019 Shadko Construction and Design318248 21-0142 5800 28,757.61 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 28,757.61 0.00 0.00 0.00 $28,757.61

Project Subtotal $28,757.61

PROJECT: 251-9650-5192 - Piner High - Other FeesB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/04/2019 Division of State Architect 317629 21-0142 5800 3,536.32 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,536.32 0.00 0.00 0.00 $3,536.32

Project Subtotal $3,536.32

PROJECT: 251-9851-5192 - Piner High - Site ImprovementsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/12/2019 Shadko Construction and Design315387 21-0142 5800 1,475.00 Other Services & Operating Expenditures

CALIFORNIA FINANCIAL SERVICES PAGE 8 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201910

Page 11: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,475.00 0.00 0.00 0.00 $1,475.00

Project Subtotal $1,475.00

PROJECT: 252-9650-5192 - Santa Rosa High - Traffic FlowB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/25/2019 S.R.C.S. 316549 21-0142 5800 1,250.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,250.00 0.00 0.00 0.00 $1,250.00

Project Subtotal $1,250.00

PROJECT: 253-9500-5192 - Elsie Allen High - Athletic FieldsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/23/2019 Carlile - Macy 316384 21-0142 5800 300.00 Other Services & Operating Expenditures

05/30/2019 Carlile - Macy 317505 21-0142 5800 3,132.50 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,432.50 0.00 0.00 0.00 $3,432.50

Project Subtotal $3,432.50

PROJECT: 253-9502-5192 - Elsie Allen High - Track RepairsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

04/18/2019 California Wine Tours Inc. 316286 21-0142 5800 1,273.59 Other Services & Operating Expenditures

04/23/2019 California Wine Tours Inc. 316383 21-0142 5800 986.72 Other Services & Operating Expenditures

04/25/2019 KYA Services 316530 21-0142 5800 907,453.30 Other Services & Operating Expenditures

05/30/2019 KYA Services 317551 21-0142 5800 424,881.25 Other Services & Operating Expenditures

06/20/2019 West County Transportation 318265 21-0142 5800 457.97 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,335,052.83 0.00 0.00 0.00 $1,335,052.83

Project Subtotal $1,335,052.83

PROJECT: 253-9566-5192 - Elsie Allen High - School SignageB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/20/2019 Shadko Construction and Design318248 21-0142 5800 23,006.08 Other Services & Operating Expenditures

CALIFORNIA FINANCIAL SERVICES PAGE 9 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201911

Page 12: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 23,006.08 0.00 0.00 0.00 $23,006.08

Project Subtotal $23,006.08

PROJECT: 253-9821-5192 - Elsie Allen High - Roofing ReplacementC - Construction

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

04/09/2019 Matrix HG Inc. 316043 21-0142 6210 17,507.93 Buildings & Improvement

C - Construction Subtotal 17,507.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17,507.93

Project Subtotal $17,507.93

PROJECT: 254-9502-5192 - Maria Carrillo High - Track RepairsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/26/2019 KYA Services 315658 21-0142 5800 81,330.45 Other Services & Operating Expenditures

05/02/2019 Quattrocchi Kwok Architects 316636 21-0142 6220 1,205.20 Architect Fees

06/06/2019 KYA Services 317787 21-0142 5800 63,301.75 Other Services & Operating Expenditures

B - Planning Subtotal 1,205.20 0.00 0.00 0.00 0.00 144,632.20 0.00 0.00 0.00 $145,837.40

Project Subtotal $145,837.40

PROJECT: 254-9821-5192 - Maria Carrillo High - Roofing ReplacementC - Construction

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

04/09/2019 Matrix HG Inc. 316043 21-0142 6210 105,720.75 Buildings & Improvement

C - Construction Subtotal 105,720.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $105,720.75

Project Subtotal $105,720.75

PROJECT: 254-9851-5192 - Maria Carrillo High - Site ImprovementsB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

05/02/2019 Quattrocchi Kwok Architects 316636 21-0142 5800 1,680.00 Other Services & Operating Expenditures

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,680.00 0.00 0.00 0.00 $1,680.00

Project Subtotal $1,680.00

CALIFORNIA FINANCIAL SERVICES PAGE 10 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201912

Page 13: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 292-9305-9795 - Secondary For Asst Sup Busines - Operations ServicB - Planning

ACTIVITYDATE

PAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

03/08/2019 S.R.C.S. PR19-00110 21-0142 1000-3999 1,916.61 District Project Support

03/08/2019 S.R.C.S. PR19-00110 21-0142 1000-3999 118.83 District Project Support

03/08/2019 S.R.C.S. PR19-00110 21-0142 1000-3999 27.79 District Project Support

03/08/2019 S.R.C.S. PR19-00110 21-0142 1000-3999 36.80 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 1,952.02 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 340.92 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 120.95 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 28.28 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 16.64 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 0.73 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 0.97 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 37.48 District Project Support

03/29/2019 S.R.C.S. PR19-00117 21-0142 1000-3999 30.76 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 1,952.02 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 340.92 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 120.95 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 28.28 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 16.64 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 0.73 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 0.97 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 37.48 District Project Support

04/30/2019 S.R.C.S. PR19-00125 21-0142 1000-3999 30.76 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 1,952.02 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 340.92 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 120.95 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 28.28 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 16.64 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 0.73 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 0.97 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 37.48 District Project Support

05/31/2019 S.R.C.S. PR19-00132 21-0142 1000-3999 30.76 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 1,952.02 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 340.92 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 120.95 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 28.28 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 16.64 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 0.73 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 0.97 District Project Support

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 37.48 District Project Support

CALIFORNIA FINANCIAL SERVICES PAGE 11 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201913

Page 14: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, From 03/01/2019 Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningACTIVITY

DATEPAYEENAME

WARRANT /PAYMENTNUMBER

APN NUMBER

FUND CODE

OBJECT CODE

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

06/28/2019 S.R.C.S. PR19-00139 21-0142 1000-3999 30.76 District Project Support

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 12,215.03 0.00 0.00 0.00 $12,215.03

Project Subtotal $12,215.03

Grand Totals for Selected ProjectsSelected Projects Total $5,953,900.70

CALIFORNIA FINANCIAL SERVICES PAGE 12 of 12 Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201914

Page 15: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School District2014 General Obligation Authorization - Measure IOn November 4, 2014, the voters of the SANTA ROSA HIGH SCHOOL DISTRICTauthorized MEASURE I under the Proposition 39 statutes. MEASURE I authorizedthe issuance of $175 million in General Obligation Bonds. Proceeds from thesales of the Bonds will be used to finance the acquisition, construction,furnishing and equipping of District facilities in accordance with the bondproposition approved at the Election, and a project list including basic schoolrepairs, upgrades and capital improvements to classrooms, labs and facilities,school safety, and technology improvements to provide a 21st Century Education.

Measure I – General Obligation Bonds Series A Bonds Sold February 25, 2016 $ 12,165,000Series B Bonds Sold December 8, 2016 $ 50,000,000Series C and D Bonds Sold May 30, 2018 $ 70,000,000

Subtotal - Bonds Issued $132,165,000Remaining Bond Authorization $ 42,835,000Total Bond Authorization $175,000,000

15

Page 16: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School District2014 General Obligation Authorization - Measure I

Bonds Issued with Series A, B, C & D $132,165,000Interest Earnings and Miscellaneous Deposit $ 1,944,510Less: Costs of Issuance, Debt Service, COI Refund ($ 613,737)Net Proceeds from Series A and B for Projects $133,495,773

Current Measure I Project Related Bond Costs: Expenditures as of 6-28-2019 $ 70,324,090Encumbered Balance for Projects $ 9,382,363

Total Commitments $ 79,706,453Transfer for Bond Support Oversight $ 389,420Proceeds Remaining for Additional Projects $ 53,399,900Total Projects $133,495,773

16

Page 17: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictOverall Project Summary Report – Measure I

Program Overall Summary Report

Measure I

Cumulative as of 6-28-2019

17

Page 18: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Program Overall Summary ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT BUD TOTAL ENCUMBERED DISBURSEMENT BUD REMAIN. ENC BALANCE

000-0000-0000 - District Wide $0.00 $0.00 $0.00 $0.00 $0.00

200-0000-0000 - Secondary Schools $0.00 $0.00 $0.00 $0.00 $0.00

200-9650-5192 - Secondary Schools - Other Fees $64,761.00 $64,761.00 ($64,761.00) $0.00 $0.00

230-9532-5189 - Cook Middle - Security $109,926.41 $109,926.41 ($87,295.16) $0.00 $22,631.25

230-9650-5192 - Cook Middle - Other Fees $0.00 $0.00 $0.00 $0.00 $0.00

230-9806-5192 - Cook Middle - Portable Classrooms $858,632.15 $858,632.15 ($857,598.13) $0.00 $1,034.02

230-9810-5192 - Cook Middle - Portable Restroom $0.00 $0.00 $0.00 $0.00 $0.00

230-9817-5192 - Cook Middle - HVAC Replacement $10,490.00 $10,490.00 ($10,490.00) $0.00 $0.00

230-9851-5192 - Cook Middle - Site Improvements $22,886.16 $22,886.16 ($22,886.16) $0.00 $0.00

230-9875-5192 - Cook Middle - Modernization $2,631.88 $2,631.88 ($2,631.88) $0.00 $0.00

230-9876-5192 - Cook Middle - Modernization 2 $20,223.72 $20,223.72 ($20,223.72) $0.00 $0.00

231-9532-5189 - Slater Middle - Security $98,825.23 $98,825.23 ($76,462.73) $0.00 $22,362.50

231-9540-5192 - Slater Middle - Asbestos/Hazardous Materials $57,984.00 $57,984.00 ($57,984.00) $0.00 $0.00

231-9566-5192 - Slater Middle - School Signage $27,976.04 $27,976.04 ($27,976.04) $0.00 $0.00

231-9650-5192 - Slater Middle - Other Fees $78,750.00 $78,750.00 ($78,750.00) $0.00 $0.00

231-9821-5192 - Slater Middle - Roofing Replacement $733,812.00 $733,812.00 ($722,387.00) $0.00 $11,425.00

232-9532-5189 - Comstock Middle - Security $110,332.61 $110,332.61 $0.00 $0.00 $110,332.61

232-9532-5192 - Comstock Middle - Security $13,891.00 $13,891.00 ($13,891.00) $0.00 $0.00

232-9540-5192 - Comstock Middle - Asbestos/Haz. Mat. $1,038.00 $1,038.00 ($1,038.00) $0.00 $0.00

232-9806-5192 - Comstock Middle - Portable Classrooms $86,900.00 $86,900.00 ($6,083.00) $0.00 $80,817.00

232-9821-5192 - Comstock Middle - Roofing Replacement $5,102,813.90 $5,102,813.90 ($4,810,752.47) $0.00 $292,061.43

232-9851-5192 - Comstock Middle - Site Improvements $12,853.16 $12,853.16 ($12,853.16) $0.00 $0.00

232-9876-5192 - Comstock Middle - Modernization 2 $20,223.73 $20,223.73 ($20,223.73) $0.00 $0.00

233-9531-5192 - Rincon Valley Middle - Site Safety $43,841.00 $43,841.00 ($43,841.00) $0.00 $0.00

233-9532-5189 - Rincon Valley Middle - Security $106,016.87 $106,016.87 $0.00 $0.00 $106,016.87

233-9806-5192 - Rincon Valley Middle - Portable Classrooms $2,249.35 $2,249.35 ($2,249.35) $0.00 $0.00

233-9875-5192 - Rincon Valley Middle - Modernization $669.00 $669.00 ($669.00) $0.00 $0.00

234-9532-5189 - Santa Rosa Middle - Security $105,106.77 $105,106.77 $0.00 $0.00 $105,106.77

234-9851-5192 - Santa Rosa Middle - Site Improvements $61,050.00 $61,050.00 ($61,050.00) $0.00 $0.00

243-9816-5189 - Lewis / Alternative Ed - Hvac Systems $22,987.00 $22,987.00 ($22,987.00) $0.00 $0.00

249-0000-5192 - Secondary District Wide - Undistributed $12,084.50 $12,084.50 ($12,084.50) $0.00 $0.00

249-9400-5192 - Secondary District Wide - Bond Election Costs $0.00 $0.00 $0.00 $0.00 $0.00

249-9402-5192 - Secondary District Wide - Bond Election 2014 ($50,407.42) ($50,407.42) $50,407.42 $0.00 $0.00

249-9403-5192 - Secondary District Wide - Security $46,000.00 $46,000.00 ($46,000.00) $0.00 $0.00

249-9500-5192 - Secondary District Wide - Athletic Fields $626.32 $626.32 ($626.32) $0.00 $0.00

249-9531-5192 - Secondary District Wide - Site Safety $66,240.64 $66,240.64 ($66,240.64) $0.00 $0.00

249-9532-5189 - Secondary District Wide - Security $108,528.65 $108,528.65 $0.00 $0.00 $108,528.65

249-9540-5192 - Secondary District Wide - Asbestos/Hazardous $13,438.06 $13,438.06 ($560.00) $0.00 $12,878.06

249-9650-5192 - Secondary District Wide - Other Fees $6,234,046.95 $6,234,046.95 ($5,263,602.20) $0.00 $970,444.75

249-9806-5192 - Secondary District Wide - Portable Classrooms $410,935.08 $410,935.08 ($405,095.08) $0.00 $5,840.00

249-9816-5192 - Secondary District Wide - Hvac Systems $25,359.90 $25,359.90 ($25,359.90) $0.00 $0.00

CALIFORNIA FINANCIAL SERVICES PAGE 1 of 3 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 170530) RUN DATE: 08/15/201918

Page 19: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Program Overall Summary ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT BUD TOTAL ENCUMBERED DISBURSEMENT BUD REMAIN. ENC BALANCE

249-9817-5192 - Secondary District Wide - Hvac Replacement $7,953.40 $7,953.40 ($7,953.40) $0.00 $0.00

249-9821-5192 - Secondary District Wide - Roofing Replacement $178,859.08 $178,859.08 ($178,859.08) $0.00 $0.00

249-9851-5192 - Secondary District Wide - Site Improvements $8,988.50 $8,988.50 ($8,988.50) $0.00 $0.00

249-9852-5192 - Secondary District Wide - Site Improvement 2 $304,131.76 $304,131.76 ($304,131.76) $0.00 $0.00

249-9861-5192 - Secondary District Wide - Management $91,294.85 $91,294.85 ($91,001.71) $0.00 $293.14

249-9900-5189 - Secondary District Wide - Tech. Infrastructure $7,308,763.19 $7,308,763.19 ($7,233,084.20) $0.00 $75,678.99

249-9902-5189 - Secondary District Wide - Phone Intercom System $2,725,751.53 $2,725,751.53 ($2,723,285.13) $0.00 $2,466.40

249-9907-5189 - Secondary District Wide - Technology Other $10,581,654.94 $10,581,654.94 ($10,219,820.32) $0.00 $361,834.62

249-9977-5192 - Secondary District Wide - Master Plan - Infrastruc $1,704,260.52 $1,704,260.52 ($1,704,260.52) $0.00 $0.00

250-9500-5192 - Montgomery High - Athletic Fields $20,100.00 $20,100.00 ($9,348.16) $0.00 $10,751.84

250-9502-5192 - Montgomery High - Track Repairs $1,976,591.47 $1,976,591.47 ($1,875,386.90) $0.00 $101,204.57

250-9532-5189 - Montgomery High - Security $154,114.75 $154,114.75 ($147,570.76) $0.00 $6,543.99

250-9650-5192 - Montgomery High - Other Fees $500.00 $500.00 ($500.00) $0.00 $0.00

250-9654-5192 - Montgomery High - Restroom Reconditioning $16,709.62 $16,709.62 ($16,709.62) $0.00 $0.00

250-9800-5192 - Montgomery High - Permanent Bldgs New $1,196,741.00 $1,196,741.00 ($811,513.60) $0.00 $385,227.40

250-9821-5192 - Montgomery High - Roofing Replacement $162,750.00 $162,750.00 ($162,750.00) $0.00 $0.00

250-9851-5192 - Montgomery High - Site Improvements $613,319.00 $613,319.00 ($611,371.25) $0.00 $1,947.75

250-9907-5189 - Montgomery High - Technology Other $3,670.02 $3,670.02 $0.00 $0.00 $3,670.02

251-9500-5192 - Piner High - Athletic Fields $19,700.00 $19,700.00 ($4,330.00) $0.00 $15,370.00

251-9502-5192 - Piner High - Track Repairs $1,885,058.53 $1,885,058.53 ($1,723,314.63) $0.00 $161,743.90

251-9506-5192 - Piner High - Athletic Field Lighting $1,963,555.98 $1,963,555.98 ($1,868,719.87) $0.00 $94,836.11

251-9532-5189 - Piner High - Security $175,001.76 $175,001.76 ($136,670.51) $0.00 $38,331.25

251-9536-5192 - Piner High - Site Improvements 1 $99,993.18 $99,993.18 $0.00 $0.00 $99,993.18

251-9540-5192 - Piner High - Asbestos/Hazardous Materials $5,430.00 $5,430.00 ($3,687.00) $0.00 $1,743.00

251-9566-5192 - Piner High - School Signage $66,817.85 $66,817.85 ($28,757.61) $0.00 $38,060.24

251-9650-5192 - Piner High - Other Fees $3,536.32 $3,536.32 ($3,536.32) $0.00 $0.00

251-9654-5192 - Piner High - Restroom Reconditioning $16,709.62 $16,709.62 ($16,709.62) $0.00 $0.00

251-9821-5192 - Piner High - Roofing Replacement $3,996,264.00 $3,996,264.00 ($3,950,817.99) $0.00 $45,446.01

251-9851-5192 - Piner High - Site Improvements $388,749.87 $388,749.87 ($387,480.14) $0.00 $1,269.73

251-9861-5192 - Piner High - Management $3,000.00 $3,000.00 ($3,000.00) $0.00 $0.00

251-9900-5192 - Piner High - Technology Infrastructure $24,200.00 $24,200.00 ($24,200.00) $0.00 $0.00

251-9907-5189 - Piner High - Technology Other $2,950.00 $2,950.00 $0.00 $0.00 $2,950.00

252-9500-5192 - Santa Rosa High - Athletic Fields $18,821.00 $18,821.00 $0.00 $0.00 $18,821.00

252-9502-5192 - Santa Rosa High - Track Repairs $1,921,066.10 $1,921,066.10 ($36,876.71) $0.00 $1,884,189.39

252-9532-5189 - Santa Rosa High - Security $171,101.57 $171,101.57 $0.00 $0.00 $171,101.57

252-9650-5192 - Santa Rosa High - Traffic Flow $1,250.00 $1,250.00 ($1,250.00) $0.00 $0.00

252-9654-5192 - Santa Rosa High - Restroom Reconditioning $26,257.97 $26,257.97 ($26,257.97) $0.00 $0.00

252-9821-5192 - Santa Rosa High - Roofing Replacement $5,425,707.90 $5,425,707.90 ($4,816,555.70) $0.00 $609,152.20

252-9851-5192 - Santa Rosa High - Site Improvements $14,552.00 $14,552.00 ($14,552.00) $0.00 $0.00

252-9907-5189 - Santa Rosa High - Technology Other $3,084.00 $3,084.00 $0.00 $0.00 $3,084.00

253-9500-5192 - Elsie Allen High - Athletic Fields $19,700.00 $19,700.00 ($3,432.50) $0.00 $16,267.50

CALIFORNIA FINANCIAL SERVICES PAGE 2 of 3 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 170530) RUN DATE: 08/15/201919

Page 20: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Program Overall Summary ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT BUD TOTAL ENCUMBERED DISBURSEMENT BUD REMAIN. ENC BALANCE

253-9502-5192 - Elsie Allen High - Track Repairs $1,934,458.73 $1,934,458.73 ($1,362,053.43) $0.00 $572,405.30

253-9532-5189 - Elsie Allen High - Security $177,156.36 $177,156.36 $0.00 $0.00 $177,156.36

253-9566-5192 - Elsie Allen High - School Signage $55,317.85 $55,317.85 ($23,006.08) $0.00 $32,311.77

253-9654-5192 - Elsie Allen High - Restroom Reconditioning $9,548.35 $9,548.35 ($9,548.35) $0.00 $0.00

253-9817-5192 - Elsie Allen High - HVAC Replacement $8,955.00 $8,955.00 ($8,955.00) $0.00 $0.00

253-9821-5192 - Elsie Allen High - Roofing Replacement $7,791,572.55 $7,791,572.55 ($6,344,750.55) $0.00 $1,446,822.00

253-9851-5192 - Elsie Allen High - Site Improvements $75,668.77 $75,668.77 ($75,668.77) $0.00 $0.00

253-9907-5189 - Elsie Allen High - Technology Other $3,843.98 $3,843.98 $0.00 $0.00 $3,843.98

254-9500-5192 - Maria Carrillo High - Athletic Fields $38,889.60 $38,889.60 ($31,165.60) $0.00 $7,724.00

254-9502-5192 - Maria Carrillo High - Track Repairs $5,133,130.16 $5,133,130.16 ($5,122,685.96) $0.00 $10,444.20

254-9532-5189 - Maria Carrillo High - Security $168,349.01 $168,349.01 $0.00 $0.00 $168,349.01

254-9536-5192 - Maria Carrillo High - Site Improvements 1 $135,000.00 $135,000.00 $0.00 $0.00 $135,000.00

254-9650-5192 - Maria Carrillo High - Traffic Flow $21,376.97 $21,376.97 ($21,376.97) $0.00 $0.00

254-9654-5192 - Maria Carrillo High - Restroom Reconditioning $7,161.27 $7,161.27 ($7,161.27) $0.00 $0.00

254-9800-5192 - Maria Carrillo High - Permanent Bldgs New $15,378.00 $15,378.00 ($15,378.00) $0.00 $0.00

254-9821-5192 - Maria Carrillo High - Roofing Replacement $5,498,923.55 $5,498,923.55 ($4,744,159.58) $0.00 $754,763.97

254-9851-5192 - Maria Carrillo High - Site Improvements $70,258.82 $70,258.82 ($63,652.62) $0.00 $6,606.20

260-9532-5189 - Ridgway Continuation High - Security $61,749.77 $61,749.77 $0.00 $0.00 $61,749.77

260-9654-5192 - Ridgway Continuation High - Restroom Reconditionin $4,774.18 $4,774.18 ($4,774.18) $0.00 $0.00

260-9806-5192 - Ridgway Continuation High - Portable Classrooms $10,195.62 $10,195.62 ($10,195.62) $0.00 $0.00

260-9808-5192 - Ridgway Continuation High - Portable Classroom $90,921.52 $90,921.52 ($90,921.52) $0.00 $0.00

260-9851-5192 - Ridgway Continuation High - Site Improvements $23,000.00 $23,000.00 ($23,000.00) $0.00 $0.00

260-9854-5192 - Ridgway Continuation High - Site Improvements 4 $26,858.92 $26,858.92 ($26,858.92) $0.00 $0.00

260-9875-5192 - Ridgway Continuation High - Modernization $1,094.88 $1,094.88 ($1,094.88) $0.00 $0.00

260-9907-5189 - Ridgway Continuation High - Technology Other $3,730.00 $3,730.00 $0.00 $0.00 $3,730.00

291-9305-9795 - Secondary For Director Dp - Operations Services $251,024.85 $251,024.85 ($251,024.85) $0.00 $0.00

292-9305-9795 - Secondary For Asst Sup Busines - Operations Servic $133,635.90 $133,635.90 ($133,635.90) $0.00 $0.00

389-9907-5189 - Technology District Wide - Technology Other $0.00 $0.00 $0.00 $0.00 $0.00

389-9907-5192 - Technology District Wide - Technology Other $1,216.71 $1,216.71 ($1,216.71) $0.00 $0.00

392-9535-5192 - Business - Site Improvements $877.12 $877.12 ($877.12) $0.00 $0.00

Grand Total $79,706,453.38 $79,706,453.38 ($70,324,090.11) ($0.00) $9,382,363.27

CALIFORNIA FINANCIAL SERVICES PAGE 3 of 3 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 170530) RUN DATE: 08/15/201920

Page 21: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictBudget Report by Location – Measure I

Budget Report by Location

Measure I

Cumulative as of 6-28-2019

21

Page 22: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Location Budget EncumberedCode Description Budgeted Encumbered Disbursements Remaining Balance

200 Secondary Schools 64,761.00$ 64,761.00$ 64,761.00$ -$ -$ 230 Cook Middle 1,024,790.32$ 1,024,790.32$ 1,001,125.05$ -$ 23,665.27$ 231 Slater Middle 997,347.27$ 997,347.27$ 963,559.77$ -$ 33,787.50$ 232 Comstock Middle 5,348,052.40$ 5,348,052.40$ 4,864,841.36$ -$ 483,211.04$ 233 Rincon Valley Middle 152,776.22$ 152,776.22$ 46,759.35$ -$ 106,016.87$ 234 Santa Rosa Middle 166,156.77$ 166,156.77$ 61,050.00$ -$ 105,106.77$ 243 Lewis / Alternative Ed 22,987.00$ 22,987.00$ 22,987.00$ -$ -$ 249 Secondary District Wide 29,778,510.45$ 29,778,510.45$ 28,240,545.84$ -$ 1,537,964.61$ 250 Montgomery High 4,144,495.86$ 4,144,495.86$ 3,635,150.29$ -$ 509,345.57$ 251 Piner High 8,650,967.11$ 8,650,967.11$ 8,151,223.69$ -$ 499,743.42$ 252 Santa Rosa High 7,581,840.54$ 7,581,840.54$ 4,895,492.38$ -$ 2,686,348.16$ 253 Elsie Allen High 10,076,221.59$ 10,076,221.59$ 7,827,414.68$ -$ 2,248,806.91$ 254 Maria Carrillo High 11,088,467.38$ 11,088,467.38$ 10,005,580.00$ -$ 1,082,887.38$ 260 Ridgway Continuation High 222,324.89$ 222,324.89$ 156,845.12$ -$ 65,479.77$ 291 Secondary For Director Dp-Operations 251,024.85$ 251,024.85$ 251,024.85$ -$ -$ 292 Secondary For Asst Sup Busines-Operations 133,635.90$ 133,635.90$ 133,635.90$ -$ -$ 389 Technology District Wide 1,216.71$ 1,216.71$ 1,216.71$ -$ -$ 392 Business - Site Improvements 877.12$ 877.12$ 877.12$ -$ -$

TOTAL 79,706,453.38$ 79,706,453.38$ 70,324,090.11$ -$ 9,382,363.27$

Santa Rosa High School Bond Measure IBudget Report Breakdown by Location

As of June 28, 2019

22

Page 23: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictBudget Report by Location – Measure I

Budget Report by Project Type

Measure I

Cumulative as of 6-28-2019

23

Page 24: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Budget EncumberedType Description Budgeted Encumbered Disbursements Remaining Balance

0000 Undistributed-High School - Districtwide 12,084.50$ 12,084.50$ 12,084.50$ -$ -$ 9305 Operations Services 384,660.75$ 384,660.75$ 384,660.75$ -$ -$ 9402 Bond Election 2014 (50,407.42)$ (50,407.42)$ (50,407.42)$ -$ -$ 9403 Cost of Issuance 46,000.00$ 46,000.00$ 46,000.00$ -$ -$ 9500 Athletic Fields 117,836.92$ 117,836.92$ 48,902.58$ -$ 68,934.34$ 9502 Track Repairs 12,850,304.99$ 12,850,304.99$ 10,120,317.63$ -$ 2,729,987.36$ 9506 Athletic Field Lighting 1,963,555.98$ 1,963,555.98$ 1,868,719.87$ -$ 94,836.11$ 9531 Site Safety 110,081.64$ 110,081.64$ 110,081.64$ -$ -$ 9532 Security 1,560,100.76$ 1,560,100.76$ 461,890.16$ -$ 1,098,210.60$ 9535 Site Improvements 877.12$ 877.12$ 877.12$ -$ -$ 9536 Site Improvements 1 234,993.18$ 234,993.18$ -$ -$ 234,993.18$ 9540 Asbestos/Hazardous Materials 77,890.06$ 77,890.06$ 63,269.00$ -$ 14,621.06$ 9566 School Signage 150,111.74$ 150,111.74$ 79,739.73$ -$ 70,372.01$ 9650 Other Fees 6,404,221.24$ 6,404,221.24$ 5,433,776.49$ -$ 970,444.75$ 9654 Restroom Reconditioning 81,161.01$ 81,161.01$ 81,161.01$ -$ -$ 9800 Permanent Buildings New 1,212,119.00$ 1,212,119.00$ 826,891.60$ -$ 385,227.40$ 9806 Portable Classrooms 1,368,912.20$ 1,368,912.20$ 1,281,221.18$ -$ 87,691.02$ 9808 Portable Classrooms 90,921.52$ 90,921.52$ 90,921.52$ -$ -$ 9816 HVAC Systems 48,346.90$ 48,346.90$ 48,346.90$ -$ -$ 9817 HVAC Replacement 27,398.40$ 27,398.40$ 27,398.40$ -$ -$ 9821 Roofing Replacement 28,890,702.98$ 28,890,702.98$ 25,731,032.37$ -$ 3,159,670.61$ 9851 Site Improvements 1,291,326.28$ 1,291,326.28$ 1,281,502.60$ -$ 9,823.68$ 9852 Site Improvement 2 304,131.76$ 304,131.76$ 304,131.76$ -$ -$ 9854 Site Improvements 4 26,858.92$ 26,858.92$ 26,858.92$ -$ -$ 9861 Management 94,294.85$ 94,294.85$ 94,001.71$ -$ 293.14$ 9875 Modernization 4,395.76$ 4,395.76$ 4,395.76$ -$ -$ 9876 Modernization 2 40,447.45$ 40,447.45$ 40,447.45$ -$ -$ 9900 Technology Infrastructure 7,332,963.19$ 7,332,963.19$ 7,257,284.20$ -$ 75,678.99$ 9902 Phone Intercom System 2,725,751.53$ 2,725,751.53$ 2,723,285.13$ -$ 2,466.40$ 9907 Technology Other 10,600,149.65$ 10,600,149.65$ 10,221,037.03$ -$ 379,112.62$ 9977 Master Plan 1,704,260.52$ 1,704,260.52$ 1,704,260.52$ -$ -$

TOTAL 79,706,453.38$ 79,706,453.38$ 70,324,090.11$ -$ 9,382,363.27$

Santa Rosa High School Bond Measure IBudget Report Breakdown by Project Type

As of June 28, 2019

24

Page 25: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictProject Encumbrance Report – Measure I

Project Encumbrance Summary Report

Measure I

Cumulative as of 6-28-2019

25

Page 26: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

200-9650-5192 - Secondary Schools - Other FeesB&O Title Services $450.00 ($450.00) $0.00 Project Planning Support

City of Santa Rosa $9,335.00 ($9,335.00) $0.00 Permits & Fees

Clark & Associates Inc, Edd $8,087.00 ($8,087.00) $0.00 Environmental Costs

GHD Inc $43,769.25 ($43,769.25) $0.00 Construction Management

S.R.C.S. $3,119.75 ($3,119.75) $0.00 Project Planning Support

$64,761.00 ($64,761.00) $0.00 Project Totals for 200-9650-5192 - Secondary Schools - Other Fees

230-9532-5189 - Cook Middle - SecurityInteg Security Controls Inc $109,926.41 ($87,295.16) $22,631.25 Security Services

$109,926.41 ($87,295.16) $22,631.25 Project Totals for 230-9532-5189 - Cook Middle - Security

230-9650-5192 - Cook Middle - Other FeesDepartment of General Services $0.00 $0.00 $0.00 Project Planning Support

$0.00 $0.00 $0.00 Project Totals for 230-9650-5192 - Cook Middle - Other Fees

230-9806-5192 - Cook Middle - Portable ClassroomsQuattrocchi Kwok Architects $83,130.00 ($82,095.98) $1,034.02 Architect Costs

Siri Grading & Paving Inc $770,252.15 ($770,252.15) $0.00 Paving Costs

S.R.C.S. $5,250.00 ($5,250.00) $0.00 Project Planning Support

$858,632.15 ($857,598.13) $1,034.02 Project Totals for 230-9806-5192 - Cook Middle - Portable Classrooms

230-9810-5192 - Cook Middle - Portable RestroomSiri Grading & Paving Inc $0.00 $0.00 $0.00 Paving Costs

$0.00 $0.00 $0.00 Project Totals for 230-9810-5192 - Cook Middle - Portable Restroom

230-9817-5192 - Cook Middle - HVAC ReplacementRoberts Mechanical $10,490.00 ($10,490.00) $0.00 Utility Costs

$10,490.00 ($10,490.00) $0.00 Project Totals for 230-9817-5192 - Cook Middle - HVAC Replacement

230-9851-5192 - Cook Middle - Site ImprovementsLACO Associates $10,496.16 ($10,496.16) $0.00 Geotechincal

NSP3 $0.00 $0.00 $0.00 Playground Equipment

Philco Air Co $12,390.00 ($12,390.00) $0.00 HVAC

$22,886.16 ($22,886.16) $0.00 Project Totals for 230-9851-5192 - Cook Middle - Site Improvements

230-9875-5192 - Cook Middle - ModernizationKenwood Fence Co. Inc. $2,631.88 ($2,631.88) $0.00 Fencing Costs

$2,631.88 ($2,631.88) $0.00 Project Totals for 230-9875-5192 - Cook Middle - Modernization

CALIFORNIA FINANCIAL SERVICES PAGE 1 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201926

Page 27: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

230-9876-5192 - Cook Middle - Modernization 2RSD - Total Control $20,223.72 ($20,223.72) $0.00 Utility Costs

$20,223.72 ($20,223.72) $0.00 Project Totals for 230-9876-5192 - Cook Middle - Modernization 2

231-9532-5189 - Slater Middle - SecurityInteg Security Controls Inc $98,825.23 ($76,462.73) $22,362.50 Security Services

$98,825.23 ($76,462.73) $22,362.50 Project Totals for 231-9532-5189 - Slater Middle - Security

231-9540-5192 - Slater Middle - Asbestos/Hazardous MaterialsCentral Valley Environmental $54,135.00 ($54,135.00) $0.00 Environmental Costs

NorBay Consulting $3,849.00 ($3,849.00) $0.00 Environmental Costs

$57,984.00 ($57,984.00) $0.00 Project Totals for 231-9540-5192 - Slater Middle - Asbestos/Hazardous Materials

231-9566-5192 - Slater Middle - School SignageShadko Construction and Design $14,500.00 ($14,500.00) $0.00 Other Services & Operating Expenditures

Stewart Signs $13,476.04 ($13,476.04) $0.00 Equipment > $5000

$27,976.04 ($27,976.04) $0.00 Project Totals for 231-9566-5192 - Slater Middle - School Signage

231-9650-5192 - Slater Middle - Other FeesDivision of State Architect $78,750.00 ($78,750.00) $0.00 Plan Check Fees

$78,750.00 ($78,750.00) $0.00 Project Totals for 231-9650-5192 - Slater Middle - Other Fees

231-9821-5192 - Slater Middle - Roofing ReplacementAlcal Specialty Contracting $174,414.00 ($162,989.00) $11,425.00 Construction Costs

Henris Supply $559,398.00 ($559,398.00) $0.00 Roofing Costs

$733,812.00 ($722,387.00) $11,425.00 Project Totals for 231-9821-5192 - Slater Middle - Roofing Replacement

232-9532-5189 - Comstock Middle - SecurityInteg Security Controls Inc $110,332.61 $0.00 $110,332.61 Security Services

$110,332.61 $0.00 $110,332.61 Project Totals for 232-9532-5189 - Comstock Middle - Security

232-9532-5192 - Comstock Middle - SecurityJacobson Fence Co. Inc. $13,891.00 ($13,891.00) $0.00 Fencing Costs

$13,891.00 ($13,891.00) $0.00 Project Totals for 232-9532-5192 - Comstock Middle - Security

232-9540-5192 - Comstock Middle - Asbestos/Haz. Mat.NorBay Consulting $1,038.00 ($1,038.00) $0.00 Environmental Costs

$1,038.00 ($1,038.00) $0.00 Project Totals for 232-9540-5192 - Comstock Middle - Asbestos/Haz. Mat.

CALIFORNIA FINANCIAL SERVICES PAGE 2 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201927

Page 28: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

232-9806-5192 - Comstock Middle - Portable ClassroomsQuattrocchi Kwok Architects $86,900.00 ($6,083.00) $80,817.00 Architect Costs

$86,900.00 ($6,083.00) $80,817.00 Project Totals for 232-9806-5192 - Comstock Middle - Portable Classrooms

232-9821-5192 - Comstock Middle - Roofing ReplacementMatrix HG Inc. $5,102,813.90 ($4,810,752.47) $292,061.43 HVAC

$5,102,813.90 ($4,810,752.47) $292,061.43 Project Totals for 232-9821-5192 - Comstock Middle - Roofing Replacement

232-9851-5192 - Comstock Middle - Site ImprovementsPhilco Air Co $12,853.16 ($12,853.16) $0.00 HVAC

$12,853.16 ($12,853.16) $0.00 Project Totals for 232-9851-5192 - Comstock Middle - Site Improvements

232-9876-5192 - Comstock Middle - Modernization 2RSD - Total Control $20,223.73 ($20,223.73) ($0.00) Utility Costs

$20,223.73 ($20,223.73) ($0.00) Project Totals for 232-9876-5192 - Comstock Middle - Modernization 2

233-9531-5192 - Rincon Valley Middle - Site SafetyStripe $43,841.00 ($43,841.00) $0.00 Paving Costs

$43,841.00 ($43,841.00) $0.00 Project Totals for 233-9531-5192 - Rincon Valley Middle - Site Safety

233-9532-5189 - Rincon Valley Middle - SecurityInteg Security Controls Inc $106,016.87 $0.00 $106,016.87 Security Services

$106,016.87 $0.00 $106,016.87 Project Totals for 233-9532-5189 - Rincon Valley Middle - Security

233-9806-5192 - Rincon Valley Middle - Portable ClassroomsDiscount Best Blinds $2,249.35 ($2,249.35) ($0.00) Furniture & Equipment

$2,249.35 ($2,249.35) ($0.00) Project Totals for 233-9806-5192 - Rincon Valley Middle - Portable Classrooms

233-9875-5192 - Rincon Valley Middle - ModernizationSonoma Media-Advertising $669.00 ($669.00) $0.00 Advertising

$669.00 ($669.00) $0.00 Project Totals for 233-9875-5192 - Rincon Valley Middle - Modernization

234-9532-5189 - Santa Rosa Middle - SecurityInteg Security Controls Inc $105,106.77 $0.00 $105,106.77 Security Services

$105,106.77 $0.00 $105,106.77 Project Totals for 234-9532-5189 - Santa Rosa Middle - Security

234-9851-5192 - Santa Rosa Middle - Site ImprovementsDivision of State Architect $61,050.00 ($61,050.00) $0.00 Plan Check Fees

$61,050.00 ($61,050.00) $0.00 Project Totals for 234-9851-5192 - Santa Rosa Middle - Site Improvements

CALIFORNIA FINANCIAL SERVICES PAGE 3 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201928

Page 29: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

243-9816-5189 - Lewis / Alternative Ed - Hvac SystemsMatrix HG Inc. $22,987.00 ($22,987.00) $0.00 HVAC

$22,987.00 ($22,987.00) $0.00 Project Totals for 243-9816-5189 - Lewis / Alternative Ed - Hvac Systems

249-0000-5192 - Secondary District Wide - UndistributedFagen, Friedman, Fulfrost $6,244.50 ($6,244.50) $0.00 Legal Costs

S.R.C.S. $5,840.00 ($5,840.00) $0.00 Project Planning Support

$12,084.50 ($12,084.50) $0.00 Project Totals for 249-0000-5192 - Secondary District Wide - Undistributed

249-9400-5192 - Secondary District Wide - Bond Election CostsSonoma, County Of $0.00 $0.00 $0.00 District Support Costs

$0.00 $0.00 $0.00 Project Totals for 249-9400-5192 - Secondary District Wide - Bond Election Costs

249-9402-5192 - Secondary District Wide - Bond Election 2014County of Sonoma ($75,187.15) $75,187.15 $0.00 District Support Costs

Isom Advisors $24,779.73 ($24,779.73) $0.00 Project Planning Support

($50,407.42) $50,407.42 $0.00 Project Totals for 249-9402-5192 - Secondary District Wide - Bond Election 2014

249-9403-5192 - Secondary District Wide - SecurityDWK $15,000.00 ($15,000.00) $0.00 Furniture & Equipment

Isom Advisors $24,779.73 ($24,779.73) $0.00 Project Planning Support

Moody's Investment $31,000.00 ($31,000.00) $0.00 Credit Ratings

S.R.C.S. ($24,779.73) $24,779.73 $0.00 Project Planning Support

$46,000.00 ($46,000.00) $0.00 Project Totals for 249-9403-5192 - Secondary District Wide - Security

249-9500-5192 - Secondary District Wide - Athletic FieldsS.R.C.S. $626.32 ($626.32) $0.00 Project Planning Support

$626.32 ($626.32) $0.00 Project Totals for 249-9500-5192 - Secondary District Wide - Athletic Fields

249-9531-5192 - Secondary District Wide - Site SafetyCA School Inspections LLC $43,175.64 ($43,175.64) $0.00 Inspection Costs

Facility Inspection Services $23,065.00 ($23,065.00) $0.00 Inspection Costs

$66,240.64 ($66,240.64) $0.00 Project Totals for 249-9531-5192 - Secondary District Wide - Site Safety

249-9532-5189 - Secondary District Wide - SecurityInteg Security Controls Inc $108,528.65 $0.00 $108,528.65 Security Services

$108,528.65 $0.00 $108,528.65 Project Totals for 249-9532-5189 - Secondary District Wide - Security

249-9540-5192 - Secondary District Wide - Asbestos/Hazardous

CALIFORNIA FINANCIAL SERVICES PAGE 4 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201929

Page 30: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

RegasGroup Environ Conslt $560.00 ($560.00) $0.00 Environmental Consulting

Servpro $12,878.06 $0.00 $12,878.06 Other Services & Operating Expenditures

$13,438.06 ($560.00) $12,878.06 Project Totals for 249-9540-5192 - Secondary District Wide - Asbestos/Hazardous

249-9650-5192 - Secondary District Wide - Other FeesHarrison Management $166,183.50 ($166,183.50) $0.00 District Support Costs

KTR Facilities Consulting Inc $56,000.00 ($42,210.00) $13,790.00 Facilities Consulting

PBK $6,011,863.45 ($5,055,208.70) $956,654.75 Engineering Costs

$6,234,046.95 ($5,263,602.20) $970,444.75 Project Totals for 249-9650-5192 - Secondary District Wide - Other Fees

249-9806-5192 - Secondary District Wide - Portable ClassroomsDgs $13,359.72 ($13,359.72) $0.00 Project Planning Support

Hirtzer, Kurt A. $174,900.00 ($169,060.00) $5,840.00 Inspection Costs

Quattrocchi Kwok Architects $222,675.36 ($222,675.36) $0.00 Architect Costs

$410,935.08 ($405,095.08) $5,840.00 Project Totals for 249-9806-5192 - Secondary District Wide - Portable Classrooms

249-9816-5192 - Secondary District Wide - Hvac SystemsS.R.C.S. $25,359.90 ($25,359.90) $0.00 Project Planning Support

$25,359.90 ($25,359.90) $0.00 Project Totals for 249-9816-5192 - Secondary District Wide - Hvac Systems

249-9817-5192 - Secondary District Wide - Hvac ReplacementS.R.C.S. $7,953.40 ($7,953.40) $0.00 Project Planning Support

$7,953.40 ($7,953.40) $0.00 Project Totals for 249-9817-5192 - Secondary District Wide - Hvac Replacement

249-9821-5192 - Secondary District Wide - Roofing ReplacementGreystone West $178,859.08 ($178,859.08) ($0.00) Other Construction Costs

$178,859.08 ($178,859.08) ($0.00) Project Totals for 249-9821-5192 - Secondary District Wide - Roofing Replacement

249-9851-5192 - Secondary District Wide - Site ImprovementsRoberts Mechanical $0.00 $0.00 $0.00 Utility Costs

S.R.C.S. $8,988.50 ($8,988.50) $0.00 Project Planning Support

$8,988.50 ($8,988.50) $0.00 Project Totals for 249-9851-5192 - Secondary District Wide - Site Improvements

249-9852-5192 - Secondary District Wide - Site Improvement 2Siri Grading & Paving Inc $304,131.76 ($304,131.76) $0.00 Paving Costs

$304,131.76 ($304,131.76) $0.00 Project Totals for 249-9852-5192 - Secondary District Wide - Site Improvement 2

249-9861-5192 - Secondary District Wide - ManagementCalifornia Financial Services $81,200.00 ($81,200.00) $0.00 Project Planning Support

CALIFORNIA FINANCIAL SERVICES PAGE 5 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201930

Page 31: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

KBA Docusys Inc $293.14 $0.00 $293.14 Printing Costs

Office Depot $106.49 ($106.49) $0.00 Supplies

Sonoma Media-Advertising $1,164.60 ($1,164.60) $0.00 Advertising

S.R.C.S. $8,530.62 ($8,530.62) $0.00 Project Planning Support

$91,294.85 ($91,001.71) $293.14 Project Totals for 249-9861-5192 - Secondary District Wide - Management

249-9900-5189 - Secondary District Wide - Tech. InfrastructureDevelopment Group, Inc. $6,392,261.19 ($6,343,819.59) $48,441.60 Technology Costs

Golden State Electric Inc $829,634.24 ($829,634.24) $0.00 Electrical Costs

Ivan J Arano $19,600.56 ($13,065.92) $6,534.64 Other Services

S.R.C.S. $0.00 $0.00 $0.00 Project Planning Support

TEKsystems $67,267.20 ($46,564.45) $20,702.75 Other Services & Operating Expenditures

$7,308,763.19 ($7,233,084.20) $75,678.99 Project Totals for 249-9900-5189 - Secondary District Wide - Tech. Infrastructure

249-9902-5189 - Secondary District Wide - Phone Intercom SystemDevelopment Group, Inc. $2,602,801.53 ($2,600,335.13) $2,466.40 Technology Costs

Lunardi Electric Inc, Joe $122,950.00 ($122,950.00) $0.00 Electrical Costs

$2,725,751.53 ($2,723,285.13) $2,466.40 Project Totals for 249-9902-5189 - Secondary District Wide - Phone Intercom System

249-9907-5189 - Secondary District Wide - Technology OtherAmazon.com $741.72 ($741.72) $0.00 Supplies

Apple Inc. - Education Sales $0.00 $0.00 $0.00 computers, IT

Bay Area Labels $626.50 ($626.50) $0.00 Printing Costs

BorderLAN Security $77,456.36 ($77,456.36) $0.00 Technology Costs

Bretford $555.85 ($555.85) $0.00 Technology Costs

CDW-G $42,430.73 ($42,430.73) $0.00 Technology Costs

Consolidated N $0.00 $0.00 $0.00 Technology Costs

Decotech Systems $501,953.20 ($501,953.20) $0.00 Technology Costs

Development Group, Inc. $2,961,820.87 ($2,915,504.35) $46,316.52 Technology Costs

Entrust Resources $6,545.11 ($6,545.11) $0.00 Technology Costs

EyeP Solution $263,747.43 ($263,747.43) $0.00 Technology Costs

Faronics Technologies USA Inc $17,872.40 ($17,872.40) $0.00 Technology Costs

First Bankcard $71.37 ($71.37) $0.00 Credit Card

Golden State Electric Inc $0.00 $0.00 $0.00 Electrical Costs

Hewlett-Packard $6,181.18 ($6,181.18) $0.00 Technology Costs

HP Inc $128,442.41 ($128,442.41) $0.00 Technology Costs

PCM-G $432.84 ($432.84) $0.00 Technology Costs

Sonic.net, Inc $34,539.81 ($34,539.81) $0.00 Technology Costs

TechSmith Corporation $0.00 $0.00 $0.00 Technology Costs

T&R Communications Inc $6,510,955.39 ($6,195,437.29) $315,518.10 Technology Costs

Troxell Communications Inc $27,281.77 ($27,281.77) $0.00 Technology Costs

CALIFORNIA FINANCIAL SERVICES PAGE 6 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201931

Page 32: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

$10,581,654.94 ($10,219,820.32) $361,834.62 Project Totals for 249-9907-5189 - Secondary District Wide - Technology Other

249-9977-5192 - Secondary District Wide - Master Plan - InfrastrucAmerican Storage, LLC $960.00 ($960.00) $0.00 Rentals, Leases & Repairs

Brelje & Race Engineers $11,300.00 ($11,300.00) $0.00 Engineering Costs

Counterpoint Construction $157,992.07 ($157,992.07) $0.00 Construction Management

Lunardi Electric Inc, Joe $0.00 $0.00 $0.00 Electrical Costs

Quattrocchi Kwok Architects $375,096.45 ($375,096.45) $0.00 Architect Costs

Ridgeview Builders Inc $1,155,974.00 ($1,155,974.00) $0.00 Construction Costs

Subtronic Corporation $2,938.00 ($2,938.00) $0.00 Engineering Costs

$1,704,260.52 ($1,704,260.52) $0.00 Project Totals for 249-9977-5192 - Secondary District Wide - Master Plan - Infrastruc

250-9500-5192 - Montgomery High - Athletic FieldsA-Z Playground Safety $1,600.00 $0.00 $1,600.00 Playground Safety

Carlile - Macy $15,500.00 ($8,067.56) $7,432.44 Engineering Costs

Miller Pacific Engineering $3,000.00 ($1,280.60) $1,719.40 Geotechnical

$20,100.00 ($9,348.16) $10,751.84 Project Totals for 250-9500-5192 - Montgomery High - Athletic Fields

250-9502-5192 - Montgomery High - Track RepairsKYA Services $1,976,591.47 ($1,875,386.90) $101,204.57 Engineering & Construction Services

$1,976,591.47 ($1,875,386.90) $101,204.57 Project Totals for 250-9502-5192 - Montgomery High - Track Repairs

250-9532-5189 - Montgomery High - SecurityAA&T Communications $2,410.24 $0.00 $2,410.24

Integ Security Controls Inc $151,704.51 ($147,570.76) $4,133.75 Security Services

$154,114.75 ($147,570.76) $6,543.99 Project Totals for 250-9532-5189 - Montgomery High - Security

250-9650-5192 - Montgomery High - Other FeesS.R.C.S. $500.00 ($500.00) $0.00 Project Planning Support

$500.00 ($500.00) $0.00 Project Totals for 250-9650-5192 - Montgomery High - Other Fees

250-9654-5192 - Montgomery High - Restroom ReconditioningEllis Flooring $16,709.62 ($16,709.62) $0.00 Flooring Costs

$16,709.62 ($16,709.62) $0.00 Project Totals for 250-9654-5192 - Montgomery High - Restroom Reconditioning

250-9800-5192 - Montgomery High - Permanent Bldgs NewRGH Geotechnical & Environment $24,100.00 ($24,100.00) $0.00 Geotechnical

Subtronic Corporation $3,807.00 ($3,807.00) $0.00 Engineering Costs

TLCD Architecture Inc $1,168,834.00 ($783,606.60) $385,227.40 Architect Costs

$1,196,741.00 ($811,513.60) $385,227.40 Project Totals for 250-9800-5192 - Montgomery High - Permanent Bldgs New

CALIFORNIA FINANCIAL SERVICES PAGE 7 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201932

Page 33: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

250-9821-5192 - Montgomery High - Roofing ReplacementDivision of State Architect $162,750.00 ($162,750.00) $0.00 Plan Check Fees

$162,750.00 ($162,750.00) $0.00 Project Totals for 250-9821-5192 - Montgomery High - Roofing Replacement

250-9851-5192 - Montgomery High - Site ImprovementsB.T. Mancini $0.00 $0.00 $0.00 Architect Costs

California Geological Survey $3,600.00 ($3,600.00) $0.00 Geological Surveying

Division of State Architect $236,450.00 ($236,450.00) $0.00 Plan Check Fees

Matrix HG Inc. $373,269.00 ($371,321.25) $1,947.75 HVAC

$613,319.00 ($611,371.25) $1,947.75 Project Totals for 250-9851-5192 - Montgomery High - Site Improvements

250-9907-5189 - Montgomery High - Technology OtherT&R Communications Inc $3,670.02 $0.00 $3,670.02 Technology Costs

$3,670.02 $0.00 $3,670.02 Project Totals for 250-9907-5189 - Montgomery High - Technology Other

251-9500-5192 - Piner High - Athletic FieldsA-Z Playground Safety $1,200.00 $0.00 $1,200.00 Playground Safety

Carlile - Macy $15,500.00 ($4,330.00) $11,170.00 Engineering Costs

Miller Pacific Engineering $3,000.00 $0.00 $3,000.00 Geotechnical

$19,700.00 ($4,330.00) $15,370.00 Project Totals for 251-9500-5192 - Piner High - Athletic Fields

251-9502-5192 - Piner High - Track RepairsKYA Services $1,877,015.40 ($1,723,314.63) $153,700.77 Engineering & Construction Services

West County Transportation $8,043.13 $0.00 $8,043.13 Transportation Services

$1,885,058.53 ($1,723,314.63) $161,743.90 Project Totals for 251-9502-5192 - Piner High - Track Repairs

251-9506-5192 - Piner High - Athletic Field LightingAxia Architects $125,085.98 ($122,153.87) $2,932.11 Architect Costs

Carr's Construction $1,838,100.00 ($1,746,196.00) $91,904.00 Construction Company

RGH Geotechnical & Environment $370.00 ($370.00) $0.00 Geotechnical

$1,963,555.98 ($1,868,719.87) $94,836.11 Project Totals for 251-9506-5192 - Piner High - Athletic Field Lighting

251-9532-5189 - Piner High - SecurityInteg Security Controls Inc $175,001.76 ($136,670.51) $38,331.25 Security Services

$175,001.76 ($136,670.51) $38,331.25 Project Totals for 251-9532-5189 - Piner High - Security

251-9536-5192 - Piner High - Site Improvements 1KYA Services $99,993.18 $0.00 $99,993.18 Engineering & Construction Services

$99,993.18 $0.00 $99,993.18 Project Totals for 251-9536-5192 - Piner High - Site Improvements 1

CALIFORNIA FINANCIAL SERVICES PAGE 8 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201933

Page 34: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

251-9540-5192 - Piner High - Asbestos/Hazardous MaterialsCentral Valley Environmental $1,743.00 $0.00 $1,743.00 Environmental Costs

NorBay Consulting $3,687.00 ($3,687.00) $0.00 Environmental Costs

$5,430.00 ($3,687.00) $1,743.00 Project Totals for 251-9540-5192 - Piner High - Asbestos/Hazardous Materials

251-9566-5192 - Piner High - School SignageShadko Construction and Design $57,500.00 ($28,757.61) $28,742.39 Other Services & Operating Expenditures

Stewart Signs $9,317.85 $0.00 $9,317.85 Equipment > $5000

$66,817.85 ($28,757.61) $38,060.24 Project Totals for 251-9566-5192 - Piner High - School Signage

251-9650-5192 - Piner High - Other FeesDivision of State Architect $3,536.32 ($3,536.32) $0.00 Plan Check Fees

$3,536.32 ($3,536.32) $0.00 Project Totals for 251-9650-5192 - Piner High - Other Fees

251-9654-5192 - Piner High - Restroom ReconditioningEllis Flooring $16,709.62 ($16,709.62) $0.00 Flooring Costs

$16,709.62 ($16,709.62) $0.00 Project Totals for 251-9654-5192 - Piner High - Restroom Reconditioning

251-9821-5192 - Piner High - Roofing ReplacementDan George Roofing $0.00 $0.00 $0.00 Roofing Costs

Matrix HG Inc. $3,996,264.00 ($3,950,817.99) $45,446.01 HVAC

Westech Roofing Inc $0.00 $0.00 $0.00 Roofing Costs

$3,996,264.00 ($3,950,817.99) $45,446.01 Project Totals for 251-9821-5192 - Piner High - Roofing Replacement

251-9851-5192 - Piner High - Site ImprovementsCinquini & Passarino Inc. $14,022.50 ($14,022.50) $0.00 Surveying Costs

Guardian Booth $9,185.91 ($9,185.91) $0.00 Other Services & Operating Expenditures

LACO Associates $26,860.00 ($25,590.27) $1,269.73 Geotechincal

Musco Sports Lighting $257,791.03 ($257,791.03) $0.00 Sports Lighting

RGH Geotechnical & Environment $17,505.00 ($17,505.00) $0.00 Geotechnical

River City Testing $4,650.00 ($4,650.00) $0.00 Testing

Shadko Construction and Design $29,500.00 ($29,500.00) $0.00 Other Services & Operating Expenditures

S.R.C.S. $8,358.43 ($8,358.43) $0.00 Project Planning Support

Stocksdale, John P. $20,877.00 ($20,877.00) $0.00 Site Costs

$388,749.87 ($387,480.14) $1,269.73 Project Totals for 251-9851-5192 - Piner High - Site Improvements

251-9861-5192 - Piner High - ManagementCounterpoint Construction $3,000.00 ($3,000.00) $0.00 Construction Management

$3,000.00 ($3,000.00) $0.00 Project Totals for 251-9861-5192 - Piner High - Management

CALIFORNIA FINANCIAL SERVICES PAGE 9 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201934

Page 35: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

251-9900-5192 - Piner High - Technology InfrastructureLunardi Electric Inc, Joe $24,200.00 ($24,200.00) $0.00 Electrical Costs

$24,200.00 ($24,200.00) $0.00 Project Totals for 251-9900-5192 - Piner High - Technology Infrastructure

251-9907-5189 - Piner High - Technology OtherT&R Communications Inc $2,950.00 $0.00 $2,950.00 Technology Costs

$2,950.00 $0.00 $2,950.00 Project Totals for 251-9907-5189 - Piner High - Technology Other

252-9500-5192 - Santa Rosa High - Athletic FieldsA-Z Playground Safety $321.00 $0.00 $321.00 Playground Safety

Carlile - Macy $15,500.00 $0.00 $15,500.00 Engineering Costs

Miller Pacific Engineering $3,000.00 $0.00 $3,000.00 Geotechnical

$18,821.00 $0.00 $18,821.00 Project Totals for 252-9500-5192 - Santa Rosa High - Athletic Fields

252-9502-5192 - Santa Rosa High - Track RepairsKYA Services $1,921,066.10 ($36,876.71) $1,884,189.39 Engineering & Construction Services

$1,921,066.10 ($36,876.71) $1,884,189.39 Project Totals for 252-9502-5192 - Santa Rosa High - Track Repairs

252-9532-5189 - Santa Rosa High - SecurityInteg Security Controls Inc $171,101.57 $0.00 $171,101.57 Security Services

$171,101.57 $0.00 $171,101.57 Project Totals for 252-9532-5189 - Santa Rosa High - Security

252-9650-5192 - Santa Rosa High - Traffic FlowDivision of State Architect $0.00 $0.00 $0.00 Plan Check Fees

S.R.C.S. $1,250.00 ($1,250.00) $0.00 Project Planning Support

$1,250.00 ($1,250.00) $0.00 Project Totals for 252-9650-5192 - Santa Rosa High - Traffic Flow

252-9654-5192 - Santa Rosa High - Restroom ReconditioningEllis Flooring $26,257.97 ($26,257.97) $0.00 Flooring Costs

$26,257.97 ($26,257.97) $0.00 Project Totals for 252-9654-5192 - Santa Rosa High - Restroom Reconditioning

252-9821-5192 - Santa Rosa High - Roofing ReplacementDivision of State Architect $84,750.00 ($84,750.00) $0.00 Plan Check Fees

Matrix HG Inc. $5,340,957.90 ($4,731,805.70) $609,152.20 HVAC

$5,425,707.90 ($4,816,555.70) $609,152.20 Project Totals for 252-9821-5192 - Santa Rosa High - Roofing Replacement

252-9851-5192 - Santa Rosa High - Site ImprovementsS.R.C.S. $14,552.00 ($14,552.00) $0.00 Project Planning Support

$14,552.00 ($14,552.00) $0.00 Project Totals for 252-9851-5192 - Santa Rosa High - Site Improvements

CALIFORNIA FINANCIAL SERVICES PAGE 10 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201935

Page 36: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

252-9907-5189 - Santa Rosa High - Technology OtherT&R Communications Inc $3,084.00 $0.00 $3,084.00 Technology Costs

$3,084.00 $0.00 $3,084.00 Project Totals for 252-9907-5189 - Santa Rosa High - Technology Other

253-9500-5192 - Elsie Allen High - Athletic FieldsA-Z Playground Safety $1,200.00 $0.00 $1,200.00 Playground Safety

Carlile - Macy $15,500.00 ($3,432.50) $12,067.50 Engineering Costs

Miller Pacific Engineering $3,000.00 $0.00 $3,000.00 Geotechnical

$19,700.00 ($3,432.50) $16,267.50 Project Totals for 253-9500-5192 - Elsie Allen High - Athletic Fields

253-9502-5192 - Elsie Allen High - Track RepairsCalifornia Wine Tours Inc. $2,260.31 ($2,260.31) $0.00

KYA Services $1,931,061.60 ($1,359,335.15) $571,726.45 Engineering & Construction Services

West County Transportation $1,136.82 ($457.97) $678.85 Transportation Services

$1,934,458.73 ($1,362,053.43) $572,405.30 Project Totals for 253-9502-5192 - Elsie Allen High - Track Repairs

253-9532-5189 - Elsie Allen High - SecurityInteg Security Controls Inc $177,156.36 $0.00 $177,156.36 Security Services

$177,156.36 $0.00 $177,156.36 Project Totals for 253-9532-5189 - Elsie Allen High - Security

253-9566-5192 - Elsie Allen High - School SignageShadko Construction and Design $46,000.00 ($23,006.08) $22,993.92 Other Services & Operating Expenditures

Stewart Signs $9,317.85 $0.00 $9,317.85 Equipment > $5000

$55,317.85 ($23,006.08) $32,311.77 Project Totals for 253-9566-5192 - Elsie Allen High - School Signage

253-9654-5192 - Elsie Allen High - Restroom ReconditioningEllis Flooring $9,548.35 ($9,548.35) $0.00 Flooring Costs

$9,548.35 ($9,548.35) $0.00 Project Totals for 253-9654-5192 - Elsie Allen High - Restroom Reconditioning

253-9817-5192 - Elsie Allen High - HVAC ReplacementRoberts Mechanical $8,955.00 ($8,955.00) $0.00 Utility Costs

$8,955.00 ($8,955.00) $0.00 Project Totals for 253-9817-5192 - Elsie Allen High - HVAC Replacement

253-9821-5192 - Elsie Allen High - Roofing ReplacementLongroad Energy Holdings LLC $245,882.35 ($245,882.35) $0.00 Buildings & Improvement

Matrix HG Inc. $7,545,690.20 ($6,098,868.20) $1,446,822.00 HVAC

$7,791,572.55 ($6,344,750.55) $1,446,822.00 Project Totals for 253-9821-5192 - Elsie Allen High - Roofing Replacement

253-9851-5192 - Elsie Allen High - Site Improvements

CALIFORNIA FINANCIAL SERVICES PAGE 11 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201936

Page 37: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

Bartley Pump $44,310.00 ($44,310.00) $0.00 Utility Costs

S.R.C.S. $31,358.77 ($31,358.77) $0.00 Project Planning Support

$75,668.77 ($75,668.77) $0.00 Project Totals for 253-9851-5192 - Elsie Allen High - Site Improvements

253-9907-5189 - Elsie Allen High - Technology OtherT&R Communications Inc $3,843.98 $0.00 $3,843.98 Technology Costs

$3,843.98 $0.00 $3,843.98 Project Totals for 253-9907-5189 - Elsie Allen High - Technology Other

254-9500-5192 - Maria Carrillo High - Athletic FieldsLACO Associates $6,213.00 ($3,111.00) $3,102.00 Geotechincal

Miller Pacific Engineering $10,322.00 ($5,700.00) $4,622.00 Geotechnical

S.R.C.S. $15,654.06 ($15,654.06) $0.00 Project Planning Support

Stocksdale, John P. $6,233.24 ($6,233.24) $0.00 Site Costs

West County Transportation $467.30 ($467.30) $0.00 Transportation Services

$38,889.60 ($31,165.60) $7,724.00 Project Totals for 254-9500-5192 - Maria Carrillo High - Athletic Fields

254-9502-5192 - Maria Carrillo High - Track RepairsCarlile - Macy $15,997.50 ($15,997.50) $0.00 Engineering Costs

KYA Services $4,631,237.16 ($4,631,237.16) $0.00 Engineering & Construction Services

Quattrocchi Kwok Architects $472,063.00 ($461,618.80) $10,444.20 Architect Costs

Santa Rosa Jr. College $13,832.50 ($13,832.50) $0.00 Project Planning Support

$5,133,130.16 ($5,122,685.96) $10,444.20 Project Totals for 254-9502-5192 - Maria Carrillo High - Track Repairs

254-9532-5189 - Maria Carrillo High - SecurityInteg Security Controls Inc $168,349.01 $0.00 $168,349.01 Security Services

$168,349.01 $0.00 $168,349.01 Project Totals for 254-9532-5189 - Maria Carrillo High - Security

254-9536-5192 - Maria Carrillo High - Site Improvements 1SturdiSteel $135,000.00 $0.00 $135,000.00 Site Improvements

$135,000.00 $0.00 $135,000.00 Project Totals for 254-9536-5192 - Maria Carrillo High - Site Improvements 1

254-9650-5192 - Maria Carrillo High - Traffic FlowDivision of State Architect $15,588.71 ($15,588.71) $0.00 Plan Check Fees

NorBay Consulting $748.00 ($748.00) $0.00 Environmental Costs

Sports City $2,077.50 ($2,077.50) $0.00 Facility Rental

West County Transportation $2,962.76 ($2,962.76) $0.00 Transportation Services

$21,376.97 ($21,376.97) $0.00 Project Totals for 254-9650-5192 - Maria Carrillo High - Traffic Flow

254-9654-5192 - Maria Carrillo High - Restroom ReconditioningEllis Flooring $7,161.27 ($7,161.27) $0.00 Flooring Costs

CALIFORNIA FINANCIAL SERVICES PAGE 12 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201937

Page 38: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

$7,161.27 ($7,161.27) $0.00 Project Totals for 254-9654-5192 - Maria Carrillo High - Restroom Reconditioning

254-9800-5192 - Maria Carrillo High - Permanent Bldgs NewMiller Pacific Engineering $15,378.00 ($15,378.00) $0.00 Geotechnical

$15,378.00 ($15,378.00) $0.00 Project Totals for 254-9800-5192 - Maria Carrillo High - Permanent Bldgs New

254-9821-5192 - Maria Carrillo High - Roofing ReplacementLongroad Energy Holdings LLC $189,307.65 ($189,307.65) $0.00 Buildings & Improvement

Matrix HG Inc. $5,309,615.90 ($4,554,851.93) $754,763.97 HVAC

$5,498,923.55 ($4,744,159.58) $754,763.97 Project Totals for 254-9821-5192 - Maria Carrillo High - Roofing Replacement

254-9851-5192 - Maria Carrillo High - Site ImprovementsB.T. Mancini $4,952.00 ($4,952.00) $0.00 Architect Costs

Carlile - Macy $3,483.75 ($3,483.75) $0.00 Engineering Costs

Division of State Architect $5,125.00 ($5,125.00) $0.00 Plan Check Fees

Quattrocchi Kwok Architects $29,000.00 ($22,393.80) $6,606.20 Architect Costs

S.R.C.S. $7,744.31 ($7,744.31) $0.00 Project Planning Support

Stocksdale, John P. $19,953.76 ($19,953.76) $0.00 Site Costs

$70,258.82 ($63,652.62) $6,606.20 Project Totals for 254-9851-5192 - Maria Carrillo High - Site Improvements

260-9532-5189 - Ridgway Continuation High - SecurityInteg Security Controls Inc $61,749.77 $0.00 $61,749.77 Security Services

$61,749.77 $0.00 $61,749.77 Project Totals for 260-9532-5189 - Ridgway Continuation High - Security

260-9654-5192 - Ridgway Continuation High - Restroom ReconditioninEllis Flooring $4,774.18 ($4,774.18) $0.00 Flooring Costs

$4,774.18 ($4,774.18) $0.00 Project Totals for 260-9654-5192 - Ridgway Continuation High - Restroom Reconditionin

260-9806-5192 - Ridgway Continuation High - Portable ClassroomsCustom Design $8,634.00 ($8,634.00) $0.00 Furniture & Equipment

Discount Best Blinds $1,561.62 ($1,561.62) $0.00 Furniture & Equipment

$10,195.62 ($10,195.62) $0.00 Project Totals for 260-9806-5192 - Ridgway Continuation High - Portable Classrooms

260-9808-5192 - Ridgway Continuation High - Portable ClassroomCoggins Fence $12,541.02 ($12,541.02) $0.00 Fencing Costs

FRC Inc $74,426.00 ($74,426.00) $0.00 Other Construction Costs

Golden State Electric Inc $2,600.00 ($2,600.00) $0.00 Electrical Costs

Reliable Crane & Rigging Inc $1,354.50 ($1,354.50) $0.00 Rentals, Leases & Repairs

$90,921.52 ($90,921.52) $0.00 Project Totals for 260-9808-5192 - Ridgway Continuation High - Portable Classroom

CALIFORNIA FINANCIAL SERVICES PAGE 13 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201938

Page 39: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Encumbrance ReportSanta Rosa City Schools

Encumbrances, Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

VENDOR ENCUMBRANCE EXPENDITURE BALANCE DESCRIPTION

260-9851-5192 - Ridgway Continuation High - Site ImprovementsS.R.C.S. $23,000.00 ($23,000.00) $0.00 Project Planning Support

$23,000.00 ($23,000.00) $0.00 Project Totals for 260-9851-5192 - Ridgway Continuation High - Site Improvements

260-9854-5192 - Ridgway Continuation High - Site Improvements 4PlayGrounds Unlimited $26,858.92 ($26,858.92) $0.00 Playground Equipment

$26,858.92 ($26,858.92) $0.00 Project Totals for 260-9854-5192 - Ridgway Continuation High - Site Improvements 4

260-9875-5192 - Ridgway Continuation High - ModernizationHome Depot $425.88 ($425.88) $0.00 Supplies

Sonoma Media-Advertising $669.00 ($669.00) $0.00 Advertising

$1,094.88 ($1,094.88) $0.00 Project Totals for 260-9875-5192 - Ridgway Continuation High - Modernization

260-9907-5189 - Ridgway Continuation High - Technology OtherT&R Communications Inc $3,730.00 $0.00 $3,730.00 Technology Costs

$3,730.00 $0.00 $3,730.00 Project Totals for 260-9907-5189 - Ridgway Continuation High - Technology Other

291-9305-9795 - Secondary For Director Dp - Operations ServicesS.R.C.S. $251,024.85 ($251,024.85) ($0.00) Project Planning Support

$251,024.85 ($251,024.85) ($0.00) Project Totals for 291-9305-9795 - Secondary For Director Dp - Operations Services

292-9305-9795 - Secondary For Asst Sup Busines - Operations ServicS.R.C.S. $133,635.90 ($133,635.90) $0.00 Project Planning Support

$133,635.90 ($133,635.90) $0.00 Project Totals for 292-9305-9795 - Secondary For Asst Sup Busines - Operations Servic

389-9907-5189 - Technology District Wide - Technology OtherBay Area Labels $0.00 $0.00 $0.00 Printing Costs

$0.00 $0.00 $0.00 Project Totals for 389-9907-5189 - Technology District Wide - Technology Other

389-9907-5192 - Technology District Wide - Technology OtherBay Area Labels $1,216.71 ($1,216.71) $0.00 Printing Costs

$1,216.71 ($1,216.71) $0.00 Project Totals for 389-9907-5192 - Technology District Wide - Technology Other

392-9535-5192 - Business - Site ImprovementsS.R.C.S. $877.12 ($877.12) ($0.00) Project Planning Support

$877.12 ($877.12) ($0.00) Project Totals for 392-9535-5192 - Business - Site Improvements

$79,706,453.38 ($70,324,090.11) $9,382,363.27 District Grand Totals for Santa Rosa City Schools (for selected data)

CALIFORNIA FINANCIAL SERVICES PAGE 14 of 14 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 171030) RUN DATE: 08/19/201939

Page 40: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Santa Rosa High School DistrictProject Expenditure Report – Measure I

Project Expenditure Summary Report

Measure I

Cumulative as of 6-28-2019

40

Page 41: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 200-9650-5192 - Secondary Schools - Other FeesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 64,761.00 0.00 0.00 0.00 $64,761.00

Project Subtotal $64,761.00

PROJECT: 230-9532-5189 - Cook Middle - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 87,295.16 0.00 0.00 0.00 $87,295.16

Project Subtotal $87,295.16

PROJECT: 230-9806-5192 - Cook Middle - Portable ClassroomsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 82,095.98 0.00 0.00 0.00 0.00 775,502.15 0.00 0.00 0.00 $857,598.13

Project Subtotal $857,598.13

PROJECT: 230-9817-5192 - Cook Middle - HVAC ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 10,490.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $10,490.00

Project Subtotal $10,490.00

PROJECT: 230-9851-5192 - Cook Middle - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 22,886.16 0.00 0.00 0.00 $22,886.16

Project Subtotal $22,886.16

PROJECT: 230-9875-5192 - Cook Middle - ModernizationB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 1 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201941

Page 42: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 2,631.88 0.00 0.00 0.00 $2,631.88

Project Subtotal $2,631.88

PROJECT: 230-9876-5192 - Cook Middle - Modernization 2C - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,223.72 0.00 $20,223.72

Project Subtotal $20,223.72

PROJECT: 231-9532-5189 - Slater Middle - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 76,462.73 0.00 0.00 0.00 $76,462.73

Project Subtotal $76,462.73

PROJECT: 231-9540-5192 - Slater Middle - Asbestos/Hazardous MaterialsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 57,984.00 0.00 0.00 0.00 $57,984.00

Project Subtotal $57,984.00

PROJECT: 231-9566-5192 - Slater Middle - School SignageB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 14,500.00 0.00 0.00 0.00 $14,500.00

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,476.04 0.00 $13,476.04

Project Subtotal $27,976.04

CALIFORNIA FINANCIAL SERVICES PAGE 2 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201942

Page 43: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 231-9650-5192 - Slater Middle - Other FeesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 78,750.00 0.00 0.00 0.00 $78,750.00

Project Subtotal $78,750.00

PROJECT: 231-9821-5192 - Slater Middle - Roofing ReplacementB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 162,989.00 0.00 0.00 0.00 $162,989.00

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 559,398.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $559,398.00

Project Subtotal $722,387.00

PROJECT: 232-9532-5192 - Comstock Middle - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 13,891.00 0.00 0.00 0.00 $13,891.00

Project Subtotal $13,891.00

PROJECT: 232-9540-5192 - Comstock Middle - Asbestos/Haz. Mat.B - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,038.00 0.00 0.00 0.00 $1,038.00

Project Subtotal $1,038.00

PROJECT: 232-9806-5192 - Comstock Middle - Portable ClassroomsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 6,083.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $6,083.00

Project Subtotal $6,083.00

CALIFORNIA FINANCIAL SERVICES PAGE 3 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201943

Page 44: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 232-9821-5192 - Comstock Middle - Roofing ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 4,810,752.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $4,810,752.47

Project Subtotal $4,810,752.47

PROJECT: 232-9851-5192 - Comstock Middle - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 12,853.16 0.00 0.00 0.00 $12,853.16

Project Subtotal $12,853.16

PROJECT: 232-9876-5192 - Comstock Middle - Modernization 2C - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,223.73 0.00 $20,223.73

Project Subtotal $20,223.73

PROJECT: 233-9531-5192 - Rincon Valley Middle - Site SafetyB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 43,841.00 0.00 0.00 0.00 $43,841.00

Project Subtotal $43,841.00

PROJECT: 233-9806-5192 - Rincon Valley Middle - Portable ClassroomsC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,249.35 0.00 $2,249.35

Project Subtotal $2,249.35

PROJECT: 233-9875-5192 - Rincon Valley Middle - ModernizationB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 4 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201944

Page 45: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 669.00 0.00 0.00 0.00 $669.00

Project Subtotal $669.00

PROJECT: 234-9851-5192 - Santa Rosa Middle - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 61,050.00 0.00 0.00 0.00 $61,050.00

Project Subtotal $61,050.00

PROJECT: 243-9816-5189 - Lewis / Alternative Ed - Hvac SystemsC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 22,987.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22,987.00

Project Subtotal $22,987.00

PROJECT: 249-0000-5192 - Secondary District Wide - UndistributedB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 12,084.50 0.00 0.00 0.00 $12,084.50

Project Subtotal $12,084.50

PROJECT: 249-9400-5192 - Secondary District Wide - Bond Election CostsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00

Project Subtotal $0.00

PROJECT: 249-9402-5192 - Secondary District Wide - Bond Election 2014B - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 (50,407.42) 0.00 0.00 0.00 ($50,407.42)

CALIFORNIA FINANCIAL SERVICES PAGE 5 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201945

Page 46: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

Project Subtotal ($50,407.42)

PROJECT: 249-9403-5192 - Secondary District Wide - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 46,000.00 0.00 0.00 0.00 $46,000.00

Project Subtotal $46,000.00

PROJECT: 249-9500-5192 - Secondary District Wide - Athletic FieldsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 626.32 0.00 0.00 0.00 $626.32

Project Subtotal $626.32

PROJECT: 249-9531-5192 - Secondary District Wide - Site SafetyB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 66,240.64 0.00 0.00 0.00 $66,240.64

Project Subtotal $66,240.64

PROJECT: 249-9540-5192 - Secondary District Wide - Asbestos/HazardousB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 560.00 0.00 0.00 0.00 $560.00

Project Subtotal $560.00

PROJECT: 249-9650-5192 - Secondary District Wide - Other FeesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 5,263,602.20 0.00 0.00 0.00 $5,263,602.20

Project Subtotal $5,263,602.20

CALIFORNIA FINANCIAL SERVICES PAGE 6 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201946

Page 47: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 222,675.36 0.00 0.00 0.00 0.00 13,359.72 0.00 0.00 0.00 $236,035.08

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 169,060.00 0.00 0.00 0.00 $169,060.00

Project Subtotal $405,095.08

PROJECT: 249-9816-5192 - Secondary District Wide - Hvac SystemsC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 25,359.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25,359.90

Project Subtotal $25,359.90

PROJECT: 249-9817-5192 - Secondary District Wide - Hvac ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 7,953.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $7,953.40

Project Subtotal $7,953.40

PROJECT: 249-9821-5192 - Secondary District Wide - Roofing ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 178,859.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $178,859.08

Project Subtotal $178,859.08

PROJECT: 249-9851-5192 - Secondary District Wide - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 848.90 0.00 0.00 0.00 $848.90

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 7 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019

PROJECT: 249-9806-5192 - Secondary District Wide - Portable Classrooms

47

Page 48: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,139.60 0.00 $8,139.60

Project Subtotal $8,988.50

PROJECT: 249-9852-5192 - Secondary District Wide - Site Improvement 2C - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 304,131.76 0.00 0.00 0.00 0.00 0.00 $304,131.76

Project Subtotal $304,131.76

PROJECT: 249-9861-5192 - Secondary District Wide - ManagementB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 90,764.60 0.00 0.00 0.00 $90,764.60

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 237.11 0.00 $237.11

Project Subtotal $91,001.71

PROJECT: 249-9900-5189 - Secondary District Wide - Tech. InfrastructureB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 462,528.97 0.00 0.00 0.00 $462,528.97

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,770,555.23 0.00 $6,770,555.23

Project Subtotal $7,233,084.20

PROJECT: 249-9902-5189 - Secondary District Wide - Phone Intercom SystemB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 8 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201948

Page 49: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 2,723,285.13 0.00 0.00 0.00 $2,723,285.13

Project Subtotal $2,723,285.13

PROJECT: 249-9907-5189 - Secondary District Wide - Technology OtherB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 6,229,977.10 0.00 0.00 0.00 $6,229,977.10

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,989,843.22 0.00 $3,989,843.22

Project Subtotal $10,219,820.32

PROJECT: 249-9977-5192 - Secondary District Wide - Master Plan - InfrastrucB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 1,704,260.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $1,704,260.52

Project Subtotal $1,704,260.52

PROJECT: 250-9500-5192 - Montgomery High - Athletic FieldsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 9,348.16 0.00 0.00 0.00 $9,348.16

Project Subtotal $9,348.16

PROJECT: 250-9502-5192 - Montgomery High - Track RepairsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,875,386.90 0.00 0.00 0.00 $1,875,386.90

Project Subtotal $1,875,386.90

CALIFORNIA FINANCIAL SERVICES PAGE 9 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201949

Page 50: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 250-9532-5189 - Montgomery High - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 147,570.76 0.00 0.00 0.00 $147,570.76

Project Subtotal $147,570.76

PROJECT: 250-9650-5192 - Montgomery High - Other FeesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 500.00 0.00 0.00 0.00 $500.00

Project Subtotal $500.00

PROJECT: 250-9654-5192 - Montgomery High - Restroom ReconditioningB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 16,709.62 0.00 0.00 0.00 $16,709.62

Project Subtotal $16,709.62

PROJECT: 250-9800-5192 - Montgomery High - Permanent Bldgs NewA - Site

PURCHASEPRICE OF

PROPERTY

APPRAISAL, ESCROW

& SURVEYING

SITESUPPORT

COSTS

POESSA/PEACOSTS

DTSC FEES HAZARDOUSWASTE

REMOVAL

OTHER SITECOSTS

DESCRIPTION /PURPOSE

A - Site Subtotal 0.00 3,807.00 0.00 0.00 0.00 0.00 0.00 $3,807.00

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 783,606.60 0.00 0.00 0.00 0.00 24,100.00 0.00 0.00 0.00 $807,706.60

Project Subtotal $811,513.60

PROJECT: 250-9821-5192 - Montgomery High - Roofing ReplacementB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 162,750.00 0.00 0.00 0.00 $162,750.00

Project Subtotal $162,750.00

CALIFORNIA FINANCIAL SERVICES PAGE 10 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201950

Page 51: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 250-9851-5192 - Montgomery High - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 611,371.25 0.00 0.00 0.00 $611,371.25

Project Subtotal $611,371.25

PROJECT: 251-9500-5192 - Piner High - Athletic FieldsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 4,330.00 0.00 0.00 0.00 $4,330.00

Project Subtotal $4,330.00

PROJECT: 251-9502-5192 - Piner High - Track RepairsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,723,314.63 0.00 0.00 0.00 $1,723,314.63

Project Subtotal $1,723,314.63

PROJECT: 251-9506-5192 - Piner High - Athletic Field LightingB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 102,722.89 0.00 0.00 0.00 0.00 1,765,996.98 0.00 0.00 0.00 $1,868,719.87

Project Subtotal $1,868,719.87

PROJECT: 251-9532-5189 - Piner High - SecurityB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 136,670.51 0.00 0.00 0.00 $136,670.51

Project Subtotal $136,670.51

PROJECT: 251-9540-5192 - Piner High - Asbestos/Hazardous MaterialsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 11 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201951

Page 52: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,687.00 0.00 0.00 0.00 $3,687.00

Project Subtotal $3,687.00

PROJECT: 251-9566-5192 - Piner High - School SignageB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 28,757.61 0.00 0.00 0.00 $28,757.61

Project Subtotal $28,757.61

PROJECT: 251-9650-5192 - Piner High - Other FeesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,536.32 0.00 0.00 0.00 $3,536.32

Project Subtotal $3,536.32

PROJECT: 251-9654-5192 - Piner High - Restroom ReconditioningB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 16,709.62 0.00 0.00 0.00 $16,709.62

Project Subtotal $16,709.62

PROJECT: 251-9821-5192 - Piner High - Roofing ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 3,950,817.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $3,950,817.99

Project Subtotal $3,950,817.99

PROJECT: 251-9851-5192 - Piner High - Site ImprovementsA - Site

PURCHASEPRICE OF

PROPERTY

APPRAISAL, ESCROW

& SURVEYING

SITESUPPORT

COSTS

POESSA/PEACOSTS

DTSC FEES HAZARDOUSWASTE

REMOVAL

OTHER SITECOSTS

DESCRIPTION /PURPOSE

A - Site Subtotal 0.00 14,022.50 0.00 0.00 0.00 0.00 0.00 $14,022.50

CALIFORNIA FINANCIAL SERVICES PAGE 12 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201952

Page 53: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 373,457.64 0.00 0.00 0.00 $373,457.64

Project Subtotal $387,480.14

PROJECT: 251-9861-5192 - Piner High - ManagementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 3,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $3,000.00

Project Subtotal $3,000.00

PROJECT: 251-9900-5192 - Piner High - Technology InfrastructureC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 24,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24,200.00

Project Subtotal $24,200.00

PROJECT: 252-9502-5192 - Santa Rosa High - Track RepairsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 36,876.71 0.00 0.00 0.00 $36,876.71

Project Subtotal $36,876.71

PROJECT: 252-9650-5192 - Santa Rosa High - Traffic FlowB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,250.00 0.00 0.00 0.00 $1,250.00

Project Subtotal $1,250.00

PROJECT: 252-9654-5192 - Santa Rosa High - Restroom ReconditioningB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 26,257.97 0.00 0.00 0.00 $26,257.97

CALIFORNIA FINANCIAL SERVICES PAGE 13 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201953

Page 54: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

Project Subtotal $26,257.97

PROJECT: 252-9821-5192 - Santa Rosa High - Roofing ReplacementB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 84,750.00 0.00 0.00 0.00 $84,750.00

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 4,731,805.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $4,731,805.70

Project Subtotal $4,816,555.70

PROJECT: 252-9851-5192 - Santa Rosa High - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 14,552.00 0.00 0.00 0.00 $14,552.00

Project Subtotal $14,552.00

PROJECT: 253-9500-5192 - Elsie Allen High - Athletic FieldsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 3,432.50 0.00 0.00 0.00 $3,432.50

Project Subtotal $3,432.50

PROJECT: 253-9502-5192 - Elsie Allen High - Track RepairsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,362,053.43 0.00 0.00 0.00 $1,362,053.43

Project Subtotal $1,362,053.43

PROJECT: 253-9566-5192 - Elsie Allen High - School SignageB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 23,006.08 0.00 0.00 0.00 $23,006.08

CALIFORNIA FINANCIAL SERVICES PAGE 14 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201954

Page 55: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

Project Subtotal $23,006.08

PROJECT: 253-9654-5192 - Elsie Allen High - Restroom ReconditioningB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 9,548.35 0.00 0.00 0.00 $9,548.35

Project Subtotal $9,548.35

PROJECT: 253-9817-5192 - Elsie Allen High - HVAC ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 8,955.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $8,955.00

Project Subtotal $8,955.00

PROJECT: 253-9821-5192 - Elsie Allen High - Roofing ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 6,344,750.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $6,344,750.55

Project Subtotal $6,344,750.55

PROJECT: 253-9851-5192 - Elsie Allen High - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 75,668.77 0.00 0.00 0.00 $75,668.77

Project Subtotal $75,668.77

PROJECT: 254-9500-5192 - Maria Carrillo High - Athletic FieldsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 31,165.60 0.00 0.00 0.00 $31,165.60

Project Subtotal $31,165.60

CALIFORNIA FINANCIAL SERVICES PAGE 15 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201955

Page 56: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 461,618.80 0.00 0.00 0.00 0.00 4,661,067.16 0.00 0.00 0.00 $5,122,685.96

Project Subtotal $5,122,685.96

PROJECT: 254-9650-5192 - Maria Carrillo High - Traffic FlowB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 21,376.97 0.00 0.00 0.00 $21,376.97

Project Subtotal $21,376.97

PROJECT: 254-9654-5192 - Maria Carrillo High - Restroom ReconditioningB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 7,161.27 0.00 0.00 0.00 $7,161.27

Project Subtotal $7,161.27

PROJECT: 254-9800-5192 - Maria Carrillo High - Permanent Bldgs NewC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 15,378.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $15,378.00

Project Subtotal $15,378.00

PROJECT: 254-9821-5192 - Maria Carrillo High - Roofing ReplacementC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 4,744,159.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $4,744,159.58

Project Subtotal $4,744,159.58

PROJECT: 254-9851-5192 - Maria Carrillo High - Site ImprovementsA - Site

PURCHASEPRICE OF

PROPERTY

APPRAISAL, ESCROW

& SURVEYING

SITESUPPORT

COSTS

POESSA/PEACOSTS

DTSC FEES HAZARDOUSWASTE

REMOVAL

OTHER SITECOSTS

DESCRIPTION /PURPOSE

A - Site Subtotal 0.00 3,483.75 0.00 0.00 0.00 0.00 0.00 $3,483.75

CALIFORNIA FINANCIAL SERVICES PAGE 16 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019

PROJECT: 254-9502-5192 - Maria Carrillo High - Track Repairs

56

Page 57: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 60,168.87 0.00 0.00 0.00 $60,168.87

Project Subtotal $63,652.62

PROJECT: 260-9654-5192 - Ridgway Continuation High - Restroom ReconditioninB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 4,774.18 0.00 0.00 0.00 $4,774.18

Project Subtotal $4,774.18

PROJECT: 260-9806-5192 - Ridgway Continuation High - Portable ClassroomsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 8,634.00 0.00 0.00 0.00 $8,634.00

C - ConstructionMAIN

CONSTRUCTIONCOSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,561.62 0.00 $1,561.62

Project Subtotal $10,195.62

PROJECT: 260-9808-5192 - Ridgway Continuation High - Portable ClassroomB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 90,921.52 0.00 0.00 0.00 $90,921.52

Project Subtotal $90,921.52

PROJECT: 260-9851-5192 - Ridgway Continuation High - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 23,000.00 0.00 0.00 0.00 $23,000.00

Project Subtotal $23,000.00

CALIFORNIA FINANCIAL SERVICES PAGE 17 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201957

Page 58: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

PROJECT: 260-9854-5192 - Ridgway Continuation High - Site Improvements 4B - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 26,858.92 0.00 0.00 0.00 $26,858.92

Project Subtotal $26,858.92

PROJECT: 260-9875-5192 - Ridgway Continuation High - ModernizationB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 1,094.88 0.00 0.00 0.00 $1,094.88

Project Subtotal $1,094.88

PROJECT: 291-9305-9795 - Secondary For Director Dp - Operations ServicesB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 251,024.85 0.00 0.00 0.00 $251,024.85

Project Subtotal $251,024.85

PROJECT: 292-9305-9795 - Secondary For Asst Sup Busines - Operations ServicB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 133,635.90 0.00 0.00 0.00 $133,635.90

Project Subtotal $133,635.90

PROJECT: 389-9907-5192 - Technology District Wide - Technology OtherC - Construction

MAINCONSTRUCTION

COSTS

CONSTRUCTIONMANAGEMENT

DEMOLITION OTHERCONSTRUCTION

INTERIMHOUSING

INSPECTIONS CONSTRUCTIONTESTS

FURNITURE&

EQUIPMENT

LABORCOMPLIANCE

PROGRAM

DESCRIPTION /PURPOSE

C - Construction Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,216.71 0.00 $1,216.71

Project Subtotal $1,216.71

PROJECT: 392-9535-5192 - Business - Site ImprovementsB - Planning

ARCHITECT/ENGINEERING

FEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

CALIFORNIA FINANCIAL SERVICES PAGE 18 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201958

Page 59: Santa Rosa City Schools · CALIFORNIA FINANCIAL SERVICES PAGE 1 of 12 3Expenditures 3/1/19 to 6/28/19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/2019 Project

Project Expenditures ReportSanta Rosa City Schools

Expenses and Current Liabilities, Up To 06/29/2019, Fund 21 - RES 0142 (2014 Bond - Secondary)

B - PlanningARCHITECT/

ENGINEERINGFEES

DSA FEES CDE FEES ENERGYANALYSIS

PRELIMINARYTESTS

OTHERCOSTS

DESCRIPTION /PURPOSE

B - Planning Subtotal 0.00 0.00 0.00 0.00 0.00 877.12 0.00 0.00 0.00 $877.12

Project Subtotal $877.12

Grand Totals for Selected ProjectsSelected Projects Total $70,324,090.11

CALIFORNIA FINANCIAL SERVICES PAGE 19 of 19 AS OF 6-28-19 DISTRICT REPORT RUN DATE: 07/01/2019 (rev 150805) RUN DATE: 08/15/201959