Scaffolding Company Review Audit Client’s Name: Barratt Group Scaffolding Contractors Name and Head Office Address: Website address: Currently being built SWC Scaffolds Ltd. Cherry Lodge, Bristol Road, Iron Acton, Bristol BS37 9TG Contact Name(s): Mike Kendal and Dave Baber Contact Telephone Number 01454 228836 Audit Date(s): 21 & 28 October 2013 Auditors Name: Nigel Kotula (Scaffolding Safety Consultant)

Upload: hoangdung

Post on 07-Feb-2018

246 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Scaffolding Company Review Audit Client’s Name: Barratt Group Scaffolding Contractors Name and Head Office Address: Website address: Currently being built

SWC Scaffolds Ltd. Cherry Lodge, Bristol Road, Iron Acton, Bristol BS37 9TG

Contact Name(s):

Mike Kendal and Dave Baber

Contact Telephone Number

01454 228836

Audit Date(s):

21 & 28 October 2013

Auditors Name:

Nigel Kotula (Scaffolding Safety Consultant)

mike
Cross-Out
mike
Text Box
Page 2: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 2 of 20

Scaffold Company History: Formed in February 2013 as part of Small Works Contractors Ltd following a buyout of Skyway

Scaffolding who had been operating for the last 15 years Turnover last 2 years February 2013 – October 2013 approx £500,000+ Total number office based There are two directly employed plus office staff connected to SWC ltd. employees: Total number of Scaffolders, Trainee Scaffolders & Scaffolding Labourers: 13 of which 100% directly employed scaffold operatives Total number of Drivers/Yard staff: 5 drivers of which are 100% directly employed 1 x yard operative directly employed Type of Scaffolding Equipment Traditional tube and fitting Owned: Ladder safety gates, Up and over loading bay gates Type of works undertaken: New house build, council works, roofing, construction, domestic etc. Vehicles owned/Leased: 5 x HGV

3 x small vans

mike
Text Box
mike
Text Box
Page 3: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 3 of 20

1.0 Policy How Company comply? Recommended action 1.1 Health & Safety Policy Document 1.1.1 Do you have a health and safety policy as

required by Section 2(3) of the Health and Safety at Work etc. Act 1974 that includes a Policy Statement, Organisation and Arrangements?

Safety policy statement signed by Dave Baber March 2013. The health and safety policy is very descriptive and specific to the type of works carried out by SWC. And has been referenced to the health and safety at works act etc

No amendments required

1.1.2 Is a Director/Proprietor identified as having ultimate or primary responsibility for health and safety?

YES - Dave Baber -

1.1.3 Are basic responsibilities for health and safety identified?

YES – very precise and descriptive -

1.1.4 How has/is the current policy communicated to employees and new starters?

Discussed during induction, there is a copy on safety notice board and copies available if required

-

1.1.5 Are there copies of current EL and PL Insurance certificates available and to what limit?

EL £10 million, PL £10 million 05/02/13 – 04 02/14

-

1.2 Procedures, Instructions, Standards etc…

1.2 Safety Management System 1.2.1 Has the Company developed the Policy

etc a safety management system, if so what specification has it been developed to?

See 1.1.1. as per HSE HS (G) 65 Very good

1.2.2 Is the safety management system accredited by a third party organisation to a recognised specification (e.g. OHSAS 18001, CHAS, Constructionline etc)?

YES , both CHAS accredited and SMAS accredited until February 2014

-

Page 4: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 4 of 20

1.2.3 What standards do the Company keep

copies of to ensure compliance with industry standards (eg: Regulations, Codes of Practice, Client Specifications etc)

The company were able to produce copies of TG20:08, and SG4:10 Also Barrett specifications J and K

-

2. Organisation How Company comply? Recommended Action 2.1 Competence 2.1.1 How does the Company get competent

advice on health and safety matters, as required by Regulation 7 of the Management of Health & Safety at Work Regulations 1999?

The company retain the services of ‘ Worksafe’, Gloucester to provide their health and safety advice

-

2.1.2 How are training needs identified?

Regular review of training needs through established matrix

-

2.1.3 Have minimum competence levels been identified for each role?

13 Scaffolding Operative (incl 1 Supervisor) split: 3 CISRS Labourers 6 CISRS Scaffolder (1 due to do Advanced course shortly) 3 CISRS Trainee Scaffolders (incl 1 who has done Part 2 training and 2 who have done Part 1 training) 100% CISRS cards, EXCELLENT - NASC minimum IS 90% 54% CISRS Scaffolder or Advanced Scaffolder, GOOD – NASC minimum is 50% Supervisors and managers hold SSSTS

-

2.1.4 What arrangements are in place for induction training?

Any new starters work in yard for a time before being mentored by established and experienced team during probation period. Induction check lists and information sheet filled out by all new starters

-

mike
Text Box
Page 5: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 5 of 20

2.1.5 How are training records maintained?

Via matrix and hard copies managed by Mike Kendall Scanned copies of all training cards on record

-

2.1.6 Have line-management received any form of safety management training?

2 x harness inspectors 1 x SSSTS 1 x advanced scaffold inspector

-

2.2 Control 2.2.1 Describe the arrangements in place to

ensure Supervisory control of your operations, considering the nature of the business?

2 x managers carry out spot checks and day to day site visits. Continuous tool box talks carried out with all operatives and supervisors carry out daily site visits

-

2.2.2 What special supervisory arrangements are made for new employees, trainees and young persons?

All new starters must carry out the touch screen H&S test prior to going out on site. No young persons would be allowed out onto site or in lorry. There are no lone workers allowed.

-

2.2.3 What arrangements are made for the control and co-ordination of Sub-Contractors? E.g. q Vetting & selection q Contract (clear & unambiguous

expectations of performance) q Supervision/monitoring q Assessment of performance

No sub contract workers employed or used by SWC scaffolds ltd.

-

3.0 Planning & Implementation How Company comply? Recommended action 3.1 Risk Assessment & Method Statements 3.1.1 How do you ensure suitable and sufficient

assessment of the risks to health and safety of employees and others, as required by regulation 3 of the Management of Health and Safety at Work Regulations 1999?

A risk assessment is carried out for each job that records initial risk, control measures and residual risk Tool box talks carried out on regular basis

-

Page 6: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 6 of 20

3.1.2 How do you ensure risk assessments remain dynamic and relevant? (E.g. new or unforeseen hazards identified, changing environment/conditions, variation management, new statutory requirements, improved practices etc…)

As above. Also SWC carry out a job check which is recorded onto check sheet prior to all works commencing and this would highlight all hazards. If risks change, operatives will contact supervisor to have all RAMS re-done to make relevant to job

-

3.1.3 How do you implement control measures identified through the risk assessment process and the preparation of method statements?

A detailed site method statement specific is developed for each job which would include risk assessment and control measures

-

3.1.4 Review examples of risk assessments and method statements?

Reviewed – Markey construction, Grove street , Cheltenham. All RAMS were found to be very well put together, relevant to job specific. They were acceptable and record all initial risks and control measures

-

3.2 Preventing Falls 3.2.1 Have Scaffolding Operatives been issued

with suitable fall arrest equipment?

YES all signed for and good records in place

-

3.2.2 How do you ensure that fall arrest equipment is maintained in good order?

Very good three monthly records Inspected by trained harness inspectors

-

3.2.3 Have Scaffolding Operatives received training covering the National Access and Scaffolding Confederation’s (NASC) safety guidance note SG4:10 – Preventing Falls in Scaffolding?

YES – all operatives have had training through CISRS courses plus in house training in SG4:10 and collective fall prevention methods SG04:10 Booklets have been issued to all operatives and signed for

-

3.2.4 Have line-management received the above training (item 3.3.3)?

YES

-

mike
Text Box
Page 7: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 7 of 20

3.2.5 Have personnel been appointed and trained to undertake formal inspections of fall arrest equipment?

YES – see 3.2.2. -

3.3 Scaffold Material Control 3.3.1 What arrangements are in place to ensure

the systematic inspection and servicing of materials to ensure they are maintained in good order?

Very good controls in place with all materials being inspected prior to going out of yard and on return to yard. All materials are segregated on return prior to inspection. There are quarantine areas in place

-

3.4 Mobile Plant, Vehicles & Transport 3.4.1 How do ensure that mobile plant is only

used by trained and appointed persons?

The forklift truck that operates in the yard belongs to sister company ( SWC builders) and is only driven by qualified operator

-

3.4.2 What arrangements are in place to ensure that mobile plant equipment is maintained in good order?

See 3.4.1. -

3.4.3 Does mobile plant meet the requirements of the Provision and Use of Work Equipment Regulations 1998?

N/A -

3.5 Lifting Operations & Equipment 3.5.1 How are lifting operations controlled?

All lifting operations on sites carried out by client

-

3.5.2 Is lifting equipment examined and inspected in accordance with the Lifting Operations and Lifting Equipment Regulations 1998, with suitable records maintained?

All gin wheels are new. A lifting equipment log is available

-

3.6 Manual Handling 3.6.1 Have manual handling risk assessments

been undertaken in accordance with the Manual Handling Operations Regulations 1992?

YES and as part of CISRS training -

Page 8: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 8 of 20

3.6.2 Have all operatives received training in correct kinetic handling?

Only by operatives attending CISRS training courses and via tool box talks

Consider using NASC manual handling toolbox talk presentation and DVD

3.7 Health Surveillance & Screening 3.7.1 How are new employees vetted to ensure

they are physically capable and do not have any inherent injuries or ill health that may affect their own health and safety or that of others?

As part of the induction format. All operatives complete medical health questionnaire

NK has agreed to forward S&A format

3.7.2 Do you carry out any other form of medical checks or health screening (e.g. drivers, general health monitoring etc.)?

HGV -

3.8 Scaffold Design 3.8.1 How do you identify when design input is

required?

By reference to TG20:08 and any scaffolding that may not be termed as basic scaffolding

-

3.8.2 When identified who carries out design engineering and how have you established their competence?

Optima, scaffold design consultants, a very established and well respected design engineering company

-

3.8.3 How do you ensure that structures are erected in accordance with design?

By selection of right grade of scaffold operative, and hand over by competent scaffold supervisor

-

3.9 Scaffold Inspection, Commissioning & Handover

3.9.1 Who carries out the commissioning inspection and how are they deemed competent?

Scaffold operative of the correct grade for the scaffold – normally by advanced scaffold inspector

REMINDER - Handover inspections must be undertaken by someone independent of the erection team to comply with Barratt Group Specification.

3.9.2 Is a formal handing over certificate completed and is it suitable?

yes -

3.9.3 What arrangements are made for undertaking statutory scaffold inspections as required by the Work at Height Regulations 2005?

Usually carried out by the client on site but SWC have advanced scaffold inspectors that can carry out this duty if requested to do so by client

-

Page 9: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 9 of 20

3.10 Scaffold Anchor Testing 3.10.1 What arrangements are made for proof

testing scaffold anchors?

The company prefer Apollo or Hilti for tying. They have a proof test machine that has been calibrated. However further training has been considered for all operatives Very rarely used on Barrett group sites

-

3.11 Personal Protective Equipment 3.11.1 What arrangements are in place for the

selection, issue, storage and maintenance of PPE?

All relevant P.P.E is available in store. All P.P.E. must be signed for

-

3.11.2 Are records of PPE issue kept?

See above. Log seen by NK -

3.12 First Aid & Emergency Arrangements 3.12.1 Has a fire and emergency risk assessment

been undertaken?

YES - very good -

3.13 Welfare Facilities 3.13.1 What arrangements are made for the

provision of welfare facilities in accordance with the Workplace (Health, Safety & Welfare) Regulations 1992 and the Construction (Design and Management) Regulations 2007

Office and yard very good facilities. Both ladies and gents toilets available. Office complex upstairs very well organised and tidy. Welfare facilities are in the process of being refurbished and upgraded Drying facilities also available

-

3.14 Smoking at Work 3.14.1 Does the Company have a smoking policy

to protect employees from the discomfort of tobacco smoke?

Yes – all vehicles with no smoking stickers in and tool box talks relevant to topic carried out

-

3.15 Substance abuse 3.15.1 Has the Company a substance abuse

policy for drugs and alcohol etc at work (illegal and prescribed)?

As part of 1.1.1.

-

mike
Text Box
Page 10: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 10 of 20

3.16 Young Persons at Work (Under 18 years)

3.16.1 What arrangements are made for young persons under the age of eighteen, as required by the Management of Health and Safety at Work Regulations 1999 ACOP?

No young persons under the age of eighteen employed by SWC, but covered in policy as 1.1.1

-

3.17 Equal Opportunities Policy 3.17.1 Has the Company got a policy statement

and arrangements?

As part of 1.1.1. good -

4.0 Measuring Performance How Company comply Recommended Action 4.1 Reactive Monitoring 4.1.1 What arrangements are in place for

accident reporting and investigation?

There is a procedure in place 1.1.1. and in any major investigation arrangements have been made to call their safety consultants ‘Worksafe’

-

4.1.2 What enforcement action has been taken against the Company in the past 5 years (e.g. prosecutions, prohibition notices, improvement notices or abatement notices)?

None, this was confirmed by checking the HSE website under SWC Scaffolds Ltd and the previous company Skyway Scaffolding

-

4.2 Proactive Monitoring 4.2.1 What formal arrangements are made for

line-management to undertake health and safety monitoring? NB. In addition to day to day informal supervision.

Supervisors and managers carry out random site spot checks which are recorded in writing Regular health and safety meetings take place in office to discuss safety issues

-

4.2.2 Are any arrangements made for independent monitoring by a third party organisation (i.e. safety consultants)?

Safety consultants have been set up to carry out regular site visits

-

Page 11: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 11 of 20

5.0 Auditing How Company comply? Recommended Action 5.1 Are the safety management arrangements

audited by the Company, if so how is this managed?

The safety consultants are set to carry out annual review audits as from 2014

-

6.0 Scaffold Inspection How Company comply? Recommended Action 6.1 Inspect scaffolds and Scaffolders working

practices on an active site Inspection of scaffolding on Markey construction, Cheltenham. To be carried out on Monday 28/10/13

YARD AUDIT:

· Forklift operated by sister company and driven by trained operator only. · All materials after inspection are stored into racks and ends painted blue to indicate inspected and fit for use. · Racks very tidy and all materials segregated into correct sizes · Upper areas of racks have good safe access with ladder gates and double handrail and toeboards in place

mike
Text Box
mike
Text Box
Page 12: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 12 of 20

· Following inspection and servicing of fittings they are segregated into correct types and stored into relevant bays ready for use · Yard compound was found to be very tidy and organised

· Boards stored into stacks of fifty, banded and stored in a safe manner under cover · Access to all racks and storage areas for lorries etc very good

Page 13: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 13 of 20

Site audit - Markey construction, Cheltenham.

This is a new build house project managed by Markey construction. SWC at present have erected two number external base lifts to allow block work to continue. There is also a number of internal base lift scaffolds erected as required.

Page 14: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 14 of 20

internal scaffolds

· all scaffolds on site have been erected as per industry best practice ( TG20:08) · all scaffolds have 100% brick guards included · all scaffolds have ladder gates fitted to all access points · loading bays have been erected as per generic design

Page 15: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 15 of 20

· would suggest that SWL signage be fitted to all loading bay gates to inform users of scaffold limitations

- unacceptable corner standard base on loading bay

Page 16: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 16 of 20

good scaffold tag regime in place on site

Page 17: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 17 of 20

this ladder gate has been fixed upside down preventing the self close mechanism to operate correctly – NEEDS TO BE CORRECTED OR REPLACED

all internal scaffolds have had yellow plastic base pads placed under each standard

Page 18: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 18 of 20

overview of base lift scaffolds

Page 19: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 19 of 20

· generally all scaffold on site was found to of been erected to a good and satisfactory standard throughout. · Feedback from site management was very positive · No operatives on site at the time of the audit · Documentation was found to be in good order – training records, scaffold register, RAMS etc.

Page 20: Scaffolding Company Review Audit - SWC Scaffolding …swcscaffolds.co.uk/swcaudit2013.pdf · Scaffolding Company Review Audit Client’s Name: ... 3.2.1 Have Scaffolding Operatives

Barratt Group Scaffold Company Audit SWC Scaffolds Ltd 21 & 28 October 2013 Page 20 of 20

CONCLUSIONS

1) Would the Company pass a NASC audit?

I believe that at the time of the audit SWC Scaffolds Ltd would NOT pass an NASC membership audit for the following reasons:

a. The Company have not been trading for a minimum of 2 years under their new name as required by NASC rules

In my opinion the Company WOULD have passed the NASC site inspection

2) Recommendations for Barratt Group

Overall, notwithstanding the comments in the body of this report the overall standard of this Scaffolding Company was found to be VERY GOOD, the policy and procedures are VERY GOOD. The management of operations is generally EXCELLENT. 100% CISRS cards is EXCELLENT, 54% trained Scaffolders is GOOD (and it can be seen that this will be increased over the next few months to 60% to 70%)). Actual work on site was in the main VERY GOOD (with the exception of 1 standard on a loading bay and poor ladder gate, that the Company stated would be put right as soon as possible) I would therefore recommend, unconditionally, that this Company should be given a FULL acceptance that they meet Barratt’s minimum requirements.