school presentation
TRANSCRIPT
![Page 1: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/1.jpg)
It’s Time To RethinkIt’s Time To Rethink Modular ConstructionModular Construction
L ic . # 7 6 7 5 0 5
![Page 2: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/2.jpg)
In the 50’s the term was “pre-fab,”
in the 70’s it was“modular”
and today it’s “systems-built.”
![Page 3: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/3.jpg)
However, what you call us is not nearly as important as understanding when you choose to build with modular technology,
you benefit from fastconstruction and the superior quality
control only available in a systems-built unit.
![Page 4: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/4.jpg)
Systems-builtSystems-built high standards high standards
Quality manufacturingQuality manufacturing Random inspections and testingRandom inspections and testing Quality controlQuality control Strict accordance with regulations and Strict accordance with regulations and
codescodes
![Page 5: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/5.jpg)
The systems-built process produces less waste.
Systems-built construction is a safer alternative.
Conventional construction workers at the construction siteregularly work in less than ideal conditions, with temperature extremes, rain, wind, or any combination of natural conditions.
Because the systems-built structure is substantially completed in a factory- controlled setting using dry materials, the potential for
high levels of mold and contaminants is eliminated.
The systems-built structure is constructed off-site, reducing the
Time and impact on the surrounding site environment.
![Page 6: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/6.jpg)
Can we design and construct a school environment based on the principles?
• High visibility into and out of all learning spaces
• Flexibility of spaces for different learning needs and interests
• Open spaces where teachers and students teach and learn together Project based
• School identity reflected in design Specialized spaces
![Page 7: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/7.jpg)
The Design
Utilize district standards
Sustainability (30 years)
Flexibility of installation
Easily expanded
10% - 45% or more savings depending on designs and materials
![Page 8: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/8.jpg)
Excavation begins. Modular constructionHas already commenced.
Excavation begins.
![Page 9: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/9.jpg)
Foundation begins while module construction continues.
Foundation begins.
![Page 10: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/10.jpg)
First complete modules come off the line. Site work continues.
![Page 11: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/11.jpg)
Start setting modules. Site work continues.
![Page 12: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/12.jpg)
Set top floor. Site work continues.
![Page 13: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/13.jpg)
Interior work commences. Exterior work continues.
![Page 14: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/14.jpg)
90% CompleteExterior work continues.
55% CompleteExterior work continues.
Interior work begins.
![Page 15: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/15.jpg)
100% CompleteSchool opens within 8 months.
65% CompleteExterior work continues.
![Page 16: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/16.jpg)
100% CompleteReady for instruction to begin.
85% CompleteSite work continues.
![Page 17: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/17.jpg)
Opened in 8 months. Opened in 15 months.
![Page 18: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/18.jpg)
![Page 19: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/19.jpg)
S o if you have . . .
• have immediate space needs
• need for quality buildings comparable to site constructed buildings in function and aesthetics
• need to maximize purchasing dollars
![Page 20: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/20.jpg)
![Page 21: School presentation](https://reader034.vdocuments.net/reader034/viewer/2022052622/55961e071a28ab920e8b46dd/html5/thumbnails/21.jpg)
Let’s get started today…Let’s get started today…
Lic.# 767505
2206 Alpine Blvd. Ste. B – Alpine CA 91901 619.722.7179
Enriching the neighborhood we live in – one building at a time