sarah hartman rop - gibson tech team

19
Sarah Hartman Fossil Hydro Operations Engineering Co-op Program December 2015

Upload: sarah-hartman

Post on 23-Feb-2017

140 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sarah Hartman ROP - Gibson Tech Team

Sarah HartmanFossil Hydro OperationsEngineering Co-op ProgramDecember 2015

Page 2: Sarah Hartman ROP - Gibson Tech Team

About Me■ University of Cincinnati

– Chemical Engineering

– Expected Graduation, May 2017

■ 4th Session with Duke Energy

Gibson Technical Team– Manager, Clint Fuhs

– Mentors, Sarah Hamman and

Josh Estep

2

Page 3: Sarah Hartman ROP - Gibson Tech Team

Previous Co-ops■ 1st and 2nd Sessions – Air Emissions Management

– Midwest Emissions Compliance Monthly Call Report

■ 3rd Session – Water / Waste– EPA Regulations and Permits

3

Page 4: Sarah Hartman ROP - Gibson Tech Team

Co-op Development Opportunities

■ United Way Day of Caring Helped paint parking spots and buildings, along with Jana Jochim (pictured) and Mike Hobson.

■ Attended:― Reverse Osmosis Seminar― Confined Space Training,

Entrant and Air Monitor― Enable training, New item

request/change

4

Page 5: Sarah Hartman ROP - Gibson Tech Team

Overview & Rotation Responsibilities■ Presentation Overview:

– Ammonia Vapor Equalization Header

– Equipment Inspections

■ Rotation Responsibilities:– Participating in Daily Pre-Job Briefs

– Ordering Materials for the Header Project

– Creating Purge & Repair Plans

5

Page 6: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Equalization Header Project

■ Business Case: The current tank equalization header has a drop leg in the lines, where liquid can get trapped and build up pressure. The replacement line has the header spanning overtop the tanks, which will provide better equalization and safer operation.

■ Project Scope: Participating in daily pre-job briefs, ordering materials, and creating Purge & Repair plans.

■ Lessons Learned: Being Flexible

Communication

Decision Making Process

LOTO Requirements

Enterprise Asset Management (EAM) system

6

Page 7: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Equalization Header Project

7

PSM – Process Safety Management. An OSHA program designed to promote safe use and storage of Highly Hazardous Chemicals.

Current Design New Design

Page 8: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Eq. Header ProjectDaily Pre-Job Briefs

■ For each pre-job I would introduce a daily PSM / safety topic, as well as any new information on the project.

8

Example of information for morning meetings

Page 9: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Eq. Header ProjectPurge and Repair Plans

■ Header is to be implemented in 3 Stages, – Stage 1 – Spade Flange (pancake) on each tank where header attaches.

– Stage 2 – Put a high-point vent on 2A and 2B Tank Truck unloading lines.

– Stage 3 – Tie Header into system.

9

Page 10: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Eq. Header ProjectPurge and Repair Plans

■ Driving Safety through Procedures:

10

Page 11: Sarah Hartman ROP - Gibson Tech Team

Driving Safety through Procedures

Page 12: Sarah Hartman ROP - Gibson Tech Team

Stage 1 P&IDs

Page 13: Sarah Hartman ROP - Gibson Tech Team

Stage 1 Pancakes

Before After

Pancake Handle

Page 14: Sarah Hartman ROP - Gibson Tech Team

Stage 2 P&IDs

Page 15: Sarah Hartman ROP - Gibson Tech Team

Stage 3 P&IDs

Page 16: Sarah Hartman ROP - Gibson Tech Team

Ammonia Vapor Eq. Header ProjectChallenges

■ Coordinating Materials ■ Constantly evolving Plans

16

Page 17: Sarah Hartman ROP - Gibson Tech Team

Equipment Inspections

17

■ SCR Absorber■ FGD Surge Tank■ Boiler Penthouse■ Condenser & Water Box – Mapped Tube Plugs■ DC Heater, Induct Heat Exchanger (Not Inspections)

Surge Tank Boiler Penthouse

Page 18: Sarah Hartman ROP - Gibson Tech Team

Looking Ahead

Next Work Rotation■ My next work rotation will by my 5th and final co-op before

graduation.■ I will be working at the Cincinnati Office with Ashley Norton in the

Water Cycle Chemistry Group.

18

Page 19: Sarah Hartman ROP - Gibson Tech Team

Questions?

19