section 1a 2

2
TITLE : Single-ply membrane / felt installation detail 1 2 3 4 5 SCALE : DWG NO. : NP-004INST-B SHEET NO. : DATE : 1:2 @ A3 DO NOT SCALE 08/11/2018 1 OF 2 REVISION: B * This is a suggested installation detail which may not be exactly applicable to all situations and constructions. It is not a detailed or constructional proposal. Installers and designers are advised to check their own details for compliance with all currently applicable Local Authority by-laws, Acts of Parliament and British / ISO standards. A B C D A B C D 1 2 3 4 5 > A rooflight range suitable for flat roofs between 3° and 10° All information contained within this drawing is copyright © and design right of the Rooflight Company. The intellectual property rights of the products detailed within this drawing and embedded 3D models are owned by the Rooflight Company. w: www.therooflightcompany.co.uk t: 01993 833 108 e: [email protected] DB : NT CB : PD neo Plateau Secured by Design Level 1 Installation Pitch 3° - 10° 4 3 6 1b 5 2 1a 1 7 8 1d 1c 9 10 0 100 200 SCALE 1 : 2 @ A3 - mm SECTION THERMAL PERFORMANCE | U-Value 1.3w/m²Kº NOTES All installation components contractor supplied except part № 1a to 1d (factory fitted), 3 (factory fitted) & 4 (supplied loose). Calculated in accordance with BS EN ISO 10077-2 and BS EN 673 based on roof opening area of 1.8204m² for the rooflight only using a centre pane ug value of 1.0W/m²K. Key: 1. neo™ Plateau Rooflight 1a. Perimeter silicone weather-seal. 1b. Internal air-seal. 1c. IGU (10mm P6B laminate (Glass/Poly/Glass), 16mm argon filled cavity, 6mm low-emissivity toughened outer). 1d. Thermoliner – thermal and moisture control. 2. Perimeter silicone seal – seal perimeter of rooflight (1) with a thick continuous bead of low modulus neutral cure silicone. 3. Localised fixing lug (part of roofight frame). 4. Internal fixing - M10x50 A2 stainless steel coach screw & washer. 5. Fixing tolerance – pack any gap behind the fixing lug prior to bolting up the coach screw (4). 6. Insulation. 7. Vapour barrier – sealed to the underside of the Thermoliner (1d). 8. Internal finish – hardwood timber recommended. 9. Structural member. 10. Finished roof covering. Finished External Kerb Clear Viewable Low Profile Height 102 50 130 Black Border (applied to glass) Kerb Height To Be Determined By Installer* 1 Structural Kerb Width* 75 Typical Kerb Width 125 Roof Covering* 3 Internal Finish* 15 Insul.* 32 *1 - This detail does not specify kerb height. We recommend that installers follow the guidance outlined in BS6229:2003 ‘Flat roofs with continuously supported coverings - Code of practice’

Upload: others

Post on 21-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SECTION 1a 2

TITLE :

Single-ply membrane / felt installation detail

1 2 3 4 5

SCALE :

DWG NO. : NP-004INST-B SHEET NO. :

DATE :1:2 @ A3DO NOT SCALE 08/11/2018

1 OF 2 REVISION:

B* This is a suggested installation detail which may not be exactly applicable to all situations and constructions. It is not a detailed or constructional proposal. Installers and designers are advised to check their own details for compliance with all currently applicable Local Authority by-laws, Acts of Parliament and British / ISO standards.

A

B

C

D

A

B

C

D

1 2 3 4 5

> A rooflight range suitable for flat roofs between 3° and 10°All information contained within this drawing is copyright © and design right of the Rooflight Company. The intellectual property rights of the products detailed within this drawing and embedded 3D models are owned by the Rooflight Company.

w: www.therooflightcompany.co.uk t: 01993 833 108 e: [email protected] : NTCB : PD

neo™ Plateau Secured by Design Level 1

Installation Pitch 3° - 10°

4

3

6

1b

5

21a

1

7

8

1d

1c

9 10

0 100 200

SCALE 1 : 2 @ A3 - mm

SECTION

THERMAL PERFORMANCE | U-Value 1.3w/m²Kº NOTES All installation components contractor supplied except part № 1a to 1d (factory fitted), 3 (factory fitted) & 4 (supplied loose).

Calculated in accordance with BS EN ISO 10077-2 and BS EN 673 based on roof opening area of 1.8204m² for the roo�ight only using a centre pane ug value of 1.0W/m²K.

Key:1. neo™ Plateau Rooflight

1a. Perimeter silicone weather-seal.1b. Internal air-seal.1c. IGU (10mm P6B laminate (Glass/Poly/Glass), 16mm argon filled cavity, 6mm low-emissivity toughened outer).1d. Thermoliner – thermal and moisture control.

2. Perimeter silicone seal – seal perimeter of rooflight (1) with a thick continuous bead of low modulus neutral cure silicone.3. Localised fixing lug (part of roofight frame).4. Internal fixing - M10x50 A2 stainless steel coach screw & washer.5. Fixing tolerance – pack any gap behind the fixing lug prior to bolting up the coach screw (4).6. Insulation.7. Vapour barrier – sealed to the underside of the Thermoliner (1d).8. Internal finish – hardwood timber recommended.9. Structural member.10. Finished roof covering.

Finished External Kerb

Clear Viewable

Low Profile Height 102

50

130Black Border

(applied to glass)

Kerb HeightTo Be Determined

By Installer*1

Structural Kerb Width*

75Typical

Kerb Width125

Roof Covering*3 Internal Finish*

15Insul.*

32

*1 - This detail does not specify kerb height. We recommend that installers follow the guidance outlined in BS6229:2003 ‘Flat roofs with continuously supported coverings - Code of practice’

0ºc Outside

20ºc Inside

Page 2: SECTION 1a 2

TITLE :

Single-ply membrane / felt installation detail

1 2 3 4 5

SCALE :

DWG NO. : NP-004INST-B SHEET NO. :

DATE :1:2 @ A3DO NOT SCALE 08/11/2018

2 OF 2 REVISION:

B* This is a suggested installation detail which may not be exactly applicable to all situations and constructions. It is not a detailed or constructional proposal. Installers and designers are advised to check their own details for compliance with all currently applicable Local Authority by-laws, Acts of Parliament and British / ISO standards.

A

B

C

D

A

B

C

D

1 2 3 4 5

> A rooflight range suitable for flat roofs between 3° and 10°All information contained within this drawing is copyright © and design right of the Rooflight Company. The intellectual property rights of the products detailed within this drawing and embedded 3D models are owned by the Rooflight Company.

w: www.therooflightcompany.co.uk t: 01993 833 108 e: [email protected] : NTCB : PD

neo™ Plateau Secured by Design Level 1

12

34

56

7

SECTION

THERMAL PERFORMANCE | U-Value 1.3w/m²Kº NOTES

Calculated in accordance with BS EN ISO 10077-2 and BS EN 673 based on roof opening area of 1.8204m² for the roo�ight only using a centre pane ug value of 1.0W/m²K.

Key:1. Roof deck.2. Internal finish – hardwood timber recommended.3. Vapour barrier.4. Insulation.5. Structural member.6. Finished roof covering.7. Perimeter silicone seal – seal perimeter of rooflight with a thick continuous bead of low modulus neutral cure silicone.

*1 - This detail does not specify kerb height. We recommend that installers follow the guidance outlined in BS6229:2003 ‘Flat roofs with continuously supported coverings - Code of practice’

Finished External Kerb LengthFinished External Kerb Width

0ºc Outside

20ºc Inside