sauter presenatation

Download Sauter Presenatation

Post on 12-Apr-2017

374 views

Category:

Business

0 download

Embed Size (px)

TRANSCRIPT

PowerPoint-Prsentation

PeopleNatureCompaniesBuildingsYour specialist for building automation.Our solutions improve energy efficiency and sustain the environments of the future.

#

2

2010Evolution Systems3Building management by SAUTER. We create solutions for living environments that have a future.

For people.

For nature.

For your building.

For your company.

33

2010Evolution Systems4In 1910, he set up a workshop in the village of Grindelwald in the Bernese Mountains.

On the premises pictured here, he began producing time-switches:- to use off-peak electricity and to switch the street lighting on and off the design and precision of which was acclaimed by the experts

Fritz SauterElectrical and design engineer.The companys founder

4Versuchstechniker fr die weltbekannte Firma Brown, Boveri & COReisen in die ganze Weltsammelte Erfahrungen und theoretische KenntnisseZeitschalter vorhanden aber keine deren Aufbau den Anforderungen entsprachenEntwicklung von Zeitschaltermodellen, welche teilweise unter Patentschutz gestellt wurden

2010Evolution Systems5Company history1910 Workshop set up

1912 First consignment of time-switches

1919 Company re-locates to Basle with around 100 employees

1920 Converted into a joint-stock company

1925 Subsidiary company founded in Freiburg, Germany

1925/27 and 1934 Production facilities in Basle enlarged1935 Approximately 520 employees

1948 Subsidiary company founded in St. Louis, France

Further offices opened in Zurich, Geneva and Lausanne

Agents in over 50 countries

Developed into an international company by focussing on quality and know-how

Sauter Group presently has roughly 1900 employees throughout Europe

51914 Stockung durch Weltkrieg (Grenzbesetzungsdienst, Materialbeschaffung)1916 Bau von Heisswasserspeicher und Akkumulierfen fr die Raumheizung1919 Anfang Serienfabrikation und Neuentwicklungen in Basel1920 Aktiengesellschaft mit 800.000,- Kapital

SAUTER is represented internationallyand therefore always close to you.

#

6

The revenues of the SAUTER Group by division.

11 % Components54 % Systems35 % Services / FM

#

7

CONTACT DETAILS

#

#

APPROVALS

#

ConsultantProjects Mediclinic Hospital North WingHyder Consulting,an ARCADIS CompanyAl Naboodah Contracting Co. LLCTransgulf Office BuildingNational Engineering BureauEKFC ExpansionDewan Architects & EngineersAbu Dhabi Future Schools Program (Phase2) Package No.2 Al AinSTS Abu Dhabi E/M Co. LLCSheikh Khalifa General Hospital, Um Al QwainARENCODEWA GarageClarke Samadhin AssociatesLaboratory & Office BuildingKEOMixed Use Development, Downtown DubaiClarke Samadhin AssociatesThe Beach JBR

SAUTER has worked with the following consultants

#

11

ClientsProjects MERAASThe Beach JBRSofitel Downtown DubaiSOFITELHyattHyatt Place, DubaiADECFuture Schools Phase-2 Al AinNAKHEELDiscovery Garden, DubaiWASLHyatt Place, DubaiSAGA InternationalDEC Towers, DubaiLife PharmacareLife Pharma DubaiOther Pretigious ClientsNovartisGerman Stock exchangePfizer PharmaZydus Pharmaceutical Ltd.Torrent PharmaceuticalsVolkswagenRabobank, Netherlands

Our Clients.

#

12

CERTIFICATES / AWARDS

#

#

#

#

#

#

#

#

COMPANY REGISTRATION CERTIFICATES

#

#

SAUTER STRENGTH

#

End-to-end SAUTER software environment, from planning, engineering and programming through to commissioning and fault analysis/monitoringEngineering software with the comprehensive SAUTER knowledge databaseCosts are cut thanks to efficient engineering and programmingIndividual solutions for specific applications, based on tried-and-tested librariesSimple integration of our own new solutionsGuaranteed total quality standardBest service in terms of quality, experience, expertise and reduced throughput times

#

ARCHITECTURE SYSTEM

#

SAUTER Building and Energy Management Solution.

#

BACnet/IP Room Automation Stations

Integration of KNX Room-Units

Room 5Room 8Room 1Room 4

KNX

Operating Unit Structure

Operating blockFrameEY-RU31xEY-RU34xEY-SU306

29

Accessories

Separation of frame and operating blockSeparate ordering positions

Different colours forframelabelling films

Types of mountingRecessed box installationBase for wall mounting (universal, like EYB25x)Cable cover plate for cable leadthroughs at the side

30

ecoUnit1: wireless room operating unit with bi-directional communicationTechnology: EnOcean 868 MHzProduct range:The maximum configuration provides the following functions:Data captureSetpoint adjusterOccupancy button with display (3-level)Fan-speed controlButtons for lights ON/OFFor blinds UP/DOWN

The ecoUnit1 room operating unit is extensible by up to six switching functions. The EY-SU106 switching unit is wired to the ecoUnit1 and supplies the room operating unit with additional solar power.EY-RU110EY-RU141EY-RU146EY-RU144

EY-SU106 switching unit

31

SAUTER PRODUCTS

#

SAUTER BMS Software FamilyPositioning, competitors and advantages!

Functionality and complexitySmall buildingsSmall to mid sized buildingsCampus, centralized buildings, mid sized to large buildings

Large projects FDA projects

Positioning 2015

RetailEducationHotelsSport and wellnessResidential buildingsOffice buildingsHealthIndustryPublic buildingsLife SciencesLarge projects

Functionality and complexitySmall buildingsSmall to mid sized buildingsCampus, centralized buildings, mid sized to large buildings

Large projects FDA projects

Positioning 2016 - 2017

RetailEducationHotelsSport and wellnessResidential buildingsOffice buildingsHealthIndustryPublic buildingsLife SciencesLarge projects

Functionality and complexitySmall buildingsSmall to mid sized buildingsCampus, centralized buildings, mid sized to large buildings

Large projects FDA projects

Positioning 2018

RetailEducationHotelsSport and wellnessResidential buildingsOffice buildingsHealthIndustryPublic buildingsLife SciencesLarge projects

Competitor comparison

Competitor comparisonSimilar technologies

SVCDesigo CCTridium Framework 4Delta Controls EnteliWebWonderware InTouchWindows 2012/2008/7Windows 2008/7Windows / Linux / PortableWindows 2003/2008/7Windows 2008/7

Technologies chosen for the products are similar:MS SQL ServerWindows Operating systemsHTML5 for the Web interfaceIP security with HTTPS38

SAUTER impresses through expertise and responsibility.A large number of building references testify to this.

#

39

#

#

#

#

Tour ElithisDijon, France

2009, first positive energy office building in the world at standard costsEnergy savings/year: 65,320Renewable energy produced: 189,660 kW

Selected references.

#

German stock exchangeEschborn, Germany

Management level - novaPro OpenEMSFirst LEED Platinum-certified commercial building in Europe

#

45

45

NuOfficeMunich, Germany

The most sustainable building in the worldMultiple certifications and awardsEY-modulo 5 building/room automationnovaPro Open management levelEnergy management and SAUTER EMSGreen Building monitor

#

Novartis CampusShanghai, China

188,008 m, 8000 data points Laboratories and office spaces Large laboratory installationsEnergy and data centre in the basement Caf and auditorium

#

47

47

Roche Bau 1Basel, Switzerland

EY-modulo 5 building automationIntegrated room automation with wireless sunshade, lighting and climate controlSAUTER novaPro Open building management software

#

Tamkeen TowerRiyadh, Saudi Arabia

Management level: novaPro OpenHVAC and room automation: EY-modulo 5High system integration

#

49

Frankfurt AirportFrankfurt am Main, Germany

Management level: novaPro OpenAutomation level: EY-modulo 5Service & maintenance contract for terminal 2

#

50

Satellite 4 Aroport Charles de GaulleParis, France

Largest French and second-largest European airportEnergy management with SAUTER EMSContinuous reduction in the consumption values for cold water, electricity and domestic hot water

#

RabobankUtrecht, Netherlands

Management level: novaPro OpenAutomation level: SAUTER EY-modulo 5Room automation with lighting control

#

52

Palace of JusticeAmsterdam, Netherlands

Certified according to BREEAMEY-modulo 5 building/room automationControlling and monitoring with SAUTER novaPro OpenIntegrated room automation with wireless lighting and climate control

#

Songdo CityIncheon, South Korea

Energy-efficient planned city 2020350 buildings75,000 inhabitants, 300,000 commutersBuilding management systems from SAUTERfor multiple large residential and office blocks, incl. shopping centres

#

Ritz CarltonBangalore, India

Luxurious 5* hotel with traditional charmBuilding automation with EY-modulo5 systemSystem integration ofCCTV systemaccess control systemsecurity and alarm system

#

Mariott International Renaissance HotelTlemcen, Algeria

novaPro Open building management systemIntegration of hotel booking systemEY-modulo building and room automation Integration of energy meters

#

#