sap s/4hana asset management learning journey and roadmap
TRANSCRIPT
PUBLIC
Rachel Romanoski,
Solution Manager – Digital Assets
April, 2021
SAP S/4HANA – Asset ManagementLearning Journey and Roadmap
2PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of
SAP. Except for your obligation to protect confidential information, this presentation is not subject to your license agreement or
any other service or subscription agreement with SAP. SAP has no obligation to pursue any course of business outlined in this
presentation or any related document, or to develop or release any functionality mentioned therein.
This presentation, or any related document and SAP's strategy and possible future developments, products and or platforms
directions and functionality are all subject to change and may be changed by SAP at any time for any reason without notice.
The information in this presentation is not a commitment, promise or legal obligation to deliver any material, code or
functionality. This presentation is provided without a warranty of any kind, either express or implied, including but not limited to,
the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. This presentation is for
informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in
this presentation, except if such damages were caused by SAP’s intentional or gross negligence.
All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially
from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only
as of their dates, and they should not be relied upon in making purchasing decisions.
Disclaimer
3PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP Solution Overview for Maintenance Operations
What’s New with SAP S/4HANA Asset Management Best Practices
Focus Topics for 2021 and Beyond
Demo for Reactive Maintenance
RISE with SAP What is it and How to Get Started
Q & A
Ag
en
da
Solution Overview
5PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Functional Locations
and Equipment
Specifications,
Drawings, and Work
Permits
Maintenance
Plans
Sensor Data &
Predictive
Insights
Failure Modes
Maintenance Order
Task List &
OperationsSpatial Asset
Management
Spare Parts
Measurement
Readings &
Inspections
Connect with new
collaborative networks
Connect assets with Industry
4.0 for real-time insights
Connect strategy, planning and
execution processes
Connect operations across the
supply chain and enterprise
Intelligent Asset and Service Management Suite
6PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Maintenance & Service Operations Planning & Orchestration
Maintain Asset master data for operations including;
maintenance plans, task lists, equipment characteristics,
and spatial data
Screen demand and evaluate work priority or task
deferrals with risk-based assessments.
Orchestrate order readiness optimized coordination
between procurement and other logistic support teams
Build work package to plan activities in detail, including
time, material, tools, safety permits and documentation
Leverage planning buckets defined by scope to
effectively manage maintenance and service backlog
Solutions in Scope:
SAP S/4HANA Asset Management
7PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Maintenance & Service OperationsScheduling & Dispatching
Optimize work and resource schedules using
advanced rules, automatic routing and scheduling
Dispatch in real time to optimally match work to
technician availability and skills
Intelligently source and manage third party resources
through Crowd Sourcing and Partner Collaboration
Schedule Maintenance and Service, identify capacity
bottlenecks and level work center utilization
Monitor schedule compliance metrics of planned vs
actual work completed
Solutions in Scope:
SAP S/4HANA Asset Management for
Resource Scheduling
SAP Field Service Management
8PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Maintenance & Service OperationsExecution & Reporting
Identify poor performing assets to continuously
improve maintenance strategies
Capture and track work history, failure modes, labor
time and materials consumed.
Embedded real-time costing and analytics monitor
compliance to maintenance budget
Manage and process all work types including work
request and orders, inspection rounds and checklists
Solutions in Scope:
SAP S/4HANA Asset Management
SAP Asset Manager*
9PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Maintenance & Service OperationsEnvironmental, Health & Safety
Enable an end-to-end process for identifying and
dealing with all manner of hazards and risks
Provide a centralized solution to track all types of
incidents, investigation and corrective actions
Central repository for all compliance requirements
from enterprise down to specific equipment
Provide an end to end process to create execute and
monitor change effectively within an organization
Full electronic support for controlling hazardous
work using permits and isolation procedures
Solutions in Scope:
SAP Work Clearance Management
SAP Incident Management
SAP EHS for Asset Management
10PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Maintenance & Service OperationsSpatial Asset Management*
Seamlessly integrate with GIS and business spatial data
providing end-to-end spatial workflows
Create and Manage geometry: points, lines,
polygons for maintenance business objects
Dynamic segmentation with multiple sets of attributes
associated with any portion of an existing linear feature
independently of where it begins or ends
Use a linear referencing method as a mean to describe
and locate a position along the length of the linear asset.
*New Solution Bundle with Linear Asset Management and Geo-Enablement Framework for EAM Available starting Q3 2021
Solutions in Scope:
SAP Geo-Enablement Framework for
Asset Management
SAP Linear Asset Management
Move from Alphanumeric to Spatial and improves
efficiency by driving business transactions from a Map
from desktop or mobile device
Maintenance Management
Best Practices
12PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
End-to-end Maintenance Management Processes with SAP S/4HANA
Planning &
Orchestration
Execute &
CloseIdentify Schedule &
Dispatch
How is Maintenance Work generated?
• Maintenance Process Phases
• Screen Maintenance Requests and Backlog
• Risk-based Event Prioritization
• Group work based on scope or time
• Approval and Preparation
• Manage work center utilization
• Maintain flexible schedule periods
• Monitor non-working times
• Must-Start On constraints and last acceptable completion
• Share and Collaborate on Schedules
• Monitor Schedule Attainment
• Process all work types
• Leverage Work Instructions
• Capture work history, failure modes, labor time and materials consumed
• Work Permits
• Mobile enabled processes for offline execution
Analyze• Analyze MTTR and MTBF
• Identify Bad Actors and common failures
• Monitor costs – baseline, planed, and actual across work
How do you prioritize and prepare work packages and monitor order readiness?
How do you manage capacity, utilization and optimize resources?
How do we perform work quickly, correctly, and safely?
How can we continuously improve maintenance strategies, costs, and equipment uptime?
• Reactive Maintenance – Work requests
• Proactive Maintenance
• Improvement Maintenance
• Operational and Overhead Maintenance
• Condition Monitoring
• IoT/Predictive Monotiling
13PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
What’s New! – Discover SAP Best Practice Explorer
New!
New!
New!
New!
S/4HANA Cloud Asset Management New Scope Items (Available Since 2011)
• 4HH - Reactive Maintenance
• 4HI – Proactive Maintenance
• 4VT – Improvement Maintenance
• 4WM – Operational and Overhead Maintenance
• 43R – Maintenance Resource Scheduling (License Scope Item)*
• 3YE – Asset Central Integration (License Scope Item) *
New Phase Model Approach! (Available Since 2011)
• New best practice ‘process phases’ to track the life cycle of the
maintenance processes as an alternative to ‘System and User statuses’
used previously
• Available with new Scope Items only for both maintenance requests and
maintenance orders
• Phase and Sub-phases uses for selection criteria to permit or prohibit
transactions.
• Manual or Automatic
• Phase Control code allows to control transition of phases – similar to user
status
• Check out this blog post for more details!
14PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Focus Topics 2011 CE and beyond
Maintenance Management*
▪ Simplified configuration of business processes (2011)
▪ Reactive Maintenance Work , Proactive Maintenance Work ,
Improvement Order (tight integration with EPPM) (2011)
▪ Operational Maintenance Work (minor work, operator work)
Overhead Work in Maintenance (2011)
▪ New standard user roles – “Supervisor”(2011)
▪ Support of industry standards (e.g. ISO 14224) (2011)
▪ Intelligent Scenario for Damage Code Prediction (2102)
▪ Phase Control Codes (2102)
▪ Damage Code Machine Learning (2105)
▪ Perform Maintenance Jobs (2105)
Additional key capabilities:
▪ Master data management (Floc/Equi, BOMs, TLs,…)
▪ Resource Scheduling (RSH)
▪ Document Mgmt., Cost Approval, APIs, Analytics etc.
Asset Intelligence Network, Asset Strategy & Performance Management, Predictive Maintenance & Service complete the offering as Intelligent Asset Management Suite
15PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Best Practice Process – Reactive Maintenance
Today: Process control via system status of several business objects
New: “Best Practices” E2E-Prozess via process phases and new concept for user statuses
▪ Available in Notification, Order and Maintenance Plan
▪ Allowed configurations for process variants and process control
EROF FREI TABG ABGS
INITInitiation
SCRNScreening
PLANPlanning
PREPPreparation
APPRApproval
SCEDScheduling
EXECExecution
CLOSClosure
POSTPost-Execution
Simplified Status Management to guide users along the process
▪ ✓ In Clarification Status: Confirmed by <User>
▪ 🛇 Change Management triggered Status: In Process by <User>
▪ ⏳ Permit for Crane Status: Requested
▪ …
……
16PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Work Request Screening
Work Activity Planning
Work ApprovalWork
PreparationScheduling & Dispatching
Work ExecutionPost Work Execution
Closure
Work Request(proactive) optional
Confirmation
E2E Process
Business
Objects
Optional – as additional “gate-keeping” step for selected preventive activities!
▪ Screen incoming work request
▪ Clarify/enrich details on reported event
▪ Prioritize event and approve (for work) or reject
Optional – create work order in phase “Activity Planning”
▪ Validate and adjust (if needed) scope of preventive work
▪ Submit for approval
Optional –approve work in e.g. adjusted scope
▪ Do cost approval for planned work scope
▪ Do order release (e.g. PR/PO creation) with submit for work preparation
▪ Prepare work (material, tools, etc.)
▪ Monitor order readiness by availability of materials and external services
▪ Submit order / operations for scheduling
▪ Arrange and optimize sequence of operations in a given time window (aligned with production)
▪ Assign resources to operations
▪ Submit for work execution
▪ Execute work (pre- and main-work activities)
▪ Capture time progress and/or time and material consumption
▪ Confirm main work is done with handover to production;
▪ Move-on to post-work activities
▪ Execute post-work activities
▪ Capture time progress and/or time and material consumption
▪ Capture malfunction data (optional)
▪ Submit for closure
▪ Receive and process incoming documents (invoices)
▪ Settle order and business close
optionaloptionalWork Order(proactive)
Maintenance Plan (S/4HANA Cloud)
Best Practice Process - Proactive Maintenance
17PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Work Activity Planning
Work ApprovalWork
PreparationScheduling & Dispatching
Work ExecutionPost Work Execution
Closure
Confirmation
E2E Process
Business
Objects
▪ Prepare work (material, tools, etc.)
▪ Monitor order readiness by availability of materials and external services
▪ Submit order / operations for scheduling
▪ Arrange and optimize sequence of operations in a given time window (aligned with production)
▪ Assign resources to operations
▪ Submit for work execution
▪ Execute work (pre- and main-work activities)
▪ Capture time progress and/or time and material consumption
▪ Confirm main work is done with handover to production
▪ Move-on to post-work activities
▪ Execute post-work activities
▪ Capture time progress and/or time and material consumption
▪ Capture malfunction data (optional)
▪ Submit for closure
▪ Receive and process incoming documents (invoices)
▪ Settle order and business close
Project Definition (S/4HANA Cloud)
Work Order(Improvement)
▪ Create work order and plan work activities in detail (internal/external), time, material, tools, relationships etc.) with reference to a project (align time, cost, etc.)
▪ Re-use task list, existing work orders etc.)
▪ Submit for approval
▪ Do cost approval for planned work scope
▪ Do order release (e.g. PR/PO creation) with submit for work preparation
Best Practice Process - Improvement Work Process
18PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Work Request Initiation
Work Request Screening
Work Activity Planning
Work ApprovalWork
PreparationScheduling & Dispatching
Work ExecutionPost Work Execution
Closure
Work Order
(“Operational”)
Confirmation
Business
Objects
▪ Time confirmation has to be simplified (depending on the level of work/ complexity)
▪ E.g.:
▪ Material/ Services is also planned in this order type
▪ Linkage of order/ops across orders needed
▪ Settlement is the same compared to reactive – cost elements are different (allocation structure –follow-up needed with CO)
Process
▪ No screening needed
▪ No Work Request” or other notification needed for this process
Specifics to Process
(Delta/Difference to Re-active)
Examples:
Work executed by operation teams, maintenance on behalf of ops
(support/assistance from maintenance people), cleaning/prep
equipment for maintenance, operator’s round
XX
▪ Full functional work order needed along the phases as due to different depth of work respective planning, approval etc. might be needed. In most cases and along the phases, an expediting might be needed.
Best Practice Process -“Operational and Overhead Work”
in Maintenance Management
Demo – Reactive Maintenance
20PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Fiori App to Create Maintenance Requests*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
SAP Demo
Technician
21PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Fiori App for Maintenance Request screening*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
Maintenance Supervisor
22PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
New Risk-based Event Prioritization-Matrix*
Likelihood
Co
ns
eq
uen
ze
s
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
Valuation of risk of an event
based on▪ Possible consequences
▪ Likelihood of occurrence
Automatic derivation of order
priority based on the risk
Flexible customer specific
configuration of the Matrix
Maintenance Supervisor
23PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Fiori Apps to Manage the Maintenance Backlog*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
Maintenance work can be organized via
Planning Buckets, by
▪ Defining “maintenance windows”
▪ Creation of single or repetitive Planning Buckets
▪ Flexible definition of Planning Buckets according
– Plant
– Planner Group
– Work Centre
– Technical Objects
Maintenance Supervisor
24PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA Asset Management for Resource Scheduling
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
▪ Identify capacity bottlenecks of maintenance work
centers.
▪ Consider Operations, sub-operations and
maintenance plans
▪ Get insight with graphical and list views and
operations on timelines.
▪ Take action and schedule and dispatch work.
▪ Level the work and reschedule and reassign set of
operations.
▪ Create and refine schedules.
Maintenance Scheduler
25PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
New Fiori App - Perform Maintenance Jobs for Technician*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
New ‘Perform Maintenance Jobs’
application for Technician to
▪ The Assigned to Me allows technician to pick an
assigned operations which are already assigned.
▪ The Latest Scheduled Finish suggests that the
job should be finished by the time.
▪ The Subphase defines the current state of the
job. There are 3 default subphases considered:
▫ Ready for Execution
▫ Work in Execution
▫ Work Paused
Technician
26PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
New Fiori App - Perform Maintenance Jobs for Technician*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
Perform Maintenance Jobs:
▪ Easy visualization can help technician
to see the amount of work done,
remaining work
▪ Enter time confirmations, spare parts for
performed work
▪ Malfunction Data can be seen and
recorded like Effects, Breakdown
information, duration, detection method
etc.
Technician
27PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Fiori App to Analyze Costs*
INIT
Initiation
SCRN
ScreeningPLAN
Planning
PREP
PreparationAPPR
Approval
SCED
Scheduling
EXEC
Execution
CLOS
Closure
POST
Post-
Execution
Embedded real-time cost
analytics, including
▪ Estimated Costs
▪ Planned Costs
▪ Baseline Costs
▪ Actual Costs
*This is the current state of planning and may be changed by SAP at any time without notice
Technician
Roadmap
29PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
S/4HANA Maintenance Management
Enable risk and criticality assessment during the maintenance planning
• Evaluate the risk associated with the deferral of a maintenance task to a future time
and resolve or reduce risk by evaluating various mitigation strategies
• Prioritize maintenance tasks based on the evaluated risk and effectively manage the
maintenance workload
Standardized and optimized management of the maintenance backlog for
recurring maintenance periods
• Define recurring maintenance periods (such as maintenance windows) with time and
scope
• Gain visibility into coverage of the spare parts needed to execute the maintenance
work expected during the period
Flexible workflow for maintenance orders
• Increase flexibility through the ability to configure multiple approval levels and
preconditions for each approval level
Improved activity management at engineer and task level
• Improved administration for supervisors, i.e., Drag and drop planning board and
mobile administration
What’s New Our Vision and Roadmap
Closed Loop integration through SAP S/4HANA and Asset Performance
Management Suite
Ability to leverage machine learning (ML) algorithms to proactively
manage your maintenance activities
• Interpret the long text in work notifications and suggest failure codes
• Interpret the long text in work notifications and display lists of work notifications and
work orders that resolved a similar problem
Enable external collaboration with service providers and subcontractors
• For assets requiring extremely high technical knowledge for effective maintenance,
help for maintenance planners in collaborating with external subcontractors
Identification of cost “bad actors” in planned and unplanned maintenance
• Know when to replace poorly performing assets by projecting the long-term impact of
the cost of maintaining them and improve budget compliance without jeopardizing
asset reliability or availability
Integrated Scheduling and Dispatching with SAP Field Service
Management
• Combine workflows for both mid term scheduling and short term, sub day
dispatching with route optimization and re-scheduling
Maintenance planning helps reduce unplanned work but can create a rigid cyclic operation that is not matched to real maintenance needs. Dynamic maintenance
planning, based on latest intelligence allows forward planning to prioritize work over time, plan projects and coordinate needed resources
What’s new in SAP S/4HANASAP S/4HANA Roadmap
30PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Learn More!
➢ SAP.com
➢ Interactive Roadmap for Asset Management
➢ S/4HANA Best Practice Explorer
➢ S/4HANA Asset Management Link Collection
➢ Asset Management in SAP S/4HANA Cloud 2102
➢ Asset Management in SAP S/4HANA Cloud 2011
➢ New Phase Models for Maintenance processes in S/4HANA Cloud
RISE with SAP
32PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
ONE Offer
ONE Contract
Unmatched TCO
Comprehensive, intelligent,
customer-specific offering
Optional components
Additional services
Analyze how processes perform, get tailored recommendations, and benchmark against industry standards.
Tools and services from SAP to support your whole journey
that can be augmented by SAP’s strong ecosystem
Complement, extend and integrate with SAP, partner, or third-party solutions using the same data model and business services as SAP applications.
Digitize collaboration with all of your trading partners.
Offering components
SAP Business Process Intelligence
Discovery Reports
Custom Code Analyzer, Readiness
Check, Learning Hub
SAP S/4HANA Cloud
SAP Business Technology Platform
CPEA Credits
SAP Business Network,
Starter Package
On Infrastructure Provider of Choice*
Build YOUR Intelligent Enterprise
33PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
RISE with SAP: What’s really included?
S A P S / 4 H A N A C L O U DD e p l o y m e n t o f c h o i c e
S/4HANA Public Cloud
Or
S/4HANA Private Cloud
T O O L S & S E R V I C E SS A P B U S I N E S S
P R O C E S S I N T E L L I G E N C ED i s c o v e r y R e p o r t s
S A P B U S I N E S S T E C H N O L O G Y P L A T F O R M
P l a t f o r m S e r v i c e s
S A P B U S I N E S S N E T W O R KS t a r t e r P a c k *
Cloud Platform Enterprise Agreement Credits
(CPEA)
• For Public Cloud:
min 2k annual credit value, max cap 16K,
computed as 1% of annual net public cloud value
• For Private Cloud:
min 4k annual credit value, max cap 16K,
computed as 1% of annual net private cloud value
Embedded Services & Tools:
• Readiness Check
• Custom Code Migration App
• Learning Hub – Auto Attached as of RD02
• Identify and implement business process
improvements through process analysis
• Process Discovery opportunities through
Free Online One Time Report
• Receive tailored Recommendation
Ariba Network:
• Included: 2,000 documents, 1 ERP
Asset Intelligence Network:
• Included: 200 equipment units,
2 connections, and 10 partner portal invitees
Logistics Business Network:
• Included: 1000 documents and either (a) 1
Logistics Service Provider and one digital
forwarder or (b) 2 Logistics Service Providers
*SAP BTP and Network Starter Pack Accelerator packages are delivered provided customers do not already have the same already licensed
34PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Our strategic choice for companies ready to embrace the
future of ERP with a new implementation and
pre-defined processes
SAP S/4HANA Public Cloud SAP S/4HANA Private Cloud SAP S/4HANA On-Premise
Complete, modern, SaaS ERP Cloud value, traditional flexibility & full scope Total control and individualization
As a ProductAs a Service
ONE Data Model • ONE Semantic • ONE User Experience
Designed to provide innovation and
cloud value while allowing customers
to retain their investments by
converting their existing system(s)
Innovative, intelligent ERP for
customers that require maximum
control of their ERP system,
usually in their own data centers
or with existing IaaS partnerships
SAP S/4HANA: The right fit for every organization
35PUBLIC© 2021 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA, Private Cloud Edition:
Traditional flexibility & scope + cloud value
SAP S/4HANA Private Cloud
Designed to provide innovation and
cloud value while allowing customers
to retain their investments by converting
their existing systems
• Full S/4HANA scope including LOB
and industry processes, supporting
25 industries
• Code enhancements & code
modifications supported
• Expert configuration via full
IMG access
• Operating Expense via subscription-
based commercial model
• Hyperscaler infrastructure to scale
up or down quickly
Cloud Value Innovation Simplicity
One SLA, One hand to shake
Rapid conversion of your existing
ERP/ECC environments to a modern,
cloud-based architecture
Prior ECC and partner solution
investments safeguarded
CapEX to OpEx with
a subscription-based commercial
model
Transformation to a pure SaaS-
based landscape at your pace
Partner add-ons allowed to enhance
competitive differentiation
Contact information:
Rachel Romanoski
SAP Solution Manager – Assets, Maintenance & Service
Houston, TX
Thank you.