Steven L. Beshear Governor Leonard K. Peters Secretary Energy and Environment Cabinet PARTIES OF RECORD Re: Case No. 2012-00169 Commonwealth of Kentucky Public Service Commission 211 Sower Blvd P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460 psc.ky .. gov January 16, 2013 David L. Armstrong Chairman James W. Gardner Vice Chairman Linda Breathitt Commissioner Application of East Kentucky Power Cooperative, Inc. to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, LLC Attached is a copy of the memorandum which is being filed in the record of the above-referenced case. If you have any comments you would like to make regarding the contents of the informal conference memorandum, please do so within five days of receipt of this letter. If you have any questions, please contact Richard Raff, Staff Attorney, at 502-782-2588. RR/kar Attachments KentuckyUnbridledSpirit.com An Equal Opportunity Employer M/F/D

Upload: others

Post on 30-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Steven L. Beshear Governor

Leonard K. Peters Secretary Energy and Environment Cabinet

PARTIES OF RECORD

Re: Case No. 2012-00169

Commonwealth of Kentucky Public Service Commission

211 Sower Blvd P.O Box 615

Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940

Fax. (502) 564-3460 psc.ky .. gov

January 16, 2013

David L. Armstrong Chairman

James W. Gardner Vice Chairman

Linda Breathitt Commissioner

Application of East Kentucky Power Cooperative, Inc. to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, LLC

Attached is a copy of the memorandum which is being filed in the record of the above-referenced case. If you have any comments you would like to make regarding the contents of the informal conference memorandum, please do so within five days of receipt of this letter. If you have any questions, please contact Richard Raff, Staff Attorney, at 502-782-2588.

RR/kar

Attachments

KentuckyUnbridledSpirit.com An Equal Opportunity Employer M/F/D

Page 2: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

TO:

FROM:

DATE:

RE:

INTRA-AGENCY MEMORANDUM

KENTUCKY PUBLIC SERVICE COMMISSION

Case File

Richard Raff, Staff Attorney ~ January 16, 2013

Case No. 2012-00169 Application of East Kentucky Power Cooperative, Inc. to Transfer Functional Control of Certain Transmission Facilities to PJM Interconnection, LLC

Pursuant to the Commission Staff's notice issued October 1, 2012, an informal conference was held at the Commission's offices on October 12, 2012 for the purposes of discussing all issues in the case and to provide an opportunity to PJM Interconnect, LLC to present an overview of its operations including, but not limited to, participation in capacity markets, reserve margin requirements, reliability must run units, and demand response programs.

PJM made a formal presentation of its operations and markets, a copy of which was provided to all parties and is attached hereto (but is not being served with this memo due to its voluminous nature). The parties also discussed the issues and the potential for resolving some of the pending issues.

By Staff notice issued on October 17, 2012, an additional conference was held on October 19, 2012, and by staff notice issued on October 25, 2012, a further conference was held on October 26, 2012, both for the purposes of clarification of the issues and discussing potential resolution of outstanding issues. A list of the attendees at each conference is attached hereto.

Attachment - Lists of Attendees

cc: Parties of Record

Page 3: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

COMMONWEALTH OF KENTUCKY

BEFORE THE PUBLIC SERVICE COMMISSION

In the Matter of:

APPLICATION OF EAST KENTUCKY POWER COOPERATIVE, INC. TO TRANSFER FUNCTIONAL CONTROL OF CERTAIN TRANSMISSION FACILITIES TO PJM INTERCONNECTION, LLC

) ) CASE NO. ) 2012-00169 ) )

October 12, 2012 Please sign in:

])e£f.L( ~~~"' . ____ _

C!JLr11 Oa.,~er

_bme:_ b~/1&12 c_·]) 0/A?fO/(...) .

UvtAJv\<Z5t~ 3-hvrt?~ __ u 6

-1-

REPRESENTING

~~~~l> ~~&It fi){t?L

U<t:

-.L.K~ :;.Ko ~/Lc- L.K F

l£4?:-1-1<. &

L&t- 71<A --· 1

Page 4: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Case No. 2012-00169 October 12, 2012

NAME

;Jd It ,I (]d a ~t~ ,-/<!_

£:rl. v bowfYlvfl f~"1Lc.le,I2Vl Go~ jitar.\

J:?w~Lnr~P

- 2 -

REPRESENTING

P\J--1111

;.!( ';v~ , .J, I.

___ j::> 0 fJ(

f.{~

~_G-__ _

?sc --~E..~s~~~------------

1.-G<t ld I t< Vl

Page 5: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Case No. 2012-00169 October 12, 2012

c. h vd<. /] 0~5 CL r1

AV\n

REPRESENTING

-Psc ·--------

PsG

·- --·---------

- 2 -

Page 6: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

COMMONWEALTH OF KENTUCKY

BEFORE THE PUBLIC SERVICE COMMISSION

In the Matter of:

APPLICATION OF EAST KENTUCKY POWER COOPERATIVE, INC. TO TRANSFER FUNCTIONAL CONTROL OF CERTAIN TRANSMISSION FACILITIES TO PJM INTERCONNECTION, LLC

October 19, 2012 Please sign in:

) ) CASE NO. ) 2012-00169 ) )

REPRESENTING

f?s-c -·(cef/t!__

d}aN m..l...!.t;>.&Lalt_:::."e/=--------·

~v¥-~o~ J. ·---------\' ~LlU!Vlt- fbl0)

-1-

~~7 ~tl/;d~ ~ II-# c._

EkPL

~----PCJM

Page 7: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Case No. 2012-00169 October 19, 2012

NAME

fZ:A M'-. ((61~

0 ellll~r .. Yo ~I< v~~·;d~

_A:J;J uJooD (2.bf{ {)u8e-YL

- 2 -

REPRESENTING

Zj;_pc_ ------

~(

/3/{fJ (_

------------

Page 8: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Case No. 2012-00169 October 19, 2012

- 3 -

REPRESENTING

_51<)~ ~ 4Y~ fr.~-=-L)_' ~ L&c/k~

--------

?;I&J-1/ ~ .s:h G I ·-

St:o ~r LG-£ (tu

fSG

Page 9: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

COMMONWEALTH OF KENTUCKY

BEFORE THE PUBLIC SERVICE COMMISSION

In the Matter of:

APPLICATION OF EAST KENTUCKY POWER COOPERATIVE, INC. TO TRANSFER FUNCTIONAL CONTROL OF CERTAIN TRANSMISSION FACILITIES TO PJM INTERCONNECTION, LLC

October 26, 2012

) ) CASE NO. ) 2012-00169 ) )

Please sign in:

NAME

~lc!tftfZD RAFE __ _ I a&Y,a A/{cvf4evJs

JENNIFER BLAcK_ HAws 'd) ()AI tv'} a S" 1 'cl'

-1-

REPRESENTING

fsc-(£~fi-L-

Psc ~ ~0 ~ L(.rt.--'f::U

L ' ' ts-~E f \CV

PJM_

Page 10: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Case No. 2012-00169 October 26, 2012

NAME

4 rJA /;J ou-v

- 2 -

REPRESENTING

8C/J0G

et:-ec

) /

+----------------------

Page 11: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

n

Kentucky Public Service Commission Office October 12, 2012

~ '

- '

_ P.J M©20i 2 , i Oln 2/2Q:l2 , " '~t ~ £'

~4' "'~ "" ~ \' ~ ~ W - ,~ - '~~~ 0 ~ R

Page 12: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

~~ Introduction

~~ perations

~~ Dispatch Functions

• Energy Markets

II LMP

~~ FTRs/ARRs

~~ Capacity

• Reliability Pricing Model

11 Demand Response

genda j

Page 13: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

lntr uction r niz tion

* ~ ~ ~ "' •I -

~- ~ -

: ~ PJM©2012 ~ 3 _ ~0!;12/20:12- ~-- -": "" ~ ~' " ~ ~ ~ 0 ' ' ~ - ~ ~ ~-£ ~~< - ~ c

Page 14: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PA-NJ Interconnection is world's first continuing power pool

PJM©2012

PJM formed BG&E and GPU join

Northeast blackout

NFRC established

Pub I ic Utility Regu iatDI)I Policies Act ·:PUHPA)

/\CE and DP&L join

PJM Interconnection Association formed

Energy PoliC}' Act

PJM Interconnection established as an independent company

4

The istory

Dominion joins PJM

Allegheny Powe'" • :Reliability First Corporation · joins PJM

• ~JERC certified as Electr c Reliability Organization

Commonwealth Edison, American Electric Power and Dayton Power & light join P JM

Duke joins PJM

10/12/2012

Page 15: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

What is an RTO?

A Regional Transmission Organization (RTO) • IS:

- Independent from all market participants - Responsible for grid operations and reliability - Responsible for transmission service within region

PJM©2012 5 10/12/2012

Page 16: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

o Complexity ~~ 185,600 MW of Generating Capacity

~~ Over 65,441 Miles of Transmission Lines

~~ Over 60 Million People Served

o Uniqueness .. Single Control Area in NERC Region

• Area Served: 13 States + DC

o Members/Customers ~~ Member Companies ,_ 800+

~~ Transmission Svc. Customers -- 1 00 + .. 158,448 MW Peak Load (July 21, 2011)

PJM©2012 6 10/12/2012

Page 17: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Two Tier Governance

Generation

Independent Board (1 0)

Other Suppliers

Owners Transmission Electric Owners Distributors

End-Use Customers

PJM©2012 7 10/12/2012

Page 18: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Com Structu PJM Stakeholder Process Groups Diagram

,--------------------------------------1 I

' I I

' ' I I I I I I I I I I I I I I I I I I I I ,-1 I I I

PJM©2012

r---------------------1 I I I __ , _____ }

8

-----------------------1

CJ- Sut-::arrml~

I I I I I I I I I I I I I I I I I I I I .,

CJ- SErrorcon:rn':le

C]- r>tincJrg ccrn:-r.a::~e

I I I I

"Tne MMUAC is an ndep;:nderrt group that Cces ncx repcrt to !:h€.- ?JM Beard or MerTbers Comnit:.at-.

10/12/2012

Page 19: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

JM Basic Functions

- Plan for transmission expansion on a regional basis

-Operate competitive, non­

discriminatory markets

Market 0 eration

-Energy -Capacity

- Ancillary Services

-Monitor the high-voltage transmission grid for reliability

- Balance generation and load on an instantaneous basis

PJM©2012 9

Regional Planning

15 Yearlook- ahead to ensure transmission

capability

Grid Operations

- 24n Monitoring of Transmission Lines

- 24n Generation & Load Balance

"Supply & Demand"

10/12/2012

Page 20: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

ill

I

Page 21: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Grid Operations Control Room

PJM©2012 11 10/12/2012

Page 22: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Daily Load Curve

Hour

PJM©2012

Achievin Ene Bala ce in the Control Area

Frequency in Hz

62 61 60 59 58

12 10/12/2012

Page 23: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012 13

Single Control Area

Free flowing ties

Scheduled Interchange

10/12/2012

Page 24: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Additional Reserves

• Schedule PJM System to ensure that there is enough generation resources to cover projected load and required reserves.

Day-ahead Scheduling (Operating) Reserve :s 30

Contingency (Primary) Reserve (T s 10 Minutes)

Synchronized Non-Synchronized Reserve Reserve

PJM©2012

Secondary Reserve ( 10 Min. :S 30 Minutes)

14

Reserve Beyond 30 Minutes

10/12/2012

Page 25: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012 15

Power Transfer limits

Thermal Limits Voltage Limits Stability Limits

10/12/2012

Page 26: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

820MW

46 Mvar

Bus 1

16

Control Actions

Bus 3

System Reconfiguration

Transaction Curtailments

Generation Re-dispatch

10/12/2012

Page 27: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Latest PJM RTO Load: 95,811 MW

PJM©2012

Viewing Constraints - eData

The constraints sho'ln .,ere last updated Wednesday December 19, 2007- 16:50

j_Wednesday December 19, 2007-16:50 • j

$264 ·00 Timestamp: I $204.00 Wednesday December 19, 2007- 16:50

Constraint: Monitor COMPANY ETOWANDA230 KV ETOWANDA 3 TX

$144.00

$34.00

$24.00

-$36.00

Contingencies: Contingency ETOWANDA230 KV ETOWANDA 4 TX

Shado., Price: XFORMEFI

804.64

Reactive Interface 'lith Contingency: Reacinf-ctg COMPANY APSOUTH

A Contingencies: Contingency LINE 500 KV BEDINGTO-BIACKOAK 500KV

Shado., Price:

0.00

Reactive Interface 'lith Contingency: Reacinf-ctg COMPANY 50045005

: .. r ::ntingencies:

i Contingency LINE 500 KV BEDINGTO-BIACKOAK 500KV , ';a dow Price:

i -225.58

Constraint: Monitor COMPANY LINE 230 KV

17

I : 10:50 12/19107

12:50 12119/07

J l

'L. ~.,.... ..... .,..,.._,.,,.,,..,..,,..,..,........,..

14:50 12/19107

Scale:

16:50 12/19107

~ 24 of 24 - Clipboard I

10/12/2012

Page 28: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

r

Page 29: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Self-schedule own resources '

PJM©2012

Options for Electric Supply Bilateral

Load Serving Entities Obtain energy

to serve customers

19

Voluntary Energy Market

PJM /Spot Market

10/12/2012

Page 30: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

ffers eceived from enerators

110MW @$30 I lr-4-0M_W_@-$5--.I

/ I20MW @$10 I

I 15MW @$25 I

25MW@ $15

20 10/12/2012

Page 31: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Generator Offers are Sorted in Merit Order

Commitment of Generators to meet the Load Forecast plus Reserves

PJM©2012

1100 MW@ $90 I

125MW @$50

150MW @$25

175MW @$20

195MW @$10

5 Offers

10 Offers

15 Offers

20 Offers

30 Offers

21 10/12/2012

Page 32: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Typical Summer Load Shape

• Generation selected and dispatched in economic merit order in order to meet load.

12

11

10

90

80

70

60

50

PJM©2012

-u -~ ~ - ..41 $80 u _/I ~

- $60 l u Jf/ . "11m

I $50 I

~ ~

$40 $25 I

~

I $20 k ..11

~ _J $18 -- $17 - $15

I I I I I I I I I I I

1 3 5 7 9 11 13 15 17 19 21 23 r

22 10/12/2012

Page 33: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Sl

~ :, -~ ~ ~ ~- ~ - - ) \;

~ ~

~ , FWM©2~'12 , , , 23 , , ,t0/~,2/2~:12 " ~ ~" 'f_, :,.__; '< ~ ~w" ~c:- - ~ w ~ - "' ~ ~ -o/ - ~ - <

0 ~ '-.. ~ - £ 7 :;_ ),: -,~: ~~-

Page 34: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

• Pricing method JM uses to: ¢ price energy purchases and sales in PJM

Market

¢ price transmission congestion costs to move energy within PJM RTO

¢ price losses on the bulk power system

• Physical, flow-based pricing system: ¢ how energy actually flows, NOT contract

paths

PJM©2012 24

h is L ? Ill

10/12/2012

Page 35: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

How is LMP Used? PJM Settles the market:

Electric Generators (Sellers) get paid the clearing price at their interconnection point (node)

Loads (Buyers) pay at their zonal LMP

25 10/12/2012

Page 36: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

$20

Capacity 200 MWs

$15

Capacity 200MWs

$10

Capacity 300MWs

199 MWs@ $15

300 MWs@ $1

Economic Dispatc Exercise

lneedMWs. Sale goes to the

lowest offer with capacity. Going once ....

PJM

26

Load 499MWs

LMP

10/12/2012

Page 37: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

-..

LMP Components - System Energy Price

System Energy

Price + Transmission + Congestion

Cost

Cost of Marginal Losses

0 System Energy • r1ce

PJM©2012

o Represents optimal dispatch ignoring congestion and losses

o Same price for every bus in PJM

o Calculated both in day ahead and real time

27 10/12/2012

Page 38: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Co ponents - System nergy Price

System Energy Price = $20 Congestion = Losses= LMP= $20

1

$20 Power

System Energy Price = $20 Congestion = Losses= LMP = $20

PJM©2012 28 10/12/2012

Page 39: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

LMP Components - Congestion

---System Energy

Price

0 ongestion Price

+ Transmission + Congestion

Cost

Cost of Marginal Losses

o Represents price of congestion for binding constraints • Calculated using cost of marginal units controlling constraints

and sensitivity factors on each bus

o Will be zero if no constraints • Will vary by location if system is constrained

o Calculated both in day ahead and real time

PJM©2012 29 10/12/2012

Page 40: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

L P Co pon nts - Con estion

ispatch 1 000 MW

$20 Power

System Energy Price = $20 Congestion = $ 0 Losses= LMP = $20

PJM©2012 30

System Energy Price = $20 Congestion = $30 Losses= LMP= $50

w

10/12/2012

- I

Page 41: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

LMP Components- Marginal Losses

--System Energy

Price + Transmission + Congestion

Cost

0 Loss Price o Represents price of marginal losses

• Calculated using penalty factors

• Will vary by location

o Calculated both in day-ahead and real-time

PJM©2012 31

Cost of Marginal Losses

10/12/2012

Page 42: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

ns issio losses

• Real Power (MW) Losses o Power flow converted to heat in transmission

equipment

o Heat produced by current (I) flowing through resistance (R)

o Losses equal to 12R

o Heat loss sets the "thermal rating" of equipment HEAT DISPATED = lzR

• Losses increase with: )1/ ,...,.----'---'~ )_, ----..

o Lower voltage

o Longer lines

o Higher current

PJM©2012 32

t CONDUCTOR c 0 A c

10/12/2012

Page 43: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

LMP Components Marginal Losses

System Energy Price = $20 Congestion = $30 Losses= $ 2 LMP= $52

1

$20 Power

System Energy Price = $20 Congestion = $ 0 Losses= ($ 1) LMP= $19

PJM©2012 33 10/12/2012

Page 44: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460
Page 45: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

ay-Ahead Market Timeline

35

4:00pm PJM posts day-ahead

LMPs & hourly schedules ~- -~ - ~ ~

All times are Eastern Prevailing Time

10/12/20"12

Page 46: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Two- ettlement arkets

• Day-ahead Market - Day-ahead schedule uses least-cost unit commitment and economic

dispatch programs - Hourly LMPs for next Operating Day calculated using generation

offers, demand bids, and bilateral transaction schedules

• Real-time Energy Market - Calculate hourly LMPs based on actual operating conditions - LMP calculated every 5 minutes - Settlements based on hourly integrated LMP

PJM©2012 36 10/12/2012

-----~-~- ---------- --- ---- ----- ---------

Page 47: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Simple Example :LSE with Day-Ahead Demand less than Actual Demand

Day Ahead Market

Day Ahead LMP = $20.00

Real-time Market

Real-time LMP = $23.00

= 100 * 20s00 = $2000.00 = (105- 100)* 23.00 = $115.00

~~·- Total Charge= $2000 + $115 = $2115 ( .. )

"-·' If Day-ahead Demand had been 105 MW = $2100.00

PJM©2012 37 10/12/2012

Page 48: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

' '

Page 49: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Auction Revenue Rights are entitlements allocated annually to Firm Transmission Service Customers that entitle the holder to receive an allocation of the revenues from the Annual FTR Auction.

PJM©2012 39

What are AR 's?

10/12/2012

Page 50: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

W at can th holder do it the

• "Self Schedule" ARR into FTR Annual Auction on exact same path as ARR

• Reconfigure ARR by bidding into Annual Auction to acquire FTR on alternative path or for alternative product

• May retain allocated RR and receive associated allocation of revenues from the auction

PJM©2012 40 10/12/2012

? s

Page 51: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Financial Transmission Rights are financial instruments awarded to bidders in the FTR Auctions that entitle the holder to a stream of revenues (or charges) based on the hourly Day Ahead congestion price differences across the path

Note: Actual valuations for FTR's use the congestion component of LMP. For

=> illustration purposes, this presentation will reference "LMP" rather than "congestion component of LMP."

PJM©2012

8= 41

What are FT 's?

System Marginal Energy + Loss + Congestion

Price Price Price

10/12/2012

Page 52: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Energy elivery onsistent with F

1 '

* = $2000

PJM©2012 42 10/12/2012

Page 53: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

I

' - -~ - :::_ " " ~ - A ~

- ~ - ~

~c ~ RdM©20~2 ~ 43 c 1'011212012- , ""- ~ -~.. - -- -_,~ _'"~

~ ~ _,, "" ~ < - '0 ~ ~ ~ - ~ ~ M \ - - 0 - " ~ "'"'"~"" -- ~ :1 ~

Page 54: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Capacity

• A commitment of a resource to provide energy during PJM emergency under the capped energy price.

• Capacity revenues paid to committed resource whether or not energy is produced by resource.

• Daily product

Energy

• Generation of electrical power over a period of time

• Energy revenues paid to resource based on participation in PJM's Day-Ahead & Real-Time Energy Markets

• Hourly product

Capacity, energy & ancillary services revenues are expected, in the long term, to meet the fixed and variable costs of generation resources to ensure that adequate

generation is maintained for reliability of the electric grid.

PJM©2012 44 i 0/12/2012

Page 55: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Objectives of RPM

• Resource commitments to meet system peak loads three years in the future

• Three year forward pricing which is aligned with reliability requirements and which adequately values all capacity resources

• Provide transparent information to all participants far enough in advance for actionable response

Purpose of RPM is to enable PJM to obtain sufficient resources to reliably meet the needs of electric consumers within PJM.

PJM©2012 45 10/12/2012

Page 56: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Resource Adequacy

• Determines the amount of capacity resources required to serve the forecast peak load and satisfy the reliability criterion.

• The reliability criterion is based on Loss of Load Expectation (LOLE) not exceeding one event in ten years.

An Installed Reserve Margin (IRM) = 15.4o/o satisfies the reliability criterion for the 2015/16 Delivery Year.

Resource Adequacy I CAP Requirement= Forecast Peak Load * (1 + IRM)

PJM©2012 46 10/12/2012

-----------------------~~~- --- ------- ~-

Page 57: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Installed Reserve Margin & Forecast Pool Requirement

Installed Reserve Margin (IRM)

• Used to establish level of installed capacity resources that will provide acceptable level of reliability

PJM©2012

Forecast Pool Requirement (FPR)

• Used to establish level of unforced capacity resources that will provide acceptable level of reliability

• FPR = (1 + IRM)*(1 -pool-wide avg. EFORd)

47 10/12/2012

Page 58: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

h are Locational Const ints

• Locational Constraints are capacity import capability limitations that are caused by

transmission facility limitations, or

- voltage limitations.

• PJM determines constrained sub-regions (i.e., locational deliverability areas) to be included in RPM Auctions to recognize and quantify the locational value of capacity.

• Constrained regions are determined by comparing the import limit of a region (CETL) to the amount of capacity that needs to be imported into a region to meet the reliability criterion (CETO).

CETL = Capacity Emergency Transfer Limit

CETO = Capacity Emergency Transfer Objective

Page 59: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Locational Deliverability Areas RTEPP has currently identified 25 sub-regions as Locational Deliverability Areas (LDAs) for

evaluating the locational constraints.

• Regions Western PJM (CornEd, AEP, Dayton, APS, Duquesne, ATSI, Duke) Mid-Atlantic Area Council (MAAC) Region Eastern MAAC (PSE&G, JCP&L, PECO, AE, DPL & RECO) Southwestern MAAC (PEPCO & BG&E) Western MAAC (Penelec, MetEd, PPL)

• Zones AE, AEP, APS, ATSI, BGE, Corned, Dayton, DUO, Dominion, DPL, Duke, JCPL, MetEd, PECO, Penelec, PEPCO, PPL, PSEG

• Sub-Zones

PJM©2012

PSEG Northern Region (north of Linden substation) DPL Southern Region (south of Chesapeake and Delaware Channel)

49 10/12/2012

Page 60: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

June May

; Delivery

I EFORd

I Fixed Year

Ongoing Bilateral Market PJM©2012 50 10/12/2012

Page 61: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

RPM Auctions {Starting with 12/13 DY)

Activity Purpose

Procurement of RTO Obligation less an amount reserved for short term resources, less FRR Obligation

Allows for:

(1) replacement resource procurement

~~~~~~~~~ (2) increases and decreases in

~~~~~~~~~

PJM©2012

resource commitments due to reliability requirement adjustments; and

(3) deferred short-term resource procurement

Procurement of additional capacity in a LOA to address reliability problem that is caused by a significant transmission line delay

51

Cost of Procurement

Allocated to LSEs through Locational Reliability Charge

Allocated to resource providers that purchased replacement resources and LSEs through Locational Reliability Charge

Allocated to LSEs through Locational Reliability Charge

10/12/20"12

Page 62: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

hat is t e

The Variable Resource Requirement (VRR) Curve is a downward sloping demand curve that relates the maximum price for a given

level of capacity resource commitment relative to reliability requirements.

• The price is higher when the resources are less than the reliability requirement and lower when the resources are in excess.

PJM©2012

• VRR Curves are defined for the PJM RTO and for each constrained Locational Deliverability Area (LOA) within the PJM region.

52 10/12/2012

--------------------- ------------------~

? Ill

Page 63: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

<D ()

"i:: a_ a_ <( () :::> II

<D ()

"i:: a_

PJM©2012

1.5 Net C6ne

Net Con

0.2 Net C~ne

Illustrative Example of a VRR Curve

(a) ~

; I : I

; I

----t-----~----~-----t-----~--~-~-----t~-+--~----~-- c) . . . ' , . . .

(IRM-3%) IRM (IRM + 1%) (IRM + 5%)

Quantity = UCAP MW

53 10/12/2012

Page 64: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Clearing 01 2013 ase Resid

2012/2013 RTO Supply and Demand

> !'II

"'9 250 1---------------'1----------·

~ ....... 1:!2; 200 1-------- ------'\\;-------------,¥------.~ .. a.

0

125000

PJM©2012

130000 135000 140000 145000

MW(UCAP}

54

150000

I Au 1!1

I On

-RTOSupply

~~RTO Demand

Clearing Price

10/12/2012

Page 65: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

$300.00

$250.00

$200.00

$100.00

$50.00

s-

Base Residual Auction

I

RPM Base Residual Auction

Resource Clearing Prices (RCP)

$237.33

l>'~ ... :"..:... __ S_21_o_.1_1 __ _ L 8854

I

$102.04

2007/2008 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015

-RTO EMAAC S-WMAAC -MAAC

I 2015/2016 1

~-------------------------------------------------------------I

PJM©2012 55 10/12/2012

Page 66: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

hat is Supply Resou Ill

I p ?

In RPM, esources are =

Energy Qualifying Generation Demand Efficiency Transmission Resources Resources Resources Upgrades

(DR) (EE) (QTU) (Effective with 11/12 DY)

PJM©2012 56 10/12/2012

Page 67: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

I I ilil ntn

~"- - ~ \ ~

' ' '

2 '

- R.JM©2012 57 -10/12/20~2 , ;: c"' -

~ " - -:;: ""' ::;_ '" " "' '~ r f ' _ ~ ~ ~ _ ~ _ r ~ ";;;_f~~ -~"-~-" r;:

Page 68: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Regional Ia ning bjectives

~ 15 year outlook to identify reliability standards violations

~Test the transmission system against mandatory national standards and PJM regional standards

~ Reliability and economic efficiency drivers

PJM©2012 58 10/12/2012

Page 69: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Regional Planning Objectives

~ Develop transmission reinforcements in collaboration with Transmission Owners

~ Develop a unified Strategy for the entire PJM footprint - the RTEP

~ Submit Plan to PJM's independent governing Board for consideration and approval

PJM©2012 59 10/12/2012

Page 70: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

P Process nit ion

PJM's RTEP process identifies transmission enhancements to preserve regional transmission system reliability, taking

into consideration numerous driving factors.

PJM©2012 60 10/12/2012

Page 71: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Queue open (90 days)

Customer review report and return Facility Study Agreement {30 days)

Customer review and returnCSA

(90 days)

Feasibility Study (90 days)

Facility Study (6 months)

Interconnection Request Process

Customer review report and return Impact Study

Agreement (30 days)

Customer review report and return ISA (CSA)

or UCSA (60 days}

Impact Study (120 days)

PJM prepare CSA (45 days}

[Required only if CSA not tendered with ISA]

Remaining time line defined by ISA m i lestones1 CSAIUCSA. schedule

and rights to suspend

Approximately 1 1h years from queue entry until ISA tendered (assuming no delays)

ISA =Interconnection Service Agreement CSA = Construction Service Agreement UCSA =Upgrade Construction Service Agreement

Note: Projects May Drop Out of the Queue at any Time

PJM©2012 61 10/12/2012

Page 72: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Fuel Mix of Queued Generation Interconnection Requests

Figure 1.5: Fuel Mix of All Queued Generation Interconnection Requests Received since 1999 !Nameplate.InergyL(Januaf¥_31,_2Ul2} __

PJM©2012

Methane, 476

Hydro, 1,185

Diesel, 103 Coal, 5,055

Source: 2011 PJM RTEP Report

Nuclear, 7,

62

Oil, 752

Other, 938

10/12/2012

Page 73: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

ide s n

- "' - ~ ~ -

- -- - -- -"' - R.JM©20'12 - _ 63 _ 1011212012-- --

~ ~~ "' " "t" ~~ ~ ~"' ~ ~ - <"- ~ ~ ,' ~ f -' - - - ~ ' - ~ :: ~ ~ 'f-'"J, ~ ""' " ~--

Page 74: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM emand ide esponse

The purpose of PJM Demand Response is to enable Demand Resources under the direction and control of Curtailment Service

Providers to respond to economic prices.

Demand Response can participate within the various PJM markets: •Energy

•Day Ahead •Real Time •Dispatched

•Ancillary Services •Synchronized Reserve

•Day Ahead Scheduling Reserve •Regulation •Capacity

•Offer into auction up to 3 years in advance

PJM©2012 64 10/12/2012

Page 75: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

cti rti ipants in JM oa Resp n e rogr m

Economic Sites: 1 ,008 Economic MW: 2,282

Emergency DR Sites: 12,610 Emergency DR MW: 8,548

65 10/12/2012

Page 76: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM Market articipants in emand Side esponse

Load Serving Entity (LSE): PJM Member, including Load

aggregator or power marketer, serving end-users within the

PJM Control Area, to sell electric energy to end-users with the PJM Control Areas ..

Curtailment Service Provider (CSP):

PJM Members that will act on behalf of end-use customers

who wish to participate in PJM Load Response opportunities ..

PJM©2012 66

Electric Distribution Company (EDC):

PJM Member that owns, or leases, electric distribution

facilities that are used to provide electric distribution

service to electric load within the PJM Control Areas.

Who Can be a CSP?: ·AnyLSE ·AnyEDC

·Any third party (PJM member) specializing in Demand

Response

10/12/2012

Page 77: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM Demand Side Response

• Like a generator, a DSR resource participates in the Day Ahead and Real-Time energy markets

• Unlike a generator that is a capacity resource, DSR participation in the energy market is voluntary

PJM©2012

• After a DSR either clears in the Day-Ahead market or is dispatched in the Real-Time market, a settlement is created and a

reduction needs to be calculated in eLRS. • Reduction = CBL- metered load

• Like a generator, a DSR resource participates in the Reliability Pricing Model (RPM) • Load Management

67 10/12/2012

Page 78: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

PJM©2012

ustomer aseline alculation

A Customer Baseline Load (CBL) is a proxy for what the load would have been absent the load reduction. A CBL is calculated for the following timeframes:

Average Day L for Weekdays Average Day BL for Saturdays

Average Day C L for undays/Holidays

Detailed CBllanguage found in the PJM Operating Agreement, Section 3.3A http:l/www.pjm.com/documents/downloads/agreements/oa.pdf

68 10/12/2012

Page 79: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

DR Products for Load Management

• Effective with the 2014/2015 DY, two additional Product Type will be added:

PJM©2012 69 10/12/2012

Page 80: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

hree Product ypes available beginning in the

Availability Any weekday, other than NERC holidays, during June- Sept. period of DY

Maximum Number of 1 0 interruptions Interruptions

Hours of Day Required 12:00 PM - 8:00 PM to Respond (Hours in EPT)

Maximum Duration of 6 Hours Interruption

Any day during June­October period and following May of DY

Unlimited

1 0:00AM - 1 0:00 PM

10 Hours

2014/2015

Any day during DY (unless on an approved maintenance outage during Oct. - April)

Unlimited

Jun - Oct. and following May: 10AM -10 PM Nov. -April: 6 AM- 9 PM

10 Hours

Notification Must be able to reduce load when requested by PJM All Call system within 2 hours of notification, without additional approvals required

Registration in eLRS

Event Compliance

Test Compliance

PJM©2012

Must register sites in Emergency Load Response Program in Load Response System (eLRS)

Must provide customer-specific compliance and verification information within 45 days after the end of month in which PJM-initiated LM event occurred.

In absence of the PJM-initiated LM event, CSP must test load management resources and provide customer-specific compliance and verification information.

70 10/12/2012

Page 81: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

Load Management Types

PJM recognizes three types of LM:

• Direct Load Control (DLC) - Load management which is initiated directly by the CSP's market operations center to non-interval metered sites, employing a communication signal to cycle equipment. This is typically done for AC or hot water heaters.

• Firm Service Level (FSL) - Load management achieved by a customer reducing its load to a pre-determined level (the Firm Service Level), upon notification from the CSP's market operations center

• Guaranteed Load Drop (GLD)- Load management achieved by a customer reducing its load Q.y a pre-determined amount (the guaranteed load drop) when compared to the amount the customer would have consumed, upon notification from the CSP's market operations center

PJM©2012 71 10/12/2012

Page 82: Secretary Public Service Commission Energy and Environment ... Case Referenced...Jan 17, 2013  · P.O Box 615 Frankfort, Kentucky 40602-0615 Telephone. (502) 564-3940 Fax. (502) 564-3460

' \ I

l l '

Contact PJM:

http://www.pim.com/abou!:Pim/\Nho-we-are/contact-us.aspx

www.p1m.com

1-866-400-8980 I 61 0-666-8980

estions?

-----------~~~--~- --~~-~-~--