Operations Guide PUBLIC
SAP Enterprise Project ConnectionDocument Version: 3.0 FP01 – 2017-06-15
SAP Enterprise Project Connection 3.0 Operations Guide
Content
1 Getting Started. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2 Technical System Landscape. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3 Monitoring SAP Enterprise Project Connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
4 Managing SAP Enterprise Project Connection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5 Software Change Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
6 Troubleshooting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
7 Support Desk Management. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Content
Document History
The following table provides an overview on the most important document changes.
CautionBefore you start the implementation, make sure that you have the latest version of this document. You can find the latest version at http://help.sap.com.
Table 1:
Version Date Description
3.0 2016-04-30 Initial version
3.0 FP01 2017-06-15 New document template and template-related adaptions
SAP Enterprise Project Connection 3.0 Operations GuideDocument History P U B L I C 3
1 Getting Started
You use this guide as a starting point for managing your SAP Enterprise Project Connection application. It contains specific information for various tasks and lists the tools you use to implement them. This guide provides references to the documentation required for these tasks.
CautionThis guide does not replace the daily operations handbook that we recommend customers create for their specific production operations.
For the most current information regarding troubleshooting, see SAP Note 2294102 .
4 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Getting Started
2 Technical System Landscape
SAP Enterprise Project Connection is a part of SAP Product Lifecycle Management (PLM). It offers service- oriented architecture (SOA) based on bidirectional enterprise project data orchestration and integration capabilities between SAP ERP and SAP 4/HANA on-premise applications such as SAP Project System, SAP Plant Maintenance, and SAP Portfolio and Project Management with third-party Enterprise Project Management systems (Oracle Primavera P6 EPPM and Microsoft Project Server).
SAP Enterprise Project Connection comprises the following components:
● Integrated ServicesThe integration services component is comprised of an integration engine, infrastructure layer, persistence, and connection manager.The integration services component is deployed to SAP NetWeaver AS Java. Functionally, this component delivers the services consumed by the user interface as requests for data transfers to and from SAP ERP and SAP S4/HANA on-premise systems are processed.
● Central Technical ConfigurationCentral Technical Configuration (CTC) is a Java component deployed to SAP NetWeaver AS Java. It is referred to as the SAP Enterprise Project Connection Configuration Wizard, and provides the web-based GUI to enable you to configure connections between SAP ERP and SAP S4/HANA on-premise systems, and external systems, integration solution management, and other maintenance functions.
● Add-OnThe SAP Enterprise Project Connection ABAP Add-on component is comprised of user interface transactions and a set of BAPIs designed to support the SAP Enterprise Project Connection data integration with SAP Project Systems and SAP Plant Maintenance .The SAP GUI transactions of this component enables users to manage data transfers from SAP Project Systems and SAP Plant Maintenance to third-party Enterprise Project Management systems (Microsoft Project Server and Oracle Primavera P6 EPPM).
● Sample Integration SolutionThe SAP Enterprise Project Connection includes Sample Integration Solutions (SIS) to demonstrate the data integration between various third-party Enterprise Project Management systems (Microsoft Project Server and Oracle Primavera P6 EPPM) and SAP Project Systems, SAP Plant Maintenance, and SAP Portfolio and Project Management.For more information about the default data mappings and business rules for the Sample Integration Solutions, managing solutions, and other useful information, see SAP Note 2292815 .
SAP Enterprise Project Connection 3.0 Operations GuideTechnical System Landscape P U B L I C 5
3 Monitoring SAP Enterprise Project Connection
SAP Enterprise Project Connection produces log files used to maintain, tune, troubleshoot, and debug the system.
Trace and Log Files
The SAP Enterprise Project Connection log files can be viewed from the SAP NetWeaver AS Java Log Viewer. You can filter the SAP Enterprise Project Connection-specific logs with value CA-EPC in the “Category” column. For more information, see SAP Note 2294102 , or SAP NetWeaver AS Java documentation.
Debug File Dumps
SAP Enterprise Project Connection can produce XML files throughout the data transfer process that reflects the state of the data at any time during the process.
This option is turned on automatically when SAP Enterprise Project Connection is installed in Development mode and by default, the files are dumped to the log’s folder. When SAP Enterprise Project Connection is installed in Production mode, this option can be toggled off and on, and you can chose to give the logs unique names using a date/timestamp with the Debug Management function in the SAP Enterprise Project Connection Configuration Wizard.
6 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Monitoring SAP Enterprise Project Connection
4 Managing SAP Enterprise Project Connection
SAP provides you with an infrastructure to help your technical support consultants and system administrators effectively manage all SAP components and complete all tasks related to technical administration and operation.
You can find additional information about the underlying technology in the SAP Library under SAP NetWeaver AS Java.
Start and Stop
SAP Enterprise Project Connection components can be started or stopped by SAP NetWeaver Operation Management —> Systems —> Start & Stop —> Java Application; filter for *epc* in the “Name” column. The components are listed below and are found in the application list.
The restart order is as follows:
Table 2:
Component Sequence Tool
xapps~epc~datapath-ear 1 SAP NetWeaver AS Java Administrator
xapps~epc~ctc-ear 2 SAP NetWeaver AS Java Administrator
xapps~epc~ctc-content 3 SAP NetWeaver AS Java Administrator
SAP Enterprise Project Connection Configuration Wizard
The following Configuration Wizard functions enable you to test, troubleshoot, and manage SAP Enterprise Project Connection. For more information on configuration functions, see SAP Note 2297198 .
Table 3:
Function Description
RFC schema Returns the request and response of the desired BAPI.
Debug management Toggles debug file output when the installation mode is Production.
Restart application Enables SAP Enterprise Project Connection restart of the integration engine component.
SAP Enterprise Project Connection 3.0 Operations GuideManaging SAP Enterprise Project Connection P U B L I C 7
Function Description
Test destination system connection Provides Rest call URLs to test available connections.
Display active integration solution Provides home folder of currently running integration solution when the installation type is Development.
Clear database Clears logged scheduled jobs and transfer results from the database.
Upload/replace Oracle Primavera CRUD Java rules Enables upload or replacement of CRUD Java rules.
Diagnose connection with SAP ERP Diagnoses configured connections.
Upload/Replace Custom Java Library Manage the custom Java library.
Concurrent Processing Thread Count Enable and manage concurrent data integration process.
Add SMTP email Configuration Manage SMTP configuration to enable emails to be sent from workflows.
Character Set Encoding Modify character set encoding as per the character set used in your data. The default is ISO-8859-1.
Backup
You should back up your system landscape regularly to protect from loss in the event of hardware or system failure.
SAP NetWeaver AS Java is backed up as part of your landscape backup strategy. If an operating system-level backup of SAP NetWeaver AS Java is performed, the SAP Enterprise Project Connection application is included.
When backing up the SAP Enterprise Project Connection system, you need to back up the SAP Enterprise Project Connection database tables. If your installation type is Development, you need to copy the files under your development <EPC_HOME> directory to another location.
When backing up the SAP Enterprise Project Connection persistent storage (database), include the tables with prefix SEPC from SAP NetWeaver AS Java system database. Consult your database documentation for more details.
8 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Managing SAP Enterprise Project Connection
The following table lists the resources for your SAP Enterprise Project Connection backup:
Table 4:
Item Backup Data Frequency
Tables in SAP NetWeaver AS Java system database
● sepc_result● sepc_job● sepc_env● sepc_id_gen● sepc_intg_solu● sepc_obj_property● sepc_rsrc_jar● sepc_solu_history
Daily
Periodic Tasks
The results reports of SAP Enterprise Project Connection are stored in the SEPC_RESULT database table. To prevent this table from becoming too large, log into the SAP Enterprise Project Connection Configuration Wizard and click Clear Database.
Role Management
Users of SAP Enterprise Project Connection require certain authorizations. The following list illustrates user activities that need to be considered when assigning authorizations and creating roles:
● Planning and scheduling in Project System● Planning and scheduling in Plant Maintenance● Troubleshooting and monitoring results of user transfers● Scheduling job execution at a later time using a saved variant generated from SAP Enterprise Project
Connection filter screens● User wanting to view scheduled jobs
SAP Enterprise Project Connection 3.0 Operations GuideManaging SAP Enterprise Project Connection P U B L I C 9
Internal User Management
The following table provides details on SAP Enterprise Project Connection required internal users, their creation, and their usage:
Table 5:
User Name Creation Usage
EPC_ADMIN Manually by you after deploying, but before configuration.
● SAP NetWeaver AS Java system user.
● Used to log into the SAP Enterprise Project Connection Configuration Wizard.
● Roles are datapath-rest-access (created during deployment in SAP NetWeaver AS Java) and Administrator.
● Must be a member of a group called Administrators in SAP NetWeaver AS Java. You must create this group if it doesn't exist.
EPC_RESTUSER Automatically by SAP Configuration Wizard.
● SAP NetWeaver AS Java system. user
● Authenticates communication between SAP Enterprise Project Connection and third-party softwares.
● Role is datapath-rest-access, which is created during deployment in SAP NetWeaver AS Java.
EPCINTERFACE Automatically by SAP Configuration Wizard.
● SAP ERP System User.● Roles is EPCINTERFACE_ROLE,
which is created by you in the SAP ERP or SAP S/4HANA on-premise system before configuration.
● Authenticates communication between SAP ERP or SAP S/4HANA on-premise, and SAP Enterprise Project Connection.
10 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Managing SAP Enterprise Project Connection
5 Software Change Management
SAP Enterprise Project Connection has two installation types, or "modes" - Development and Production. Each mode provides you with different capabilities for building, testing, and running your integration solution. Once the installation mode has been selected in the SAP Enterprise Project Connection Configuration Wizard, it cannot be changed. You cannot switch to the other mode; you must uninstall and reinstall the application.
Ideally, you install the application on three systems; development, test, and production. As you can create and work with as many different integration solutions as needed, this approach allows you greater control in the management of your integration solutions.
You use the SAP Enterprise Project Connection Configuration Wizard to manage your integration solution(s) on the SAP NetWeaver Java AS system.
SAP Enterprise Project Connection contains internally stored sample integration configurations you can run, or use as a basis to create your own. If you upgrade the application to a new version, the internally stored Sample Integration Solution is not changed or updated to any new revision. For more information about the Sample Integration Solutions, as well as training and other useful documentation, see SAP Note 2292815 .
Development Mode
In Development mode, SAP Enterprise Project Connection exposes the Sample Integration Solutions on the local file system for you to run or customize. You can create different copies to work with, and switch between your copies. The location of the currently running integration solution is always referred to as the home path, and this is where the application looks for the integration solution. You select the solution you wish to run by using the SAP Enterprise Project Connection Configuration Wizard to change the home path.
You can determine the type of debug files you wish the application to generate as you test your integration solution.
When it is finished, you can create an archived (zipped) integration solution and import it to a production system
Exporting Integration Solutions
Use this function to export the currently running integration solution as a set of files to another location on the development system. This allows you to make copies as needed.
1. Launch the SAP Enterprise Project Connection Configuration Wizard, and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content Management.3. On the Manage Solutions page, select Export Solution.4. Click Next.5. To export the integration solution, on the Export page, enter the name of the location to where you want to
export the solution.6. Click Next.
Changing Home Path
SAP Enterprise Project Connection 3.0 Operations GuideSoftware Change Management P U B L I C 11
Use this function to switch from the currently running integration solution to another solution by changing the home path.
1. Launch the SAP Enterprise Project Connection Configuration Wizard, and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content Management.3. On the Manage Solutions page, select Change HomePath.4. Click Next.5. To change Development home, on the New Home page, enter the name the location on the file system that
contains the integration the solution you want to run.6. Click Next.
Creating Integration Solution Archive
Use this function to create an archived (zip) integration solution to import to your production system running SAP Enterprise Project Connection.
1. Launch the SAP Enterprise Project Connection Configuration Wizard and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content Management.3. On the Manage Solutions page, select Create Solution Archive.4. Click Next.5. On the Create Solution Archive page, the Solution Path field is pre-populated with the location of the currently
running integration solution.In the Zip File Path field, enter the location on the file system to which the solution archive zip will be created.
NoteYou must verify that the account used to run SAP NetWeaver AS Java has write access to this folder.
6. Click Next.
Update SAP Sample Integration Solution
Use this function to update the application's internally stored Sample Integration Solution copy to the latest release. It will not automatically run; you must first activate it. The Sample Integration Solution might between releases or patches. Thorough testing in a test environment is recommended. Refer to SAP Enterprise Project Connection Release Notes.
1. Launch the SAP Enterprise Project Connection Configuration Wizard, and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content.3. On the Manage Solutions page, select Update SAP Sample Solution (SIS) to Latest.4. Click Next.5. To update the integration solution, on the next page, click the appropriate (secure or non-secure) link.6. Click Next.
12 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Software Change Management
Production Mode
In Production mode, the integration solution - whether a sample integration solution or your customized solution - is run in-memory. You can run a Sample Integration Solution, or import an archived solution to run. You can select the solution to run by activating it.
Debug logging is turned off by default. If you wish to troubleshoot an integration solution, you can export it as a set of files, and switch on debug logging.
Importing Integration Solutions
Use this function to import an archived integration solution. When you import an integration solution, the application automatically makes an in-memory copy of it for safekeeping.
1. Copy the archived integration solution to the SAP NetWeaver AS Java Enterprise Project Connection production server file system.
NoteIf you are running an SAP NetWeaver AS Java cluster, copy the archive to main server (this is the instance running the Message Service).
2. Launch the SAP Enterprise Project Connection Configuration Wizard, and log in as SAP NetWeaver AS Java administrator.
3. On the Configuration Setup page, select Integration Solution Content Management.4. On the Manage Solutions page, select Import Solution.5. Click Next.6. On the Content page, enter the location to which you copied the archive in step 1.7. In the Label field, enter a unique name.8. Click Next.
Activating Integration Solutions
You use this function to activate an integration solution that you have imported. Activating the integration solution makes it the currently running solution.
1. Launch the SAP Enterprise Project Connection Configuration Wizard and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content Management.3. On the Manage Solutions page, select Activate Solution.4. Click Next.5. Select the desired integration solution to activate it.6. Click Next.
Exporting Integration Solutions
Use this function to export the currently running integration solution as a set of files on the file system.
1. Launch the SAP Enterprise Project Connection Configuration Wizard and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content Management.3. On the Manage Solutions page, select Export Solution.4. Click Next.
SAP Enterprise Project Connection 3.0 Operations GuideSoftware Change Management P U B L I C 13
5. On the Export page, enter the location to where you want to export the integration solution.6. Click Next.
Reactivate Production Integration Solution
Use this function to force a refresh of the currently running integration solution that was automatically stored in the application when it was imported.
1. Launch the SAP Enterprise Project Connection Configuration Wizard, and log in as SAP NetWeaver AS Java administrator.
2. On the Configuration Setup page, select Integration Solution Content.3. On the Manage Solutions page, select Reactivate Production Solution.4. Click Next.5. On the Reactivate Production Solution page, check the Reactivate Production Integration Solution checkbox.6. Click Next.
Update SAP Sample Integration Solution (SIS) To Latest
NoteThis step is recommended only for Development mode unless you are running the Sample Integration Solution in Production mode and you want to update it to the latest version. All changes made to the Sample Integration Solution are documented in that version's release notes.
SAP Enterprise Project Connection stores an internal copy of the sample integration solution. When you update the application, the sample integration solution is not automatically updated.
1. On the Configuration Setup page, select Integration Solution Content.2. On the Manage Solutions page, select Update SAP Sample Solution (SIS) to Latest.3. Click Next.4. On the next page, click the appropriate (secure or non-secure) link.
Provide the EPC_ADMIN credentials. If the update was successful, an XML message will be displayed to indicate this.
14 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Software Change Management
6 Troubleshooting
For the most up to date information regarding troubleshooting, see SAP Note 2294102 .
For landscape recommendations for integration with Oracle Primavera P6 EPPM and Microsoft Project Server, see SAP Note 2294103 .
SAP Enterprise Project Connection 3.0 Operations GuideTroubleshooting P U B L I C 15
7 Support Desk Management
If you want to submit issues or messages regarding SAP Enterprise Project Connection support, use CA-EPC (general messages) in the SAP Service Marketplace.
16 P U B L I CSAP Enterprise Project Connection 3.0 Operations Guide
Support Desk Management
Important Disclaimers and Legal Information
Coding SamplesAny software coding and/or code lines / strings ("Code") included in this documentation are only examples and are not intended to be used in a productive system environment. The Code is only intended to better explain and visualize the syntax and phrasing rules of certain coding. SAP does not warrant the correctness and completeness of the Code given herein, and SAP shall not be liable for errors or damages caused by the usage of the Code, unless damages were caused by SAP intentionally or by SAP's gross negligence.
AccessibilityThe information contained in the SAP documentation represents SAP's current view of accessibility criteria as of the date of publication; it is in no way intended to be a binding guideline on how to ensure accessibility of software products. SAP in particular disclaims any liability in relation to this document. This disclaimer, however, does not apply in cases of willful misconduct or gross negligence of SAP. Furthermore, this document does not result in any direct or indirect contractual obligations of SAP.
Gender-Neutral LanguageAs far as possible, SAP documentation is gender neutral. Depending on the context, the reader is addressed directly with "you", or a gender-neutral noun (such as "sales person" or "working days") is used. If when referring to members of both sexes, however, the third-person singular cannot be avoided or a gender-neutral noun does not exist, SAP reserves the right to use the masculine form of the noun and pronoun. This is to ensure that the documentation remains comprehensible.
Internet HyperlinksThe SAP documentation may contain hyperlinks to the Internet. These hyperlinks are intended to serve as a hint about where to find related information. SAP does not warrant the availability and correctness of this related information or the ability of this information to serve a particular purpose. SAP shall not be liable for any damages caused by the use of related information unless damages have been caused by SAP's gross negligence or willful misconduct. All links are categorized for transparency (see: http://help.sap.com/disclaimer).
SAP Enterprise Project Connection 3.0 Operations GuideImportant Disclaimers and Legal Information P U B L I C 17
go.sap.com/registration/contact.html
© 2017 SAP SE or an SAP affiliate company. All rights reserved.No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. The information contained herein may be changed without prior notice.Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary.These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies.Please see http://www.sap.com/corporate-en/legal/copyright/index.epx for additional trademark information and notices.