sap coe doane

24
5/20/2018 SapCoeDoane-slidepdf.com http://slidepdf.com/reader/full/sap-coe-doane 1/24 Hosted by Enterprise Applications Center of Excellence A Maturity Model Michael Doane META Group

Upload: rsantosh

Post on 10-Oct-2015

26 views

Category:

Documents


0 download

DESCRIPTION

COE

TRANSCRIPT

  • 5/20/2018 Sap Coe Doane

    1/24

    Hosted by

    Enterprise ApplicationsCenter of Excellence

    A Maturity Model

    Michael DoaneMETA Group

  • 5/20/2018 Sap Coe Doane

    2/24

    Hosted by

    Why an ERP Center ofExcellence?

    An optimization of business

    processes that drive business

    benefit continually

    An optimization of end user

    competency and employee

    fulfillment of business processes

    Continued coherence and

    integration of functionality and

    data through all process chains

  • 5/20/2018 Sap Coe Doane

    3/24

    Hosted by

    Parameters: Business Applications Span (ERP is the backbone)

    Maintenance and supportof ERP and related

    functions (ERP/CRM/SCM)

    Optimization of current

    system usage

    Continuous

    business improvement

    Prepare the company for

    transformational change

    (all the time)

    As Is

    To Be

    Center of Excellence Functions

    Business

    IT

  • 5/20/2018 Sap Coe Doane

    4/24

    Hosted by

    The Enterprise Applications Value Chain

    It is imperative to linkend users to profit & loss

    Without measurement,

    you cannot begin

    Business processimprovement is the

    source of measurable

    business improvement

    IT also has its business

    processes: reduction of

    IT costs applies to this

    value chain

    Order Fulfillment

    Process

    Sample Business Performance KPIs

    Return on sales

    Return on assets

    Net sales per employee

    Ratio of Assets/Liabilities

    Procurement

    Process

    Production

    Process

    Sample Major Business Processes

    Business Process Drivers

    Key Performance Indicators

    Profit & Loss

    SAP User Competency

    Software

  • 5/20/2018 Sap Coe Doane

    5/24

    Hosted by

    Foundation of Organization Planning

    Two aspects of IT

    Business-specific activities = the Center of Excellence

    Infrastructure/support ~ Foundation Services

    Architecture

    Infrastruc

    ture/

    Operations

    ITR

    esource/

    Governance

    Center of Excellence

  • 5/20/2018 Sap Coe Doane

    6/24

    Hosted by

    Continuous Education

    Multi-site Virtual CoE

    Finance Sales Logistics

    Enterprise Program Management

    Production

    Users

    Continuous Education

    Users Users Users

    Integration Management(Functional, Cross-Application)

    Custom Applications

    Software Configuration & Support

    Help Desk

    Production Control/Change Management

    Integration Management (Technical)

    Process Owners

    Users Users Users Users

    Functional Oversight

    Remote

    Custom Applications

    Process Oversight

  • 5/20/2018 Sap Coe Doane

    7/24

    Hosted by

    META Group Maturity Modeling

    Levels 1-5

    Elements or best practices (weighted)Up to 10 per maturity level

    Categories

    METAmap (META Group Maturity Assessment Program)

  • 5/20/2018 Sap Coe Doane

    8/24

    Hosted by

    Center of Excellence Maturity Model

    Business/ Enterprise End

    IT Alignment Applications Users Infrastructure

    1Core ERP

    There is a link between

    business and IT for

    configuration updates.

    ERP is not overly

    customized; core

    implementation is complete

    Basic end user training is

    complete.

    ERP infrastructure is

    adequate.

    2Stable ERPThe role of business in ERP

    evolution is defined.

    ERP is the backbone of

    enterprise applications.

    Applications interfacing is

    complete.

    End users fulfill ERP

    functions without excessive

    help desk or support.

    ERP infrastructure is stable.

    3CoE Defined

    Business has active

    ownership of business

    processes. Current KPI is

    measured.

    The applications portfolio is

    inventoried.

    End users receive periodic

    refresher training

    ERP infrastructure is flexible.

    Apps data is generally

    synchronized.

    4CoE Managed

    KPI measures and targets are

    in the system. EPMO directs

    business process

    transformation.

    The applications portfolio has

    been rationalized.

    End users are trained to

    business processes and

    continuous training is in

    place.

    Enterprise applications

    infrastructure is flexible.

    5CoE Evolving

    Business process change is

    guided by KPI performance

    and configuration is in the

    hands of business.

    The applications portfolio has

    been optimized.

    End user job performance is

    linked to business process

    performance

    Enterprise applications

    infrastructure is adaptive to

    applications changes.

    Level

  • 5/20/2018 Sap Coe Doane

    9/24

    Hosted by

    The Consequences of ImplementationConcerns Pre Implementation Mistakes Noted After Implementation

    Source: The State of ERP Services Multi-Client Study, META Group 2003

    Scale 1=Unimportant, 5=Very Important

  • 5/20/2018 Sap Coe Doane

    10/24

    Hosted by

    2

    1%

    1

    1%

    Do you have some form of a CoE?

    1.Yes

    2.No

  • 5/20/2018 Sap Coe Doane

    11/24

    Hosted by

    Level 1 Core ERP

    ERP is at the center of an applications portfolio

    The elements for this level are generally identical tothose of a successfully completed implementation

    It is imperative to keep the project team intact and

    ready for transfer to the Center of Excellence

  • 5/20/2018 Sap Coe Doane

    12/24

    Hosted by

    Level 2 Stable ERP

    Most new ERP installations take 3 to 4 months to

    achieve a state of stability

    In this period, project staff transitions to the Center

    of Excellence

  • 5/20/2018 Sap Coe Doane

    13/24

    Hosted by

    Level 3 CoE Defined

    After stabilization of ERP, the Center of Excellence is

    functional

    Attention turns to measures & benefits

  • 5/20/2018 Sap Coe Doane

    14/24

    Hosted by

    Level 4 CoE Managed

  • 5/20/2018 Sap Coe Doane

    15/24

    Hosted by

    Level 5 Evolving CoE

  • 5/20/2018 Sap Coe Doane

    16/24

    Hosted by

    End Users

  • 5/20/2018 Sap Coe Doane

    17/24

    Hosted by

    Business/IT Alignment

  • 5/20/2018 Sap Coe Doane

    18/24

    Hosted by

    Infrastructure

  • 5/20/2018 Sap Coe Doane

    19/24

    Hosted by

    Enterprise Applications

  • 5/20/2018 Sap Coe Doane

    20/24

    Hosted by

    Results by Maturity Elements

    Results by Category

  • 5/20/2018 Sap Coe Doane

    21/24

    Hosted by

    Overall Results

    METAmap (META Group Maturity Assessment Program)

  • 5/20/2018 Sap Coe Doane

    22/24

    Hosted by

    0% 0% 0% 0% 0%

    1 2 3 4 5

    Of those who have a CoE, whichlevel have you attained?

    1. Core ERP

    2. Stable ERP

    3. Defined CoE

    4. Managed CoE

    5. Evolving CoE

  • 5/20/2018 Sap Coe Doane

    23/24

    Hosted by

    Keys to CoE headcount control:1. Support given to Business Process Owners2. Direct software configuration by CoE (business-led)3. Active competency management/continuing knowledge transfer

  • 5/20/2018 Sap Coe Doane

    24/24

    Hosted by

    Conclusion/Recommendations The CoE must be led by business staff

    and business concerns (measurable)

    A CoE will be sustained if measurementand business benefit are at the

    foundation

    People/processes tend to decaythrough time

    Maturity is accelerated when benefits are

    achieved