    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Section XII Qualification Questionnaire

    Addis Ababa - Adama Road Project, Tender Documents i

  • 7/29/2019 Section XII - Qualification Questionnaire

    2/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Technical Proposal

    - SCHEDULE 1 Site Organization- SCHEDULE 2 Method Statement- SCHEDULE 3 Major Items of Construction Plant

    a) Construction Plant and Equipment (Own Stock)

    b) Construction Plant and Equipment (Purchase)

    c) Construction Plant and Equipment (Hire)

    - SCHEDULE 4 Subcontractors- SCHEDULE 5 Senior Site Personnel

    - SCHEDULE 6 Technical Details

    - SCHEDULE 7 Mobilisation and Performance Programme

    - Others

    Addis Ababa - Adama Road Project, Tender Documents 1

  • 7/29/2019 Section XII - Qualification Questionnaire

    3/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 1 Site Organization

    Addis Ababa - Adama Road Project, Tender Documents 2

  • 7/29/2019 Section XII - Qualification Questionnaire

    4/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 2 Method Statements

    Addis Ababa - Adama Road Project, Tender Documents 3

  • 7/29/2019 Section XII - Qualification Questionnaire

    5/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 3: MAJ OR ITEMS OF CONSTRUCTION PLANT (Form EQU)The Bidder shall provide adequate information to demonstrate clearly that it has the capability to meetthe requirements for the key equipment listed in Section III, Evaluation and Qualification Criteria.What equipment do you intend to use on this project if the Contract is awarded to you? List belowthe types and makes which you would use, age and state condition:

    a) Items which would be immediately available from your own stocks:

    Capacity

    Description(Type, Model, Make) No.

    Year ofManufacture

    EstimatedUse

    (hr, km)

    EstimatedC.I.F. Value

    *

    PowerRating

    t m

    * Bidder should state Port of Entry.

    b) Items which you would propose to purchase for the Contract together with expected deliveryperiods:

    Addis Ababa - Adama Road Project, Tender Documents 4

  • 7/29/2019 Section XII - Qualification Questionnaire

    6/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Description(Type, Model, Make) No.

    Year ofManufacture

    EstimatedUse

    EstimatedC.I.F. Value

    PowerRating

    Capacity

    (hr, km) * t m

    * Bidder should state Port of Entry.

    Addis Ababa - Adama Road Project, Tender Documents 5

  • 7/29/2019 Section XII - Qualification Questionnaire

    7/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    c) List below any items of plant which you would propose to hire:

    Description(Type, Model, Make) No.

    Year ofManufacture

    EstimatedUse

    EstimatedC.I.F. Value

    PowerRating

    Capacity

    (hr, km) * t m

    * Bidder should state Port of Entry.

    Addis Ababa - Adama Road Project, Tender Documents 6

  • 7/29/2019 Section XII - Qualification Questionnaire

    8/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 4: SUBCONTRACTORS

    If you intend to sublet part of the Works, indicate the sections for which a subcontractor is proposedtogether with the name and address of the proposed subcontractor. Enter a statement of similarworks previously executed by the proposed subcontractor, including description, location and valueof work, year completed and name and address of employer.

    Notwithstanding such information, the bidder, if awarded the Contract, shall remain entirely andsolely responsible for the satisfactory completion of the Works.

    Item Section of Work ApproximateValue

    Name and Address ofSubcontractor

    Statement ofSimilar Works

    PreviouslyExecuted

    Addis Ababa - Adama Road Project, Tender Documents 7

  • 7/29/2019 Section XII - Qualification Questionnaire

    9/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 5: SENIOR SITE PERSONNEL (Form PER-1)Set out below is a table showing the bidders proposed senior personnel for assignment to theproject site. Bidders should provide the names of suitably qualified personnel to meet the specifiedrequirements stated in Section III.

    Name Nationality Date of Birth Proposed Position in Project

    Using the form PER-2 provided below, the undersigned bidder attaches herewith curricula vitae ofhis proposed senior personnel describing details of:

    - Proposed position;

    - Name;

    - Date of birth;

    - Professional Qualifications: education and supplementary training;

    - Language capability;

    - experience record with name and address of respective previous employers including

    Employers person of contact with telephone/facsimile number and e-mail address;

    - Name and signature of person or persons authorised to sign the bid (according to

    Instructions to Bidders).

    Addis Ababa - Adama Road Project, Tender Documents 8

  • 7/29/2019 Section XII - Qualification Questionnaire

    10/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form PER-2: Resume of Proposed Personnel

    (a) Name of Bidder:(b) Position:

    (d)

    Name: (e)

    Date of Birth:(c)

    PersonnelInformation(f) Professional Qualifications:(g)(i) Name of Employer(j) Address of Employer(k) lawyer(l) Telephone (m) Contact (Manager /

    Personnel Officer)

    (n) Fax (o) Email

    (h) PresentEmployment

    (p) J ob title (q) Years with presentemployer

    (r)(s) Summarize professional experience over the last 20 years, in reverse chronologicalorder. Indicate particular technical and managerial experience relevant to the project

    (t) From (u) To (v) Company / Project / Position/ Relevant technicaland management experience

    (w) (x) (y)(z) (aa) (bb)(cc) (dd) (ee)(ff) (gg) (hh)(ii) (jj) (kk)Name of authorized representative: --------------------------------------------------------Signature of authorized representative: ---------------------------------------------------

    The bidder shall attach a staff assignment schedule for the above listed senior personnel showingtheassignment periods on siteduring the various stages of the project.

    Addis Ababa - Adama Road Project, Tender Documents 9

  • 7/29/2019 Section XII - Qualification Questionnaire

    11/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 6: TECHNICAL DETAILS

    The Clauses below summarise required technical details, which the contractor shall include in hisbid. The numbering refers to Section IV, Technical Specifications, of the Bidding Documents, andthe Clauses or extract of the Clauses below shall be read in conjunction with the said TechnicalSpecifications.

    1205 StandardsTrade Names

    Where trade names or manufacturers catalogue reference numbers are mentioned in theTechnical Specifications or the Bill of Quantities, they are intended only to serve as a guideto the type of article or material required. The Contractor may use any article or materialsimilar and equal to those specified subject to approval of the Engineer. The bidder shallgive identifying details of proposed alternative products in the Bill of Quantities.

    1302 General Requirements, (a) Camps, equipment and testing facilitiesThe Contractor shall submit with his bid a preliminary lay-out plan for his main site

    establishment as well as specifications and drawings of the water supply system, theworkshop, the laboratory, the first aid station and the ambulance service.

    1402 General (Accommodation, Services, and Attendance for the Engineer's Staff)The Contractor shall submit with his bid preliminary details and specifications of theEngineer's office and housing accommodation including lay-out plan(s) for his proposeddesign and method of construction of the buildings. He shall state any proposed deviationfrom the outline of the Bidding Document.

    1406 VehiclesThe Contractor shall submit with his bid detailed specifications and description of allvehicles including required equipment, etc., brand and type/model of vehicle which he

    intends to provide.5114 Construction Requirements for Sub-Bases Using Reprocessed Pavement Material

    (c) MillingThe Contractor shall submit with his bid detailed specifications and description of hismilling plant/equipment which he intends to provide including a list of reference projectswhere he has successfully performed milling works.

    6404 Plant and Equipment, (a) GeneralThe Contractor shall submit with his bid detailed specifications and description includingemission standards/values of his asphalt mixing plant which he intends to provide.

    9901 Lessons/Lectures

    The Contractor shall submit with his bid curriculum vitae / curricula vitae of the person(s)proposed to provide the traffic safety lessons/lectures.

    9902 Traffic Safety, (a) Speed ControlThe Contractor shall submit with his bid detailed specifications and descriptionincluding brand and type/model of the laser speed measuring equipment which heintends to provide.

    9902 Traffic Safety, (b) Weight ControlThe Contractor shall submit with his bid detailed specifications and descriptionincluding brand and type/model of the weigh bridge equipment which he intends toprovide.

    Addis Ababa - Adama Road Project, Tender Documents 10

  • 7/29/2019 Section XII - Qualification Questionnaire

    12/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    SCHEDULE 7: MOBIL ISATION AND PERFORMANCE PROGRAMME

    The Bidder shall submit with his Bid as a minimum:

    an organisation chart showing the organisation of his firm, the responsibilities of his staff etc. forthe performance of the Project;

    a performance programme showing his planned/proposed mobilisation at the Site and duration,phasing and deadlines for completion of the various activities of the Project, etc.; a time schedule indicating the requirements for the Possession of Site to be made available

    by the Employer, distinguishing also between individual sections/sub-sections of the projectroad, if any;

    a traffic management plan including proposed closing of sections of the road where the Worksshall be executed, showing the respective sections/sub-sections and the duration of the proposedclosing, if any;

    a description of organisation and methodology proposed for the performance of the variousworks items of the Project;

    in sufficient detail to demonstrate the adequacy of the Bidders proposals to meet theTechnical Specifications and the completion time referred to the bidding documents.

    Addis Ababa - Adama Road Project, Tender Documents 11

  • 7/29/2019 Section XII - Qualification Questionnaire

    13/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Bid FormsForm ELI 1.1: Bidder's Information Sheet

    Bidder's Information

    Bidder's legal name

    In case of JV, legal name

    Bidder's country of constitution

    Bidder's year of constitution

    Bidder's legal address in country ofconstitution

    Bidder's authorized representative(name, address, telephone numbers, faxnumbers, e-mail address)

    Attached are copies of the following original documents.

    1. In case of single entity, articles of incorporation or constitution of the legal entitynamed above, in accordance with ITB 4.1 and 4.2.

    2. Authorization to represent the firm or JV named in above, in accordance with ITB 20.2 3. In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1. 4. In case of a government-owned entity, any additional documents not covered under 1

    above required to comply with ITB 4.5.

    Addis Ababa - Adama Road Project, Tender Documents 12

  • 7/29/2019 Section XII - Qualification Questionnaire

    14/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form ELI 1.2: J V Information Sheet

    Each member of a JV must fill in this form

    J V/ Specialist Subcontractor Information

    Bidder's legal name

    JV Partner's orSubcontractor's legal name

    JV partner's orSubcontractor's year ofconstitution

    JV Partner's or

    Subcontractor's year ofconstitution

    JV partner's orSubcontractor's legal addressin country of constitution

    JV partner's orsubcontractor's authorizedrepresentative information(name, address, telephonenumbers, fax numbers, e-mailaddress)

    Attached are copies of the following original documents. 1. Articles of incorporation or constitution of the legal entity named above, in accordance

    with ITB 4.1 and 4.2.

    2. Authorization to represent the firm named above, in accordance with ITB 20.2. 3. In the case of government-owned entity, documents establishing legal and financial

    autonomy and compliance with commercial law, in accordance with ITB 4.5.

    Addis Ababa - Adama Road Project, Tender Documents 13

  • 7/29/2019 Section XII - Qualification Questionnaire

    15/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form CON 2

    Historical Contract Non-Performance

    [The following table shall be filled in for the Bidder and for each partner of a J oint Venture]

    Bidder's Legal Name: [insert full name]Date: [insert day, month, year]

    Joint Venture Party Legal Name: [insert full name]ICB No. and title: [insert ICB number and title]

    Page[insert page number] of[insert total number] pages

    Non-Performing contracts in accordance with Section III, Qualification Criteria and

    Requirements

    Contract non-performance did not occur during the last Five (5) years specified in Section III,Qualification Criteria and Requirements, Sub Factor 2.2.1.

    Contract (S) not performed during the last Five (5) years specified in Section III, QualificationCriteria and Requirements, requirement 2.2.1

    Year

    Nonperformedportion ofcontract

    Contract Identification

    Total contractAmount

    (current value,US$ equivalent)

    [insert year] [insert

    amount andpercentage]

    Contract Identification: [indicate complete contract

    name/ number, and any other identification]

    Name of Employer: [insert full name]

    Address of Employer; [insert full name]

    Reason(s) for non performance: [indicate mainreason(s)]

    [insert amount]

    Addis Ababa - Adama Road Project, Tender Documents 14

  • 7/29/2019 Section XII - Qualification Questionnaire

    16/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form FIN 3.1: Financial Situation

    Each Bidder or member of a JV must fill in this form

    Financial Data for previous 3 Years [US$ Equivalent]

    Year 1: Year 2: Year 3:

    Information from Balance Sheet

    Total AssetsTotal LiabilitiesNet worthCurrent AssetsCurrent Liabilities

    Information form Income Statement

    Total Revenues

    Profits Before Taxes

    Profits After Taxes

    Attached are copies of financial statements (balance sheets including all related notes, and incomestatements) for the last three years, as indicated above, complying with the following conditions.

    All such documents reflect the financial situation of the Bidder or partner to a JV, and notsister or parent companies.

    Historic financial statements must be audited by a certified accountant. Historic financial statements must be complete, including all notes to the financial statements. Historic financial statements must correspond to accounting periods already completed and

    audited (no statements for partial periods shall be requested or accepted).

    Addis Ababa - Adama Road Project, Tender Documents 15

  • 7/29/2019 Section XII - Qualification Questionnaire

    17/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form FIN 3.2: Average Annual Construction Turnover

    Each Bidder or member of a JV must fill in this form

    Annual Turnover Data for the Last 3 Years (construction only)Year

    AmountCurrency

    ExchangeRate

    US$Equivalent

    Average Annual Construction Turnover

    The information supplies should be the Annual Turnover of the Bidder or each member of a JV interms of the amounts billed to clients for each year for work in progress or completed, converted toUS$s at the rate of exchange at the end of the period reported.

    Addis Ababa - Adama Road Project, Tender Documents 16

  • 7/29/2019 Section XII - Qualification Questionnaire

    18/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form FIN 3.3 (a): Financial Resources

    Specify proposed sources of financing, such as liquid assets, unencumbered real assets, lines ofcredit, and other financial means, net of current commitments, available to meet the totalconstruction cash flow demands of the subject contract or contracts as indicated in Section III

    (Evaluation and qualification Criteria).

    Financial Resources

    No. Source of financing Amount (US$ equivalent)

    1

    2

    3

    Addis Ababa - Adama Road Project, Tender Documents 17

  • 7/29/2019 Section XII - Qualification Questionnaire

    19/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form FIN 3.3 (b): Current Contract Commitments/ works in Progress

    Bidders and each partner to a JV should provide information on their current commitments on allcontracts that have been awarded, or for which a letter of intent or acceptance has been received, orfor contracts approaching completion, but for which an unqualified, full completion certificate hasyet to be issued.

    Current Contract Commitments

    No. Name of contractEmployer's contactAddress, Tel, Fax

    Value ofoutstanding

    Work[current US$Equivalent]

    Estimatedcompletion

    Date

    Average monthlyInvoicing OverLast six Months

    [US$/month]

    1

    2

    3

    4

    5

    Addis Ababa - Adama Road Project, Tender Documents 18

  • 7/29/2019 Section XII - Qualification Questionnaire

    20/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form EXP 4.1: General construction Experience

    Each Bidder or member of a JV must fill in this form

    General Construction Experience

    StartingMonthYear

    EndingMonthYear

    Years

    Contract Identification and NameNam and Address of Employer

    Brief Description of the Works Executed bythe Bidder

    Role ofBidder

    Addis Ababa - Adama Road Project, Tender Documents 19

  • 7/29/2019 Section XII - Qualification Questionnaire

    21/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form EXP 2.4.2(a): Specific Construction Experience

    Fill up one (1) form per contract.

    Contract of Similar Size and NatureContract No.. of... Contract Identification

    Award Date Completion Date

    Role in Contract Contractor Management Contractor Subcontractor

    Total contract Amount US$

    If partner in a JV or

    subcontractor, specify

    participation of total contractamount

    Percent of Total Amount

    Employer's Name

    Address

    Telephone/Fax Number

    E-mail

    Description of the similarity in accordance with Criteria 2.4.2(a) of Section III

    Addis Ababa - Adama Road Project, Tender Documents 20

  • 7/29/2019 Section XII - Qualification Questionnaire

    22/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form EXP 2.4.2 (b) Specific Construction Experience in Key Activities

    Fill up one (1) form per contract

    Contract with Similar key ActivitiesContract No.. of... Contract Identification

    Award Date Completion Date

    Role in Contract Contractor Management Subcontractor

    Contractor

    Total contract Amount US$

    If partner in a JV or

    subcontractor, specifyparticipation of total

    contract amount

    Percent of Total Amount

    Employer's Name

    Address

    Telephone/Fax Number

    E-mail

    Description of the key activities in accordance with Criteria 2.4.2(b) of Section III

    Addis Ababa - Adama Road Project, Tender Documents 21

  • 7/29/2019 Section XII - Qualification Questionnaire

    23/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form LIT Pending Litigation

    Each Bidder or member of a JV must fill in this form

    Pending Litigation No pending litigation in accordance with Criteria 2.2.2 of Section III (Evaluation and Qualification

    Criteria)

    Pending litigation in accordance with Criteria 2.2.1 of Section III (Evaluation and Qualification Criteria)

    Year Matter in Dispute

    Value ofPendingclaim in US$Equivalent

    Value ofPendingclaim as aPercentageof net

    Worth

    Addis Ababa - Adama Road Project, Tender Documents 22

  • 7/29/2019 Section XII - Qualification Questionnaire

    24/24

    Ethiopian Roads Authority Section XII Qualification Questionnaire

    Form of Bid Security(Bank Guarantee)

    __________________________[Banks Name, and Address of Issuing Branch or Office]

    Beneficiary: Ethiopian Roads Authority

    P. O. Box 1770

    Addis Ababa, Ethiopia

    Date: __________________________

    BID GUARANTEE No.: __________________________

    We have been informed that __________________________ [name of the Bidder] (hereinafter

    called "the Bidder") has submitted to you its bid dated ___________ (hereinafter called "the Bid")for the execution of Addis Ababa - Adama Road project, under Invitation for Bids No.

    ___________ (the IFB).

    Furthermore, we understand that, according to your conditions, bids must be supported by a bidguarantee.

    At the request of the Bidder, we ____________________ [name of Bank] hereby irrevocablyundertake to pay you any sum or sums not exceeding in total an amount of ___________ [amountin figures] (____________) [amount in words] upon receipt by us of your first demand in writingaccompanied by a written statement stating that the Bidder is in breach of its obligation(s) under the

    bid conditions, because the Bidder:

    (a) has withdrawn its Bid during the period of bid validity specified by the Bidderin the Form of Bid; or

    (b) having been notified of the acceptance of its Bid by the Employer during the period ofbid validity, (i) fails or refuses to execute the Contract Agreement or (ii) fails orrefuses to furnish the performance security, in accordance with the ITB.

    This guarantee will expire: (a) if the Bidder is the successful Bidder, upon our receipt of copies of

    the contract signed by the Bidder and the performance security issued to you upon the instruction ofthe Bidder; and (b) if the Bidder is not the successful Bidder, upon the earlier of (i) our receipt of acopy your notification to the Bidder of the name of the successful Bidder; or (ii) twenty-eight daysafter the expiration of the Bidders bid.

    Consequently, any demand for payment under this guarantee must be received by us at the office onor before that date.

    This guarantee is subject to the Uniform Rules for Demand Guarantees. ICC Publication No.

    458._____________________________

    [signature(s)]