sec02 field development planning

20
   ©    A    B    B    L   u   m   m   u   s    G    l   o    b   a    l    I   n   c  .      1 Sec02_FieldDevelopmentPlanning_All.ppt Deepwater Training Field Development Planning AIPM

Upload: josue-emmanuel-blasquez-contreras

Post on 07-Apr-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 1/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1

Sec02_FieldDevelopmentPlanning_All.ppt

Deepwater Training

Field Development Planning

AIPM

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 2/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   2

Sec02_FieldDevelopmentPlanning_All.ppt

Field Development Planning

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 3/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   3

Sec02_FieldDevelopmentPlanning_All.ppt

n TLP Tension Leg Platform

n Mini-TLP Mini Tension Leg Platform (Atlantia, Modec)

n ETLP Extended Tension Leg Platform

n SPAR Cylindrical Floating Vessels

n DDCV Deep Draft Caisson Vessel

n SCF Single Column Floater (SPAR Shape)

n Semi-sub Semi-submersible Floater 

n FPS Floating Production System

n FPSO Floating Production Storage and Offloading

n GBS Concrete Gravity Based Structure

n Tendon TLP Station Keeping Method

Definitions

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 4/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   4

Sec02_FieldDevelopmentPlanning_All.ppt

n KIPS Kilo Pounds (Thousand Pounds)

n SPM Single Point Mooring

n CALM Catenary Anchor Leg Mooring

n SCR Steel Catenary Riser  

n VIV Vortex Induced Vibration

n

ROV Remotely Operated Vehiclen MODU Mobile Offshore Drilling Unit

n ABS American Bureau of Shipping

n DNV Det Norske Veritas

Definitions

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 5/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   5

Sec02_FieldDevelopmentPlanning_All.ppt

Why All The Fuss Over Deepwater ?

• Large unexplored areas3D Seismic

It is an opportunity for large reserves and high flow rates

Technology is rapidly reducing the exploration cost and time

to first oil and cost.

Why all the planning?

But it is expensive

Specialized equipment is required for drilling anddevelopment

IT IS DEEP.

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 6/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   6

Sec02_FieldDevelopmentPlanning_All.ppt

Start

First Oil

Installation

Constructibility

Program

   I  n   f   l  u  e  n  c  e  o  n   C

  o  s   t

Project DurationFinish

Lowest

Highest

Detailed Design

Construction

Preliminary

Engineering

Added Value

by moving constructabilityforward with EPCI contractor 

performing screening andconcept development

The Planning Process

n Establish Project Objectives

n Evaluate Constraints

n Economics

n Schedule

n Product

n Risk

n Identify Development Optionn Perform Feasibility Studies

n Establish Field DevelopmentPlan

n Produce Conceptual Design

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 7/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   7

Sec02_FieldDevelopmentPlanning_All.ppt

The Planning Process

n Define Interfaces

n Downhole / Subsea / Hull

n Fluid Flow / Connections / Treatment

n Electrical / Hydraulicn Subsea / Topsides

n Maintenance

n Intervention

n Prepare Specifications

n Equipment

n Quality

n Project Execution

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 8/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   8

Sec02_FieldDevelopmentPlanning_All.ppt

The Planning Process

n System Design

n Flow Assurance

n Well Locations

n Installation Risksn Maintenance

n Intervention

n Future Considerations

n Flexibility

n Expandability

n Develop “Standard” Approach

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 9/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   9

Sec02_FieldDevelopmentPlanning_All.ppt

DiscoveryReservoir Appraisal

Fluid Analysis &Field Parameters

Conceptual Evaluation - Field Options

Technology Validation

Feed

Preferred Concept

Concept Resilience Checks

Value Engineering

EPC

Tender 

Call

CriticalTechnology

Elements

Deepwater Field Development Front End Process

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 10/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   0

Sec02_FieldDevelopmentPlanning_All.ppt

STAGE 1SCOPING

"is it a good idea?" 

EMPHASIS

� IDENTIFY OPPORTUNITY

� SCOPE ECONOMICS

� ID CRITICAL ISSUES� STRATEGIC ALIGNMENT

TECHNICAL BASIS

SUFFICIENT FOR TECHNICAL

FEASIBILITY

DELIVERABLES

� PRELIMINARY

Ø BUSINESS CASE (BC)

Ø VENTURE PHILOSOPHY

(VP)

STAGE 2SCREENING

"Do we have the right solution" 

EMPHASIS

� EVALUATE OPTIONS

� RISK ANALYSIS� REFINE BUSINESS CASE

� RESOLVE CRITICAL ISSUES

� RESOURCING NEXT PHASE

DELIVERABLES

� UPDATED BC & VP

� RISK & DECISION ANALYSIS

� VENTURE BASESØ TECHNOLOGY

Ø BUSINESS & MARKETINGØ MANUFACTURING

TECHNICAL BASIS

SUFFICIENT FOR +/- 20-30%COST ESTIMATE

STAGE 3DEFINITIVE PLANNING

"Are the bases really firm?"

EMPHASIS

� REFINE BUSINESS CASE

� REFINE FACILITIES BASIS� RESOURCING NEXT PHASE

DELIVERABLES

� VENTURE MANAGER NAME

� TEAM IN PLACE

� UPDATED VENTURE BASES

� UPDATED COST ESTIAMTE

TECHNICAL BASIS

SUFFICIENT DETAIL TOENABLE PROCESS DESIGNA

ND PERMITTING

STAGE 4PROCESS DESIGN

"Any changes? Ready to go? 

DELIVERABLES

� FINAL BASIS / APPRO DOC.

� PROCESS DESIGN / HAZOP

� +/- 10% COST ESTIAMTE

TECHNICAL BASIS

SUFFICIENT TO ENABLE

� +/- 10% COST ESTIAMTE

� DETAILED ENGINEERING

� SAFETY REVIEWS

EMPHASIS

� FINAL BUSINESS CASE

TECHNICAL DEFINITION� RESOURCING THRU S/U

EPCIConceptual Field Development Studies Solution Selection

Open Architecture Technology Screening & Specification

FEED Studies

Project Development Gate Process

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 11/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   1

Sec02_FieldDevelopmentPlanning_All.ppt

Times for Definitive and Capital Cost Estimates are from

completion of basic and process engineering.

TypeType AccuracyAccuracy ClassClass TimingTiming

Definitive +/- 5% II 14-20 wks

Capital Cost +/- 10-20% II, IV 5-12 wks

Appropriation +/- 20-25% VA,VB 2-5 wks

Feasibility +/- 25-35% VI, VII days

Estimate Definition

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 12/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   2

Sec02_FieldDevelopmentPlanning_All.ppt

Zero Date

6 Months

8 Months

9 to 10 Months

Field Development StudiesField Development Studies

Operator\Partner 

In-house

Evaluation/Approval

Operator\Partner 

In-house

Evaluation/Approval

Basic EngineeringBasic Engineering

Sanction

EPCEPC

Pre-sanction Project Activities

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 13/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   3

Field Development

Objectives and

Philosophies

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 14/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   4

Sec02_FieldDevelopmentPlanning_All.ppt

Key Objectives and Philosophies

n Key Objectives

n Reduce Project Costs

n CAPEX

n OPEX

n Reduce Project Cycle Time

n from initial discovery to first

productionn Improve Safety and Risk

Parameters

n Key Philosophies

n Flexibility

n design

n installation

n operation

n expansion

n

Building Blocksn Composite Systems

n from reservoir to processing

host

n Repair and Maintenance

n without shutdown and with

least disruption to other 

equipment

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 15/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   5

Sec02_FieldDevelopmentPlanning_All.ppt

Life Cycle Cost Minimization

n Configuration simplicity consistent with Meeting Functional

Objectives

n Reliability in Equipment/Systems (Low Maintenance Intensity)

n Operations/Maintenance and Supply Base Organization Strategy

n Drilling and Well Intervention Strategies

n Shuttle Tanker Cycles fully optimized with Facilities Production

Objectives

n Procurement Strategies consistent with Field Life Expectations and

Development Schedule

n Supply Logistics

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 16/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   6

Sec02_FieldDevelopmentPlanning_All.ppt

n Provide an early definition of projectfront end requirements.

n Greatest potential to improve project

timeline and cost curve.

n Early planning can define and

control project risk.

n Reality based cost estimate for 

prospect screening economics.

n Ability to expand study detail for 

each higher level of project fundingapproval.

Value Added

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 17/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   7

Sec02_FieldDevelopmentPlanning_All.ppt

0

2

4

6

8

10

12

14

16

18

20

1987 1991 1994 1995 1995

PROJECTS

    M    U    S    D    /    W    E    L    L

Tommeliten Tordis Vigdis Tordis Øst Balder  

Budgetary Cost per Well

Cost per well is defined as the equipment 

necessary at the wellhead excluding drilling,

installation and flowlines

Cost Reduction Example

n Cost reduction achieved

through

n Concept Optimization

n Development of New

Technology

n Standardization

n Cost Effective Project

Management

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 18/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   8

Sec02_FieldDevelopmentPlanning_All.ppt

12 24 36 48

Engineering/Fabrication Duration (months)

Auger TLP1989

Mars TLP

1993

Ram/PowellTLP 1994

Ursa TLP1995

Marlin TLP

1997

Total TopsidesPayld (s-tons)

Hull Weight(s-tons)

19,000 35,700

15,000 21,345

16,000 21,071

30,000 37,087

8,500 9,085

Deepwater Project 6 18 30 42

Engineering

Fabrication

Engineering

Fabrication

Engineering

Fabrication

Engineering

Fabrication

Engineering

Fabrication

TLP Hull Engineering/Fabrication Schedules

Cost Reduction Example

8/6/2019 Sec02 Field Development Planning

http://slidepdf.com/reader/full/sec02-field-development-planning 19/19

   ©

   A   B   B   L  u  m

  m  u  s   G   l  o   b  a   l   I  n  c .  -   1   9

QUESTIONS ?