Regierungspräsidium Darmstadt
Sealing materials
ConcreteRequirementsRequirements ::
• Low and moderate demands:
- Concrete quality B 25 (Verification byreference documentation or insert ofrebound hammer)
1
rebound hammer)- Component thickness > 15 cm
• High demand:- Concrete quality B 35, component thickness> 20cm
• Appropriate joint materials
Assesing penetration depth⇒⇒⇒⇒⇒⇒⇒⇒ VerificationVerification ofof tightnesstightness isis establishedestablishedwhenwhen penetrationpenetration depthdepth isis lessless thanthan 66% 66% ofof componentcomponent partpart thicknessthickness
1.4 Materials
Regierungspräsidium Darmstadt
Rebound hammer
21.4 Materials
Regierungspräsidium Darmstadt
Sealing materials
Asphalt
RequirementsRequirements ::
Low and moderate demands
• Minimal of thickness 4 cm,
Certification of porosity (< 3 %)
3
Certification of porosity (< 3 %)
• Applicable joint material
Assessing penetration depth⇒⇒⇒⇒⇒⇒⇒⇒ VerificationVerification ofof tightnesstightness isis establishedestablishedwhenwhen penetrationpenetration depthdepth isis lessless thanthan 66% 66% ofof componentcomponent partpart thicknessthickness
1.4 Materials
FillingFilling sitesite sealedsealedwithwith asphaltasphalt
Regierungspräsidium Darmstadt
Construction of joints
General requirementsequirements :
• Prefer jointless constructions• Elaborateness planning of joint configuration
4
• Elaborateness planning of joint configurationand construction
• Joint hauling preferably in approachable andtestable areas
• Joint configuration referred to system of rules
1.5 joint construction
Regierungspräsidium Darmstadt
Joint construction with bonded joint-strip
51.5 joint construction
Regierungspräsidium Darmstadt
Drivable joint
b = 15 - 30 mm dH= 20 – 90 mm Fugenflanken 3 – 5 mm
61.5 joint construction
Regierungspräsidium Darmstadt
Sealing with concrete , trough, joint
71.5 joint construction
Regierungspräsidium Darmstadt
Sealing areaGeneral requirementsequirements :
A sealed operating area in filling sites is to locate. This area is the surfacewhile filling, it is identified with the horizontal line of pipe betweenconnection tank truck and storage tank, additionally 2,5 m roundly. (water-endangering liquids can blow out under pressure).
8
(water-endangering liquids can blow out under pressure).
The size of operating area can be reduced by installing splash guard witha height of 1meter minimum.
1.6 Sealing area
Regierungspräsidium Darmstadt
Trough
2,5 m
Operating area
Manhole pit ofa subsurfacetank
9
2,5 m
Splash guard, minimum height 1 m
Pipe
1.6 Sealing area
Regierungspräsidium Darmstadt
Pipe in connection with sealing system
> 2 %
Connecting pipe
10
• Pipes have to be testable for tightness, including junctions to componentsof sealing face.
• Pipes and sealing components have to observe tightnessand consistency requirements.
• Single walled and below ground pipes shall have weld joints, bond orflanged connection which are equate to non-detachably connection
1.6 Sealing area
Regierungspräsidium Darmstadt
Controling and monitoring sealing faces
• Expert installation of a sealing system, documented orderly
• Certification of sealing system, conducted byan independent expert
11
an independent expert
• Periodical inspection of operational reliabilityin the framework of internal survey andexternal expert inspection
1.7 Monitoring sealing faces
Regierungspräsidium Darmstadt
Evaluation of sealing facesVisual Visual inspectioninspectionChecking surface for contamination and damages:- Crack- Damage caused by mechanical attack- Damage caused by chemical attack- Bubble formation, maceration and delamination- Damaged joints
12
- Damaged joints
Technical inspectionChecking detected damages for the need for action:- Quantify crack depth and crack width, test for crack transmissibility
- Expose parts of sealing face at random and evaluate- Nondestructive test (rebound hammer)- Measure abrasion of sealing face- Core hole drilling at random
1.7 monitoring sealing faces
Regierungspräsidium Darmstadt
2. Oil separatorRange of application
• Oil separators are used on sites where oil loss or oilleakages are possibleOn open areas surface water and cleaning liquid could be added:could be added:
- filling grounds, dealing with mineral oil products- fuel filling sites- truck wash- open repair shop- traffic zone of tank trucks and switching grounds
132.1 Range of application
Regierungspräsidium Darmstadt
Mode of function
• The mode of separation is a physical process, whereat difference in density to oil and water is used. The oil separator accelerates and controls thisprocess.process.
• Generally, oil separator consists of three assemblies:- Slurry trap- Separator- Sample shaft
142.2 Mode of function/capacity
Regierungspräsidium Darmstadt
Capacity
• Separator capacity is specified by nominal value(Nenngröße , NG)NG 1 means a maximal flow of 1 l/s withoutexceeding limit value for carbon hydrideexceeding limit value for carbon hydride
• NG determination is to calculate on an individual basis. All relevant parameter are to ascertain on a siteinspection. In addition regional rain yield factor is toconsider (heavy rain= 50 l/m²).
152.2 Mode of function/capacity
Regierungspräsidium Darmstadt
Slurry trap
• The volume of slurry trap have to be in line with theoil-separator capacity:NG 1 to 3: 600 lNG 3 to 10: 2500lNG > 10: low quantity of slurry: NG x 100 l NG > 10: low quantity of slurry: NG x 100 l
moderate quantity of slurry : NG x 200 lhigh quantity of slurry : NG x 300 l
• Incoming waste water is drained off and settled withdip tube or wash plate
162.3 Slurry trap
Regierungspräsidium Darmstadt
Oil separator
• Oil separator should hold a limiting value of20 mg/l for carbon hydride discharging wastewaterto a sewage plant. Discharging wastewater in receiving waters a limiting value of 5 mg/l for carbonhydride is to advice.
• To keep a limit value of 5mg/l for carbon hydride a • To keep a limit value of 5mg/l for carbon hydride a coalescence separator is necessary .
• An automatically acting shut-off feature avoidsuncontrolled wastewater output.
172.4 Oil separator
Regierungspräsidium Darmstadt
Sample shaft
• An inclined trough at the bottom of the sample shaftpermitts wastewater extraction and quantity control
• Other split-flows wastewater shall not feed the• Other split-flows wastewater shall not feed the
shaft.
182.5 Sample shaft
Regierungspräsidium Darmstadt
Coalescence separator
19
Regierungspräsidium Darmstadt
Fuel separator + Coalescence separatorused by high rate of inflow and heavy polluted wastewater
20
Regierungspräsidium Darmstadt
Placing and maintenance• Separator shaft must be at least 130 mm higher thanthe lowest intake works. Therewith an uncontrolled oilemersion can be averted
• periodical controlls are necessary to a proven und failure-free handling:failure-free handling:- monthly function check- half-yearly maintenance- 5-yearly principal inspection (drawdown, cleaning, tightness control)
• Verification of personal qualfication
212.6 Placing and maintenance
Regierungspräsidium Darmstadt
• Shut-off feature in action
• More wastewater flows in => backwater
22
• If superelevation isimpractical =>installwarning device
2.6 Placing and maintenance