Chathams school district of the 2015 Referendum Plan April 2015 A Message from the Board of Education warranted upgrades to better prepare our students. For these reasons, the Board is proposing a referendum to the voters to address a host of capital needs that we believe cannot be deferred any longer and that will enhance the student educational experience in a comprehensive way. Specifically, this referendum seeks to replace the middle school auditorium, which dates to 1958, refurbish the high school auditorium, quadruple the number of STEM labs at Chatham Middle School, add classrooms to our elementary schools, and make improvements to both Cougar Field and the athletic fields behind Chatham High School. After consultation with architects, and with input from the community, the Board reviewed several ways it could renovate, add space, and upgrade fields. The proposed referendum took into account optimal use of space, costs, and educational programming that will meet standards and best practices for many years to come. The Board spent much time comparing project concepts and costs, and is offering the proposed plans as the most cost-effective approach by taking advantage of low interest rates, state debt-service aid, and reduced expenses, with space flexibility that takes us into the future. On April 21, residents will vote on both the referendum and the district’s annual operating budget. Recognizing that the referendum seeks to address critical capital and infrastructure needs, the Board has worked to deliver an operating budget with the lowest tax increase in more than a decade. We believe that the two proposals together deliver great value and will further improve our already high-performing district. We encourage you to read this newsletter to learn more about both the proposed operating budget and the referendum plan. We invite you to visit our website at www.chatham-nj.org for additional details, or to email Dr. Michael LaSusa, the Superintendent of Schools, at [email protected], or the Board, at [email protected], to answer any additional questions. Thank you in advance for your ongoing support of our outstanding school district. Sincerely, The School District of the Chathams Board of Education • School district enrollment has grown 27% since 2005. • Chatham spends 12% less per- pupil than the average New Jersey district. • Chatham has dramatically expanded its STEM programs over the past two years. • Chatham Middle School has less STEM lab space than any school in the district. • The two auditoriums in the district date to 1958 and 1976, and virtually all of their materials are original and outdated. • Up until now all repairs and renovations in the district over the past ten years have been completed using the district’s operating budget and capital reserve account. Fast Facts New Jersey Monthly Top Schools, 2014 School Per-Pupil Budgetary Cost 1. Chatham $12,954 2. Haddonfield $12,281 3. Northern Highlands $16,570 4. West Morris Mendham $14,561 5. Millburn $14,608 6. New Providence $13,165 7. Pascack Hills $19,277 8. Glen Rock $16,492 9. Marlboro $14,359 10. Rumson-Fair Haven $16,562 Dear Community Member, Each and every year, the Board of Education (Board) strives to present a spending plan to the residents of the Chathams that delivers the best value in public education that one can find. Our school district consistently appears near the top of state and national rankings, yet toward the bottom of any per-pupil cost comparison of New Jersey districts. We are proud of this record. At the same time, there have been occasions over the past 20 years when the Board has deemed it necessary to propose additional spending measures to address critical capital needs. Exactly one decade ago, the Board proposed a referendum to address classroom, athletic fields, gymnasium, and library improvements to meet the demands of a rising enrollment and an aging infrastructure. District enrollment has jumped another 27% in the past ten years and a number of our facilities, especially those not addressed in the 2005 referendum, need improvement. In addition, dramatic changes in the fields of STEM (Science, Technology, Engineering and Math) have and Annual Budget

Upload: alan-routh

Post on 21-Jul-2016

224 views

Category:

Documents


1 download

DESCRIPTION

School District of the Chathams 2015 referendum plan

TRANSCRIPT

Page 1: School District of the Chathams 2015 referendum plan

Chathamss c h o o l d i s t r i c t o f t h e

2015 Referendum PlanA p r i l 2 0 1 5

A Message from the Board of Education warrantedupgradestobetterprepareourstudents.Forthesereasons,theBoardisproposingareferendumtothevoterstoaddressahostofcapitalneedsthatwebelievecannotbedeferredanylongerandthatwillenhancethestudenteducationalexperienceinacomprehensiveway.

Specifically,thisreferendumseekstoreplacethemiddleschoolauditorium,whichdatesto1958,refurbishthehighschoolauditorium,quadruplethenumberofSTEMlabsatChathamMiddleSchool,addclassroomstoourelementaryschools,andmakeimprovementstobothCougarFieldandtheathleticfieldsbehindChathamHighSchool.

Afterconsultationwitharchitects,andwithinputfromthecommunity,theBoardreviewedseveralwaysitcouldrenovate,addspace,andupgradefields.Theproposedreferendumtookintoaccountoptimaluseofspace,costs,andeducationalprogrammingthatwillmeetstandardsandbestpracticesformanyyearstocome.TheBoardspentmuchtimecomparingprojectconceptsandcosts,andisofferingtheproposedplans

asthemostcost-effectiveapproachbytakingadvantageoflowinterestrates,statedebt-serviceaid,andreduced

expenses,withspaceflexibilitythattakesusintothefuture.

OnApril 21,residentswillvoteonboththereferendumandthedistrict’sannualoperatingbudget.Recognizingthatthereferendumseekstoaddresscriticalcapitalandinfrastructureneeds,theBoardhasworkedtodeliveranoperatingbudgetwiththelowesttaxincreaseinmorethanadecade.Webelievethatthetwoproposalstogetherdelivergreatvalueandwillfurtherimproveouralreadyhigh-performingdistrict.

Weencourageyoutoreadthisnewslettertolearnmoreaboutboththeproposedoperatingbudgetandthereferendumplan.Weinviteyoutovisitourwebsiteatwww.chatham-nj.orgforadditionaldetails,ortoemailDr.MichaelLaSusa,theSuperintendentofSchools,[email protected],ortheBoard,[email protected],toansweranyadditionalquestions.

Thankyouinadvanceforyourongoingsupportofouroutstandingschooldistrict.

Sincerely,

TheSchoolDistrictoftheChathamsBoardofEducation

•Schooldistrictenrollmenthasgrown27%since2005.

•Chathamspends12%lessper-pupilthantheaverageNewJerseydistrict.

•ChathamhasdramaticallyexpandeditsSTEMprogramsoverthepasttwoyears.

•ChathamMiddleSchoolhaslessSTEMlabspacethananyschoolinthedistrict.

•Thetwoauditoriumsinthedistrictdateto1958and1976,andvirtuallyalloftheirmaterialsareoriginalandoutdated.

•Upuntilnowallrepairsandrenovationsinthedistrictoverthepasttenyearshavebeencompletedusingthedistrict’soperatingbudgetandcapitalreserveaccount.

Fast Facts

New Jersey Monthly Top Schools, 2014

SchoolPer-Pupil Budgetary Cost

1. Chatham $12,954

2. Haddonfield $12,281

3. Northern Highlands $16,570

4. West Morris Mendham $14,561

5. Millburn $14,608

6. New Providence $13,165

7. Pascack Hills $19,277

8. Glen Rock $16,492

9. Marlboro $14,359

10. Rumson-Fair Haven $16,562

DearCommunityMember,

Eachandeveryyear,theBoardofEducation(Board)strivestopresentaspendingplantotheresidentsoftheChathamsthatdeliversthebestvalueinpubliceducationthatonecanfind.Ourschooldistrictconsistentlyappearsnearthetopofstateandnationalrankings,yettowardthebottomofanyper-pupilcostcomparisonofNewJerseydistricts.Weareproudofthisrecord.

Atthesametime,therehavebeenoccasionsoverthepast20yearswhentheBoardhasdeemeditnecessarytoproposeadditionalspendingmeasurestoaddresscriticalcapitalneeds.Exactlyonedecadeago,theBoardproposedareferendumtoaddressclassroom,athleticfields,gymnasium,andlibraryimprovementstomeetthedemandsofarisingenrollmentandanaginginfrastructure.

Districtenrollmenthasjumpedanother27%inthepasttenyearsandanumberofourfacilities,especiallythosenotaddressedinthe2005referendum,needimprovement.Inaddition,dramaticchangesinthefieldsofSTEM(Science,Technology,EngineeringandMath)have

and Annual Budget

Page 2: School District of the Chathams 2015 referendum plan

Referendum Scope & Plans

– 2 –

Theschooldistricthasattimesoperatedatorbeyondcapacityinitselementaryschools.Enrollmenthasnotdeclinedaspredicted.SixnewclassroomswillrelievepressureonclassroomuseandenablethedistricttomovecertainprogramsfromSBStoMAS,thuscreatingtwoadditionalclassroomspacesineachschoolbuilding.

Referendum Project Scope

•Addressthetwooutdatedauditoriumfacilitiesformaximumflexibilityandprogramimprovementfortheforeseeablefuture.

•AddSTEMclassroomsatChathamMiddleSchoolbasedoncurrentandfutureprogramneed.•AddK-3elementaryclassroomsbasedoncurrentandfutureprogramneed.•Integratethedistrictadministrativeofficestosavethedistrictnearly$100,000annuallyin

operatingexpenses.•Upgradeandenhanceathleticfacilitiesforincreaseduseandgreaterflexibility.•BringallmajordistrictfacilitiesintoADAcompliancy.

ClassroomAdditionWashingtonAvenueSchool

Washington Avenue School (WAS)

•Buildtwo(2)newclassroomswithbathrooms

ApproximateCost:$1.1million-$100,000=$1 million(statedebtrelief)

ProposedNewAuditorium

Chatham Middle School (CMS)

Constructanewauditoriumthatincludes:

• Increasedseatingcapacity• Modernlighting,sound,andtechnicalfeatures• Adequatespaceforsetconstruction• Criticalstoragespace• Largerstagearea• Dressingrooms

Repurposetheexistingauditoriumtocreate:• Three(3)newSTEMlabstohousecomputer

programming,robotics,andengineeringcourses• Additionalmediaclassroom• Districtadministrativeoffices

Note: new computer labs, engineering lab, and office space cannot be built without building the new auditorium.

Approximatecost:$14.2million-$1.4million=$12.8 million(statedebtrelief)

ProposedSTEMClassroomsandDistrictofficesChathamMiddleSchool

Page 3: School District of the Chathams 2015 referendum plan

– 3 –

Cougar Field

ManymaterialsandfacilitiesatCougarField,includingthebleachers,fencing,macadam,andparkingplanareinneedofimprovement.Arunning/walkingpathwillhelpsupportoneofourlargestathleticactivities,boysandgirlscrosscountry.

• Reviseparking• Replacespectatorseating(bleachers)• Installnewsoundsystem• Installcrushedcinderwalking/runningpath• Replacemacadamandperimeterfencing

Approximatecost:$1.4 million

CougarFieldUpgrades

2-StoryClassroomAdditionMiltonAvenueSchool Milton Avenue School (MAS)

• Buildfour(4)newclassroomsina2-storyadditionwithbathrooms

ApproximateCost:$2.2million-$300,000=$1.9 million (statedebtrelief)

ChathamHighSchool

Chatham High School (CHS)

Installanewhybrid-surfacemulti-purposefieldwith:

•Propergradinganddrainage•Artificialturfonvarsitybaseballandmulti-usefield

toenableexpandeduseforathleticteams,physicaleducationclasses,andthemarchingband

Renovateexistingauditoriumtoinclude:

• Newenergy-efficientHVACsystem• Upgradestosound,lighting,wallcoverings,andseating• Newroofingsystem• AmericanswithDisabilitiesAct(ADA)upgrades

Approximatecost:$5.9million-$1.1million=$4.8 million(statedebtrelief)

Total Cost and What the State Will Pay Thetotalcostofthereferendumplanis$24.8million.Theboardexpectstoreceivedebtserviceintheamountof$2.9millionifthereferendumisapproved.

All architect schematics are preliminary drafts.

Page 4: School District of the Chathams 2015 referendum plan

Q1. Why is there only one referendum ballot question for voters to consider?

TheBoardofEducationbelievesthisreferendumtobeaholisticandcomprehensiveapproachtoimprovethethreemajorcomponentsoftheeducationalexperience:academics,thearts,andathletics.Withthelowinterestratesandstateaid,thereferendumdeliverssignificantvaluetothedistrict.Further,bundlingtheprojectshasthepotentialtoresultinamorecompetitivebiddingprocessandefficienciesinconstruction.

Q2. Why build a new auditorium at the middle school? Why not renovate it instead?

TheBoardhasexaminedsimplyrenovatingeachauditoriumspace.Whilethisisacheaperoption,itresultsinlessseatingcapacityineachfacilityasaresultofA.D.A.requirementsandfailstoaddresscriticalauxiliaryneeds.ItalsoeithereliminatestheopportunitytocreateSTEMlabspaceorit

requirestheconstructionofthoselabsinanotherlocation.

TheBoardhasalsoexaminedexpandingbothoftheexistingauditoriums.However,duetothelocationofeachauditoriumwithinandbetweenexistingschoolfacilities,itisnotafeasibleoption.

Buildinganewfacilityofferstheopportunitytodesignatheaterfacilitythatwouldplaceusonparwithnumerousotherareaschooldistrictsandprovideincreasedseatingcapacity,aproperareaforsetconstruction,appropriatedressingroomfacilities,criticalstoragespace,andother

– 4 –

Referendum and Budget Q & A

Comparison of Current Referendum to 2005 Referendum

Year ProjectsTotal $ Amount of Referendum

Tax Impact per $100,000 of Assessed

Value

Borough Township

2005

GymnasiumsatCMSandWAS;ClassroomsatCMS,WAS,andLAF;CougarFieldHouse;LibrariesatCMSandLAF;TurfFields

$26,712,000 $71 $57

2015

AuditoriumsatCMSandCHS;STEMLabsatCMS;ClassroomsatMASandWAS;CougarFieldImprovements;TurfFieldatCHS

$24,838,000 $25* $25*

Thischartshowsthedifferenceintaximpactbetweenthemostrecentschooldistrictreferenda.Asaresultofhistoricallylowinterestrates,thecurrentreferendumresultsinalowertaximpactthanthereferendumproposedandapprovedadecadeago.*Note:Thisamountreflectsa$5reductionintaxesresultantfromtherefundingofcurrentdebt.

District Design and Technology FacilitiesBuilding Enrolllment # of Tech. Labs Student: Tech .

Lab Ratio

MAS, SBS, WAS 1264 3 421

LAF 681 2 341

CMS 997 1 997

CHS 1194 5 239

ThedistricthasbeeninvestinginitsK-12STEMprograms.Lastyear’ssecondquestionallocated$460,000tobolsteringtheseprograms,includingtheadditionofSTEMteachersattheK-8levels.AsourstudentsareexposedtomoreSTEMcurriculumK-5,itisimportanttoensurethereareadequatefacilitiesandprogramsforthemingrades6-12.Thischartshowsthefacilitiesweaknessinthedistrictisatthe6-8level.ThethreenewDesignandTechnologylabsincludedinthisreferendumwillhelpensurethattheSTEMpipelineintoChathamHighSchoolwillremainstrong.

Per $100 $ 0.0250

Referendum Tax Impact

House Value Tax Increase

Borough$700,000 $178.03

Township$700,000 $171.91

Total Referendum Cost $24,838,000

State Debt Service Relief $2.9m

Interest Rate 3.50%

moderndesignfeatures.

Inaddition,anewfacilityenablesthedistricttoimproveitsdedicatedSTEMfacilitiesatChathamMiddleSchool.AllcomponentsoftheconversionofthecurrentauditoriumintoSTEMlabandofficespacequalifyforstatedebtrelief,reducingthecosttotaxpayersfrom$3.4millionto$2million.Coupledwithsavingsinoperatingcosts,thisisthemostcost-efficientaspectofthereferendumproposal.

Q3. What are the projected operating costs associated with the referendum plan?

Thedistrictestimatestheadditionaloperatingcostsassociatedwiththenewauditoriumtoberoughly$40,000peryearinenergyandcustodialcosts.Thedistrictprojectssavingsbetween$85,000and$100,000fromrelocatingitsdistrictofficesfromtherentallocationatMeyersvilleRoadtoschoolproperty.Therefore,theoperatingcostswouldbenetpositivefortheschooldistrict.

Ifthereferendumfails,noneoftheprojectsproposedwouldmoveforwardandstateaidwouldnotbeawardedatthepresenttime.

Page 5: School District of the Chathams 2015 referendum plan

– 5 –

Operating Budget Basics 2015-16

1. BudgetarycostsaretakenfromtheNJDOETaxpayers’GuidetoEducationSpending,2014(http://www.state.nj.us/education/guide/2014/)

2. PerformancedataaretakenfromtheNJDOESchoolPerformanceReports,2015(http://education.state.nj.us/pr/)

3. APParticipationRate=Numberofstudents,asapercentageof11thand12thgraders,whotookatleastoneAPtestin2013-2014

4. Post-SecondaryEnrollment=%ofstudentsenrolledinhighereducation16monthsafterhighschoolgraduation

How Chatham ComparesSchool District

Per-Pupil Budgetary

Cost

AP Participation

Rate

Post- Secondary Enrollment

Chatham $12,954 70.1% 93.0%

New Provi-dence

$13,165 42.2% 88.0%

Millburn $14,608 61.9% 87.0%

Livingston $14,385 55.4% 89.0%

Madison $13,752 49.6% 85.0%

Westfield $13,087 44.8% 90.0%

Bernards $13,897 53.6% 88.0%

Summit $14,291 68.0% 84.0%

Montgomery $13,907 62.4% 88.0%

Princeton $18,688 87.8% 86.0%

State Average

$14,783 NA NA

What does the proposed 2015-16 district budget look like?

2013/2014 2014/2015 2015/2016

Tax Levy Increase 3.46% 3.34% 1.77%

Local Tax Levy 55,874,234 57,742,607 58,767,459

Estimated Annual Tax Impact--per $100,000 of Assessed Value

Chatham Borough $33.63 $25.79 $15.23

Chatham Township $41.32 $48.45 $27.95

Estimated Annual Tax Impact--$700,000 Home

Chatham Borough $235.43 $180.56 $106.62

Chatham Township $289.27 $339.12 $195.67

1.77% proposedtaxlevyincreaseresultsinataximpactper$100,000thatismorethan41% lower thanlastyear’staximpactinboththeBoroughandTownship.

Theproposed2015/2016operatingbudgetwillmaintainandsupportallcurrentdistrictprogramsandclasssizes.Withafocusoncapitalimprovementsviatheproposedreferendum,theBoardhasheldthetaxlevyincreasetoitslowestamountinatleastadozenyears.

State Avg. Chatham Rate of Inflation3.2 2006/7 $12,259 $11,694 $11,6942.8 2007/8 $12,881 $11,585 $12,068 $12,0213.8 2008/9 $13,338 $11,665 $12,406 $12,478

-0.4 2009/10 $13,627 $11,464 $12,877 $12,4281.6 2010/11 $13,290 $11,780 $12,825 $12,6263.2 2011/12 $13,917 $12,019 $13,030 $13,0302.1 2012/13 $14,166 $12,171 $13,447 $13,303

$10,000

$10,500

$11,000

$11,500

$12,000

$12,500

$13,000

$13,500

$14,000

$14,500

$15,000

2006/7 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13

State Avg.

Chatham

Rate of Inflation

This chart shows Chatham's spending trend over time. The rate of inflation is published by the U.S. Bureau of Labor Statistics and available at www.usinflationcalculator.com. The per-pupilspending amounts are published through the NJDOE's Taxpayers' Guide to Education and show thethe most recent years for which actual spending per pupil is available.

State Avg. Chatham Rate of Inflation3.2 2006/7 $12,259 $11,694 $11,6942.8 2007/8 $12,881 $11,585 $12,068 $12,0213.8 2008/9 $13,338 $11,665 $12,406 $12,478

-0.4 2009/10 $13,627 $11,464 $12,877 $12,4281.6 2010/11 $13,290 $11,780 $12,825 $12,6263.2 2011/12 $13,917 $12,019 $13,030 $13,0302.1 2012/13 $14,166 $12,171 $13,447 $13,303

$10,000

$10,500

$11,000

$11,500

$12,000

$12,500

$13,000

$13,500

$14,000

$14,500

$15,000

2006/7 2007/8 2008/9 2009/10 2010/11 2011/12 2012/13

State Avg.

Chatham

Rate of Inflation

This chart shows Chatham's spending trend over time. The rate of inflation is published by the U.S. Bureau of Labor Statistics and available at www.usinflationcalculator.com. The per-pupilspending amounts are published through the NJDOE's Taxpayers' Guide to Education and show thethe most recent years for which actual spending per pupil is available.

Chatham Spending vs. InflationThischartshowsChatham’sspendingtrendovertime.TherateofinflationispublishedbytheU.S.BureauofLaborStatisticsandavailableatwww.usinflationcalculator.com.Theper-pupilspendingamountsarepublishedthroughtheNJDOE’sTaxpayers’GuidetoEducationandshowthemostrecentyearsforwhichactualspendingperpupilisavailable.

Page 6: School District of the Chathams 2015 referendum plan

Overview of District ExpendituresProposed 2015-16 Operating Budget

Where can I get more information? Tuesday, April 21, 2015Polls open 7 am – 9 pm

Polling places:Borough Residents: UpperGymnasium—

ChathamMiddleSchoolTownship Residents:GymnasiumC—

ChathamHighSchool

Visitthedistrict’sWebsiteatwww.chatham-nj.org.

E-mail: [email protected]

Read:WatchforperiodicupdatesorcoverageintheStarLedger,DailyRecordandtheChathamCourier.

SpeaktomembersoftheBoardofEducationabouttheplandetails.

School District of the Chathams Board of Education

58 Meyersville RoadChatham, NJ 07928

Non-Profit Org.U.S. Postage

PAIDPermit No. 1014

Chatham, NJ 07928

Postal PatronChatham, NJ 07928

Chathamss c h o o l d i s t r i c t o f t h e

JillCritchleyWeber,PresidentMatthewGilfillan,VicePresidentThomasK.BeldingMichelleClarkRichardConnors

KimCroninPhilFranzLataKenneyJohnNonnenmacher

Dr.MichaelLaSusa,SuperintendentPeterDaquila,BusinessAdministrator

ThisnewsletterisapublicationoftheBoardofEducationoftheSchoolDistrictoftheChathamsandispaidforwithlocaltaxrevenues.Aportionofthecolorprintingofthenewsletterhasbeendonatedtooffsetcosts.

Guiding PrinciplesTheSchoolDistrictoftheChathams,recognizingthatpremiereducationalinstitutionsmustexaminetheircurrentpracticesincontextsbothwithinandbeyondtheircommunities,strivesto:

• Equipeachofourstudentswiththecompetenciesandawarenesstosucceedacademically,professionally,andsocio-emotionallyinaglobalenvironment.

• Alignourpracticesandpolicieswithcurrent,evidence-basedresearchinthefieldsoflearning,childdevelopment,andeducation.

• Ensurethatthereisequityofopportunityforeachstudenttoaccessallcurricularandextra-curricularprograms.

• Promoteprofessionalgrowthamongourstaffthroughongoingcollaboration,feedback,andself-reflection.

Regular Instruction – 34%Special Education Instruction – 16%

Co-Curricular Activities and Athletics – 2% Attendance/Nursing Services – 1%

Guidance – 2%

Curriculum/Instruction – 4%General Admin – 2%

School Admin – 4%Central Office & Admin IT – 2%

Operations/Maintenance – 9%

Transportation – 4%

Employee Benefits – 15%

Grants & Entitlements – 1%Debt Repayments – 4%

Theproposedoperatingbudgetsupportsalldistrictprogrammingandresultsinanincreaseof1.77%inthetaxlevy.

A“No”voteonthebudgetmeansthemunicipalgoverningbodieswoulddetermineatotaldollaramounttobecutfromthebudget.Thishasthepotentialtoimpactspecificprograms,staff,andclasssizes.