Engineering Standard
SAES-I-002 21 May 2012
ESP System – Supplier Integration
Document Responsibility: Electric Submersible Pump Standards Committee
Saudi Aramco DeskTop Standards
Table of Contents
1 Scope............................................................ 2
2 Conflicts and Deviations................................ 2
3 References.................................................... 2
4 Definitions...................................................... 3
5 General.......................................................... 4
6 System Design.............................................. 4
7 Controllers................................................... 10
8 Transformers............................................... 10
9 Building........................................................ 11
10 Downhole Equipment.................................. 12
11 Shipping....................................................... 26
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 2 of 26
1 Scope
1.1 This standard is intended to be used by the ESP system supplier (ESPSS) and
presents the mandatory requirements for the design, application and integration
of the complete ESP package.
1.2 It is acceptable that this document be included with purchase orders.
2 Conflicts and Deviations
2.1 If there are any conflicts between this standard and associated purchasing,
project or engineering documents, this specification shall take precedence.
2.2 Direct all requests to deviate from this standard in writing to the Company or
Buyer Representative, who shall follow internal company waiver procedure.
2.3 The designation “Commentary” is used to label a sub-paragraph that contains
comments that are explanatory or advisory. These comments are not mandatory,
except to the extent that they explain mandatory requirements contained in this
standard.
3 References
The following is a summary of all the documents which have been mentioned within
this standard. Full compliance to these documents is not necessarily required.
Whether the entire document or specific part(s) of these documents are applicable, have
been identified throughout this standard.
3.1 Saudi Aramco References
Saudi Aramco Materials System Specifications
55-SAMSS-001 ESP Controller Skid – Outdoors
55-SAMSS-002 ESP Controllers
55-SAMSS-003 ESP Transformers – Outdoors
55-SAMSS-004 Modular Building for ESP Equipment
3.2 Industry Codes and Standards
International Code Council (ICC)
ICC IBC International Building Code
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 3 of 26
American Petroleum Institute (API)
API RP 11S8 Recommended Practice on Electric Submersible
Pump Vibrations
Institute of Electrical and Electronic Engineers (IEEE)
IEEE 519 IEEE Recommended Practices and Requirements
for Harmonic Control in Electrical Power
Systems
4 Definitions
AFD: Adjustable Frequency Drive
Approval: Written approval from the Chairman of the Saudi Aramco Electric
Submersible Pump Committee
BEP: Best Efficiency Point
Controller: Either AFD, FVC or RVC
Severely Corrosive Environment: Offshore, or onshore within 5 kM of coastline
Mildly Corrosive Enviroment: Anywhere beyond the 5 km of the coastline.
Crude Oil Service: Direct crude oil production or producing water in support of crude
oil production.
ESD: Emergency Shutdown System
ESP: Electric Submersible Pump.
ESPSS: ESP System Supplier. The contractor responsible to supply the material,
service and installation required to meet the performance requirements defined within
the purchasing documents.
FVC: Full Voltage Controller
High Voltage: Voltages greater than 1 kV.
Indoors: Inside building designed per 55-SAMSS-004
Loop Distribution: Characterized by equipment having two incoming power
connections and multiple outgoing power feeds, but only one source of power.
The incoming connection that is not the power source is used to route the power to
another loop distribution device.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 4 of 26
Low Voltage: Less than 1000 V.
Offshore: Overwater or onshore within 5 kM of the coastline
Onshore: On-land
RTU: Remote Terminal Unit
RVC: Reduced Voltage Controller
SD Transformer: Step-down transformer. Transformer used to match the voltage input
of the electrical service to the voltage and phasing requirements of the ESP controller.
This transformer can be dedicated to an individual ESP or can serve multiple ESPs.
SU Transformer: Step-up transformer. Transformer used to match the voltage output
of the ESP controller to the voltage rating of the ESP motor.
Standard: The main body of this document. Does not include the information
contained within the Appendices.
Stainless steel: Either 316 series or 317 series stainless steel material.
5 General
5.1 Terms in bold font are defined within Section 4.
5.2 Whenever this standard requires compliance to a third party document
(e.g., ANSI, API, IEC, etc.), this document shall be the edition which was in
effect on the date of the Quotation Request.
5.3 This standard shall take precedence over any referenced third party document.
5.4 All documentation shall be in English.
5.5 All temperatures are in Celsius units (unless specified otherwise).
5.6 Oil-filled equipment (e.g., transformers, switches) shall not be installed indoors.
6 System Design
6.1 General
6.1.1 Surface equipment system shall be specified as suitable for either a
severely corrosive or mildly-corrosive environment.
6.1.2 If specified by Saudi Aramco that a loop distribution configuration will
be used to feed the SD transformers, these transformers shall be
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 5 of 26
specified with integral loop-feed switches.
6.1.3 SD transformers that are feeding multiple ESPs shall be specified with
a distribution panel.
6.1.4 Design and packaging of surface electrical equipment shall assume that
the equipment may be ‘mothballed’ for up to one year before use.
6.1.5 Each ESP shall have a separate controller, SD transformer and SU
transformer (if applicable). This equipment shall be contained on an
individual skid constructed per 55-SAMSS-001.
Exception 6.1.5:
Where multiple wells are fed from one drill site or platform, the SD transformer may be installed separately, to reduce footprint and weight requirements.
6.1.6 Individual skids are not required if the ESP equipment is installed
indoors.
6.1.7 Wellhead junction boxes that are not mounted on the controller skid
shall have the following characteristics:
6.1.7.1 Be equipped with either:
6.1.7.1.1 A breather and drain mechanism.
6.1.7.1.2 For sheet metal enclosures, the above or a 5 mm
hole drilled in the bottom of the enclosure.
6.1.7.2 Be certified and labeled by a third-party certification
organization as meeting the below NEMA or IP criteria.
6.1.7.3 If installed in a severely corrosive environment:
6.1.7.3.1 Be NEMA 250 Type 4X or IP6X per IEC 60529
with ‘X’ being a numeral between ‘4’ and ‘8’.
6.1.7.3.2 Box material and external hardware such as
fasteners (bolts, screws), hinges and locking devices
shall be stainless steel.
6.1.7.4 If installed in a mildly corrosive environment:
6.1.7.4.1 Be NEMA 250 Type 4 or IP6X per IEC 60529 with
‘X’ being a numeral between ‘4’ and ‘8’.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 6 of 26
6.1.7.4.2 Box material shall be Manufacturer’s standard and
external hardware such as fasteners (bolts, screws),
hinges and locking devices shall be of similar metal
to the enclosure to avoid galvanic corrosion.
6.1.8 For offshore locations a deck drawing has been provided with the
purchasing documents. The surface equipment shall be arranged based
upon the criteria and the layout submitted with the quotation.
6.1.9 Horizontal spacing from the edge of the platform or support column to
the outside edge/wall of the controller skid, transformer or controller
building shall be a minimum of 1 meter.
6.1.10 The wellhead junction box that interfaces the controller to the wellhead
shall be sized to accommodate the termination of 5 kV rated armored
cable and stress cones type terminations.
6.2 Service Conditions
6.2.1 ESP system shall operate under the following electrical conditions:
6.2.1.1 Continuous at rated capacity:
6.2.1.1.1 Input voltage level: - 5% or + 10%
6.2.1.1.2 Input frequency: ± 2%
6.2.1.1.3 Phase Unbalance: ± 2%
6.2.1.2 Continuous but at reduced output power/torque:
Input voltage level: -5% to – 10%
6.2.1.3 For up to 200 ms, at reduced power/torque:
Input voltage level: - 10% to – 55%
6.2.2 ESP system shall operate under the following environmental conditions:
6.2.2.1 Ambient Air Temperature
6.2.2.1.1 Minimum: 0 degrees.
6.2.2.1.2 Maximum:
6.2.2.1.2.1 Outdoor: Onshore; 55 degrees,
Offshore; 55 degrees
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 7 of 26
6.2.2.1.2.2 Indoor: 40 degrees
6.2.2.1.3 Average, over one month:
6.2.2.1.3.1 Outdoor: Onshore; 40 degrees,
Offshore; 35 degrees.
6.2.2.1.3.2 Indoor: 35 degrees
6.2.2.2 Manufacturer shall consider internal temperature rise of his
equipment and confirm that it will operate under all load
conditions in the environments indicated in Paragraph 6.2.2.1.
The temperature of metal surfaces exposed to direct solar
radiation can reach 75°C. The interiors of unventilated metal
cabinets (exclusive of internal heat-producing sources) can reach
56°C. The transformer and its accessories, including cabinets and
junction boxes, shall be designed accordingly. Sun shields shall
not be fitted, unless specified
6.2.2.3 Relative Humidity (Condensing)
6.2.2.3.1 24 hour average: 95%.
6.2.2.3.2 1 month average: 90%.
6.2.2.3.3 Maximum (outdoor): 100%
6.2.2.4 Earthquakes: None. Site Class D per IBC or ASCE 7
6.2.2.5 Electrical Area Classification: Unclassified
6.2.2.6 Sand and dust storms, fog, airborne contaminants (outdoor):
6.2.2.6.1 NaCl to 300 ppm. MgCl to 50 ppm.
6.2.2.6.2 Dust concentrations of 1 mg/m³. 95% of dust
particles are less than 20 micrometers in diameter.
50% of dust particles are less than 1.5 micrometers
in diameter. Compound in dust include sodium,
magnesium, silicon and aluminum.
6.2.2.6.3 Pollutants (worst case): H2S-5ppm, SO2-10 ppm,
CO-100 ppm, NOx-5 ppm and hydrocarbons-
150ppm.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 8 of 26
6.2.2.6.4 For offshore installations, accumulation of wetted
salt (NaCl) and windborne seawater salt spray.
6.2.2.7 Wind – maximum (outdoors):
6.2.2.7.1 Two second gust: 32.6 m/sec (73 mph)
6.2.2.7.2 One minute withstand: 28.3 m/sec (63 mph).
6.2.2.8 Rain: Minimal. Occasional heavy rainstorms (outdoors).
6.2.2.9 Directly exposed to sun (outdoors).
Exception 6.2.2.9:
Unless indicated otherwise in purchasing documents.
6.2.2.10 Altitude: Less than 1000 meters.
Commentary 6.2.1, 6.2.2:
The above service conditions are contained within the material specifications for the specific ESP surface electrical equipment.
6.3 Monitoring/Communications
6.3.1 Saudi Aramco shall provide an RTU connection to the controller
system. The following information shall be provided for transmission to
this RTU:
6.3.1.1 Suction Pressure
6.3.1.2 Discharge Pressure
6.3.1.3 Motor run/stop status (Digital Input)
6.3.1.4 Motor Temperature
6.3.1.5 Motor Amps
6.3.1.6 Current Leakage
6.3.1.7 Frequency Setting
6.3.1.8 AFD cabinet temperature
6.3.1.9 AFD cabinet high temperature shutdown
6.3.1.10 Fluid Intake Temperature
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 9 of 26
6.3.1.11 Pump Vibration
6.3.1.12 Down Hole Fluid Flow (Calculated)
6.3.1.13 ESP Start/Stop Command (Digital Output)
6.3.1.14 Frequency Signal (Analog Output)
6.3.1.15 AFD Output Voltage
6.3.1.16 Overload Amps Setting
6.3.2 Other data streams that are provided as standard equipment shall be
provided for Saudi Aramco’s approval.
6.3.3 The data format to the RTU shall be defined and provided to Saudi
Aramco within 4 weeks after receipt of order.
6.3.4 For AFDs, the pump speed will be adjusted from the Saudi Aramco
remote control room via the RTU.
6.4 Emergency Shutdown System (ESD)
6.4.1 A local or remote ESD by Saudi Aramco shuts in wells and switches off
power to the wellsite. ESP equipment shall be configured such that a
loss of power due to ESD or other power interruption does not lose
accumulated data or set points.
6.4.2 ESD signal will be fail-safe.
6.4.3 Saudi Aramco shall supply equipment, if any, required to de-energize the
wellsite upon receipt of an ESD signal from Saudi Aramco’s RTU.
6.4.4 ESP equipment shall be designed so there is no damage to the equipment
after an ESD.
6.5 Power Quality
6.5.1 ESP system shall be designed so that for all connection combinations of
Saudi Aramco’s power system and all energization and loading
combinations of the controllers, the voltage and current distortion at the
point of connection to the Saudi Aramco’s power source (i.e., high
voltage connection at primary winding of SD transformer) shall meet
the following criteria with input harmonic filters (if required):
6.5.1.1 The voltage Total Harmonic Distortion (THD) shall not exceed
5% and individual harmonic voltage distortion shall not exceed
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 10 of 26
3% as measured at primary voltage side of the step-down
transformer(s) at any wellsite location.
6.5.1.2 Current distortion limits shall not exceed the values presented
within IEEE 519 for General Distribution Systems.
6.5.1.3 The maximum commutation notch depth shall be 20%.
6.5.1.4 The maximum notch area shall be 22,800 volt-microseconds.
6.5.1.5 The values above are based upon 480 V systems. Values must
be adjusted for actual system voltage.
6.5.2 ESPSS shall perform a computer-simulated harmonic analysis and
supply any equipment needed to ensure that these performance criteria
are met. The analysis results shall be provided to Saudi Aramco for
review prior to the installation of the surface electrical equipment.
6.5.3 ESPSS shall identify what Saudi Aramco electrical system information
is required to perform the analysis. Saudi Aramco shall be allowed a
minimum of four (4) weeks to provide this information.
6.5.4 The analysis shall give consideration to the cable capacitance of shielded
power cables connected to the Saudi Aramco’s system. The analysis
shall be performed including all harmonics through the 33rd
, as a
minimum.
6.5.5 The ESPSS shall be responsible to perform any testing or obtain any
measurement of the electrical system that is necessary for the analysis.
6.5.6 The ESPSS shall provide information for electrical load and short circuit
system studies to be performed by Saudi Aramco, for the transformers,
controllers, pumps, motors and cables.
7 Controllers
7.1 ESP electrical controllers shall meet the requirements of 55-SAMSS-002.
Exception to 7.1:
With an existing AFD installation which are fed from a common SD transformer, the addition of a new AFD may require that the new AFD match the technical characteristics of the existing units. With approval, specific AFD design characteristics may be altered to match the existing AFDs.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 11 of 26
7.2 If controllers are located outdoors and the controllers, or SD transformer is
fed by an overhead power line, the controllers shall be specified with transient
voltage surge suppression device(s).
7.3 The AFD shall meet the above detailed harmonic system performance criteria in
the without the use of any filtration. No special filtration shall be considered as
a technically acceptable alternative due to the varying anticipated system loads
over the life of the project.
7.4 The controller rating, in addition to the previous calculation, must include any
losses expected from the SU transformer (if required) and any required thermal
de-rating of the controller.
8 Transformers
8.1 Transformers associated with ESPs shall meet the requirements of
55-SAMSS-003.
8.2 For offshore applications, a maximum of five(5) ESPs shall be fed with one SD
transformer.
8.3 For onshore applications each ESP shall have a dedicated SD transformer.
8.4 SU or SD transformers shall not be installed indoors.
Exception to 8.4:
Non-oil filled SD transformer that is integrated into the AFD by the AFD manufacturer.
8.5 KVA sizing of transformers shall be as follows:
8.5.1 Each transformer shall be sized based on expected total operating load
with its corresponding ESP at any time during the production periods of
the well.
8.5.2 If the transformer must be de-rated for ambient temperature, only the de-
rated KVA capacity shall be considered and the original KVA and de-
rated values must be clearly stated in the proposal.
8.5.3 Detailed calculations shall be provided showing how the KVA ratings
were derived. No “rule-of-thumb” calculations will be accepted.
8.5.4 The maximum KVA determined by the calculation method described in
this section shall be used as the basis for determining the applicable
pricing schedule as outlined in the purchasing documents.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 12 of 26
8.5.5 KVA sizing of SU transformer shall be as follows:
8.5.5.1 Use the motor nameplate horsepower selected that was used to
size the pump based on the highest water cut and lowest
reservoir pressure prediction (i.e., worst case scenario) for each
well and assume that the motor is fully loaded and operating at
70 Hz.
8.5.5.2 Include motor power factor, cable losses, and any harmonic.
8.5.6 KVA sizing of SD transformer shall be as follows:
Include any losses introduced by the controller and any harmonic
content resulting from any non-sinusoidal waveforms which could cause
additional heating of this transformer.
9 Building
Buildings housing ESP power/control equipment shall meet the requirements of
55-SAMSS-004.
10 Downhole Equipment
10.1 Cable
10.1.1 Motor feeder downhole cable shall be suitable for downhole service
environmental conditions as described in the purchasing documents.
10.1.2 Conductors shall be solid copper with lead-tin coating. Plain or bare
copper conductors are not allowed.
10.1.3 The cable primary insulation shall be positively bonded individually to
each coated conductor.
10.1.4 Power cable conductors shall be #4 AWG (or equivalent) or larger and
must be selected to consider startup losses to ensure the ESP motor is
capable of starting. Conductor sizes smaller than #4 AWG will not be
permitted under any circumstances. Appropriate conductor size shall
be considered when developing the pricing schedules in the purchasing
documents.
10.1.5 Power cable shall be round configuration to minimize voltage
imbalance except where space restrictions require the use of parallel
cable.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 13 of 26
10.1.6 The motor lead extension cable primary insulation shall be either
Kapton or PEEK with an EPDM secondary insulation. All motor lead
cables shall be lead jacketed and come with Monel protective armor.
Pothead termination insulation shall be epoxy or other similar material.
The use of lead (Pb) backfill in the pothead is not permitted.
10.1.7 Downhole cable information shall be provided including type of cable,
flat or round cable configuration, type of armor, size of the conductors,
ampacity charts, length of cables, characteristics of cables (such as
resistance {RDC, RAC}, temperature compensation, initial
temperature, running temperature, reactance, capacitance).
10.1.8 Cable information data sheets contained with the purchasing
documentation shall be completed and submitted to Saudi Aramco.
10.1.9 Cable shall be supplied on a reel suitable for use on the ESPSS
supplied Cable Spooler.
10.1.10 Appropriate banding materials shall be provided. If necessary, cross
coupling cable protectors as means of fixing and protecting cable on
down-hole production tubing, packer, pump and protector, shall be
provided.
10.1.11 The electric cable between the packer and motor must resist corrosion
and gas permeation. This section of cable must also be resistant to
hydrochloric acid (15%) in the event that an acid squeeze is performed.
10.2 Packer Penetrator
10.2.1 Penetrator design shall minimize the number of infield connections.
Ideally splices will be located above the packer.
10.2.2 The penetrator shall have a mechanism to account for space out/length
adjustment.
10.2.3 The penetrator shall feature a proven sealing mechanism.
10.2.4 The penetrator shall be compatible with the proposed production
packer, it is envisaged that the packer penetrator design will make up
to a 1.9” 10 round API tubing connection.
10.2.5 Pressure, temperature and power rating of the penetrator shall be
provided.
10.2.6 All flow wetted parts must be resistant to corrosion assuming the
water, gas and oil compositions indicated in the purchasing documents.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 14 of 26
10.3 Production Packer
10.3.1 Packer shall be retrievable.
10.3.2 Packer shall be compatible with penetrator systems proposed by the
ESPSS.
10.3.3 Packer elements and elastomers shall be compatible with well
conditions and completion fluids indicated in the purchasing
documents.
10.3.4 All flow wetted parts must be resistant to corrosion assuming the
water, gas and oil compositions indicated in the purchasing documents.
10.3.5 Packer shall be sized for the appropriate casing size and weight. Refer
to purchasing documents.
10.3.6 Packer shall be field redressable.
10.3.7 Detailed & dimensional drawings shall be included in technical
proposal.
10.3.8 Load to unseat packer shall be submitted (e.g. 50,000 lbs over pull).
10.3.9 Packer shall not have any differential movement as it sets and unsets.
10.3.10 Threads top and bottom are to be new VAM unless otherwise indicated
in the purchasing documents. Mandrel length shall allow for at least
one re-cut at each end.
10.4 Free Flow Device
Completions may include a free flow device that meets the following
requirements:
10.4.1 Automatically opens to direct fluid and solids up the tubing when the
pump is started.
10.4.2 Automatically closes to prevent fluid and solids fall back through the
pump when the pump is stopped.
10.4.3 Automatically allows fluid and solids to bypass the pump assembly
when flowing the well with the pump not running.
10.4.4 All flow wetted parts must be resistant to corrosion and erosion
assuming the water, gas and oil compositions indicated in the
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 15 of 26
purchasing documents. Preferred design is moving dart (sliding
sleeve) design over flapper.
10.4.5 A detailed, dimensional drawing shall be submitted. Drawing shall be
submitted for 2 3/8”, 2-7/8”, 3-1/2” and 4-1/2” tubing. The free flow
device shall screw directly into pump discharge/sensor sub.
10.4.6 The integrity of the free flow device shall be guaranteed by the
manufacturers. ESPSS must provide 2 years case history and contact
numbers for operator personnel.
10.4.7 Include redress/rebuild kit price with Free Flow Device equipment
table quote.
10.5 By-Pass System
(Y-Tool) for 9-5/8” Casing Completions or Larger shall be provided with the
following characteristics:
10.5.1 The By-pass system shall allow wireline, logging or coil tubing access
below the ESP completion.
10.5.2 The By-pass system shall be installed in 9-5/8” casing with 40 or 44#
weight.
10.5.3 Materials shall be compatible with the well bore fluids as indicated in
the purchasing documents.
10.5.4 Properly designed clamps above and below shall be provided: Pump,
Seal, Motor and Downhole multi-sensor to clamp to the 2-7/8” Flush
Joint bypass.
10.5.5 A blanking plug shall be provided. The blanking plug latches into the
bypass and shall prevent ESP pumped fluid from re-circulating back
down the bypass tubing.
10.5.6 A re-entry guide on the end of the 2-7/8” tubing, shall be provided.
10.5.7 A Slick-Line plug shall be provided. This plug latches into the bypass
and provides a hydraulic seal during slick-line operations (0.108 &
0.125” wire).
10.5.8 A Coil Tubing plug shall be provided. This plug latches into the
bypass and provides a hydraulic seal during coil tubing operations
(1.5 & 1.75” CT).
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 16 of 26
10.5.9 A Logging plug. This plug latches into the bypass and provides a
hydraulic seal during logging operations (0.219, 0.25 & 0.469” cable).
10.5.10 An Isolation plug shall be provided. This plug latches into the bypass
and shall be used during surface bull-heading operations to pump fluid
down the flush joint tubing only.
10.5.11 2-7/8” flush joint tubing for the Bypass shall be provided. The length
of this tubing will be as required to extend to the bottom of the ESP
assembly plus an additional 10 feet to extend below. If, for any reason,
the completion will require additional length to the bypass tubing to
satisfy any completion requirements, this additional length of tubing
will be supplied by Saudi Aramco.
10.5.12 Complete prices in the contract catalog detailing all component prices,
shall be provided. Prices shall be listed separately to allow ordering of
individual components as needed by Saudi Aramco.
10.5.13 ESPSS shall be responsible for rebuilding, repair or redressing the
latch-in tools. Redress/ repair charges in the contract catalog, shall be
provided. Also, provide the cost of a rebuild kit where Saudi Aramco
purchases the kit and rebuilds the tools themselves.
10.5.14 A complete bypass assembly system for every 9-5/8” completion
including only the blanking latch-in tool, shall be provided.
The remaining latch-in tools: Slick-line, Coil Tubing, Isolation and
Logging Plugs four(4) complete sets shall be required as well service
tool spares. By-pass assembly shall be compatible with the ESP
equipment specified for the well.
10.5.15 The latch-in plug/tools shall be provided to Saudi Aramco Wireline /
Field Services. Wireline / Field Services shall decide the final storage
point for these tools. All tools shall be listed on the well completion /
installation paper work for inventory/ invoice purposes.
10.6 Pump
10.6.1 The design flow rates shall take into consideration any anticipated
changes in reservoir performance for three years of operation and be
designed to achieve the target date under any such conditions.
10.6.2 Pumps shall be selected to operate at equal to or greater than the BEP
shown on the 60 Hz pump curve from the ESPSS’s catalog but no
more than half way between the BEP flow rate and the maximum
recommended operating rate at 60 Hz. In different wording, the pump
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 17 of 26
type selected must produce the design flow rate between 50% and 75%
inclusive of the ESPSS’s recommended operating range as published
in the catalog while operating at 60 Hz.
10.6.3 The number of pump stages selected shall be based on the worst case
conditions that could be encountered during the first three years of
production while still operating at 60 Hz. The “worst case” condition
shall be defined as the highest expected water cut and the lowest
anticipated reservoir pressure even if they do not happen to fall within
the same year. For example, given a particular well is expected to have
reservoir pressures for the first three years of 3012 psi, 2816, psi and
2940 psi respectively and, during that same three year period, the
anticipated water cuts will be 12%, 26% and 43% respectively, the
“worst case” condition would be 2816 psi (year 2) and 43% water cut
(year 3).
10.6.4 All calculations and selections shall be performed with the latest
version of SubPump currently released and the results of these
calculations shall be included as supporting information for the
technical proposal. No software other than SubPump will be allowed
or technically accepted.
10.6.5 A combination of standard housings that contains a number of stages
equal to the required number of stages shall be used if possible. A
combination of standard housings that contains a number of stages
closest to the required number, but larger than the required number,
shall be used if the combination does not match the required number of
stages. All housings shall contain the full number of stages. No
“destaging” of pump housings is permitted.
10.6.6 Wellbore data shall be provided during final detailed design.
10.6.7 Setting Depth shall be as indicated in the purchasing documents.
ESPSS shall ensure that the setting depth for each well allows the ESP
to be landed in a favorable operating location that will not place any
unnecessary stress on the operating ESP.
10.6.8 The following information shall be provided to the ESPSS during final
detailed design:
10.6.8.1 Flowing (pumping) wellhead pressure
10.6.8.2 Static bottomhole pressure
10.6.8.3 Water cut
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 18 of 26
10.6.8.4 Proposed or actual directional survey
10.6.8.5 Inflow performance
10.6.9 Fluid properties shall be as indicated in the purchasing documents.
10.6.10 All exposed materials must be resistant to corrosion assuming the
water, gas, and oil compositions shown in the purchasing documents.
10.6.11 The wellheads will be equipped with a variable choke.
10.6.12 The ESP downhole equipment shall be designed for two alternatives.
The first alternative shall be STANDARD SPECIFICATION
equipment and the second alternative shall be HIGH SPECIFICATION
equipment. The details of these two specifications shall be as indicated
in the purchasing documents. These details shall be the minimum
requirements. If the ESPSS feels additional enhancements are required
over and above these minimum requirements, the ESPSS is
encouraged to offer these enhancements if they are likely to improve
runlife performance. For example, although stainless equipment may
not be clearly specified in the purchasing documents, if the ESPSS
believes it is warranted based on the fluid analysis provided in the
purchasing documents, he should clearly state this in his technical
proposal as his proposed alternative.
10.6.13 Pump testing prior to installation shall be in accordance with the latest
API RP 11S Series as appropriate and as amended per purchasing
documents.
10.7 Motor
10.7.1 Motor shall be three phase, squirrel cage induction type, designed to
operate continuously at any speed within the control range of the
controller.
10.7.2 ESPSS shall ensure that the winding temperature sensor (prefer
thermocouple inserted into the motor winding) in the motor is
compatible with the downhole sensor package.
10.7.3 ESPSS shall submit the motor coating design to Saudi Aramco for
approval. The same system shall be used on pump, protector and
motor. In place of coating, corrosion resistant materials may be
substituted.
10.7.4 Motor shall be filled with the ESPSS’s high dielectric oil to provide
bearing lubrication and assist in heat transfer. The oil selected will take
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 19 of 26
into account the expected motor operating temperatures under normal
operating conditions.
10.7.5 Selection of specific motor shall include pump load requirements
throughout the anticipated operating range plus the additional loading
for accessory items that absorb motor torque (seal sections, thrust
bearings, etc.).
10.7.6 ESPSS shall clearly indicate HP per unit length of motor used in his
designs at 60 HZ base freq.
10.7.7 The motor will be the standard sized motor, or combination of motors,
that is required to produce the pump selected above at the highest
water cut and at an operating frequency of 70 Hz regardless of the
actual design frequency chosen to select the pump.
10.7.8 The motor, or combination of motors, shall be larger than the required
horsepower at maximum operating frequency but closest to the
required horsepower.
10.7.9 The ESPSS should verify that the motor has sufficient HP capacity for
unloading the well of killfluid.
10.7.10 In the event that the motor selected to operate up to 70 Hz will be
operating in a severely underloaded condition at nominal conditions,
the motor frame selected may be smaller in order to improve the
loading as long as the motor is capable of achieving all possible
operating conditions requested and this is demonstrated to be based on
sound engineering judgment. For the purpose of selection, a severe
underload is defined as anything below 50% of nameplate rating.
10.7.11 It should be kept in mind that, especially for AFD operated units, field
rerating of motors will be allowed to improve motor loading at lower
nominal operating conditions and this may be considered in the motor
selection. For example, if a motor selected to operate up to 70 Hz
would give a nominal loading less than 50% for base conditions but
that motor could be safely field rerated to improve the load in excess of
50% for that operating condition, the motor would still be considered
the best choice.
10.7.12 As a minimum, the following motor tests shall be performed:
10.7.12.1 Winding analysis surge test per ESPSS’s QC standard test.
A copy of the surge curve shall be submitted with the test
documentation.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 20 of 26
10.7.12.2 High potential test on the stator.
10.7.12.3 Insulation resistance test.
10.7.12.4 Measurement of the winding resistance.
10.7.12.5 Measurement of no-load current (each phase).
10.7.12.6 Measurement of nominal no-load speed.
10.7.12.7 Polarization index test/Surge test.
10.7.12.8 Coast test
10.7.12.9 Motor load test
10.7.12.10 Vibration test as per requirements in “String Testing”
section of this standard. The written test procedure shall
be submitted for approval prior to manufacture of any
motor. In all cases, the pass/fail criteria for each test shall
be clearly identified.
10.8 Bottom Hole Assembly (BHA) Configuration
10.8.1 The ESP may be conventionally deployed on jointed tubing, coiled
tubing or be a “cable internal” Coiled Tubing Deployed ESP
(CTDESP). Refer to the purchasing documents for the sketch that
shows the bottom hole assembly. ESPSS will provide equipment as
indicated in purchasing documents.
10.8.2 Conventionally deployed ESPs shall be per the following:
10.8.2.1 No downhole bleeder valve will be installed.
10.8.2.2 The base design is to include double bag / double labyrinth
protectors (i.e., four chambers) or equivalent. Series bag
sections shall be the standard and parallel bags should only
be used where the motor size requires its application.
10.8.2.3 A downhole sensor package is to be provided with the
following data points as a minimum:
10.8.2.3.1 Suction Pressure
10.8.2.3.2 Discharge Pressure
10.8.2.3.3 Motor Winding Temperature
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 21 of 26
10.8.2.3.4 Downhole temperature (at fluid intake)
10.8.2.3.5 Current leakage
10.8.2.3.6 Vibration
10.8.2.4 Downhole sensor is to be compatible with surface
monitoring equipment package.
10.8.2.5 Saudi Aramco will provide 2-3/8”, 2-7/8”, 3-1/2”, 4-1/2”
and 5-1/2” tubing for wells completed with 4-½”, 5”, 7” and
9-5/8” casings/liners. Final tubing size & type shall be
confirmed by Saudi Aramco prior to ESPSS ordering
downhole materials.
10.8.2.6 ESPSS may be required to provide a free flow device
(see 10.10) installed above the pump that will automatically
open when the pump is running, automatically close when
the pump is off, and automatically allow flow to by-pass the
pump. This requirement shall be detailed in Exhibit 1 of
this Attachment II of Schedule B.
10.8.2.7 The packer is to be hydraulic type. Saudi Aramco will
supply a seating nipple as shown on Exhibit 4 of this
Attachment II of Schedule B. Packer setting depth will be
determined after contract award but, in general, will be
approximately 200 feet above the pump setting depth.
10.8.2.8 For packer force calculations, use the following average
tubing string temperatures: ESPSS shall submit tube
movement/packer calculations for approval.
10.8.2.8.1 140F for stabilized shut-in conditions
10.8.2.8.2 170F for stabilized producing conditions
10.8.2.8.3 120F for worst-case contraction case
(squeezing or circulating annular fluid)
10.8.2.8.4 Tubing hydrotest pressure is 3000 psi
10.8.2.8.5 Wellhead/annulus testing pressure is 3000 psi
10.8.3 Coiled Tubing Deployed ESP (CTDESP)
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 22 of 26
10.8.3.1 In addition to the downhole ESP completion, ESPSS may
be required to supply the coiled tubing with the power cable
internally installed. Although this type of system could
conceivably be run in any well, it is ideally suited to
SmartWell completions where the ESP would be run inside
a 7” production liner. Cable assemble shall be as follows:
10.8.3.1.1 Power Cable size shall be # 2 or # 1 AWG, to
be deployed in a 2” or 2-3/8” coiled tubing.
The yield strength rating and wall thickness of
the CT shall be determined based on the
following:
10.8.3.1.1.1 Maximum length to run.
10.8.3.1.1.2 Combined weight of cable, flat
pack (if required) & the oil
filling the CT.
10.8.3.1.1.3 Weight of ESP completion.
10.8.3.1.1.4 Corrosion rate.
10.8.3.1.2 The cable shall be supported inside the CT by
some mechanical means such that there will be
no slippage of the cable in relation to the CT
either while running in hole or normal
operation. The mechanical retention may be
accomplished by internal clamping or simple
friction in addition to any buoyancy fluid that
might be used to fill the inside of the CT. If a
Flat Pack [control line and/or TEC (Tubing
Encapsulated Conductor)] is required to be
installed inside the CT, a heavy fluid may be
selected to provide additional buoyancy.
10.8.3.2 The lower electrical connector shall be a 2 piece design.
The top half is the slip connector that crimps onto the coiled
tubing. The lower half, bolted to the upper half, is to be
bolted to the center tandem motor. It should have an anti-
torque pins with a yield rating in excess of any potential
transient load that might be encountered.
10.8.3.3 The power cable shall be connected to the lower connector
through a field attachable connector (5000 PSI, 5 KV, 125
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 23 of 26
amp, 300F rating) with all reservoir fluid exposed parts of
the lower connector to be made of 416 stainless steel
material or higher specification. It shall have a good fishing
profile to pull the string. It shall also incorporate a
constraint not to allow for the power cable to come out of
the coiled tubing.
10.8.3.4 The motor shall be a center tandem design. Motor rating
shall be selected considering the motor winding temperature
not to exceed the lower connector rating (300F).
The motor shall either have an internal mechanism to
prevent any upward movement of the shaft/rotor assembly
or may incorporate a separate upthrust prevention chamber
to be bolted between the motor and the lower connector.
10.8.3.5 The Universal Motor Base-Bottom Intake type is to provide
a Y-point and allow for the shaft running through the UMB.
It shall also provide the termination of the sensor wires to
the motor.
10.8.3.6 Protector or Seal Section shall be a Bottom Intake design
and installed below the motor and an Expansion Chamber
(if required) located above the motor. The BI Protector
shaft shall be designed to be rigidly locked to the pump
shaft. The BI protector shall be capable of withstanding
any and all upthrust and/or downthrust conditions
developed within the ESP system.
10.8.3.7 The Bottom Intake protector must support the pump shaft
and pump thrust from above. The protector design is to
include double bag /double labyrinth (i.e., four chambers)
or equivalent.
10.8.3.8 Expansion chamber (Shaft less Protector) as an additional
section may be added above the motor if this is the
ESPSS’s preferred design. Expansion chamber base design
can include double bag/single labyrinth (i.e., three
chambers). Additional parallel bags should be added to
account for tandem motor applications.
10.8.3.9 The pump discharge head shall be a non-locking type and to
allow the pump and protector shafts to be rigidly coupled
together. The discharge head should be manufactured from
full duplex stainless steel and be designed without any
sharp radii to avoid the creation of stress concentrations.
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 24 of 26
10.8.3.10 The pump intake shall be designed to deliver the produced
fluid from the tailpipe directly into the pump without the
need for any shroud or lower thrust section to be installed
below the pump. A “shrouded” pump will generally not
meet Saudi Aramco’s completion or production
requirements due to the OD constraint placed on the pump
housing by a shroud.
10.8.3.11 The downhole sensor system shall be capable of delivering
the same information as indicated above with a
conventionally deployed ESP.
10.8.3.12 The ESPSS shall provide the stinger to mate to the pump
intake and shall be compatible with the lower completion
assembly.
10.8.3.13 If required, the ESPSS shall provide the lower completion
to provide a seal between the pump intake and discharge.
In this event, a permanent seal bore packer with the
accessories (i.e., latching device, expansion joint, and
anchor) shall be installed. The packer can be set with coil
tubing. Seal bore packer shall have the following
characteristics.
10.8.3.13.1 The Seal bore packer shall be retrievable and
can be reset using CT without the need for
milling.
10.8.3.13.2 The Seal bore packer can be set at the
optimum pump setting depth independent of
the lower completion design constraints. In
different wording, if the ESP stinger gets too
long, the packer can be pulled and replaced
with a new length or pull the upper packer and
replace it deeper in the well to accommodate
the longer CTDESP string and maximize the
drawdown at the pump intake.
10.8.4 Encapsulated ESP System (Pod ESP)
10.8.4.1 As an alternative completion, the ESPSS shall quote an
encapsulated ESP system for use in both 9 5/8” and 7”
cased holes. This Pod ESP may either be for single string
use where there is a need for casing protection or tandem
use where the desire is to provide a redundant system to
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 25 of 26
increase the time between well interventions to increase
useful operating life. For the purpose of pricing in this
contract, please refer to the Exhibits of this Attachment II to
Schedule B to determine whether this contract will be for
single or redundant systems. Pod ESP systems shall not
consider the need for Y-tools. In addition to the ESP string,
the Pod ESP system shall, as a minimum, consist of:
10.8.4.1.1 Tubing (Saudi Aramco provided) to pup joint
crossover.
10.8.4.1.2 Pup joint to suit the shroud hanger assembly
10.8.4.1.3 Shroud hanger assembly
10.8.4.1.4 Electrical penetrator for shroud assembly
10.8.4.1.5 Lower pup joint
10.8.4.1.6 Adjustable union
10.8.4.1.7 Offset sub and lower pup joint
10.8.4.1.8 Crossover pup joint (if required)
10.8.4.1.9 Additional pup joints as required for spaceout
10.8.4.1.10 Auto-diverter valve
10.8.4.1.11 Adapter into pump discharge or pump
discharge pressure adapter
10.8.4.1.12 ESP centralizer
10.8.4.1.13 Crossover from shroud assembly to shroud
casing
10.8.4.1.14 Shroud casing as required to encapsulate the
ESP string
10.8.4.1.15 Lower shroud to tubing crossover
10.8.4.1.16 Shroud stinger (no more than 20 feet shall be
quoted – if additional length is required, this
will be provided by Saudi Aramco)
Document Responsibility: Electric Submersible Pump Standards Committee SAES-I-002
Issue Date: 21 May 2012
Next Planned Update: 1 February 2016 ESP System - Supplier Integration
Page 26 of 26
10.8.4.1.17 Tubing adapter to match Saudi Aramco
provided stinger tubing (if required)
10.8.4.1.18 Tubing nipple (sealbore)
10.8.4.1.19 Assembly and pressure testing is required with
certification to be provided to Saudi Aramco
prior to equipment acceptance.
10.8.4.1.20 The diameter of the shroud will be on the
advice of the ESPSS. The diameter should
take into account the ESP landing location
including running through any dogleg, flow
velocity across the motor and pressure loss
across the ESP string prior to the pump intake.
All these calculations will be performed and
agreed to prior to running in hole.
10.9 String Testing
Mechanical vibration testing shall be performed per API RP 11S8. The
maximum allowable vibration for any piece of equipment will be 0.10 in/sec and
shall be measured in two perpendicular planes at the locations specified under
API RP 11S8. If the purchasing documents require a full string vibration test be
performed, the maximum allowable vibration at any point of the string shall not
exceed 0.10 in/sec.
11 Shipping
Shipping containers for surface electrical equipment shall be suitable for storage in an
outdoor tropical location for up to one year before use. The container shall have a
provision for access to connections for space heaters.
Revision Summary
1 February 2011 New Saudi Aramco Engineering Standard. 21 May 2012 Changed primary contact, removed downhole equipment to separate specification.