sbc-inter aps’s undated report · 2014-12-01 · unitor. boiler cleanin 01.00 pm 02.25 pm 05.00...

23
Annex E SBC-inter ApS’s undated report

Upload: others

Post on 18-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting

Annex E

SBC-inter ApS’s undated report

Page 2: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 3: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 4: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting

Annex F

Cleaning instructions in use at the time of the accident including overseer's annotations

Page 5: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 6: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 7: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 8: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 9: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 10: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 11: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 12: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 13: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting

Annex G

International Labour Organization’s - International Chemical Data Sheet No 0328 for Sulphamic Acid

Page 14: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 15: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 16: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting

Annex H

Mr Walton’s boiler chemical cleaning documentation produced on 24 April 2003

Page 17: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 18: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 19: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 20: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 21: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 22: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting
Page 23: SBC-inter ApS’s undated report · 2014-12-01 · Unitor. Boiler Cleanin 01.00 pm 02.25 pm 05.00 pm - Heating of the water stopped, reaching 570C in mixing tank and workers starting