Saverio Minutoli INFN Genova 1 Saverio Minutoli INFN Genova 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine Other development: 16chs preamplifier. Cabling and Power Supplies: T1 Trigger Architecture Optic cabling High Voltage Low Voltage Patch panels CERN Electronics Meeting 22 Nov. 2007

Upload: jeffry-wells

Post on 12-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

1Saverio Minutoli INFN Genova

1

T1 Electronic status

Electronics Cards involved:

Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine

Other development: 16chs preamplifier.

Cabling and Power Supplies:

T1 Trigger Architecture Optic cabling High Voltage Low Voltage Patch panels

CERN Electronics Meeting 22 Nov. 2007

Page 2: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

2Saverio Minutoli INFN Genova

2

Electronics Cards

Page 3: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

3Saverio Minutoli INFN Genova

3

VFAT hybrid input ground isolation new feature.

5 pieces of 1P and 5G already produced. Waiting for the components loading.

Mass production launched. PCBs ready within Dec. 2007. Decision on passive components networks

within Dec. 07 Components mounting within ½ Feb.08 End tests, validation and CSCs soldering

March 08

AFEC

Page 4: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

4Saverio Minutoli INFN Genova

4

CFEC (1) First PCB almost tested.

Results under evaluation New layout in progress. Ten PBCs ready 51st w/07 PCBs mounted within 2nd-3rd

w/08

Decision on passive components networks within Dec. 07

Mass production ready within ½ Feb.08

End tests and validation March 08.

Page 5: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

5Saverio Minutoli INFN Genova

5

CFEC (2)

Upgrade to high resolution.

New layout Jan. 08 Few prototypes

ready March 08. End tests and

validation April 08. Mass production

ready June 08.

Page 6: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

6Saverio Minutoli INFN Genova

6

ROC (1)

Some delays due to CERN custom components procurement. Needed to avoid wrong components packages association.

Several features implemented: DOHM and CCUM emulation. DOHM I2C lines handling (follow the CCUM-SCR redundancy

scheme). Trigger VFAT Mezzanine GOHs mezzanines input pattern generator. Several Data GOH DAV sources available. Several Trigger GOHs DAV sources (BC0, Static, Timed by CCUM) Foreseen a SPY Mezzanine based on T1 Digital Mezzanine.

The layout is in progress. 5 PCB ready ½ Dec.07 3 Circuits mounted and tested ½ Jan.08 PCBs mass production ½ Feb. 08 Full ROCs ready within March 08.

Page 7: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

7Saverio Minutoli INFN Genova

7

ROC (2)

Page 8: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

8Saverio Minutoli INFN Genova

8

ROC (3)

BC0b

IDLEb/ON

TR_GOH_DAV

I/O CCUM

MUX

CSC1

A

DATA_GOH_DAV

I/O CCUM

MUX

MUX

MUX

I/O CCUM

CSC2

A

K

K

K

TRIGGER

DAV

DATA

DAV

Has been tested ???

Page 9: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

9Saverio Minutoli INFN Genova

9

VFAT hybrids

Hybrids production (PCBs and components mounting) at CERN. High density input connectors available from T1.

Bonding may be made in Genoa. Needs agreement with the people in Genoa lab. Needs to know all the rules and material used by the CERN

bonding lab. Needs some VFAT dummy chips in order to test all the procedures. Could be useful a training period at CERN of our bonding

technician. Validation of the first hybrids in accord with the CERN people

(W.S.- P.A.). The installation of 1 arm (30 CSCs) in March 08 involve 140 VFAT

hybrids. This number is equivalent to the full T1 anode VFATS hybrids

production including spares. In this installation 60 will be dedicates for the anodes and 80 for

the cathodes (CFEC VFAT only based). VFAT hybrids schedule is CERN production dependent…

Page 10: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

10Saverio Minutoli INFN Genova

10

T1 Trigger Mezzanine

T1 detector have 15 trigger fibers per each ¼ while each OptoRx mezzanine accept up to 12 fibers.

In order to merge and manipulate with a dedicate algorithm all the trigger bits (30 fibers in total), we will need the custom TTM mezzanine to add to the Trigger TOT-FED.

The trigger system is not completely fixed, need some more iterations within the trigger group.

TTM not needed at the beginning (March 08). Expected to be available in June 08.

Page 11: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

11Saverio Minutoli INFN Genova

11

16 channels preamplifier (1)

This small boards use the same FE preamplifier device integrated inside the VFAT chip (see Jan Kaplon).

Needed for final studies on T1 CSC detector. Layout in progress. Some PCBs ready and mounted 2nd w/Dec.07 End tests and decision on the AFEC and CFEC

passives networks components within Dec. 07

Page 12: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

12Saverio Minutoli INFN Genova

12

16 channels preamplifier (2)

Page 13: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

13Saverio Minutoli INFN Genova

13

Cabling and Power Supplies

Page 14: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

14Saverio Minutoli INFN Genova

14

OLD Section

Page 15: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

15Saverio Minutoli INFN Genova

15

Platform to 6th T1 Frame cable tray

Who is responsible for this cables ??(Putting in work and purchase)

NEW Section

Page 16: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

16Saverio Minutoli INFN Genova

16

T1 Trigger Architecture

~6kwires

CSC

ROC

T1 ARM

8

1x22

30

~6kwires

CSC

ROC

T1 ARM

8

1x2 2

x15 30

T1 TRG_TOTFED

12 1233

T1 TRG_TOTFED

1212 3 3

GLOBALTRG_TOTFED

8bits

X XCOUNTING ROOM

CAVERN

Trigger Bits 2 x 480 = 960

x15

x2 x2

(Needs TRG algo.)LV1

Y

(16bits)VFAT

(16bits) 8bitsVFAT

TTM TTM

Page 17: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

17Saverio Minutoli INFN Genova

17

CSC#1

CSC#15

HV ch#1

HV ch#15

Patch Panel on 6th frame

Patch Panel on T1 Platform

A1

55

0P

-Ca

en

HV

24

ch

sH

V P

.S.

100m HV Cable

15m HV Cable

Counting Room

T1 Rack Platform

T1 ¼

Ma

in F

ram

eS

Y1

52

7

Inside T1 1/4

T1 ¼ HV cabling schematicS.M. 24/04/2007

Page 18: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

18Saverio Minutoli INFN Genova

18

T1 Optic Architecture (OLD version)

Page 19: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

19Saverio Minutoli INFN Genova

19

Low Voltage and High Voltage components.

Placed order at CERN for 5 WIENER fully equipped MARATON low voltages system. Two simple VME crates are also purchased for

the MARATON remote control cards. Delivery expected within March 2008.

Almost placed an order to CAEN for 6 HV modules A1550P, and one mainframe SY1527. Delivery expected March/April 2008.

Page 20: Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT

Saverio Minutoli INFN Genova

20Saverio Minutoli INFN Genova

20

Patch panels

Hosted on the platform: Low voltage it could simplify the connections with the

WIENER. (not needed at the beginning) High Voltage to be done, (not needed at the

beginning) but ok for March 08. Connector procurement done.

Hosted on the 6th T1 Frame: Low voltage prototype almost ready, ok March 08. High Voltage all produced, one prototype almost

ready, ok March 08. Optic fiber to be done, need a fiber cable fan-out and

MPO connector for the dimensioning of the box (see W.S.).