SGC-120 Schedule
M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S M T W T F S
Actual Assembly Period
Transport SGC
Assembly SGC 120
XRTL
Load test
Certification
Machine deck equipment
Assembly Mast RH - LH
Installation Mast RH - LH - Bracings
Counterweight- Filling soils
Installation Mast Top Sheave Beam
Assembly Main Boom + Pendants
Connect Mainboom
Connect BH 1 / 2
Boom Up
Assembly hook
Reeving
Machine deck
Inspection Ground preparation
Unload Containers/counterweight
Crane mats
Load spreading ring
Measure ring by surveyor
Supports + CS250
Crane Frame
Wheel Assemblies
Jacking & Driving
Transport to site
Planning Assembly SGC 120 130MB
Activities
Week 1 Week 2 week 3 week 4 week 5 week 6 week 7 week 8
Arrival at Port
Unload Ship
Costums