section 22.i technology readiness infrastructure grants

24
SECTION 22.I TECHNOLOGY READINESS INFRASTRUCTURE GRANTS MAEDS October 25, 2012 Shanty Creek, Belaire, MI 1 10/25/2012, v1

Upload: affrica

Post on 24-Feb-2016

37 views

Category:

Documents


0 download

DESCRIPTION

MAEDS October 25, 2012 Shanty Creek, Belaire, MI. Section 22.i Technology Readiness Infrastructure Grants. 10/25/2012, v1. 1. Presenters. Bruce Umpstead, State Ed Tech Director MDE Office Of Educational Improvement and Innovation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Section 22.i Technology Readiness Infrastructure Grants

SECTION 22.ITECHNOLOGY READINESS

INFRASTRUCTURE GRANTS

MAEDSOctober 25, 2012

Shanty Creek, Belaire, MI

110/25/2012, v1

Page 2: Section 22.i Technology Readiness Infrastructure Grants

Presenters Bruce Umpstead, State Ed Tech Director

MDE Office Of Educational Improvement and Innovation

Tim Hall, Coordinator, Michigan Tech ReadinessMDE Office Of Educational Improvement and Innovation

Ron Faulds, Educational Technology ConsultantMDE Office Of Educational Improvement and Innovation

Also appearing … Michael Andrews, Coordinator, Michigan E-rate

MDE Office Of Educational Improvement and Innovation210/25/2012, v1

Page 3: Section 22.i Technology Readiness Infrastructure Grants

310/25/2012, v1

Page 4: Section 22.i Technology Readiness Infrastructure Grants

Any Time, Any Place, Any Way, Any Place

410/25/2012, v1

Page 5: Section 22.i Technology Readiness Infrastructure Grants

Online Assessments Available by 2014-15

510/25/2012, v1

Page 6: Section 22.i Technology Readiness Infrastructure Grants

Bridging Online Assessments and the 4 Any’s

OnlineSBAC/MEAP Technology

Infrastructure Grants

(Title IIA)

Any TimeAny PlaceAny WayAny PaceLearning

610/25/2012, v1

Page 7: Section 22.i Technology Readiness Infrastructure Grants

Section 22.i

710/25/2012, v1

Page 8: Section 22.i Technology Readiness Infrastructure Grants

Section 22.i Grant Criteria

1. Collaborative purchasing arrangements

2. Sustainable, cost effective collaborations

3. Capacity building

810/25/2012, v1

Page 9: Section 22.i Technology Readiness Infrastructure Grants

All Districts Eligible …and encouraged to apply!

Complete SBAC Survey (30% 100%)November 29, 2012

910/25/2012, v1

Page 10: Section 22.i Technology Readiness Infrastructure Grants

MDE wants all districts to participate! MDE considering consortia model to achieve

cost-saving, pursuant to legislation

All Districts Eligible …and encouraged to apply!

1010/25/2012, v1

Page 11: Section 22.i Technology Readiness Infrastructure Grants

PUBLISHING SECTION 22.I GRANT PACKET

Target Release:November 15, 2012

1110/25/2012, v1

Page 12: Section 22.i Technology Readiness Infrastructure Grants

Updated TechPlan.org

1210/25/2012, v1

http://techplan.apollo.foxbright.com

Page 13: Section 22.i Technology Readiness Infrastructure Grants

SBAC Technology Readiness Survey

www.techreadiness.net

Page 14: Section 22.i Technology Readiness Infrastructure Grants

Data Field ChangesSchool Survey Questions

Page 15: Section 22.i Technology Readiness Infrastructure Grants

Data Field ChangesDevice Inventory

Page 16: Section 22.i Technology Readiness Infrastructure Grants

Further DefinitionsAssessment Environment

appropriate = Current environment appropriate for assessmentadaptable = Moveable to environment appropriate for assessmentinappropriate = Current environment NOT appropriate for assessment and, NOT sufficiently mobile to move to one

Page 17: Section 22.i Technology Readiness Infrastructure Grants

Further DefinitionsDevice Owner

school = Schoolstudent = Studentother = Other

Page 18: Section 22.i Technology Readiness Infrastructure Grants

Current Submission Status

39%

61%

Districts completingsurvey

Districts not completingsurvey

336 Districts1818 Buildings282,910 Devices

Page 19: Section 22.i Technology Readiness Infrastructure Grants

Device Memory

11.40%

88.60%

0.00% 10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

Devices NOT meetingmemory Requirements

Devices meetingmemory Requirements

Page 20: Section 22.i Technology Readiness Infrastructure Grants

District Bandwidth Capacity

Page 21: Section 22.i Technology Readiness Infrastructure Grants

Operating Systems

7%

8%

26%

49%

7%3%

IOS

Mac OS X

Windows 7

Windows XP

Blank

Other

Page 22: Section 22.i Technology Readiness Infrastructure Grants

Purchasing Guidelines

Page 23: Section 22.i Technology Readiness Infrastructure Grants

Updates

Final submission date is November 29 Additional surveys

MAISA RFP

Page 24: Section 22.i Technology Readiness Infrastructure Grants

CONTACT INFORMATION Bruce Umpstead

[email protected] Tim Hall

[email protected] Ron Faulds

[email protected] Michael Andrews

[email protected] www.TechPlan.org

2410/25/2012, v1