seattle design commission presentation october 3, 2013

47
JIMI HENDRIX PARK SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

Upload: others

Post on 15-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX PARK SEATTLE DESIGN COMMISSION PRESENTATION

OCTOBER 3, 2013

Page 2: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

23RD

AV

E S.

JIMI HENDRIX

PARK

2

Page 3: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

3

Page 4: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

4

Page 5: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW OF PARK FROM SOUTH (EXISTING PARKING LOT) 5

Page 6: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW OF PARK FROM SOUTHEAST (MT. BAKER NEIGHBORHOOD) 6

Page 7: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

NORTHWEST AFRICAN AMERICAN MUSEUM ENTRANCE

PATH LOOKING NORTHEAST TO I-90 TRAIL PATH LOOKING SOUTHWEST 7

Page 8: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

8

Page 9: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW TO SOUTHEAST FROM NAAM ROOF 9

Page 10: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

RETAINING WALL INHIBITS ACCESS FROM SOUTHEAST 10

Page 11: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW TO MOUNT RAINIER 11

Page 12: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX PARK 12

Page 13: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX DRAWING INSPIRATION 13

Page 14: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX INSPIRATION 14

Page 15: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX PARK

• Phasing • Literal vs. Abstract • Entries • Retaining wall/stairs • Detail • ADA • CPTED

15

Page 16: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

GRADING PLAN 16

Page 17: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW FROM SOUTHEAST CORNER

17

Page 18: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

VIEW FROM NORTHEAST CORNER

18

Page 19: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX PARK ENTRIES 19

Page 20: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SOUTHEAST CORNER ENTRY 20

Page 21: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SOUTHEAST CORNER ENTRY CONCRETE SEAT

JIMI HENDRIX SIGNATURE SANDBLASTED INTO CONCRETE WALL

21

Page 22: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SOUTHWEST FROM NAAM SIDEWALK 22

PAULOWNIA TREE

Page 23: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

WEST FROM NAAM ENTRY 23

Page 24: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

NORTHEAST CORNER ENTRIES

Page 25: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

NORTHEAST CORNER ENTRIES 25

Page 26: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

WAVE FEATURE FLATTENED ELEVATION 26

Page 27: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

WAVE FEATURE VIEW FROM SOUTHWEST 27

Page 28: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

WAVE FEATURE VIEW FROM SOUTHEAST 28

Page 29: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

WAVE FEATURE FOOTING 29

Page 30: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CENTRAL SHELTER 30

Page 31: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CENTRAL PLAZA

B B’

A’ A

31

Page 32: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CENTRAL SHELTER

PLAN VIEW

RIB SECTION

32

Page 33: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CENTRAL SHELTER

CONCRETE FOOTING AND BASE PLATE PLAN

BASE PLATE PLAN

CONCRETE FOOTING AND BASE PLATE SECTION 33

Page 34: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SPECIALTY PAVING

LITHOCRETE WITH SEEDED COLORED GLASS

34

Page 35: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

TEXT IMBEDDED IN STEM OF GUITAR TIMELINE PATH

35

Page 36: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

TIMELINE CATEGORIES: • THE EARLY YEARS • LOCAL PERFORMANCE DATES • RECORDING STUDIO DATES • WORLD-WIDE CONCERT DATES

TEXT IMBEDDED IN STEM OF GUITAR TIMELINE PATH 36

‘LITTLE WING’ LYRICS

Page 37: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SITE FURNITURE 37

Page 38: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CONCRETE SEATING

CONCRETE SEAT WALLS

CONCRETE SEATS

ORANGE RED LITHOCRETE WITH GROUND DOWN TOPS

38

Page 39: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SITE FURNITURE

LANDSCAPE FORMS ‘BOLA’ BIKE RACK TRASH RECEPTACLE

39

Page 40: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

SITE TREES 40

Page 41: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

STORMWATER GARDEN 41

Page 42: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

BUTTERFLY GARDEN 42

BOSTON IVY WALL VINE

Page 43: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

LIGHTING PLAN 43

Page 44: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

LIGHTING

PEDESTRIAN HEIGHT POLE TOP LUMINAIRE BY BEGA

12’ HT ALONG PATHS, 16’ AT PARKING LOTS

CENTRAL PLAZA MAST LIGHT LUMINAIRE BY BEGA

30’ HT POLE

44

Page 45: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

CPTED REVIEW WITH SPD 45

Page 46: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013

JIMI HENDRIX PARK 46

Page 47: SEATTLE DESIGN COMMISSION PRESENTATION OCTOBER 3, 2013